CN108274607A - A kind of pre-stress rail plate continuous production complete set of equipments - Google Patents
A kind of pre-stress rail plate continuous production complete set of equipments Download PDFInfo
- Publication number
- CN108274607A CN108274607A CN201810196953.8A CN201810196953A CN108274607A CN 108274607 A CN108274607 A CN 108274607A CN 201810196953 A CN201810196953 A CN 201810196953A CN 108274607 A CN108274607 A CN 108274607A
- Authority
- CN
- China
- Prior art keywords
- rack
- brush
- die
- tensioning
- driving
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010924 continuous production Methods 0.000 title claims abstract description 26
- 230000007246 mechanism Effects 0.000 claims abstract description 100
- 230000007723 transport mechanism Effects 0.000 claims abstract description 45
- 238000000034 method Methods 0.000 claims abstract description 26
- 230000008569 process Effects 0.000 claims abstract description 26
- 238000012545 processing Methods 0.000 claims abstract description 14
- 238000005266 casting Methods 0.000 claims abstract description 13
- 238000001816 cooling Methods 0.000 claims abstract description 6
- 238000010304 firing Methods 0.000 claims abstract description 5
- 238000009413 insulation Methods 0.000 claims description 42
- 238000001514 detection method Methods 0.000 claims description 41
- 238000012544 monitoring process Methods 0.000 claims description 26
- 230000003014 reinforcing effect Effects 0.000 claims description 26
- 238000005507 spraying Methods 0.000 claims description 25
- 230000002787 reinforcement Effects 0.000 claims description 22
- 229910000831 Steel Inorganic materials 0.000 claims description 20
- 239000010959 steel Substances 0.000 claims description 20
- 238000005304 joining Methods 0.000 claims description 19
- 239000000428 dust Substances 0.000 claims description 17
- 230000033001 locomotion Effects 0.000 claims description 13
- 239000007921 spray Substances 0.000 claims description 12
- 241000309551 Arthraxon hispidus Species 0.000 claims description 11
- 230000002093 peripheral effect Effects 0.000 claims description 11
- 230000000694 effects Effects 0.000 claims description 10
- 239000000835 fiber Substances 0.000 claims description 7
- 238000000465 moulding Methods 0.000 claims description 7
- 239000003795 chemical substances by application Substances 0.000 claims description 6
- 239000011440 grout Substances 0.000 claims description 4
- 238000012806 monitoring device Methods 0.000 claims description 3
- 230000010412 perfusion Effects 0.000 claims description 3
- 239000012858 resilient material Substances 0.000 claims description 3
- 238000003825 pressing Methods 0.000 claims description 2
- 238000007689 inspection Methods 0.000 claims 1
- 238000004519 manufacturing process Methods 0.000 abstract description 9
- 230000008901 benefit Effects 0.000 abstract description 6
- 238000010586 diagram Methods 0.000 description 25
- 238000004140 cleaning Methods 0.000 description 8
- 238000012423 maintenance Methods 0.000 description 7
- 230000006835 compression Effects 0.000 description 5
- 238000007906 compression Methods 0.000 description 5
- 238000009434 installation Methods 0.000 description 5
- 239000007787 solid Substances 0.000 description 5
- 238000006073 displacement reaction Methods 0.000 description 4
- 239000002245 particle Substances 0.000 description 4
- 238000010079 rubber tapping Methods 0.000 description 4
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 3
- 235000017491 Bambusa tulda Nutrition 0.000 description 3
- 241001330002 Bambuseae Species 0.000 description 3
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 3
- 239000011425 bamboo Substances 0.000 description 3
- 238000010276 construction Methods 0.000 description 3
- 238000013461 design Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- WSNMPAVSZJSIMT-UHFFFAOYSA-N COc1c(C)c2COC(=O)c2c(O)c1CC(O)C1(C)CCC(=O)O1 Chemical compound COc1c(C)c2COC(=O)c2c(O)c1CC(O)C1(C)CCC(=O)O1 WSNMPAVSZJSIMT-UHFFFAOYSA-N 0.000 description 2
- 230000009471 action Effects 0.000 description 2
- 238000005452 bending Methods 0.000 description 2
- 230000000903 blocking effect Effects 0.000 description 2
- 210000000078 claw Anatomy 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 210000003205 muscle Anatomy 0.000 description 2
- 238000009527 percussion Methods 0.000 description 2
- 230000001360 synchronised effect Effects 0.000 description 2
- 206010016173 Fall Diseases 0.000 description 1
- 244000131316 Panax pseudoginseng Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000001680 brushing effect Effects 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 239000013536 elastomeric material Substances 0.000 description 1
- 230000003028 elevating effect Effects 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 239000011664 nicotinic acid Substances 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
- 229920003023 plastic Polymers 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 238000010408 sweeping Methods 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B15/00—General arrangement or layout of plant ; Industrial outlines or plant installations
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
Abstract
The invention discloses a kind of pre-stress rail plate continuous production complete set of equipments, it includes the stripping process equipment being sequentially distributed from after going to, clear die process equipment, package processing apparatus and casting equipment, pre-stress rail plate continuous production complete set of equipments further includes two sets of transport mechanisms, steering conveyor structure and curing kilns, more set transport mechanisms are arranged in parallel, steering conveyor structure is located at transport mechanism both ends and is used for delivery track board mold, two sets of transport mechanisms and the rectangular pipeline of steering conveyor structure group, pipeline is equipped with spaced multiple railway plate dies, stripping process equipment, clear die process equipment, package processing apparatus and casting equipment are located in a set of transport mechanism, remaining send mechanism to be located in curing kilns, rest chamber is set gradually in curing kilns, firing chamber, thermostatic chamber and cooling chamber.The continuous production of pre-stress rail plate can be achieved in the present invention, has the advantages that the track plates quality of production is effectively ensured and improves labor efficiency.
Description
Technical field
The present invention relates to a kind of pre-stress rail plate continuous production complete set of equipments.
Background technology
Currently, with the continuous development of China express railway standard of construction, ballastless track structure form is generally used.For
The ballastless track structure pattern adapted under different operation conditions is improved, is carried for the going global development strategy of China express railway
For strong technical support, the Ministry of Railways organizes III plate-type ballastless track structures of relevant unit's independent research CRTS.
III type track plates of CRTS(Pre-stress rail plate)In process of production, it needs to carry out following processing step, first have to
Clear mould, to ensure track plates Surface Quality of Concrete, after template is cleaned out, one layer of releasing agent of even application;Secondly it carries out
The installation lifting of service sleeve, steel reinforcement cage be put into and mantle fiber, after mantle fiber, reinforcing bar just pre-tighten, cushion block is placed into
After carry out reinforced bar stretching, carry out Insulation monitoring after tensioning;Finally, concrete is put into mold and is vibrated, steam curing
After put, tear open and demoulding, then carry out water-bath maintenance.
For above-mentioned production technology, the processing line of complete set and relevant device, which are realized, currently not yet produces, and needs
Railway plate die is transported through repeatedly, thus efficiency is low and the quality of product is difficult to be guaranteed.
Invention content
The technical problem to be solved by the present invention is in view of the foregoing drawbacks, provide a kind of pre-stress rail plate continuous production at
Complete equipment realizes continuous production, while ensure that the quality of production of pre-stress rail plate.
In order to solve the above-mentioned technical problem, the pre-stress rail plate continuous production complete set of equipments provided includes going to certainly
Stripping process equipment, clear die process equipment, package processing apparatus and the casting equipment being sequentially distributed afterwards, it is characterized in that:It is described
Pre-stress rail plate continuous production complete set of equipments further includes at least two sets of transport mechanisms, steering conveyor structure and curing kilns,
More set transport mechanisms are arranged in parallel, and steering conveyor structure is located at transport mechanism both ends and is used for delivery track board mold, conveyer
Structure and the rectangular pipeline of steering conveyor structure group, pipeline is equipped with spaced multiple railway plate dies, described de-
Die process equipment, clear die process equipment, package processing apparatus and casting equipment are located in a set of transport mechanism, remaining conveyer
Structure is located in curing kilns, and rest chamber, firing chamber, thermostatic chamber and cooling chamber are set gradually in curing kilns.
With the above structure, it is acted on by the series connection of transport mechanism, steering conveyor structure, by the organic series connection of each equipment
Together, circulating production is realized, that is, passes through the operating of railway plate die, the up-to-standard pre-stress rail of continuous production
Plate is arranged, it is no longer necessary to pre-stress rail plate be transported maintenance on a large scale, directly in life by the structure of curing kilns and position
It is directly stored after conserving and conserve in producing line, substantially increases efficiency.The equipment arrangement of this serialization is convenient for
Line monitors, and the problem in the energy each process of timely processing ensure that the quality of production of pre-stress rail plate.
The transport mechanism includes conveyer frames and guide rail, and the railway plate die can slide on guide rail, be gone here and there on conveyer frames
Be connected to more power push-rods, be hinged on power push-rod overturning before drive railway plate die to slide forward, overturn after can be detached from rail
The promotion pawl that guidance tape mold slides backward, it is one of that pawl is pushed to be driven by actuating unit, be also hinged on conveyer frames by
Railway plate die is driven to reach the station lever of specified station after the overturning of actuating unit driving in place;Steering conveyor structure includes flat
Two tracks of row setting and the support bracket that can be slid along track, support bracket bottom are equipped with the row by motor drives edge track travel
Wheel is walked, the upper rail slid for railway plate die trolley is housed at the top of support bracket, is also equipped on support bracket and is inserted into for power push-rod
Track truss, multiple detection switch are housed on track truss or support bracket.
The stripping process equipment includes tearing top side bolt mechanism, Fang Zhang mechanisms, Chai Zhang mechanisms and demoulding mechanism open, described to put
Mechanism includes putting a rack, put slidably connected in a rack by put an elevator drives oscilaltion and be oppositely arranged to
Few a pair of hoisting cross beam is connected on hoisting cross beam by putting the tenter of putting that a lateral machine drives edge hoisting cross beam moves horizontally, two
It is a be oppositely arranged put to be correspondingly connected in tenter and put a joint head by put the driving of machine, it includes rotation connection to put a joint head
Put an axis on putting tenter, put be connected by power on an axis have it is dynamic and can be along put that an axis axially slides at least two with a shaft rotation is put
A drive sleeve, two drive sleeves suit and are put to be connected between an axis and put a top spring at the overhanging end of two drive sleeves, and two drive
The inner extending end portion of moving sleeve is respectively equipped with the groove stagger setting of face gear and both ends of the surface gear, the inner extending end for putting an axis
Portion is rotatably connected to puts a driving head, and the overhanging end face for putting a driving head is equipped with and can be engaged with any of which face gear
Driven face gear.
