CN108130917A - Pile foundation earth-retaining wall construction method - Google Patents

Pile foundation earth-retaining wall construction method Download PDF

Info

Publication number
CN108130917A
CN108130917A CN201711424024.XA CN201711424024A CN108130917A CN 108130917 A CN108130917 A CN 108130917A CN 201711424024 A CN201711424024 A CN 201711424024A CN 108130917 A CN108130917 A CN 108130917A
Authority
CN
China
Prior art keywords
retaining wall
wallboard
pile foundation
construction method
wall construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711424024.XA
Other languages
Chinese (zh)
Inventor
吴铭
陈向荣
王洋
袁晨曦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201711424024.XA priority Critical patent/CN108130917A/en
Publication of CN108130917A publication Critical patent/CN108130917A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0266Retaining or protecting walls characterised by constructional features made up of preformed elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The present invention proposes a kind of pile foundation earth-retaining wall construction method, including:The wallboard of prefabricated retaining wall;Casting concrete pile body;The wallboard and the pile body are connected as one, form the pile foundation retaining wall.The cushion cap on the pile body top is poured according to the size of the wallboard.Force analysis is carried out to the retaining wall, the size of the wallboard is determined according to the result of the force analysis.By way of to the retaining wall modeling Simulation, the force analysis is carried out.It is combined by way of prefabricated panel and cast-in-place pile foundation, makes the form of construction work diversification of retaining wall, adapt to various complicated landforms and the construction application of geological conditions;Avoid concrete unnecessary waste during wallboard is poured simultaneously;Further, the stressing conditions of retaining wall are analyzed by machine software modeling Simulation, determine stress concentrated area, and increase the security performance of retaining wall entirety by strengthening concrete strength or strengthening the modes such as arrangement reinforcing bar when prefabricated in this region.

