CN108190503A - Novel flange dispenses frame - Google Patents

Novel flange dispenses frame Download PDF

Info

Publication number
CN108190503A
CN108190503A CN201711185223.XA CN201711185223A CN108190503A CN 108190503 A CN108190503 A CN 108190503A CN 201711185223 A CN201711185223 A CN 201711185223A CN 108190503 A CN108190503 A CN 108190503A
Authority
CN
China
Prior art keywords
frame
broach
carriage
synchronous belt
broach frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201711185223.XA
Other languages
Chinese (zh)
Inventor
徐晓蓉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711185223.XA priority Critical patent/CN108190503A/en
Publication of CN108190503A publication Critical patent/CN108190503A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G47/00Article or material-handling devices associated with conveyors; Methods employing such devices
    • B65G47/74Feeding, transfer, or discharging devices of particular kinds or types
    • B65G47/90Devices for picking-up and depositing articles or materials
    • B65G47/91Devices for picking-up and depositing articles or materials incorporating pneumatic, e.g. suction, grippers
    • B65G47/912Devices for picking-up and depositing articles or materials incorporating pneumatic, e.g. suction, grippers provided with drive systems with rectilinear movements only
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G17/00Conveyors having an endless traction element, e.g. a chain, transmitting movement to a continuous or substantially-continuous load-carrying surface or to a series of individual load-carriers; Endless-chain conveyors in which the chains form the load-carrying surface
    • B65G17/12Conveyors having an endless traction element, e.g. a chain, transmitting movement to a continuous or substantially-continuous load-carrying surface or to a series of individual load-carriers; Endless-chain conveyors in which the chains form the load-carrying surface comprising a series of individual load-carriers fixed, or normally fixed, relative to traction element
    • B65G17/123Conveyors having an endless traction element, e.g. a chain, transmitting movement to a continuous or substantially-continuous load-carrying surface or to a series of individual load-carriers; Endless-chain conveyors in which the chains form the load-carrying surface comprising a series of individual load-carriers fixed, or normally fixed, relative to traction element arranged to keep the load-carriers horizontally during at least a part of the conveyor run
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G17/00Conveyors having an endless traction element, e.g. a chain, transmitting movement to a continuous or substantially-continuous load-carrying surface or to a series of individual load-carriers; Endless-chain conveyors in which the chains form the load-carrying surface
    • B65G17/30Details; Auxiliary devices
    • B65G17/32Individual load-carriers
    • B65G17/34Individual load-carriers having flat surfaces, e.g. platforms, grids, forks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G57/00Stacking of articles
    • B65G57/02Stacking of articles by adding to the top of the stack
    • B65G57/11Stacking of articles by adding to the top of the stack the articles being stacked by direct action of the feeding conveyor

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

The present invention provides a kind of novel flange dispatching frame, it couples finishing department and storage workshop, finishing numerical control bed is symmetrically disposed on it and is located at the both sides of the finishing department part, including carriage, be set between finishing numerically-controlled machine tool and the carriage for the hoisting mechanism on work piece hoisting to the carriage on numerically-controlled machine tool will to be finished, it is set to the job stacking mechanism of the carriage output terminal, the workpiece epicyclical mechanism being set between the carriage and the job stacking mechanism, the large-sized flange ring machined in finishing department can be delivered to storage workshop automatically, without manually lifting, conveying is convenient, it is efficient.