The demoulding mechanism includes being correspondingly arranged at transport mechanism both sides and piston rod can withstand on the bottom of railway plate die
At least four support cylinders on face, the lower sections of the central axes of transport mechanism are equipped at least one demoulding oil jar and demoulding oil jar
Piston rod can jack up the track plates in railway plate die, and the both sides of transport mechanism are arranged with demoulding bearing, demould and cut with scissors on bearing
It is pressed against oil cylinder equipped with demoulding swing arm and demoulding, demoulding swing arm inner end is hinged with downwardly extending demoulding pressure head, outer end and demoulding and presses
Piston rod by oil cylinder is hinged, and demoulding pressure head includes downwardly extending demoulding last item, and demoulding last item connects resilient material from bottom to top
Manufactured pressure head ontology, pressure sensor and limit casing.
The clear die process equipment includes clear mold mechanism and spray body, and the clear mold mechanism includes clear mould rack and by moving
The clear mould supporting rack of the clear mould stands longitudinal sliding of power machine drives edge, clear mould support frame bottom is connected with swipes power apparatus driving the bottom of by
Horizontal sliding and bottom surface roller brush by motor-driven rotation, bottom surface roller brush include horizontal cylindrical stent cylinder and are arranged in cylinder
The bristle of shape rack tube external peripheral surface, clear mould supporting rack lower part both sides are connected with vertically to be slid by side brush power plant driving energy
And by the side roller brush of motor-driven rotation, the front and rear of clear mould supporting rack has been correspondingly connected with swipes power apparatus by end respectively
Power apparatus driving horizontal sliding and vertical sliding are swiped with slot and by the end face roller brush and slot brush of motor-driven rotation, side roller
Brush, end face roller brush and slot brush all include the cylindrical stent cylinder being vertically arranged and the brush in cylindrical stent cylinder external peripheral surface are arranged
Hair;The bottom of clear mould supporting rack, which is also associated with, to be swiped power apparatus driving horizontal sliding and vertical sliding by rib and is turned by motor driving
There is the caput of brush bar and spherical crown shape, brush bar and caput to be all provided with bristle for dynamic rib brush, rib brush, and the bottom of clear mould supporting rack is also
Be connected with and the vertical sliding of power apparatus driving swiped by set and by the set brush of motor-driven rotation, set brush with cylindric brush pot and
Bristle is connected on the inner wall of brush pot and bottom surface, equipped with for drawing each dust for sweeping up brushed on the clear mould supporting rack
Dust exhaust apparatus.
The spray body includes the spraying supporting rack for spraying rack and spraying rack longitudinal sliding motion by engine drives edge,
Spraying support frame bottom is connected with swipes power apparatus driving horizontal sliding and by the bottom surface roller brush of motor-driven rotation, bottom surface the bottom of by
Roller brush includes horizontal cylindrical stent cylinder and is arranged the bristle in cylindrical stent cylinder external peripheral surface, spraying supporting rack lower part
Both sides, which are connected with, vertically to be slid by side brush power plant driving energy and by the side roller brush of motor-driven rotation, sprays supporting rack
Front and rear be correspondingly connected with power apparatus swiped by end respectively and slot swipe power apparatus driving horizontal sliding and vertical sliding and
By the end face roller brush and slot brush of motor-driven rotation, side roller brush, end face roller brush and slot brush all include the cylinder being vertically arranged
Rack tube and the bristle in cylindrical stent cylinder external peripheral surface is set;The front end of spraying supporting rack, which is equipped with, to be laterally arranged
Supporting rod, multiple nozzles being arranged downward are installed at interval on supporting rod, and each nozzle is connect by pipeline with releasing agent delivery pipe.
The package processing apparatus includes that service sleeve installing mechanism, steel reinforcement cage enter mold mechanism, mantle fiber mechanism, just open machine
Structure puts cushion block mechanism, tensioning mechanism and Insulation monitoring mechanism, and the service sleeve installing mechanism includes service sleeve rack, institute
The service sleeve crossbeam for being equipped in service sleeve rack and driving straight skidding by crossbeam driving device is stated, on service sleeve crossbeam
The hanger and cantilever that horizontal sliding is driven by power plant are installed, hanger is equipped with service sleeve bracket, under cantilever
Portion is equipped with service sleeve pick-and-place manipulator, and it is quickly solid that the service sleeve being located above service sleeve pick-and-place manipulator is housed on cantilever
Determine device, service sleeve rapid fixing includes the portable pillar that is connected on cantilever and can slide vertically, the bottom of portable pillar
Equipped with tup, it is connected with limiting plate on cantilever, is hinged in portable pillar and is stretched out outside portable pillar under the effect of suppressing of elastomeric element
The limited block on surface is set with the driving cylinder that the when of vertically capable of sliding and move downward drives limited block to be retracted, driving in portable pillar
Equipped with the driving top spring for driving cylinder is abutted against upwards between cylinder and the inner wall of portable pillar, it is connected with lifting actuating cylinder on cantilever, is carried
The piston rod of motive force cylinder can push away when being located in portable pillar upper lumen and can be lifted when moving upwards portable pillar, moving downward
Dynamic driving cylinder.
The tensioning mechanism includes tensioning rack, is slidably connected in the tensioning rack and is oppositely arranged on railway plate die
Two opposite side on the outside of and drive by actuating unit the tensioning sliding rack of synchronization lifting, be connected with by combining power in tensioning sliding rack
The inside and outside tensioning joining rack slid of mechanism drives edge tensioning rack, track template die can be acted against by being connected on the tensioning joining rack
Bar is abutted against on tool, is corresponded on two opposite tensioning joining racks equipped with the stretching rack driven by stretch power mechanism, stretching rack
Inner end is equipped with the fixation tensioning pawl stretched into for the abnormity nut of the tension rod on railway plate die, and being connected with tensioning on stretching rack answers
Power monitoring device is also equipped on the tensioning joining rack and drives sliding up and down by power plant and can taper liner be hammered tension rod
Taper liner between land and the fixation inclined plate of railway plate die hammers device, and the taper liner includes up and down connected at least two tiltedly
Pad, taper liner body have the elongated slot passed through from its bottom for reinforcing bar.
The Insulation monitoring mechanism includes Insulation monitoring supporting rack, is connected on Insulation monitoring supporting rack and is filled by sliding power
The two overhang insulations detection crossbeam and intermediate insulation detection crossbeam of driving straight skidding are set, is connected on overhang insulation detection crossbeam
Have and the multiple contact bases slid up and down are driven by Insulation monitoring power plant, is equipped on contact base and is driven by detection actuating unit
And the first contact that can be contacted with longitudinal reinforcement, multiple first contacts of two overhang insulation detection crossbeams are oppositely arranged respectively;
It is connected with and is driven by Insulation monitoring power plant and spaced at least two contact base on intermediate insulation detection crossbeam, contact
The second contact that is driven by detection actuating unit and can be contacted with transverse steel, two the first opposite contact shapes are connected on seat
One longitudinal preliminary examination sets of contacts of pairs of longitudinal reinforcement detection, two spaced second contacts are formed to a transverse direction
One lateral preliminary examination sets of contacts of reinforcing bar detection, any one first contact and the second contact form the longitudinal reinforcement being in contact to it
With a cross point detection sets of contacts of the cross point detection of transverse steel, longitudinal preliminary examination sets of contacts, lateral preliminary examination sets of contacts and
Cross point detection sets of contacts is connect by conducting wire with insulation detecting circuit respectively.
The railway plate die includes die ontology, and there is die ontology molding cavity, the side wall upper part of die ontology to connect
It is connected to reinforcing beam, end is fitted on the side wall of die ontology and stretches out tension rod outside reinforcing beam, is hinged on die ontology
More intervals are arranged and top is connected to the counter-jib on reinforcing beam, the counter-jib on two opposite side walls of the die ontology
It is oppositely arranged, the middle part of counter-jib is hinged on by hinged shaft and hinged seat on the side wall of die ontology and under two opposite counter-jibs
It is connected with balancing pull rod between portion, bottom-up extension is connected on the die ontology bottom wall of inner cavity and makes pre- after perfusion
Stress track plates form the grouting hole forming equipment of grout hole, and grouting can be jacked up by also being slidably connected on die ontology bottom wall of inner cavity
Hole forming equipment is to make the top cover of pre-stress rail plate demoulding after molding.
In conclusion said program has the following advantages compared with prior art:Pre-stress rail plate can be achieved in the present invention
Continuous production, have the advantages that be effectively ensured the track plates quality of production and improve labor efficiency.
Description of the drawings
The specific implementation mode of the present invention is described in further detail below in conjunction with the accompanying drawings:
Fig. 1 is the structural schematic diagram of an embodiment of the present invention;
Fig. 2 is the structural schematic diagram of transport mechanism;
Fig. 3 is the structural schematic diagram for pushing pawl;
Fig. 4 is the structural schematic diagram of station lever;
Fig. 5 is the structural schematic diagram of steering conveyor structure;
Fig. 6 be along Fig. 5 A to structural schematic diagram;
Fig. 7 be along Fig. 5 B to structural schematic diagram;
Fig. 8 is the structural schematic diagram of Fang Zhang mechanisms;
Fig. 9 is the structural schematic diagram for putting a joint head;
Figure 10 is the structural schematic diagram of demoulding mechanism;
Figure 11 is the structural schematic diagram of clear mold mechanism;
Figure 12 is the structural schematic diagram of the clear mould supporting rack of one of them in clear mold mechanism;
Figure 13 is the structural schematic diagram of the clear mould supporting rack of another in clear mold mechanism;
Figure 14 is the structural schematic diagram of spray body;
Figure 15 is the structural schematic diagram of service sleeve installing mechanism;
Figure 16 is the structural schematic diagram of the line C-C section view along Figure 15;
Figure 17 is the structural schematic diagram of service sleeve rapid fixing;
Figure 18 is the structural schematic diagram of tensioning mechanism;
Figure 19 is the structural schematic diagram on tensioning joining rack;
Figure 20 be in Figure 19 D to structural schematic diagram;
Figure 21 is the structural schematic diagram that taper liner hammers device;
Figure 22 is the structural schematic diagram of the right apparent directions of Figure 21;
Figure 23 is the structural schematic diagram of Insulation monitoring mechanism;
Figure 24 is the structural schematic diagram that contact is connect with contact base;
Figure 25 is the structural schematic diagram of railway plate die.