Description

Pile foundation earth-retaining wall construction method
Technical field
The present invention relates to Geotechnical Engineering field, in particular to a kind of pile foundation earth-retaining wall construction method.
Background technology
At present, it for existing retaining wall, mostly constructs using by pile foundation and retaining wall integral production, and construct at the scene Be all based on cast-in-place, it is single for the wall form used mostly in same engineering construction, and use it is cast-in-place build it is time-consuming and laborious, And construction quality can not ensure, leverage project progress.
Invention content
In consideration of it, the present invention proposes a kind of pile foundation earth-retaining wall construction method, it is intended to solve to construct by condition in retaining wall During limitation, the problem of retaining wall is made to adapt to different places, improves the safety of retaining wall.
On one side, the present invention proposes a kind of pile foundation earth-retaining wall construction method, including:The wallboard of prefabricated retaining wall;It pours Build concrete pile body;The wallboard and the pile body are connected as one, form the pile foundation retaining wall.
Further, the cushion cap on the pile body top is poured according to the size of the wallboard.
Further, force analysis is carried out to the retaining wall, the wallboard is determined according to the result of the force analysis Size.
Further, by way of to the retaining wall modeling Simulation, the force analysis is carried out.
Further, quality graphic data in base area carries out the modeling Simulation.
Further, when pouring the cushion cap, remain for connecting the connection reinforcing bar of the wallboard in advance.
Further, it when making the wallboard, reserves and connects the corresponding connecting hole of reinforcing bar with described, pass through the company The cooperation of reinforcing bar and connecting hole is connect, so that the cushion cap is connected as one with the wallboard.
Further, the mode being in the milk by using sleeve, the reserved steel bar and the preformed hole are poured and are integrated.
Further, which is characterized in that the security performance of the retaining wall is determined according to the force analysis result.
Further, by strengthening concrete strength, with enhance the security performance of the retaining wall and/or, pass through reinforcement The specification and/or quantity of the reinforcing bar of arrangement, to enhance the security performance.
Beneficial effects of the present invention are:It is combined by way of prefabricated panel and cast-in-place pile foundation, makes the construction party of retaining wall Formula diversification, adapts to various complicated landforms and the construction application of geological conditions;Avoiding concrete is pouring wallboard mistake simultaneously Unnecessary waste in journey;Further, the stressing conditions of retaining wall are analyzed by machine software modeling Simulation, determine stress collection Middle region, and increase retaining wall entirety by strengthening concrete strength or strengthening the modes such as arrangement reinforcing bar when prefabricated in this region Security performance.
Description of the drawings
By reading the detailed description of hereafter preferred embodiment, it is various other the advantages of and benefit it is common for this field Technical staff will become clear.Attached drawing is only used for showing the purpose of preferred embodiment, and is not considered as to the present invention Limitation.And throughout the drawings, the same reference numbers will be used to refer to the same parts.In the accompanying drawings:
Fig. 1 is the flow chart of pile foundation earth-retaining wall construction method of the embodiment of the present invention;
Fig. 2 is the constructing structure figure of pile foundation earth-retaining wall construction method of the embodiment of the present invention.
Specific embodiment
The exemplary embodiment of the disclosure is more fully described below with reference to accompanying drawings.Although the disclosure is shown in attached drawing Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here It is limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure Completely it is communicated to those skilled in the art.It should be noted that in the absence of conflict, embodiment in the present invention and Feature in embodiment can be combined with each other.The present invention will be described in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
As shown in fig.1, it is the flow chart of pile foundation earth-retaining wall construction method of the embodiment of the present invention.Stake described in the present embodiment Base earth-retaining wall construction method, includes the following steps:
Step S101, the wallboard of prefabricated retaining wall;
Step S102, casting concrete pile body;
Step S103, wallboard and pile body are connected as one.
Specifically, step S101, the wallboard of prefabricated retaining wall.According to the pile foundation retaining wall of design, with reference to practical work The condition of the geology landform of journey need to set the position of retaining wall, by using modeling software, modeling Simulation is carried out to retaining wall It calculates, to calculate the stress concentrated area of retaining wall.Specifically, establish the model of retaining wall, by this model is carried out by Power is analyzed, and obtains analysis result, and determines according to the analysis result obtained the size of the wallboard 1 of retaining wall.According to the ruler of wall The wallboard 1 of very little prefabricated retaining wall, can be according to different analysis results, prefabricated different classes of wallboard 1, to meet practical need It asks.The process of prefabricated panel 1 can be made in identical place, can also at the construction field (site) other than factory in into Row is uniformly manufactured, and so as to which the time needed for cast-in-place walling plate be greatly saved, while the time has been saved, is improved and is applied Work efficiency rate.