Description

Novel flange dispenses frame
Technical field
The present invention relates to a kind of novel flanges to dispense frame.
Background technology
Large-sized flange ring finishing department complete processing after need to remove stage makeup and costume from board, after be distributed to storage workshop progress Storage, existing mode of operation are lifted, and can only lift a product every time by large size driving, and efficiency is low Under, and since finishing department to driving between storage workshop can not pass through, also need to carry out by tote cart in centre defeated It send, in storage workshop, needs again to be lifted after the workpiece discharging on tote cart first to suitable position progress heap by driving It is folded, it is cumbersome, and multiple operators is needed to coordinate and are completed.
Invention content
It is an object of the invention to overcome the shortcomings of above-mentioned technology, so as to provide a kind of novel flange dispatching frame, can incite somebody to action It is delivered to storage workshop automatically in the large-sized flange ring that finishing department machines, without manually lifting, conveying is convenient, efficiency It is high.
Technical solution is such used by invention:Novel flange dispenses frame, connection finishing department and storage vehicle Between, finishing numerical control bed is symmetrically disposed on it and is located at the both sides of the finishing department part, including carriage, is set to finishing It is used to finish on the work piece hoisting to the carriage on numerically-controlled machine tool between work numerically-controlled machine tool and the carriage Hoisting mechanism, is set to the carriage and the job stacking at the job stacking mechanism for being set to the carriage output terminal Workpiece epicyclical mechanism between mechanism;
The carriage include rack, be fixedly installed on the central rack supporting rack, be symmetrically disposed on support frame as described above two The synchronous belt component of side includes the first synchronizing wheel being rotatably dispose in the rack and the per synchronous belt component described in side Two synchronizing wheels, the synchronous belt being set around in first synchronizing wheel and second synchronizing wheel, support frame as described above with it is described same Step band in similar figures, the upper and lower surface of support frame as described above respectively with the lateral surface flush of the synchronous belt, on support frame as described above It is evenly distributed with several conveying broach framves along its length, the both ends of the conveying broach frame are mutually solid with the synchronous belt respectively Fixed connection, the middle part rotation of the lower surface of the conveying broach frame are provided with support pulley, and support frame as described above is offered described in confession Support pulley by escape groove;
The hoisting mechanism includes lifting extend along the width direction of the synchronous belt and above the synchronous belt Frame, the guiding axis for being fixedly installed on the mast-up side, turns the platform sling that setting is slided along the length direction of the mast-up The dynamic first movement leading screw for being set to the mast-up opposite side, offers on the platform sling and the guiding axis is matched leads Xiang Kong, with the matched threaded hole of first movement leading screw, be provided with hoist engine on the platform sling, winding on the hoist engine There is steel wire rope, the end of the steel wire rope is connected with hanging ring, locating rod is fixedly installed on the hanging ring, is had in the locating rod There is the perforation for the steel wire penetrating, guiding mechanism is provided between the locating rod and the platform sling, is slided on the hanging ring Dynamic to be provided with several sliding parts, the lower end of the sliding part is provided with sucker, and the sliding part is driven by the first cylinder and slided, Rotation is provided with several L-shaped hooks on the hanging ring, and the upper end of the grab rotates with the hanging ring and connect, lower end For free end, the grab is driven by the second cylinder and rotated;
The pedestal, the turntable being vertically rotatably dispose on the pedestal, fixation that the workpiece epicyclical mechanism includes fixed setting are set It is placed on the turntable and is slideably positioned in along radially extend rotating arm of the turntable, along upper and lower directions described The turnover broach frame of rotating arm end, the end rotation of the rotating arm are provided with vertically disposed driving leading screw, the turnover It is provided on broach frame and the driving matched lifting swivel nut of leading screw, the turnover broach frame and the conveying broach frame phase Cooperation;