Specific implementation mode
As shown in Figure 1, The present invention gives a kind of embodiment of pre-stress rail plate continuous production complete set of equipments, packet
Include stripping process equipment, clear die process equipment, package processing apparatus and the casting equipment being sequentially distributed from after going to, wherein
Stripping process equipment includes tearing top side bolt mechanism, Fang Zhang mechanisms, Chai Zhang mechanisms and demoulding mechanism open, and clear die process equipment includes clear
Mold mechanism and spray body, package processing apparatus include service sleeve installing mechanism, steel reinforcement cage enter mold mechanism, mantle fiber mechanism,
Cushion block mechanism, tensioning mechanism and insulating monitoring mechanism are put in Chu Zhang mechanisms, and casting equipment includes casting mechanism, concrete vibrating mechanism and drawing
The station of corresponding above-mentioned each mechanism can be arranged in hair mechanism on entire tinuous production, carried out using above-mentioned each mechanism
The operation of each step process.
The pre-stress rail plate continuous production complete set of equipments further includes at least two sets of transport mechanisms, steering conveyor structure
And curing kilns, the transport mechanisms that cover are arranged in parallel more, steering conveyor structure is located at transport mechanism both ends and is used for conveyor track guidance tape
Mold, two sets of transport mechanisms and the rectangular pipeline of steering conveyor structure group, pipeline are equipped with spaced multiple rails
Guidance tape mold, the stripping process equipment, clear die process equipment, package processing apparatus and casting equipment are located at a set of conveyer
On structure, remaining transport mechanism is located in curing kilns 10, such as is provided with four sets of transport mechanisms in the present embodiment in curing kilns, maintenance
Setting rest chamber, firing chamber, thermostatic chamber and cooling chamber in kiln.
As shown in Figure 1, in order to which each mechanism is carried out organic series connection, the invention also includes be arranged in parallel and be used to convey mould
Two sets of transport mechanism I the having and steering conveyor structure II positioned at two sets of both ends transport mechanism I and for delivery mold.In this reality
It applies in example, referring to figs. 2 and 3, the transport mechanism includes conveyer frames 1 and guide rail, and the railway plate die can be slided on guide rail
It moves, the trolley below railway plate die is only illustrated in figure, more power push-rods 3, power push-rod 3 are serially connected on conveyer frames 1
By idler wheel can the front and back sliding on conveyer frames, drive railway plate die to slide forward, turn over before overturning is hinged on power push-rod 3
The promotion pawl 4 that the board mold that can de-orbit after turning slides backward pushes the interval of pawl 4 that multiple, preferably each station is arranged
Two are correspondingly arranged, one of that pawl is pushed to be driven by actuating unit, which is the sprocket wheel being connected on conveyer frames
And chain, one of sprocket wheel are connect with engine, the promotion pawl 4 and chain are by link block be connected by power, with reference to 3 institute of figure
Show, it includes the pawl bar being connected on power push-rod to push pawl, and pawl is hinged on pawl bar, spine is hinged in the middle part of pawl
On claw bar, the rear part weight is much larger than front weight, and the block for support pawl lower rear is arranged on pawl bar, pawl
Front end tilts and with the promotion face being vertically arranged, the crossbeam in promotion face and the bottom of trolley below railway plate die offsets, to real
Promotion of the pawl to the trolley of railway plate die is now pushed, after promotion, above-mentioned actuating unit reversion pushes pawl to retreat,
The upper extending portion section of pawl is overturn after touching the bottom of railway plate die trolley, and pawl no longer plays railway plate die trolley and pushes away
Action is used, and pawl is pushed to step back to after certain distance, is ready for transmission next time.With reference to figure 2 and Fig. 4, gone back on conveyer frames 1
It is hinged with the station lever 5 by driving railway plate die to reach specified station after the driving overturning of actuating unit in place, station lever 5
Be hinged on conveyer frames, in place actuating unit can be cylinder or oil cylinder, when railway plate die trolley in place before, station lever
5 under the driving of cylinder in end tilt state, the trolley of railway plate die can be blocked, in place after, railway plate die it is small
The front end of vehicle withstands on the tilting end of station lever, then by the pulling of cylinder, makes the tilting end return of station lever 5, return
In the process it is accurately positioned the trolley of railway plate die, it is larger that the design of above structure is derived from railway plate die quality, thus
It realizes that power drive is positioned with brake using the above structure, there is the simple in structure and flexible benefit of driving.With reference to figure 5 to Fig. 7
Shown, the steering conveyor structure II includes two tracks disposed in parallel and can be along the support bracket 6 that track slides, support bracket 6
Bottom is equipped with the traveling wheel by motor drives edge track travel, and specifically, the side of support bracket is equipped with motor, traveling wheel setting
In the four corners of support bracket, motor is equipped with two-way power output shaft, and two power output shafts pass through shaft coupling and walking respectively
The wheel shaft power of wheel connects, and 6 top of support bracket is equipped with the upper rail 7 slid for railway plate die trolley, is also equipped on support bracket 6
For the track truss 8 that power push-rod is inserted into, multiple detection switch are housed on track truss 8 or support bracket 6, which can be with
Including close to switch and infrared detection sensor, two tracks of lower part are vertical with the carriage direction of above-mentioned transport mechanism to be set
It sets, gets on the right track 7 length direction and the carriage direction of transport mechanism is arranged in parallel, the detection switch passed through on track truss detects
To the transport mechanism in curing kilns 10, by the sliding of support bracket 6, so that the support bracket is aligned with transport mechanism, pass through conveyer
The trolley of railway plate die is transported on support bracket 6 by structure, so that the trolley of railway plate die is located on upper rail, and can set
Two or three fixed close switches, make the trolley of railway plate die slowly stop, then restart the motor of support bracket bottom, make
Support bracket slides along track, is conveyed in the transport mechanism that more complete equipments are arranged.Certainly, which can also
Using other structures, such as comprising two tracks disposed in parallel and the support bracket on track, on support bracket equipped with by
The traveling wheel of motor drives edge track travel is also equipped on support bracket and is risen by lifting power plant driving, is used for support mould
Pallet, lifting power plant can be lifting cylinder, and when to define above-mentioned track be longitudinal, above-mentioned transport mechanism is laterally to set
It sets, by the power drive of lifting cylinder, pallet is made to hold up mold and pre-stress rail plate, vertically moved along track, it is mobile
To transport mechanism end when, lifting cylinder makes pallet fall, and mold and pre-stress rail plate are fallen in transport mechanism by passing
Mechanism is sent to be conveyed, vice versa.
With reference to figure 1, rest chamber, firing chamber, thermostatic chamber and cooling chamber are set in curing kilns 10, by being arranged in curing kilns
Spaced walls and the isolation structure for starting door, form above-mentioned each independent chamber body in curing kilns, in the present embodiment, maintenance
It is upper in kiln 10 that temperature sensor and steam access tube are housed, electromagnetic valve, temperature sensor and electromagnetism are housed on steam access tube
Valve is all electrically connected with the controller for controlling the temperature in curing kilns 10, and above-mentioned temperature sensor and steam access tube are all not
Illustrate in figure, specific mounting structure needs are designed according to the structure in curing box, integrally to meet sets requirement into
Row maintenance stands 3h or more, then into calefactive interzone, heating rate after guarantee concreting in 5~30 DEG C of section
It is not greater than 15 DEG C/h, subsequently into constant temperature section, constant temperature time 8h or more, thermostat temperature ensures plate no more than 45 DEG C
Inner core concrete temperature is no more than 55 DEG C, finally enters cooling section, and rate of temperature fall is not greater than 10 DEG C/h.Pass through conveyer
The movement of structure makes the pre-stress rail plate in railway plate die and railway plate die pass through each chamber body in above-mentioned curing kilns,
After the completion of maintenance, then the operation that can carry out the next step is transported by steering conveyor structure.
Each position equipment in pre-stress rail plate continuous production complete set of equipments is described one by one below.
As shown in Figure 8 and Figure 9, a kind of Fang Zhang mechanisms are illustrated in figure, according to technological requirement, the Fang Zhang mechanisms role
It is the both ends to same reinforcing bar while to put simultaneously(The end of reinforcing bar and tension rod are unclamped), and meet a plurality of steel as possible
Synchronous Radio, Fang Zhang mechanisms include putting a rack 1-1 to muscle simultaneously, put to slidably connect on a rack 1-1 and be driven by putting an elevator
It is connected on dynamic oscilaltion and at least a pair of of the hoisting cross beam 1-2, hoisting cross beam 1-2 that are oppositely arranged by putting a lateral machine driving
Two couple moved horizontally along hoisting cross beam puts tenter 1-3, two be oppositely arranged put be correspondingly connected on tenter 1-3 it is dynamic by putting
A joint head is put in the driving of power machine machine, i.e., a pair of two sections opposite for putting a joint head while a reinforcing bar being clamped are carried out while being put
, it includes being rotatably connected on to put to put an axis 1-4 in tenter to put a joint head, and putting be connected by power on an axis 1-4 has with putting an axis
It rotation and can be sleeved on together along the two drive sleeve 1-5 put an axis and axially slid, drive sleeve, drive sleeve 1-5's
Overhanging end and put to be connected between an axis and put a top spring 1-6, the inner extending end portions of two drive sleeves be respectively equipped with face gear and
The groove stagger setting of both ends of the surface gear, the inner extending end portion for putting an axis, which is rotatably connected to, puts a driving head 1-7, puts a driving
The overhanging end face of head 1-7 is equipped with the driven face gear that can be engaged with any of which face gear.The Fang Zhang mechanisms are moved
When put, by the lifting of hoisting cross beam and the inside and outside sliding of tenter is put, makes position and the tension rod of putting a joint head
Position correspond to, putting a driving head 1-7 can be combined with the abnormity nut of the end of tension rod, put a joint head and put an engine
Be rotated by, realize and put Zhang Gong's skill, and combine a setting for header structure by putting, same reinforcing bar both ends can be made
Put a driving head 1-7 initial rotation position be unlikely to be staggered a face gear a tooth misalignment angle, put when driving
When opening joint head rotation, more reinforcing bars Synchronous Radio simultaneously can effectively ensure that.