Specifically, step S102, casting concrete pile body.After 1 prefabricated completion of wallboard or in prefabricated process In, carry out the working procedure of pile foundation.When carrying out pile foundation construction, according to fixed design, stake holes, stake are excavated in scheduled position Hole sets stake holes armlet, and bar construction is placed in stake holes after the completion of excavating in stake holes, and carries out concrete to pile body 5 and pour It builds.In the cushion cap 4 for pouring 5 top of pile body, cushion cap 4 is poured according to the size of wallboard 1, is poured with specific reference to the thickness of wallboard 1 Cushion cap 4 so that wallboard 1 can be effectively positioned on cushion cap 4, and makes wallboard 1 be connected as one with cushion cap 4.
Specifically, step S103, wallboard and pile body are connected as one.After cushion cap 4 is poured and finished, by dry wall Plate 1 is lifted to cushion cap 4, and the two is fixed.Specifically, when pouring cushion cap 4, remain for the connection of connection wall plate 1 in advance Reinforcing bar 3 lengthens the bar construction of pile body 5 with the part that cushion cap 4 is connect, so that the reinforcing bar can expose cushion cap 4 surface makes reinforcing bar expose certain length to form connection reinforcing bar 3;Simultaneously when making wallboard 1, on wallboard 1 reserve and 3 corresponding connecting hole 2 of reinforcing bar is connected, by connecting the cooperation of reinforcing bar 3 and connecting hole 2, so that cushion cap 4 is connect with wallboard 1 It being integrated, the diameter of connecting hole 2 is more than the diameter of connection reinforcing bar 3, while the length of connecting hole 2 is more than the length of connection reinforcing bar 3, So that connection reinforcing bar 3 can be arranged in connecting hole 2.When wallboard 1 and cushion cap 4 are fixed together, specifically using sleeve Preformed hole on reserved steel bar on cushion cap 4 and wallboard 1 is poured and is integrated by the mode of grouting.
It is understood that the present embodiment uses the form that cast-in-place pile foundation is combined with prefabricated panel 1 so that retaining wall shape Formula realizes diversification in construction, adapts to various complicated landforms and the construction application of geological conditions.
As shown in fig.2, the constructing structure figure of pile foundation earth-retaining wall construction method of the embodiment of the present invention.Pile foundation is poured, makes stake Bar construction in hole is connect with cushion cap 4, and a part of reinforcing bar of bar construction is lengthened, and reveals the reinforcing bar of elongated portion Go out the surface of cushion cap 4, the reinforcing bar of exposing is to connect reinforcing bar 3, to be connect with prefabricated panel 1.In prefabricated panel 1 and cushion cap 4 Connecting hole 2 is set at the position of connection, and connecting hole 2 is configured relatively with connecting reinforcing bar 3 so that connection reinforcing bar 3 can be complete It is threaded through in connecting hole 2, and reinforcing bar 3 and connecting hole 2 will be connected by the method that sleeve is in the milk and are fixed together, so that wallboard 1 and cushion cap 4 be connected as one.Specifically, 4 cross section of cushion cap is set as and the corresponding concave shape in 1 cross section of wallboard so that wall Plate 1 stronger can be fixed on cushion cap 4.
Further, the side of prefabricated panel 1 is provided with grouting mouth 6, and 6 top of grouting mouth is provided with thick liquid discharge mouth 7, and be in the milk mouth 6 and thick liquid discharge mouth 7 be arranged in parallel, connected respectively with connecting hole 2, and be vertically arranged with connecting hole 2, grouting mouth 6 is to connecting hole 2 Connecting hole 2 and connection reinforcing bar 3 are poured and are integrated by interior injection slurries;When filling slurries in connecting hole 2, pass through thick liquid discharge mouth 7 Connecting hole 2 is discharged, meanwhile, by setting thick liquid discharge mouth 7 that can also make the air circulation in connecting hole 2, to reduce into connecting hole 2 The air pressure generated during slip casting is had resulted in when pouring connecting hole 2, pours not exclusively, has hollow space in connecting hole 2 Situation.Each connecting hole 2 is both provided with grouting mouth 6 and thick liquid discharge mouth 7, and all grouting mouths 6 and thick liquid discharge mouth 7 are arranged at prefabricated panel 1 the same side alternatively, 2 inside of all connecting holes connects, only sets grouting mouth 6 and thick liquid discharge mouth 7, to carry out on a connecting hole 2 Connecting hole 2 pours.Specifically, grouting mouth 6 is arranged on the downside of connecting hole 2, thick liquid discharge mouth 7 is arranged on the upside of connecting hole 2, leads to Mode after from bottom to up is attached pouring for hole 2.
Specifically, according to the force analysis of modeling Simulation as a result, determining the security performance of retaining wall.When retaining wall according to When existing design is set, if analysis result meets code requirement for security performance, earth-retaining is carried out according to current set-up mode The prefabricated construction of wall;If analysis result does not meet code requirement for security performance, by changing existing design, to improve earth-retaining The security performance of wall, specifically, by strengthening concrete strength, with the security performance for enhancing retaining wall or by strengthening cloth The specification and/or quantity for the reinforcing bar put to enhance the security performance, can also strengthen concrete strength and strengthen arranging simultaneously Reinforcing bar specification and strengthen simultaneously concrete strength and strengthen arrangement reinforcing bar quantity.
It is understood that the present embodiment is combined by way of prefabricated panel and cast-in-place pile foundation, make the construction of retaining wall Mode diversification, adapts to various complicated landforms and the construction application of geological conditions;Avoiding concrete is pouring wallboard simultaneously Unnecessary waste in the process;Further, the stressing conditions of retaining wall are analyzed by machine software modeling Simulation, determine stress Concentrated area, and in this region by strengthening concrete strength or strengthening the modes such as arrangement reinforcing bar when prefabricated to increase retaining wall whole The security performance of body.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art God and range.In this way, if these modifications and changes of the present invention belongs to the range of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to include these modifications and variations.