The job stacking mechanism is set including stacking shelf, the shifting roller for being rotatably dispose in the stacking shelf bottom, vertical rotation It is placed in the first elevating screw of the stacking shelf both sides and the second elevating screw, along vertical direction is slideably positioned in the heap If dried layer in superimposed stacks broach frame, the both sides for stacking broach frame offer respectively with first elevating screw and The matched threaded hole of second elevating screw, the stacking broach frame are matched with the turnover broach frame.
It is further improved to be:The upper surface of the conveying broach frame is provided with anti-skidding reticulate pattern.
It is further improved to be:The elevating mechanism includes vertically being rotatably dispose in first sliding rack/described second Third elevating screw on sliding rack, offers on first crane/second crane and third lifting silk The matched threaded hole of thick stick.
It is further improved to be:The end of the broach of the turnover broach frame is tapered.
By using preceding solution, the beneficial effects of the invention are as follows:When finishing numerically-controlled machine tool is completed to add to workpiece After work, will be conveyed on work piece hoisting to carriage by hoisting mechanism, and the operation directly by the operative employee of numerically-controlled machine tool just It can complete, workpiece is fed directly to storage workshop by carriage, since carriage includes synchronous belt and supporting rack, supporting rack Rigid support is provided, and synchronous belt is mainly used for conveying workpiece, and the resistance by setting support pulley reduction when mobile, Workpiece epicyclical mechanism and job stacking mechanism are set in storage workshop, due to being provided with conveying broach frame on synchronous belt, same It is under the cooperation of having enough to meet the need broach frame of the conveying broach frame with workpiece epicyclical mechanism, workpiece is direct when step band is sent to output terminal It is placed on turnover broach frame, then has enough to meet the need broach frame and rise the heap that a station avoids turning to after carriage job stacking mechanism Folded position, the transhipment of the lifting implementation workpiece by stacking broach frame then substantially increase the dispatching efficiency of workpiece, save labor Power.
Description of the drawings
Fig. 1 is vertical view of the present invention;
Fig. 2 is the side view of carriage;
Fig. 3 is hoisting mechanism schematic diagram.
Wherein:1st, synchronous belt;2nd, supporting rack;3rd, broach frame is conveyed;4th, pulley is supported;5th, escape groove;7th, platform sling;8th, first Mobile leading screw;9th, guiding axis;10th, hoist engine;11st, steel wire rope;12nd, hanging ring;13rd, locating rod;14th, sliding part;15th, turntable;16、 Rotating arm;17th, broach frame is had enough to meet the need;18th, broach frame is stacked;19th, sucker;20th, the first cylinder;21st, L-shaped hook;22nd, the second gas Cylinder.
Specific embodiment
It is further illustrated the present invention below in conjunction with the drawings and specific embodiments.
As shown in Figure 1-Figure 3, the present invention discloses a kind of novel flange dispatching frame, connection finishing department and storage vehicle Between, finishing numerical control bed is symmetrically disposed on it and is located at the both sides of the finishing department part, including carriage, is set to finishing It is used to finish on the work piece hoisting to the carriage on numerically-controlled machine tool between work numerically-controlled machine tool and the carriage Hoisting mechanism, is set to the carriage and the job stacking at the job stacking mechanism for being set to the carriage output terminal Workpiece epicyclical mechanism between mechanism;
The carriage include rack, be fixedly installed on the central rack supporting rack 2, be symmetrically disposed on support frame as described above 2 The synchronous belt component of both sides, include per synchronous belt component described in side the first synchronizing wheel being rotatably dispose in the rack and Second synchronizing wheel, the synchronous belt 1 being set around in first synchronizing wheel and second synchronizing wheel, support frame as described above 2 and institute Synchronous belt 1 is stated in similar figures, the upper and lower surface of the support frame as described above 2 lateral surface flush with the synchronous belt 1 respectively, the branch Be evenly distributed with several conveying broach framves 3 on support 2 along its length, the both ends of the conveying broach frame 3 respectively with it is described 1 phase of synchronous belt is fixedly connected, and the middle part rotation of the lower surface of the conveying broach frame 3 is provided with support pulley 4, support frame as described above 2 offer for it is described support pulley 4 by escape groove 5;