As shown in Figure 10, a kind of demoulding mechanism is illustrated in figure, according to technological requirement, the demoulding mechanism role be by
The pre-stress rail plate that prefabricated and maintenance is completed is deviate from from track Die and mould plate, and the demoulding mechanism includes being correspondingly arranged at biography
Send mechanism both sides and piston rod that can withstand at least four support cylinder 2-1 on the bottom surface of railway plate die, transport mechanism
What the lower section of central axes was equipped with that the piston rod of at least one demoulding oil jar 2-2 and demoulding oil jar can jack up in railway plate die pre- answers
The both sides of power track plates, transport mechanism are arranged with demoulding bearing 2-3, and demoulding swing arm 2-4 is hinged on demoulding bearing 2-3 and is taken off
Oil cylinder 2-5 is depended in molding, and demoulding swing arm 2-4 inner ends are hinged with downwardly extending demoulding pressure head 2-6, oil cylinder is pressed against in outer end with demoulding
Piston rod is hinged, and demoulding pressure head 2-6 includes downwardly extending demoulding last item, and demoulding last item is connected from bottom to top made of resilient material
Pressure head ontology, pressure sensor and limit casing.When being demoulded using the demoulding mechanism, driven in the power of transport mechanism
Under, railway plate die is transported to demoulding station, supports railway plate die by support cylinder 2-1, passes through the branch of support cylinder
Support acts on, and entire railway plate die can be made to have accurate horizontal steady, be conducive to the vertical depanning of track plates in later stage, then pass through
Pre-stress rail plate in the piston rod ejection railway plate die of demoulding oil jar is pressed during initial ejection by demoulding
The balance pressure of itself pressing of head and multiple demoulding pressure heads makes pre-stress rail plate steadily be erected from railway plate die by effect
To removal, the problems such as avoiding knocking side caused by drawing existing tilt phenomenon, after pre-stress rail plate is ejected a part, it is pulled through demoulding
It is pressed against oil cylinder and removes exoneration mould swing arm, ejected pre-stress rail plate completely by demoulding oil jar.
A kind of clear mold mechanism is illustrated as shown in Figure 11, Figure 12 and Figure 13, in figure, according to technological requirement, the clear mold mechanism
Role is the particle for being cleaned and being excluded to clean by the inner cavity of track Die and mould plate, and the clear mold mechanism includes clear
Mould rack 3-1 and the clear mould supporting rack 3-2 slided by the clear mould stands longitudinal of engine drives edge, the clear bottoms mould supporting rack 3-2 connect
It is connected to and power apparatus driving horizontal sliding is swiped the bottom of by and includes cross by the bottom surface roller brush 3-3 of motor-driven rotation, bottom surface roller brush 3-3
The cylindrical stent cylinder set connects with the bristle in cylindrical stent cylinder external peripheral surface, the clear lower parts mould supporting rack 3-2 both sides are arranged
It is connected to by the vertically sliding and by the side roller brush 3-4 of motor-driven rotation of side brush power plant driving energy, clear mould supporting rack 3-2's
Front and rear be correspondingly connected with power apparatus swiped by end respectively and slot swipe power apparatus driving horizontal sliding and vertical sliding and
By the end face roller brush 3-5 and slot brush 3-6 of motor-driven rotation, side roller brush, end face roller brush and slot brush all include being vertically arranged
Cylindrical stent cylinder and the bristle in cylindrical stent cylinder external peripheral surface is set;The bottom of clear mould supporting rack 3-2 is also associated with
Power apparatus driving horizontal sliding and vertical sliding are swiped by rib and there is brush bar by the rib brush 3-7 of motor-driven rotation, rib brush 3-7
With the caput of spherical crown shape, brush bar and caput are all provided with bristle, and the bottom of clear mould supporting rack 3-2 is also associated with swipes power dress by set
Set the vertical sliding of driving and by the set brush 3-8 of motor-driven rotation, set brush with cylindric brush pot and the inner wall of brush pot and
It is connected with bristle on bottom surface, is equipped on the clear mould supporting rack for drawing each dust exhaust apparatus 3-9 for brushing the dust swept up.Bottom
Face roller brush is arranged two for cleaning railway plate die bottom surface, bottom surface roller brush interval, can avoid intermediate grout hole shaping column,
Due to the both sides of the direct respective carter board mold in the position of bottom surface roller brush, for relative orbit board mold, bottom surface roller brush is for clear
It sweeps big face and its bristle is longer, upper and lower position also can determine, roller brush only needs own rotation and frame body is followed to be moved forward and backward;
Side roller brush is used to clean left and right two medial surfaces of railway plate die, position respective carter plate of the side roller brush on frame body
The surface in die inside face controls the lifting of side roller brush, after side roller brush is fallen, before following entire frame body as needed
After move, to being cleaned to two medial surfaces of mold while own rotation;End face roller brush is for cleaning track plates
The forward and backward inner face of mold, end face roller brush own rotation while can move left and right, move up and down and it is whole be moved forward and backward, if
Two end face roller brushes are set, in the lateral direction, two end face roller brushes can be opposite simultaneously or backwards to movement, to railway plate die
Inner face cleaned, end face roller brush follow frame body to be integrally moved forward and backward with select clean railway plate die front end face or after
End face;Slot brush is bulb shape for cleaning track slot, brush body bottom end, can tentatively be cleaned to track slot, two slot brushes
Position on frame body corresponds respectively to the surface of two rows of track slots, control flume brush lifting as needed, by whole
The back-and-forth motion of a frame body, two slot brush selections clean a pair of of track slot therein;Rib brush is for cleaning inside track slot
Property at parts of edges and corners, the particle adhered in slot is swept down, since track slot is relatively small, rib brush outer diameter is relatively small, and
Its brush body bottom end is bulb shape, and rib brush can be moved left and right while own rotation, moves up and down and be integrally moved forward and backward, pass through
It is accurate flexible mobile, each corner location inside track slot can be cleaned;Set brush is sleeve shaped, sleeve inner setting
Bristle, by carrying out elevating control to it, you can accurately set brush is sleeved on service sleeve pilot pin, by covering brush rotation,
Service sleeve pilot pin is cleaned, according to the arrangement rule of service sleeve pilot pin, two, set brush is for one group and in both sides
Each one group of setting carries out by cleaning service sleeve pilot pin by the front and back sliding of frame body.As it can be seen that multiple by being arranged
Brush body, and being carried out automatically controlling to brush body, can effectively clean each position of mold, and cleaning effect is good and working efficiency
It is high.In addition, in actual production, two parallel clear mould supporting rack 3-2, above-mentioned bottom surface roller brush, side can be arranged as required to
Face roller brush, end face roller brush, slot brush, rib brush and set brush and its corresponding connection structure can be connected to two clear mould branch
On support 3-2, prevent it from mutually running generation interference, mutual arrangement position relationship can be arranged according to actual conditions,
Installation.It necessarily will produce a large amount of airborne dusts and particle in cleaning, in order to improve cleaning effect, therefore, installed on clear mould supporting rack
Dust exhaust apparatus, specifically:Dust exhaust apparatus includes the air-exhaust type dust catcher being connected on the clear mould supporting rack, air-exhaust type dust catcher
Air inlet be connected with main pipeline, more branched pipes flexible are connected on main pipeline, the import of each branched pipe is guided to respectively respectively
The side of the corresponding site of a brush, the clear mould supporting rack is also equipped with negative pressure type dust collector, the air inlet of negative pressure type dust collector
Upper connection sweep-up pipe, the input end of sweep-up pipe connect dust suction bamboo rake head, and dust suction bamboo rake head is slidably and Liftable type is mounted on clear mould
The rear portion of supporting rack, by the suction-operated of air-exhaust type dust catcher and dust suction bamboo rake head, can by the dust swept up and particle into
Row is removed.
As shown in figure 14, a kind of spray body is illustrated in figure, according to technological requirement, the spray body role be by
The inner cavity of track Die and mould plate carries out spraying releasing agent, and the releasing agent of spraying is made uniformly to be attached to the internal chamber wall of track Die and mould plate
On, the spray body includes the spraying supporting rack 4- for spraying rack 4-1 and spraying rack longitudinal sliding motion by engine drives edge
The bottom 2, spraying supporting rack 4-2 is connected with swipes power apparatus driving horizontal sliding and by the bottom surface roller of motor-driven rotation the bottom of by
Brush, bottom surface roller brush include that horizontal cylindrical stent cylinder is propped up with the bristle in cylindrical stent cylinder external peripheral surface, spraying is arranged
The lower parts support 4-2 both sides are connected with by the vertically sliding and by the side roller brush of motor-driven rotation of side brush power plant driving energy,
The front and rear of spraying supporting rack 4-2 be correspondingly connected with power apparatus swiped by end respectively and slot to swipe power apparatus driving laterally sliding
It moves with vertical sliding and by the end face roller brush and slot brush of motor-driven rotation, side roller brush, end face roller brush and slot brush all wrap
It includes the cylindrical stent cylinder being vertically arranged and the bristle in cylindrical stent cylinder external peripheral surface is set.Above-mentioned bottom surface roller brush, side roller
Brush, end face roller brush, slot brush, rib brush and set brush structure it is identical with the corresponding construction in clear mold mechanism, in figure in detail illustrate with
And it no longer specifically uses herein.The front end of spraying supporting rack 4-2 is equipped with the supporting rod 4-3 being laterally arranged, on supporting rod 4-3
Multiple nozzles being arranged downward are installed at interval, and each nozzle is connect by pipeline with releasing agent delivery pipe, and the both ends of supporting rod 4-3 turn
It is dynamic to be connected on spraying supporting rack 4-2, spray the rotation driving being equipped on supporting rack 4-2 for driving supporting rod 4-3 to rotate
Mechanism.Specifically, rotation driving mechanism includes swing arm 4-4 and cylinder 4-5, one end of swing arm 4-4 is fixed in the end of supporting rod 4-3
The piston rod in portion, the other end and cylinder is hinged, and cylinder 4-5 hinges are on spraying supporting rack 4-2.Supporting rod is using rotational installation
Mode, the rotational angle by controlling supporting rod 4-3 can be adjusted the spray angle of nozzle, so as to the side to railway plate die
Angle and side carry out emphasis spraying, are further ensured that spraying effect..