Claims (10)

1. a kind of pile foundation earth-retaining wall construction method, which is characterized in that including:
The wallboard of prefabricated retaining wall;
Casting concrete pile body;
The wallboard and the pile body are connected as one, form the pile foundation retaining wall.
2. pile foundation earth-retaining wall construction method according to claim 1, which is characterized in that poured according to the size of the wallboard The cushion cap on the pile body top.
3. pile foundation earth-retaining wall construction method according to claim 2, which is characterized in that stress point is carried out to the retaining wall Analysis determines the size of the wallboard according to the result of the force analysis.
4. pile foundation earth-retaining wall construction method according to claim 3, which is characterized in that by modeling mould to the retaining wall The mode of plan carries out the force analysis.
5. pile foundation earth-retaining wall construction method according to claim 4, which is characterized in that base area quality graphic data carries out institute State modeling Simulation.
6. pile foundation earth-retaining wall construction method according to claim 5, which is characterized in that when pouring the cushion cap, reserve For connecting the connection reinforcing bar of the wallboard.
7. pile foundation earth-retaining wall construction method according to claim 6, which is characterized in that when making the wallboard, reserve With it is described connection the corresponding connecting hole of reinforcing bar, by it is described connection reinforcing bar and connecting hole cooperation so that the cushion cap with The wallboard is connected as one.
8. pile foundation earth-retaining wall construction method according to claim 7, which is characterized in that the side being in the milk by using sleeve The reserved steel bar and the preformed hole are poured and are integrated by formula.
9. according to claim 3-8 any one of them pile foundation earth-retaining wall construction methods, which is characterized in that according to the stress point Analysis result determines the security performance of the retaining wall.
10. pile foundation earth-retaining wall construction method according to claim 9, which is characterized in that by strengthening concrete strength, with Enhance the retaining wall security performance and/or,
Specification and/or quantity by the reinforcing bar for strengthening arrangement, to enhance the security performance.
CN201711424024.XA 2017-12-25 2017-12-25 Pile foundation earth-retaining wall construction method Pending CN108130917A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711424024.XA CN108130917A (en) 2017-12-25 2017-12-25 Pile foundation earth-retaining wall construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711424024.XA CN108130917A (en) 2017-12-25 2017-12-25 Pile foundation earth-retaining wall construction method

Publications (1)

Publication Number Publication Date
CN108130917A true CN108130917A (en) 2018-06-08

Family

ID=62392491

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711424024.XA Pending CN108130917A (en) 2017-12-25 2017-12-25 Pile foundation earth-retaining wall construction method

Country Status (1)

Country Link
CN (1) CN108130917A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108755728A (en) * 2018-06-22 2018-11-06 中船第九设计研究院工程有限公司 A method of it is connect with pile foundation for launching way beam
CN113502841A (en) * 2021-08-17 2021-10-15 中铁二院工程集团有限责任公司 Integral cast-in-place construction method of bearing platform pile