The hoisting mechanism includes lifting extend along the width direction of the synchronous belt and above the synchronous belt Frame, along the mast-up length direction slide setting platform sling 7, be fixedly installed on the mast-up side guiding axis 9, The first movement leading screw 8 of the mast-up opposite side is rotatably dispose in, offers on the platform sling 7 and matches with the guiding axis 9 The pilot hole of conjunction, with the 8 matched threaded hole of first movement leading screw, be provided with hoist engine 10, the volume on the platform sling 7 It raises and steel wire rope 11 is arranged on machine 10, the end of the steel wire rope 11 is connected with hanging ring 12, is fixedly installed on the hanging ring 12 Locating rod 13, has the perforation passed through for the steel wire rope 11 in the locating rod 13, the locating rod 13 and the platform sling 7 it Between be provided with guiding mechanism, slided on the hanging ring 12 and be provided with several sliding parts 14, the lower end setting of the sliding part 14 There is sucker 19, the sliding part 14 drives slip by the first cylinder 20, rotated on the hanging ring 12 and be provided with several L-shaped hooks 21, the upper end of the grab rotates with the hanging ring 12 and connect, and lower end is free end, and the grab is by the second cylinder 22 driving rotations;
The workpiece epicyclical mechanism includes the pedestal of fixed setting, the turntable 15 being vertically rotatably dispose on the pedestal, fixes It is set on the turntable 15 and is set along radially extend rotating arm 16 of the turntable 15, along upper and lower directions slip The turnover broach frame 17 of 16 end of rotating arm is placed in, the end rotation of the rotating arm 16 is provided with vertically disposed driving Leading screw, is provided on the turnover broach frame 17 and the driving matched lifting swivel nut of leading screw, the turnover broach frame 17 It is matched with the conveying broach frame 3;
The job stacking mechanism is set including stacking shelf, the shifting roller for being rotatably dispose in the stacking shelf bottom, vertical rotation It is placed in the first elevating screw of the stacking shelf both sides and the second elevating screw, along vertical direction is slideably positioned in the heap If the dried layer in superimposed stacks broach frame 18, the both sides for stacking broach frame 18 offer and first elevating screw respectively And the matched threaded hole of the second elevating screw, the stacking broach frame 18 are matched with the turnover broach frame 17.
The course of work:After numerically-controlled machine tool is finished to workpiece completion processing, work piece hoisting is extremely conveyed by hoisting mechanism It is conveyed on frame, and the operation can directly be completed by the operative employee of numerically-controlled machine tool, workpiece is fed directly to by carriage Storage workshop, since carriage includes synchronous belt 1 and supporting rack 2, supporting rack 2 provides rigid support, and synchronous belt 1 is mainly used Resistance when being conveyed in by workpiece, and supporting the reduction of pulley 4 mobile by setting, workpiece epicyclical mechanism is set in storage workshop And job stacking mechanism, due to being provided with conveying broach frame 3 on synchronous belt 1, when synchronous belt 1 is sent to output terminal, defeated Broach frame 3 is sent under the cooperation of the turnover broach frame 17 of workpiece epicyclical mechanism, workpiece is placed directly on turnover broach frame 17, and Turnover broach frame 17 rises the stacked position that a station avoids turning to after carriage job stacking mechanism afterwards, passes through and stacks comb The transhipment of the lifting implementation workpiece of braces 18 then substantially increases the dispatching efficiency of workpiece, saves labour.
Slip phenomenon occurs in transmission process for workpiece in order to prevent, and the upper surface for conveying broach frame 3 is provided with anti- Sliding reticulate pattern.
Preferred embodiment is in the present embodiment, and the elevating mechanism includes vertically being rotatably dispose in first slip Third elevating screw described in frame 9/ on second sliding rack 10 opens up described in first crane 11/ on second crane 12 Have and the matched threaded hole of third elevating screw.
Preferred embodiment is in the present embodiment, and the end of the broach of the turnover broach frame 17 is tapered.
Basic principle of the invention and main feature and its advantage has been shown and described above, the technical staff of the industry should The understanding, the present invention is not limited to the above embodiments, the original for only illustrating the present invention described in above-described embodiment and explanation Reason, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes and improvements It all fall within the protetion scope of the claimed invention, the claimed scope of the invention is by appended claims and its equivalent circle It is fixed.