As shown in Figure 15, Figure 16 and Figure 17, the service sleeve installing mechanism includes service sleeve rack 5-1, described pre-
The service sleeve crossbeam 5-2 that straight skidding is driven by crossbeam driving device, service sleeve crossbeam are installed on bushing burying rack 5-1
The hanger 5-3 and cantilever 5-4 that horizontal sliding is driven by power plant are installed, hanger 5-3 is equipped with service sleeve on 5-2
The lower part of bracket 5-5, cantilever 5-4 are equipped with to be equipped on service sleeve pick-and-place manipulator 5-6, cantilever 5-4 and be picked and placeed positioned at service sleeve
Service sleeve rapid fixing above manipulator.Railway plate die is placed below service sleeve rack 5-1, service sleeve
Multiple service sleeves arranged in rows and columns are placed on bracket 5-5.Since service sleeve crossbeam 5-2 can straight skidding, hanger
5-3 can horizontal sliding, therefore service sleeve bracket 5-5 can straight skidding again can horizontal sliding, it can be by service sleeve support
Frame 5-5 is transported to arbitrary operating position.Since service sleeve pick-and-place manipulator 5-6 can be longitudinally sliding with service sleeve crossbeam 5-2
Move, can with cantilever 5-4 horizontal slidings, therefore service sleeve pick-and-place manipulator 5-6 can be removed from service sleeve bracket 5-5 it is pre-buried
On casing and the service sleeve pilot pin being sleeved in railway plate die.Service sleeve is sleeved on service sleeve pilot pin
After upper, service sleeve rapid fixing can quickly fix service sleeve, to keep service sleeve firmly solid
It is scheduled on service sleeve pilot pin.Cantilever 5-4 in the present invention is driven by cantilever drive device, and cantilever 5-4 is close to hanger 5-3
Afterwards, boom locking device can lock the two, and hanger 5-3 can follow cantilever 5-4 to move at this time, when hanger 5-3 arrival refers to
Positioning postpones, and boom locking device can release the locking between cantilever 5-4 and hanger 5-3, and cantilever 5-4 at this time can front and back fortune
It is dynamic and hanger 5-3 is remained stationary as, it no longer needs to move since service sleeve places bracket 5 and reaches installation site, and cantilever 5-4 is then needed
It moves forward and backward to pick and place, install service sleeve, therefore the frequencys that move forward and backward of cantilever 5-4 are more and the front and back fortune of hanger 5-3
The dynamic frequency is less, using boom locking device make hanger 5-3 can follow cantilever 5-4 move, hanger 5-3 there is no need to
Driving device is separately provided again, thus can simplify design, save cost, which includes being located at consolidating on cantilever
The corresponding servo-actuated bearing determined bearing and be located on suspension arm, hold-down support are equipped with slot, what servo-actuated bearing was equipped with
Can side-to-side movement and to the left or to the right movement can be plugged into inserting column in slot, servo-actuated bearing, which is equipped with, can drive inserting column or so
The inserting column driving device of movement.Inserting column driving device can be plugged into inserting on hold-down support after driving inserting column to be moved to a direction
In slot, it thus can make hold-down support locking opposite with servo-actuated bearing, and cantilever and hanger is finally made to be in the opposite shape locked
State, at this moment hanger can follow cantilever motion, after hanger moves to designated position, inserting column driving device drives inserting column to another
One direction movement makes it be detached from slot, and the opposite latch-release between hold-down support and servo-actuated bearing, cantilever can be transported freely
It is dynamic and hanger is unaffected.This boom locking mechanism have the advantages that it is simple and reliable, can be automatically controled.Certain boom locking
Mechanism can also use other structures form, such as in another embodiment, and boom locking mechanism includes being located at cantilever
Manually controllable lockset between hanger, lockset can be used the structure similar to door lock, cantilever and hanger close to when
The two is locked using lockset, locking between the two can be released by changing the state of lockset.Above-mentioned service sleeve is quickly fixed
Device includes the portable pillar 5-14 that is connected on cantilever 5-4 and can slide vertically, and the bottom of portable pillar 5-14 is equipped with tup 5-7,
It is connected with limiting plate 5-8 on cantilever 5-4, is hinged in portable pillar 5-14 and is stretched out outside portable pillar under the effect of suppressing of elastomeric element
Two opposite limited block 5-9 are arranged in the limited block 5-9 on surface, and portable pillar is equipped with the hole stretched out for limited block 5-9, above-mentioned
Elastomeric element is the spring 5-10 between being connected to two limited blocks, and being set in portable pillar 5-14 can vertically slide and transport downwards
The driving cylinder 5-11 for driving limited block to be retracted when dynamic is equipped between driving cylinder 5-11 and the inner wall of portable pillar 5-14 and abuts against drive upwards
The driving top spring 5-12 of cylinder is moved, lifting actuating cylinder 5-13 is connected on cantilever, the piston rod of lifting actuating cylinder 5-13 is located at
Driving cylinder 5-11 can be pushed when can lift portable pillar 5-14 when in portable pillar upper lumen and moving upwards, move downward, it is pre-buried
Casing rapid fixing is limited after portable pillar 5-14 is promoted certain height using portable pillar lifting device, is released
It can make portable pillar 5-14 free-fallings after limit, tapping service sleeve using the impact force fallen behind under portable pillar 5-14 carries out it
Fixed, the height before being fallen due to portable pillar 5-14 is certain, thus can ensure that portable pillar 5-14 to each service sleeve
Percussion power be it is certain, in this way can guarantee service sleeve installation quality.It is hollow-core construction with reference to Fig. 8, portable pillar 5-14, drives
In portable pillar 5-14, portable pillar 5-14's dynamic cylinder 5-11 sliding sleeves can move up and down along the through-hole on limiting plate, lift power
After portable pillar 5-14 is promoted certain height by cylinder 5-13, when outside the extended side through-hole of limited block and keep off above limiting plate
Portable pillar 5-14 is prevented to fall, after spring drives limited block to bounce back, limited block does not re-form limiting plate blocking, portable pillar 5-14
It can free-falling.What limited block 5-9 can be swung up and down is hinged on portable pillar 5-14 inner walls, when limited block swings to set angle
When extended side through-hole outside, when portable pillar 5-14 is in raised configuration, under the spring 5-12 effects of driving top, drive cylinder 5-11
Far from limited block 5-9, under the action of spring 5-10, limited block 5-9 stretches out outside side through-hole;It needs to consolidate service sleeve
Periodically, lifting actuating cylinder 5-13 drives driving cylinder 5-11 to decline, and the lower edge of driving cylinder 5-11 pushes limited block, limited block pendulum
The dynamic limited block to be retracted into the inner cavity of portable pillar 5-14, being retracted into the inner cavity of portable pillar 5-14 no longer has blocking work
With, thus portable pillar 5-14 can free-falling, the portable pillar 5-14 of free-falling can tap service sleeve, to service sleeve
It is fixed, this limited block driving device realizes automatic trigger, convenient for control.Utilize the work for tapping contact 51 and service sleeve
With the percussion realized to service sleeve, tapping contact 51 can be made of rubber, plastics elastomeric material, the effect to service sleeve
It is softer, it avoids that service sleeve is caused to damage.Tapping contact 51 can also be individually replaced, convenient for safeguarding.Service sleeve takes
Manipulator 5-6 is put to include clamping jaw driving device and two folders of lower opposite folding being arranged in pairs can be driven in clamping jaw driving device
Pawl, clamping jaw opposite under the driving of clamping jaw driving device can merge and open relatively, this to realize picking and placeing for service sleeve
Service sleeve pick-and-place manipulator 5-6 is simple and reliable.Certain service sleeve pick-and-place manipulator 5-6 can also use other structure shapes
Formula, such as using the bionic mechanical hand of simulation human hand.Clamping jaw includes outrigger, and top fixture block is equipped on outrigger, under stretch
Be connected with down on holder and stretch connecting rod, top fixture block is equipped with V-type clip slot for service sleeve upper end to be clamped, under stretch connection
The lower end of bar is equipped with the lower part hook itself being formed by bending for service sleeve lower end to be clamped.When two clamping jaws merge relatively, two
Top fixture block, two lower part hooks can be relatively close, and two V-type clip slots clamp the upper end of service sleeve, and two lower hook claw clips are lived
The lower end of service sleeve, it is more stable to the clamping of service sleeve.