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0305258A1 (en) * 1987-08-12 1989-03-01 Pascal Louis Prefabricated elements for building walls and wallings, especially retaining walls
CN103572775A (en) * 2012-07-30 2014-02-12 深圳市工勘岩土工程有限公司 Semi-assembly type retaining wall of soil filling slope and construction method for semi-assembly type retaining wall
CN205999907U (en) * 2016-08-30 2017-03-08 中国建筑西南勘察设计研究院有限公司 Pile load retaining wall wall retaining structure
CN107059773A (en) * 2017-05-27 2017-08-18 中交第三航务工程勘察设计院有限公司 Assembled integral revetment structure and its construction method on a kind of soft soil foundation
CN107100180A (en) * 2017-06-29 2017-08-29 湖南工业大学 Superelevation light supporting structure and improvement high roadbed, the method for high slope engineering

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0305258A1 (en) * 1987-08-12 1989-03-01 Pascal Louis Prefabricated elements for building walls and wallings, especially retaining walls
CN103572775A (en) * 2012-07-30 2014-02-12 深圳市工勘岩土工程有限公司 Semi-assembly type retaining wall of soil filling slope and construction method for semi-assembly type retaining wall
CN205999907U (en) * 2016-08-30 2017-03-08 中国建筑西南勘察设计研究院有限公司 Pile load retaining wall wall retaining structure
CN107059773A (en) * 2017-05-27 2017-08-18 中交第三航务工程勘察设计院有限公司 Assembled integral revetment structure and its construction method on a kind of soft soil foundation
CN107100180A (en) * 2017-06-29 2017-08-29 湖南工业大学 Superelevation light supporting structure and improvement high roadbed, the method for high slope engineering

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李守巨等: "《例解钢筋连接方法》", 30 June 2016, 知识产权出版社 *
王全逵等: "两端悬臂式预应力挡土墙设计与施工", 《天津建设科技》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108755728A (en) * 2018-06-22 2018-11-06 中船第九设计研究院工程有限公司 A method of it is connect with pile foundation for launching way beam
CN113502841A (en) * 2021-08-17 2021-10-15 中铁二院工程集团有限责任公司 Integral cast-in-place construction method of bearing platform pile
CN113502841B (en) * 2021-08-17 2023-01-20 中铁二院工程集团有限责任公司 Integral cast-in-place construction method of bearing platform pile

Similar Documents

Publication Publication Date Title
CN106013530B (en) The reinforcement structure of concrete shear force wall based on 3D printing
CN104120788B (en) A kind of reinforced concrete structure and construction method based on 3D printing
CN109403458A (en) Novel pre-fabricated one
CN109837831A (en) A kind of centrifugation prefabricated assembled concrete bridge pier and construction method
CN105926804A (en) Reinforcement method of 3D printed reinforced masonry shear wall
CN106894587A (en) Precast stair connection method
CN108130917A (en) Pile foundation earth-retaining wall construction method
CN206328954U (en) Node pouring structure between prefabricated assembled post and post
CN106639305A (en) Constructional column steel template capable of being lifted in slipping mode and construction method thereof
CN104911999B (en) Buried anchor construction method
CN103362312B (en) Prop up the method for concrete component enhancing ring and for the support member of this enhancing ring
CN107675838A (en) Assembled architecture sidewalk brick precast beam embedded sleeve barrel joint bar construction method
CN106703291A (en) Joint pouring structure between prefabricated columns and construction method thereof
CN207526118U (en) For pre-buried and closure unwrapping wire hole unwrapping wire punch die
CN206554428U (en) A kind of precast stair connecting node
CN107574934A (en) Fabricated shear wall embedded sleeve barrel joint bar construction method
CN211922151U (en) Connection structure of crashproof kerbstone and lane board in shield tunnel
CN203947570U (en) A kind of reinforced concrete structure of printing based on 3D
CN203669189U (en) Novel concrete hollow block
CN209397710U (en) Novel pre-fabricated one
CN210104719U (en) Pile platform integrated into one piece's integrated basis
CN110468681A (en) A kind of unit construction bridge girder construction and construction method
CN110388116A (en) A kind of preparation engineering method of prefabricated assembled shock isolating pedestal
CN109338898A (en) A kind of unit construction bridge beam construction method
JP6740064B2 (en) Construction method of concrete frame

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180608