Claims (4)

1. novel flange dispenses frame, couple finishing department and storage workshop, finishing numerical control bed is symmetrically disposed on it and is located at The both sides of the finishing department part, it is characterised in that:Including carriage, it is set to finishing numerically-controlled machine tool and the conveying Between frame be used for by finish numerically-controlled machine tool on work piece hoisting to the carriage on hoisting mechanism, be set to it is described defeated Send the job stacking mechanism of frame output terminal, the workpiece epicyclical mechanism being set between the carriage and the job stacking mechanism ;
The carriage include rack, be fixedly installed on the central rack supporting rack, be symmetrically disposed on support frame as described above two The synchronous belt component of side includes the first synchronizing wheel being rotatably dispose in the rack and the per synchronous belt component described in side Two synchronizing wheels, the synchronous belt being set around in first synchronizing wheel and second synchronizing wheel, support frame as described above with it is described same Step band in similar figures, the upper and lower surface of support frame as described above respectively with the lateral surface flush of the synchronous belt, on support frame as described above It is evenly distributed with several conveying broach framves along its length, the both ends of the conveying broach frame are mutually solid with the synchronous belt respectively Fixed connection, the middle part rotation of the lower surface of the conveying broach frame are provided with support pulley, and support frame as described above is offered described in confession Support pulley by escape groove;
The hoisting mechanism includes lifting extend along the width direction of the synchronous belt and above the synchronous belt Frame, the guiding axis for being fixedly installed on the mast-up side, turns the platform sling that setting is slided along the length direction of the mast-up The dynamic first movement leading screw for being set to the mast-up opposite side, offers on the platform sling and the guiding axis is matched leads Xiang Kong, with the matched threaded hole of first movement leading screw, be provided with hoist engine on the platform sling, winding on the hoist engine There is steel wire rope, the end of the steel wire rope is connected with hanging ring, locating rod is fixedly installed on the hanging ring, is had in the locating rod There is the perforation for the steel wire penetrating, guiding mechanism is provided between the locating rod and the platform sling, is slided on the hanging ring Dynamic to be provided with several sliding parts, the lower end of the sliding part is provided with sucker, and the sliding part is driven by the first cylinder and slided, Rotation is provided with several L-shaped hooks on the hanging ring, and the upper end of the grab rotates with the hanging ring and connect, lower end For free end, the grab is driven by the second cylinder and rotated;
The pedestal, the turntable being vertically rotatably dispose on the pedestal, fixation that the workpiece epicyclical mechanism includes fixed setting are set It is placed on the turntable and is slideably positioned in along radially extend rotating arm of the turntable, along upper and lower directions described The turnover broach frame of rotating arm end, the end rotation of the rotating arm are provided with vertically disposed driving leading screw, the turnover It is provided on broach frame and the driving matched lifting swivel nut of leading screw, the turnover broach frame and the conveying broach frame phase Cooperation;
The job stacking mechanism is set including stacking shelf, the shifting roller for being rotatably dispose in the stacking shelf bottom, vertical rotation It is placed in the first elevating screw of the stacking shelf both sides and the second elevating screw, along vertical direction is slideably positioned in the heap If dried layer in superimposed stacks broach frame, the both sides for stacking broach frame offer respectively with first elevating screw and The matched threaded hole of second elevating screw, the stacking broach frame are matched with the turnover broach frame.
2. novel flange according to claim 1 dispenses frame, it is characterised in that:The upper surface setting of the conveying broach frame There is anti-skidding reticulate pattern.
3. novel flange according to claim 1 dispenses frame, it is characterised in that:The elevating mechanism includes vertical rotation and sets The third elevating screw being placed on first sliding rack/second sliding rack, first crane/second lifting It is offered on frame and the matched threaded hole of third elevating screw.
4. novel flange according to claim 1 dispenses frame, it is characterised in that:The end of the broach of the turnover broach frame It is tapered.
CN201711185223.XA 2017-11-23 2017-11-23 Novel flange dispenses frame Withdrawn CN108190503A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711185223.XA CN108190503A (en) 2017-11-23 2017-11-23 Novel flange dispenses frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711185223.XA CN108190503A (en) 2017-11-23 2017-11-23 Novel flange dispenses frame