As shown in Figure 18 to Figure 22, the tensioning mechanism includes tensioning rack 6-1, the company of sliding on the tensioning rack 6-1
It is connected on the outside of two opposite side for being oppositely arranged on railway plate die and is driven by actuating unit the tensioning sliding rack 6-2 of synchronization lifting,
The tensioning sliding rack 6-2 is slidably connected at by the structure of slide plate and guide rail on tensioning rack 6-1, naturally it is also possible to use example
It is slidably connected as the realization of the structure of guide sleeve and guide post is above-mentioned, the actuating unit includes being connected on tensioning rack 6-1 and by moving
The vertical leading screw of power machine driving rotation, engine are that private takes motor, are connected with and are screwed onto on vertical leading screw in tensioning sliding rack
Screw.In order to improve the stability of tensioning rack and the stability of tensioning sliding rack lifting, in the present embodiment, the tensioning
Rack 6-1 is substantially square comprising four columns, column are connected on the ground by foundation bolt, adjacent two root posts
Top be connected with connecting cross beam, to form stable tower structure, the four corners of the tensioning rack are respectively provided with vertically
Four leading screws are arranged in leading screw altogether, the vertical leading screw is rotatably connected in column, and four tensioning being oppositely arranged are arranged altogether and slide
Frame is moved, the screw is connected to the both ends of tensioning sliding rack, i.e., controlling multiple privates by controller takes motor synchronization driving silk
Thick stick rotates, to make tensioning sliding rack smoothly lift.It is connected on tensioning sliding rack 6-2 by combining actuating unit drives edge
The inside and outside tensioning joining rack 6-3 slid of machine drawing frame, inside and outside in the present invention are meant:Place track plates in the middle part of tensioning rack
Mold is the inside of tensioning rack close to the position of railway plate die, is its outside, tensioning joining rack 6- far from railway plate die
3 are slidably connected on tensioning sliding rack 6-2, and the combination actuating unit includes the power oil being connected on tensioning sliding rack 6-2
Cylinder, the piston rod be connected by power of the tensioning joining rack 6-3 and actuator cylinder.Being connected on the tensioning joining rack 6-3 can push up
Corresponding be equipped on bar 6-4, two opposite tensioning joining rack 6-3 that abut against leaned against on railway plate die is driven by stretch power mechanism
Stretching rack 6-5, that is, be located at railway plate die opposite sides stretching rack be oppositely arranged, two opposite stretching racks can be drawn simultaneously
The both ends of dynamic reinforcing bar, the front end of stretching rack 5 are equipped with the fixation tensioning stretched into for the abnormity nut of the tension rod on railway plate die
Pawl 6-6, stretching rack 6-5 include front end-plate and end plate, and guide post is connected between front end-plate and end plate, and guide post is slidably connected at
On tensioning joining rack 6-3, the end plate and stretch power mechanism be connected by power, the fixed tensioning pawl 6-6 are connected to front end
On plate, fixed tensioning pawl 6-6 includes the interior tensioning framework for setting accommodating chamber, and the front of tensioning framework is equipped with to be lacked for what tension rod stretched into
Mouthful, by lifting tensioning sliding rack, so that the height of fixed tensioning pawl is higher than tension rod, then by translating tensioning joining rack, make solid
Determine tensioning pawl 6-6 to be located at right over the abnormity nut of tension rod, then tensioning sliding rack is made to fall, it is solid to make abnormity nut be located at
In the accommodating chamber for determining tensioning pawl, the fast and accurately clamping of tensioning boom end is realized.It is connected with tension stress on stretching rack 6-5
Monitoring device, the stretch power mechanism include being connected to the tensioning oil cylinder 6-8 of tensioning joining rack 6-3, the tension stress prison
Survey the displacement sensor 6-9 that device includes the skidding distance for being connected to monitoring stretching rack 6-5, specifically, displacement sensor 6-9
It is connected between end plate and the outer wall of tensioning oil cylinder 6-8, piston rod and the stretching rack 6-5 of the tensioning oil cylinder 6-8 are equipped with pressure
Force snesor 6-10 fully ensures that the dynamics and reinforcing bar of tensioning by the monitoring of the displacement sensor and pressure sensor
Extension elongation ensure that reinforcing bar has suitable prestressing force.It is also equipped on the tensioning joining rack 6-3 and is driven by power plant
It slides up and down and the taper liner that can be hammered taper liner 6-7 between the land of tension rod and the fixation inclined plate of railway plate die hammers dress
It sets, the taper liner 6-7 includes connected up and down at least two taper liner bodies, and taper liner body has the length passed through from its bottom for reinforcing bar
Slot.Multiple taper liner bodies are linked together by connecting bolt, and the taper liner body of top has the notch of bottom-up extension, described to lack
Mouth is the elongated slot, and the wedge that remaining taper liner body is arranged by two pieces of parallel intervals forms, the space shape between two pieces of wedges
At the elongated slot, it is connected with vertically arranged anti-bull stick between neighbouring taper liner body, i.e., is connected by above-mentioned bolt more
A taper liner body, and there is pivot offset in taper liner body in order to prevent, above-mentioned anti-bull stick is provided with, especially by two pieces of wedge groups
At a taper liner body, can make with this configuration two pieces of wedges have consistent angles and positions.The taper liner hammers device packet
Include the upper compression cylinder 6-11 being connected on tensioning joining rack 6-3 and lower compression cylinder 6-12, the piston of upper compression cylinder 6-11
Be connected by power has hold-down frame 6-13 on bar, and being equipped on hold-down frame 6-13 can be pressed against on two of the top surfaces taper liner 6-7 both sides
Tup 6-14 is compressed, the lower compression tup 6-15 that can be pressed against in the middle part of the top surfaces taper liner 6-7 is housed on lower compression cylinder 6-12, by this
Taper liner hammers the structure of device, and hammering for wedge can be made more steady, prevent skewness.
As shown in figure 23 and figure 24, the Insulation monitoring mechanism includes Insulation monitoring supporting rack 7-1, Insulation monitoring supporting rack
Two overhang insulations detection crossbeam 7-1 and the intermediate insulation detection that straight skidding is driven by sliding power device are connected on 7-1
It is connected on crossbeam 7-2, overhang insulation detection crossbeam 7-1 and the multiple contact bases slid up and down is driven by Insulation monitoring power plant
The the first contact 7-4 that is driven by detection actuating unit and can be contacted with longitudinal reinforcement, two ends are installed on 7-3, contact base 7-3
Multiple first contacts of portion Insulation monitoring crossbeam 7-1 are oppositely arranged respectively;It is connected on intermediate insulation detection crossbeam 7-2 by insulating
It is connected with by detection actuating unit on the driving of detection power plant and spaced at least two contact bases 7-3, contact base 7-3
Driving and the second contact 7-5 that can be contacted with transverse steel, two the first opposite contact 7-4, which are formed, examines a longitudinal reinforcement
The longitudinal preliminary examination sets of contacts surveyed, two spaced second contact 7-5 form one detected to a transverse steel
Lateral preliminary examination sets of contacts, any one first contact and the second contact form the friendship of the longitudinal reinforcement and transverse steel that are in contact to it
One cross point detection sets of contacts of crunode detection, longitudinal preliminary examination sets of contacts, lateral preliminary examination sets of contacts and cross point detection contact
Group is connect by conducting wire with insulation detecting circuit respectively, and insulation detecting circuit includes multichannel megameter and display screen, each contact
(Including the first contact and the second contact)Pass through the wherein input terminal connection all the way of conducting wire and megameter respectively.It may be used more
A megameter is separately connected each contact and is detected respectively the results show that each using having the megameter of multichannel input to receive
The switching signal of a detection contact, switching signal are intuitively shown after microcontroller is handled by display screen.That is, detecting
Cheng Zhong, opposite first two the first contact 7-4(Longitudinal preliminary examination sets of contacts)The both ends of a longitudinal reinforcement are clamped, pass through insulation
Detection circuit detects the data of megameter, that is, detects whether the first contact contacts well with longitudinal reinforcement, similarly, can be two the
Two contacts(Lateral preliminary examination sets of contacts)Whether contacted well with transverse steel, such as there is a problem of that contact is bad, can be directed to
Property is adjusted;Secondly, by multiple first contacts below a wherein radicle Insulation monitoring crossbeam 7-1 respectively with longitudinal reinforcement
End contact, contacted successively with more transverse steels by the second contact, that is to say, that any one first contact and any the
Two contacts constitute the cross point detection sets of contacts in reality detection, are shown by the data of megameter, can carry out longitudinal steel
Whether muscle and transverse steel crosspoint insulate good detection, and the benefit of two radicle Insulation monitoring crossbeam 7-1 of setting also resides in,
Between on the move when Insulation monitoring crossbeam 7-2, can occur adequately avoiding space, i.e., when whether detected intersection insulate,
The phenomenon that the first contact below any one radicle Insulation monitoring crossbeam 7-1 can be used, prevent interference.In addition, ginseng
Examine Figure 25, due to being arranged upper and lower two layers of bar-mat reinforcement in the pre-stress rail plate in the present invention, contact base setting one is long and the other is short two pieces
Contact yoke plate so that each contact is corresponding with two layers of bar-mat reinforcement respectively, since the movement of each contact is first to drop to certain height
Degree, then laterally pushes by cylinder and contacts reinforcing bar, and therefore, the movement of contact on two layers is non-interference, and a displacement can be with
Detection, detection efficiency higher are carried out at the same time to two layers of reinforcing bar of steel reinforcement cage.
As shown in figure 25, the railway plate die includes die ontology 8-1, and die ontology 8-1 has molding cavity, mold
The side wall upper part of ontology 8-1 is connected with reinforcing beam 8-2, and end is fitted with above the side wall of die ontology 8-1 and is stretched out outside reinforcing beam
There is abnormity nut, inner extending end can be screwed onto on reinforcing bar for the overhanging end of the tension rod 8-3 in portion, tension rod 8-3, tension rod 8-3
On be additionally provided with the solid roof platform being exposed on the outside of die ontology, taper liner body 8-9 is connected on the outside of reinforcing beam, above-mentioned taper liner hammers device and inserts
The tension rod can be fixed after entering above-mentioned taper liner, more interval settings are hinged on die ontology 8-3 and top is connected to reinforcing beam
On counter-jib 8-4, the counter-jib 8-4 on two opposite side walls of the die ontology 8-3 is oppositely arranged, counter-jib 8-4's
Middle part is hinged on the side wall of die ontology by hinged shaft and hinged seat and is connected with balance between two opposite counter-jib lower parts
Pull rod 8-5 can make die ontology have better intensity by said structure design, prevent die ontology when tensioning from deforming,
In addition, being equipped with cushion block between the lower part of counter-jib and die ontology side wall, above-mentioned balancing pull rod passes through the cushion block, different-thickness
Cushion block can replace use, can with the length of pre-set balancing pull rod, prevent deformation cause tensioning rod bending or
The problems such as inconvenience is inserted into.It is connected with bottom-up extension on the die ontology 8-1 bottom wall of inner cavities and make after perfusion pre- answers
Power track plates form the grouting hole forming equipment of grout hole, and grouting hole forming equipment includes being connected in die ontology inner bottom wall
Lower cushion block 8-7, lower cushion block have through-hole up and down, the upper forming sleeve being tightly connected with its outer ring are fitted on lower cushion block
8-8, upper forming sleeve are in the circular cone shape that bottom is big, top is small, also slidably connect and can push up on die ontology 8-1 bottom wall of inner cavities
Grouting hole forming equipment is played to make the top cover 8-6 of pre-stress rail plate demoulding after molding, passes through bolt at the top of top cover 8-6
It is connect with above-mentioned upper forming sleeve, it can be by the piston rod top of the demoulding oil jar top cover, to make the grouting hole forming equipment certainly
Under move upwards, realize pre-stress rail plate demoulding.
In addition, with reference to figure 1, tears top side bolt mechanism open in the present invention, Bolt dismantling machine in the prior art can be used,
Chai Zhang mechanisms can be used tears a machine open and lays down tension rod in railway plate die in the prior art, and steel reinforcement cage, which enters mold mechanism and can be used, to be hung
Standby or other manipulator transloading equipments in the prior art are installed, the purpose is to will tie up the steel reinforcement cage made to be packed into railway plate die
In, die head threading machine in the prior art can be used in mantle fiber mechanism, carries out mantle fiber for reinforcing bar, the casting mechanism in casting equipment can be used existing
Some concrete conveyance casting machines 9, concrete vibrating mechanism can be used the mode of bobbing machine below railway plate die and realize, plucking mechanism
Napper in the prior art can be used, the top of concrete after can pouring smoothes out, above-mentioned each equipment in the prior art
This is no longer going to repeat them.