Publications (1)

Publication Number Publication Date
CN108190503A true CN108190503A (en) 2018-06-22

Family

ID=62572918

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711185223.XA Withdrawn CN108190503A (en) 2017-11-23 2017-11-23 Novel flange dispenses frame

Country Status (1)

Country Link
CN (1) CN108190503A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0840522A (en) * 1994-08-01 1996-02-13 Toray Ind Inc Supply method for ring-shaped packing and its device
CN102874595A (en) * 2012-11-01 2013-01-16 宁波摩科机器人科技有限公司 Combined type material picking hand device
CN105460642A (en) * 2015-12-29 2016-04-06 江阴市恒润环锻有限公司 Automatic large flange stacking and loading machine
CN205294048U (en) * 2016-01-18 2016-06-08 谢泽波 Novel automatically, pile up dolly
CN205367519U (en) * 2015-12-01 2016-07-06 重庆福丹环保建材有限公司 Prefabricated plate hoist and mount driving
CN206217316U (en) * 2016-10-26 2017-06-06 呼和浩特市兴捷成科技有限公司 Swinging auto-laminate machine
CN105109908B (en) * 2015-07-20 2017-06-16 杭州斗源机械电子有限公司 A kind of chain conveying mechanism

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0840522A (en) * 1994-08-01 1996-02-13 Toray Ind Inc Supply method for ring-shaped packing and its device
CN102874595A (en) * 2012-11-01 2013-01-16 宁波摩科机器人科技有限公司 Combined type material picking hand device
CN105109908B (en) * 2015-07-20 2017-06-16 杭州斗源机械电子有限公司 A kind of chain conveying mechanism
CN205367519U (en) * 2015-12-01 2016-07-06 重庆福丹环保建材有限公司 Prefabricated plate hoist and mount driving
CN105460642A (en) * 2015-12-29 2016-04-06 江阴市恒润环锻有限公司 Automatic large flange stacking and loading machine
CN205294048U (en) * 2016-01-18 2016-06-08 谢泽波 Novel automatically, pile up dolly
CN206217316U (en) * 2016-10-26 2017-06-06 呼和浩特市兴捷成科技有限公司 Swinging auto-laminate machine

Similar Documents

Publication Publication Date Title
CN107671222A (en) Full-automatic ring forging pipeline
CN203411255U (en) Crane for bulk cargo ship
CN114634094B (en) Annular forging is with transporting loading device
CN215626323U (en) Lifting device for robot production
CN108016856A (en) Full-automatic flange ring dispatching frame
CN214053160U (en) Steel cylinder discharging device of uncoiler
CN108082839A (en) Novel flange ring dispenses frame
CN104118754B (en) Steel band produce in put band feeding structure
CN108147006A (en) Full-automatic flange ring carriage
CN108190503A (en) Novel flange dispenses frame
CN107934495A (en) Full-automatic ring forging matches somebody with somebody line sending
CN108082933A (en) Novel flange carriage
CN108082953A (en) Novel flange ring carriage
CN107973113A (en) Full-automatic ring forging carriage
CN108217115A (en) Annulus dispenses frame
CN108147037A (en) Full-automatic flange ring delivery system
CN108163459A (en) Flange ring dispenses frame automatically
CN107902389A (en) Ring forging automatic conveyor line
CN108190387A (en) Flange dispenses frame
CN108033243A (en) Flange ring carriage
CN107973061A (en) Flange ring dispenses frame
CN213923034U (en) Intelligent mold grabbing robot for building components
CN213802533U (en) Universal bridge crane
CN108217067A (en) Full-automatic flange ring transport system
CN108190362A (en) Annulus carriage

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180622

WW01 Invention patent application withdrawn after publication