The above is the specific constructive form of the present invention, and the present invention is not limited to the above embodiments, is led in this technology
For the personnel of domain, equivalent variations and part replacement based on concrete structure in the present invention are all within the scope of the present invention.
Claims (10)
1. a kind of pre-stress rail plate continuous production complete set of equipments, including be sequentially distributed after going to certainly stripping process equipment,
Clear die process equipment, package processing apparatus and casting equipment, it is characterized in that:The pre-stress rail plate continuous production is complete
Equipment further includes at least two sets of transport mechanisms, steering conveyor structure and curing kilns, and the transport mechanisms that cover are arranged in parallel, turn to defeated more
It send mechanism to be located at transport mechanism both ends and is used for delivery track board mold, transport mechanism and rectangular defeated of steering conveyor structure group
Line sending, pipeline are equipped with spaced multiple railway plate dies, the stripping process equipment, clear die process equipment, prepackage
Part processing apparatus and casting equipment are located in a set of transport mechanism, remaining transport mechanism is located in curing kilns, in curing kilns successively
Rest chamber, firing chamber, thermostatic chamber and cooling chamber are set.
2. pre-stress rail plate continuous production complete set of equipments according to claim 1, it is characterized in that:The transport mechanism
Including conveyer frames and guide rail, the railway plate die can slide on guide rail, and more power push-rods, power are serially connected on conveyer frames
Be hinged on push rod before overturning drive railway plate die to slide forward, overturn after can de-orbit the promotion that board mold slides backward
Pawl, it is one of that pawl is pushed to be driven by actuating unit, it is also hinged on conveyer frames by after the driving overturning of actuating unit in place
Railway plate die is driven to reach the station lever of specified station;Steering conveyor structure includes two tracks disposed in parallel and can edge
The support bracket of track sliding, support bracket bottom are equipped with the traveling wheel by motor drives edge track travel, are equipped with and supply at the top of support bracket
The upper rail of railway plate die trolley sliding, is also equipped with the track truss being inserted into for power push-rod on support bracket, track truss or
Multiple detection switch are housed on support bracket.
3. pre-stress rail plate continuous production complete set of equipments according to claim 1, it is characterized in that:The stripping process
Equipment includes tearing top side bolt mechanism, Fang Zhang mechanisms, Chai Zhang mechanisms and demoulding mechanism open, and the Fang Zhang mechanisms include putting a rack,
Put at least a pair of of the hoisting cross beam slidably connected in a rack by putting an elevator drives oscilaltion and being oppositely arranged, lifting
Be connected on crossbeam by putting the tenter of putting that lateral machine drives edge hoisting cross beam moves horizontally, two be oppositely arranged put in tenter
It is correspondingly connected with and puts a joint head by put the driving of machine, it includes being rotatably connected on to put to put an axis in tenter to put a joint head,
Put be connected by power on an axis have it is dynamic and can be along at least two drive sleeves put an axis and axially slid, two actuating sleeves with a shaft rotation is put
Jacket casing fills, and the overhanging end of two drive sleeves and puts to be connected between an axis and puts a top spring, the inner extending end part of two drive sleeves
Not She You face gear and both ends of the surface gear groove stagger setting, the inner extending end portion for putting an axis is rotatably connected to put and drive
Dynamic head, the overhanging end face for putting a driving head are equipped with the driven face gear that can be engaged with any of which face gear.
4. pre-stress rail plate continuous production complete set of equipments according to claim 3, it is characterized in that:The demoulding mechanism
Including being correspondingly arranged at transport mechanism both sides and piston rod can withstand at least four support oil on the bottom surface of railway plate die
The lower section of cylinder, the central axes of transport mechanism is equipped at least one demoulding oil jar and the piston rod of demoulding oil jar can jack up track template die
The both sides of track plates in tool, transport mechanism are arranged with demoulding bearing, demould and are hinged with demoulding swing arm and demoulding pressure on bearing
By oil cylinder, the piston rod that demoulding swing arm inner end is hinged with downwardly extending demoulding pressure head, outer end and demoulding pressing oil cylinder is hinged, takes off
It includes downwardly extending demoulding last item to be molded head, and demoulding last item connects pressure head ontology made of resilient material from bottom to top, pressure passes
Sensor and limit casing.
5. the pre-stress rail plate continuous production complete set of equipments according to any one of claim 1-4, it is characterized in that:Institute
It includes clear mold mechanism and spray body to state clear die process equipment, and the clear mold mechanism includes clear mould rack and by engine drives edge
The clear mould supporting rack of clear mould stands longitudinal sliding, clear mould support frame bottom be connected with by bottom swipe power apparatus driving horizontal sliding and
By the bottom surface roller brush of motor-driven rotation, bottom surface roller brush includes horizontal cylindrical stent cylinder and is arranged outside cylindrical stent cylinder
The bristle of circumferential surface, clear mould supporting rack lower part both sides, which are connected with, vertically to be slid by side brush power plant driving energy and is driven by motor
The dynamic side roller brush of turn, the front and rear of clear mould supporting rack has been correspondingly connected with swipes power apparatus and slot swipes power by end respectively
Device drives horizontal sliding and vertical sliding and by the end face roller brush and slot brush of motor-driven rotation, side roller brush, end face roller
Brush and slot brush all include the cylindrical stent cylinder being vertically arranged and the bristle in cylindrical stent cylinder external peripheral surface are arranged;Clear mould branch
The bottom of support is also associated with swipes power apparatus driving horizontal sliding and vertical sliding and by the rib brush of motor-driven rotation by rib,
Rib brush has a caput of brush bar and spherical crown shape, and brush bar and caput are all provided with bristle, the bottom of clear mould supporting rack be also associated with by
Set swipes the vertical sliding of power apparatus driving and by the set brush of motor-driven rotation, and set brush is interior with cylindric brush pot and brush pot
It is connected with bristle on wall and bottom surface, is filled equipped with the dust suction for drawing the dust that each brush is swept up on the clear mould supporting rack
It sets.
6. pre-stress rail plate continuous production complete set of equipments according to claim 5, it is characterized in that:The spray body
The spraying supporting rack of rack longitudinal sliding motion is sprayed including spraying rack and by engine drives edge, spraying support frame bottom is connected with
Power apparatus driving horizontal sliding and by the bottom surface roller brush of motor-driven rotation is swiped the bottom of by, bottom surface roller brush includes horizontal cylinder
Rack tube is connected with the bristle in cylindrical stent cylinder external peripheral surface, spraying supporting rack lower part both sides are arranged by side brush power
Device driving energy vertically slides and by the side roller brush of motor-driven rotation, the front and rear for spraying supporting rack has been correspondingly connected with
Power apparatus is swiped by end respectively and slot swipes power apparatus driving horizontal sliding and vertical sliding and by the end face of motor-driven rotation
Roller brush and slot brush, side roller brush, end face roller brush and slot brush all include the cylindrical stent cylinder being vertically arranged and are arranged in cylinder
The bristle of rack tube external peripheral surface;The front end of spraying supporting rack is equipped with the supporting rod being laterally arranged, and is spaced on supporting rod
Multiple nozzles being arranged downward are installed, each nozzle is connect by pipeline with releasing agent delivery pipe.
7. the pre-stress rail plate continuous production complete set of equipments according to any one of claim 1-4, it is characterized in that:Institute
It includes that service sleeve installing mechanism, steel reinforcement cage enter mold mechanism, mantle fiber mechanism, Chu Zhang mechanisms, put cushion block to state package processing apparatus
Mechanism, tensioning mechanism and Insulation monitoring mechanism, the service sleeve installing mechanism include service sleeve rack, the service sleeve
The service sleeve crossbeam for driving straight skidding by crossbeam driving device is installed in rack, is equipped on service sleeve crossbeam by moving
Power apparatus drives the hanger and cantilever of horizontal sliding, hanger to be equipped with service sleeve bracket, and the lower part of cantilever is equipped with pre-buried
Casing pick-and-place manipulator, equipped with the service sleeve rapid fixing being located above service sleeve pick-and-place manipulator on cantilever, in advance
Bushing burying rapid fixing includes the portable pillar that is connected on cantilever and can slide vertically, and the bottom of portable pillar is equipped with tup,
It is connected with limiting plate on cantilever, the limit of the stretching activity outer surface of column under the effect of suppressing of elastomeric element is hinged in portable pillar
Block is set with the driving cylinder that the when of vertically capable of sliding and move downward drives limited block to be retracted in portable pillar, drives cylinder and portable pillar
Inner wall between lifting actuating cylinder is connected with equipped with the driving top spring for abutting against driving cylinder upwards, on cantilever, lift actuating cylinder
Piston rod can push driving cylinder when being located in portable pillar upper lumen and can be lifted when moving upwards portable pillar, moving downward.
8. pre-stress rail plate continuous production complete set of equipments according to claim 7, it is characterized in that:The tensioning mechanism
Including tensioning rack, slidably connects and be oppositely arranged on the outside of two opposite side of railway plate die and by power in the tensioning rack
Mechanism drives the tensioning sliding rack of synchronization lifting, is connected in tensioning sliding rack by combining in actuating unit drives edge tensioning rack
The tensioning joining rack of outer sliding is connected with the bar that abuts against that can be acted against on railway plate die on the tensioning joining rack, and two is opposite
Tensioning joining rack on it is corresponding equipped with the stretching rack driven by stretch power mechanism, the inner end of stretching rack is equipped with for railway plate die
On tension rod the fixation tensioning pawl that stretches into of abnormity nut, be connected with tension stress monitoring device, the tensioning on stretching rack
It is also equipped on joining rack and drives the land and railway plate die that slides and taper liner can be hammered tension rod up and down by power plant
Taper liner between fixed inclined plate hammers device, and the taper liner includes connected up and down at least two taper liner bodies, and taper liner body, which has, to be supplied
The elongated slot that reinforcing bar is passed through from its bottom.
9. pre-stress rail plate continuous production complete set of equipments according to claim 7, it is characterized in that:The Insulation monitoring
Mechanism includes Insulation monitoring supporting rack, and two that straight skidding is driven by sliding power device are connected on Insulation monitoring supporting rack
Overhang insulation detects crossbeam and intermediate insulation detects crossbeam, is connected with by Insulation monitoring power plant on overhang insulation detection crossbeam
Multiple contact bases that driving slides up and down are equipped on contact base and to be driven by detection actuating unit and can be contacted with longitudinal reinforcement
Multiple first contacts of first contact, two overhang insulation detection crossbeams are oppositely arranged respectively;Connect on intermediate insulation detection crossbeam
It is connected to and is driven by Insulation monitoring power plant and spaced at least two contact base, is connected with by detection power on contact base
The second contact that mechanism drives and can be contacted with transverse steel, two the first opposite contacts, which are formed, detects a longitudinal reinforcement
A longitudinal preliminary examination sets of contacts, it is pre- that two spaced second contacts form the transverse direction detected to a transverse steel
Sets of contacts is examined, any one first contact and the second contact form the crosspoint inspection of the longitudinal reinforcement and transverse steel that are in contact to it
The cross point detection sets of contacts surveyed, longitudinal preliminary examination sets of contacts, lateral preliminary examination sets of contacts and cross point detection sets of contacts difference
It is connect with insulation detecting circuit by conducting wire.
10. the pre-stress rail plate continuous production complete set of equipments according to any one of claim 1-4, it is characterized in that:
The railway plate die includes die ontology, and there is die ontology molding cavity, the side wall upper part of die ontology to be connected with reinforcement
Beam is fitted with end on the side wall of die ontology and stretches out tension rod outside reinforcing beam, more intervals are hinged on die ontology
It is arranged and top is connected to counter-jib on reinforcing beam, the counter-jib on two opposite side walls of the die ontology is opposite is set
It sets, the middle part of counter-jib is hinged on by hinged shaft and hinged seat on the side wall of die ontology and between two opposite counter-jib lower parts
It is connected with balancing pull rod, bottom-up extension is connected on the die ontology bottom wall of inner cavity and makes the prestressing force rail after perfusion
Guidance tape forms the grouting hole forming equipment of grout hole, and grouting hole forming can be jacked up by also being slidably connected on die ontology bottom wall of inner cavity
Device is to make the top cover of pre-stress rail plate demoulding after molding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810196953.8A CN108274607B (en) | 2018-03-10 | 2018-03-10 | Continuous production complete equipment for prestressed track slab |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810196953.8A CN108274607B (en) | 2018-03-10 | 2018-03-10 | Continuous production complete equipment for prestressed track slab |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108274607A true CN108274607A (en) | 2018-07-13 |
CN108274607B CN108274607B (en) | 2022-03-04 |
Family
ID=62809326
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810196953.8A Active CN108274607B (en) | 2018-03-10 | 2018-03-10 | Continuous production complete equipment for prestressed track slab |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108274607B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109262821A (en) * | 2018-10-23 | 2019-01-25 | 辽宁衍水水工水泥制品集团有限公司 | Sleeper production line |
CN109278175A (en) * | 2018-12-03 | 2019-01-29 | 山东高速轨道设备材料有限公司 | A kind of demolding of track slab machine |
CN109795029A (en) * | 2019-03-01 | 2019-05-24 | 河间市银龙轨道有限公司 | A kind of pre-stress rail plate puts a device |
CN113635422A (en) * | 2021-08-09 | 2021-11-12 | 中铁三局集团有限公司 | Collinear intelligent assembly line for track plate and floating plate |
CN113715133A (en) * | 2021-09-27 | 2021-11-30 | 筑友智造智能科技有限公司 | Vibrating table for producing prefabricated parts and prefabricated part production line |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0022095A1 (en) * | 1979-07-03 | 1981-01-07 | ITALTRACTOR I.T.M. S.p.A. | Line for assembling objects, in particular rollers for crawler track vehicles |
CN2093740U (en) * | 1991-06-17 | 1992-01-22 | 中国船舶工业总公司第七研究院第七○三研究所 | Draw on rollover and demoulding apparatus |
CN104441225A (en) * | 2014-11-21 | 2015-03-25 | 天津银龙预应力材料股份有限公司 | Continuous production line for manufacturing prestressed concrete track board for high speed railway |
WO2016078610A1 (en) * | 2014-11-21 | 2016-05-26 | 天津银龙预应力材料股份有限公司 | Production line of track plate |
CN106217590A (en) * | 2016-09-30 | 2016-12-14 | 中铁二十三局集团有限公司 | Pre-tensioned rail plate flowing water unit method produces tooling device and method |
CN106738283A (en) * | 2016-12-08 | 2017-05-31 | 山西高行液压股份有限公司 | High speed railway fragments-free track slab pre-tensioning system flowing water unit production line |
CN107322770A (en) * | 2017-08-18 | 2017-11-07 | 山东高速轨道设备材料有限公司 | The automatic mold cleaning machine of high ferro non-fragment orbit board assembly line |
CN107627447A (en) * | 2017-10-31 | 2018-01-26 | 天津银龙预应力材料股份有限公司 | A kind of track plates steam curing kiln of multi-chamber |
CN208197139U (en) * | 2018-03-10 | 2018-12-07 | 山东高速轨道设备材料有限公司 | A kind of pre-stress rail plate continuous production complete set of equipments |
-
2018
- 2018-03-10 CN CN201810196953.8A patent/CN108274607B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0022095A1 (en) * | 1979-07-03 | 1981-01-07 | ITALTRACTOR I.T.M. S.p.A. | Line for assembling objects, in particular rollers for crawler track vehicles |
CN2093740U (en) * | 1991-06-17 | 1992-01-22 | 中国船舶工业总公司第七研究院第七○三研究所 | Draw on rollover and demoulding apparatus |
CN104441225A (en) * | 2014-11-21 | 2015-03-25 | 天津银龙预应力材料股份有限公司 | Continuous production line for manufacturing prestressed concrete track board for high speed railway |
WO2016078610A1 (en) * | 2014-11-21 | 2016-05-26 | 天津银龙预应力材料股份有限公司 | Production line of track plate |
CN106217590A (en) * | 2016-09-30 | 2016-12-14 | 中铁二十三局集团有限公司 | Pre-tensioned rail plate flowing water unit method produces tooling device and method |
CN106738283A (en) * | 2016-12-08 | 2017-05-31 | 山西高行液压股份有限公司 | High speed railway fragments-free track slab pre-tensioning system flowing water unit production line |
CN107322770A (en) * | 2017-08-18 | 2017-11-07 | 山东高速轨道设备材料有限公司 | The automatic mold cleaning machine of high ferro non-fragment orbit board assembly line |
CN107627447A (en) * | 2017-10-31 | 2018-01-26 | 天津银龙预应力材料股份有限公司 | A kind of track plates steam curing kiln of multi-chamber |
CN208197139U (en) * | 2018-03-10 | 2018-12-07 | 山东高速轨道设备材料有限公司 | A kind of pre-stress rail plate continuous production complete set of equipments |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109262821A (en) * | 2018-10-23 | 2019-01-25 | 辽宁衍水水工水泥制品集团有限公司 | Sleeper production line |
CN109262821B (en) * | 2018-10-23 | 2023-11-21 | 辽宁衍水水工水泥制品集团有限公司 | Sleeper production line |
CN109278175A (en) * | 2018-12-03 | 2019-01-29 | 山东高速轨道设备材料有限公司 | A kind of demolding of track slab machine |
CN109795029A (en) * | 2019-03-01 | 2019-05-24 | 河间市银龙轨道有限公司 | A kind of pre-stress rail plate puts a device |
CN109795029B (en) * | 2019-03-01 | 2024-03-29 | 河间市银龙轨道有限公司 | Tension releasing device for prestressed track slab |
CN113635422A (en) * | 2021-08-09 | 2021-11-12 | 中铁三局集团有限公司 | Collinear intelligent assembly line for track plate and floating plate |
CN113635422B (en) * | 2021-08-09 | 2022-10-28 | 中铁三局集团有限公司 | Collinear intelligent assembly line for track plate and floating plate |
CN113715133A (en) * | 2021-09-27 | 2021-11-30 | 筑友智造智能科技有限公司 | Vibrating table for producing prefabricated parts and prefabricated part production line |
CN113715133B (en) * | 2021-09-27 | 2023-03-10 | 筑友智造智能科技有限公司 | Vibrating table for producing prefabricated parts and prefabricated part production line |
Also Published As
Publication number | Publication date |
---|---|
CN108274607B (en) | 2022-03-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108274607A (en) | A kind of pre-stress rail plate continuous production complete set of equipments | |
CN108274608A (en) | Pre-stress rail plate continuous production complete set of equipments | |
CN111186012A (en) | Automatic production line for railway track slabs | |
CN208788805U (en) | A kind of concrete precast pile automatic production line | |
CN102555052B (en) | Production line for self-insulation building blocks | |
CN208197139U (en) | A kind of pre-stress rail plate continuous production complete set of equipments | |
CN105538494B (en) | A kind of production system of construction wall concave-board | |
CN105459258A (en) | Pc component production line | |
CA1178795A (en) | Apparatus and method for making prestressed concrete products | |
CN207747210U (en) | Pretensioning prestressed concrete track board assembly line pours vibrating system | |
CN207711039U (en) | A kind of pre-stress rail plate tinuous production | |
CN104358415A (en) | Reconfigurable moving type production system and production method for concrete prefabricated component | |
CN208197140U (en) | Pre-stress rail plate continuous production complete set of equipments | |
CN109706964B (en) | Method for pipe gallery construction by using mobile platform | |
CN110158978A (en) | A kind of system and wall building method of automatically building a wall | |
CN109822736A (en) | A kind of production technology of assembled wallboard | |
CN106217639B (en) | Ladder-type sleepers prefabricated construction device and method | |
CN112454643A (en) | Modularized disassembly-free wall formwork automatic production system | |
CN206888486U (en) | A kind of Novel floor brick laying device | |
CN202439103U (en) | Self-heat-preserving building block production line | |
CN114800834A (en) | High-efficiency and low-energy-consumption prefabricated part group formwork erection production system and production method thereof | |
CN207888889U (en) | Prefabricated components integrated production line | |
CN116604694B (en) | Composite production line for prefabricated sleeper and small component and production method thereof | |
CN108177237A (en) | A kind of six rib brick ingot stripper of concrete hollow | |
CN206215824U (en) | Filling pile cage of reinforcement processing unit (plant) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 262604 No. 1020, Changxing Road, industrial park, Wujing Town, Linqu County, Weifang City, Shandong Province Applicant after: Shandong High Speed Railway Construction Equipment Co.,Ltd. Address before: 262604 No. 1020, Changxing Road, industrial park, Wujing Town, Linqu County, Weifang City, Shandong Province Applicant before: SHANDONG HIGH SPEED RAIL EQUIPMENT MATERIAL Co.,Ltd. |
|
CB02 | Change of applicant information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |