CN110388116A - A kind of preparation engineering method of prefabricated assembled shock isolating pedestal - Google Patents
A kind of preparation engineering method of prefabricated assembled shock isolating pedestal Download PDFInfo
- Publication number
- CN110388116A CN110388116A CN201910701721.8A CN201910701721A CN110388116A CN 110388116 A CN110388116 A CN 110388116A CN 201910701721 A CN201910701721 A CN 201910701721A CN 110388116 A CN110388116 A CN 110388116A
- Authority
- CN
- China
- Prior art keywords
- steel slab
- isolating pedestal
- shock isolating
- embedded steel
- stud
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000035939 shock Effects 0.000 title claims abstract description 65
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 title claims abstract description 58
- 238000002360 preparation method Methods 0.000 title claims abstract description 26
- 238000012407 engineering method Methods 0.000 title claims abstract description 25
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 78
- 239000010959 steel Substances 0.000 claims abstract description 78
- 239000004567 concrete Substances 0.000 claims abstract description 45
- 238000010276 construction Methods 0.000 claims abstract description 33
- 230000002787 reinforcement Effects 0.000 claims abstract description 26
- 238000000034 method Methods 0.000 claims abstract description 18
- 238000000465 moulding Methods 0.000 claims abstract description 14
- 238000009434 installation Methods 0.000 claims abstract description 12
- 238000004519 manufacturing process Methods 0.000 claims abstract description 10
- 238000005266 casting Methods 0.000 claims abstract description 7
- 238000009415 formwork Methods 0.000 claims abstract description 7
- 230000008569 process Effects 0.000 claims description 7
- 238000003466 welding Methods 0.000 claims description 5
- 239000011083 cement mortar Substances 0.000 claims description 3
- 238000009417 prefabrication Methods 0.000 abstract description 14
- 238000009413 insulation Methods 0.000 description 15
- 230000000694 effects Effects 0.000 description 11
- 238000005516 engineering process Methods 0.000 description 9
- 238000011065 in-situ storage Methods 0.000 description 5
- 238000002955 isolation Methods 0.000 description 5
- 239000011178 precast concrete Substances 0.000 description 5
- 238000010923 batch production Methods 0.000 description 4
- 210000003205 muscle Anatomy 0.000 description 4
- 244000046052 Phaseolus vulgaris Species 0.000 description 3
- 235000010627 Phaseolus vulgaris Nutrition 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 238000004873 anchoring Methods 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 2
- 230000015271 coagulation Effects 0.000 description 2
- 238000005345 coagulation Methods 0.000 description 2
- 230000006835 compression Effects 0.000 description 2
- 238000007906 compression Methods 0.000 description 2
- 238000011109 contamination Methods 0.000 description 2
- 230000002708 enhancing effect Effects 0.000 description 2
- 210000001320 hippocampus Anatomy 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000007711 solidification Methods 0.000 description 2
- 230000008023 solidification Effects 0.000 description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 1
- 241000209140 Triticum Species 0.000 description 1
- 235000021307 Triticum Nutrition 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 238000004026 adhesive bonding Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 235000013312 flour Nutrition 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H9/00—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
- E04H9/02—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
- E04H9/021—Bearing, supporting or connecting constructions specially adapted for such buildings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Business, Economics & Management (AREA)
- Emergency Management (AREA)
- Environmental & Geological Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Rod-Shaped Construction Members (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
The present invention provides a kind of preparation engineering methods of prefabricated assembled shock isolating pedestal, comprising the following steps: step 1: built-in bolt sleeve is fixed on the top surface of upper pre-embedded steel slab by pre-embedded steel slab in preparation;Step 2: Reinforcement and lateral stressed stirrup are arranged on upper pre-embedded steel slab;Step 3: installation formwork for placing forms column tenon pouring molding chamber and cross groove pouring molding chamber;Step 4: casting concrete is completed upper stud on upper pre-embedded steel slab and is poured, carries out rough surface production in concrete initial set period;Step 5: prefabricated upper stud will be completed and installed on shock isolating pedestal by upper pre-embedded steel slab and built-in bolt sleeve.Pass through above-mentioned engineering method, using the method for prefabrication, it stud can be directly installed on existing shock isolating pedestal on Jia Ang, so that the simplification that upper stud is constructed at the scene, reduce the wet construction of site operation, spillage and the pollution problem of cast-in-place operation are solved, while realizing the standardized designs of upper stud, improves speed of application.
Description
Technical field
The present invention relates to shock insulation and prefabrication and assembly construction technical field more particularly to a kind of preparations of prefabricated assembled shock isolating pedestal
Engineering method.
Background technique
Concrete prefabricated mounting technology is that traditional construction site cast-in-place concrete is changed into prefabrication, on-site assembly
Architecture production technology.Building trade can be reduced energy consumption, be shortened the construction period using prefabrication and assembly construction technology with water-saving and electricity-saving, more important
Be prefabrication often because have preferable mold and making condition, can make prefabricated components that there is more reliable quality.If
Meter standardization, production plant are the distinguishing features of prefabrication and assembly construction technology, and therefore, the type of only prefabricated components is few, quantity reaches
When to scale, superiority is just more obvious, otherwise be easy to cause mold type more, amortizes at high cost, and production efficiency is low etc. asks
Topic.
Seismic isolation technology is that Seismic Isolation of Isolation Layer is arranged between main structure body and basis, significantly reduces geological process to superstructure
Transmitting reduce earthquake to reduce superstructure earthquake response, play the role of protecting superstructure, while using shock insulation
The structure of technology can be designed using reduced seismic behavior, more be saved using superstructure materials, and cost more passes through
Ji property.But due to the setting of shock-insulation rubber cushion, complexity is constructed using Seismic Isolation of Isolation Layer bean column node, site operation difficulty is larger, shock insulation
The construction problems such as rubber pad deviations, column cap template spillage pollution shock-insulation rubber cushion often occur.
In view of this, it is proposed that a kind of preparation engineering method of prefabricated assembled shock isolating pedestal solves the above problems.
Summary of the invention
The purpose of the present invention is to provide a kind of preparation engineering methods of prefabricated assembled shock isolating pedestal, are produced by this engineering method
A kind of simple structure, convenient for standardized designs, the shock isolating pedestal of batch production batch production, assembled in situization construction, to realize
The site operation of high quality.
The technology that the present invention uses is:
A kind of preparation engineering method of prefabricated assembled shock isolating pedestal, comprising the following steps:
Step 1: built-in bolt sleeve is fixed on the top surface of upper pre-embedded steel slab by pre-embedded steel slab in preparation;
Step 2: Reinforcement and lateral stressed stirrup are arranged on upper pre-embedded steel slab;
Step 3: installation formwork for placing forms column tenon pouring molding chamber and cross groove pouring molding chamber;
Step 4: casting concrete is completed upper stud on upper pre-embedded steel slab and is poured, carries out rough surface in concrete initial set period
Production;
Step 5: prefabricated upper stud will be completed and installed on shock isolating pedestal by upper pre-embedded steel slab and built-in bolt sleeve.
By above-mentioned engineering method, a kind of upper stud taking pre-embedded steel slab is prepared using a kind of method of prefabrication, it can
To be directly installed on existing shock isolating pedestal, so that the simplification that upper stud is constructed at the scene, reduces the wet work of site operation
Industry solves spillage and the pollution problem of cast-in-place operation, while realizing the standardized designs of upper stud, improves speed of application.
As advanced optimizing for scheme, step 4 the following steps are included:
Step 4.1: the casting concrete since column tenon top is vibrated, is conserved;
Step 4.2: rough surface being set in column tenon top surface, column tenon medial surface and cross groove top surface, guarantees the area of rough surface
More than or equal to the 80% of faying face, the concave-convex depth of rough surface is more than or equal to 6mm.
By the way that rough surface appropriate is arranged, the cohesive force between precast concrete and cast-in-place concrete can be increased, guaranteed
Reliable power transmission at conjunction old and new concret face is of great significance to the bearing capacity and stiffness for guaranteeing bean column node, when setting is thick
When matte reaches the two indexes, support overall construction can guarantee that node area is equal to cast-in-place concrete node, adopt structure design
Computation model and actual conditions are more coincide.
As advanced optimizing for scheme, step 4.2 the following steps are included:
Step 4.2.1: rough surface is made using plucking method in column tenon top surface, using plucking equipment construction, handles plucking process
In dross;
Step 4.2.2: column tenon medial surface and cross groove top surface use undisguised material legal system to make rough surface, in the position template
Brush appropriate retarder in side;After concrete initial set, demoulding, take measures to rinse out non-condensing cement mortar.
As advanced optimizing for scheme, step 3 the following steps are included:
Step 3.1: installing stud side form, column tenon inside side form, form column tenon pouring molding chamber;
Step 3.2: cross groove backform being installed, stud side form and column tenon inside side form form cross groove molding in cooperation
Chamber.
It is attached using tenon structure and shear wall bottom joist, increases the shared part of connection, improve connection effect.
As advanced optimizing for scheme, step 2 the following steps are included:
Step 2.1: arranging lateral stressed stirrup and Reinforcement in column tenon region, form column tenon hog frame;
Step 2.2: arranging Reinforcement in cross groove region.
As advanced optimizing for scheme, step 3.2 the following steps are included:
Step 3.2.1: the Reinforcement in cross groove region is passed through into cross groove backform.
As advanced optimizing for scheme, step 4 is further comprising the steps of:
Step 4.3: removing formwork for placing, arranged on the Reinforcement in cross groove region criss-cross lateral stressed
Stirrup forms cross hog frame.
As advanced optimizing for scheme, step 5 the following steps are included:
Step 5.1: the upper stud for completing cohesion is placed on the upper junction steel plate of shock isolating pedestal;
Step 5.2: upper junction steel plate being mounted on upper pre-embedded steel slab in built-in bolt sleeve by bolt.
As advanced optimizing for scheme, step 1 the following steps are included:
Step 1.1: built-in bolt sleeve is located on the top surface of upper pre-embedded steel slab by pre-embedded steel slab in preparation;
Step 1.2: using welding manner, built-in bolt sleeve is fixed on upper pre-embedded steel slab;
Step 1.3: the vertical fixed die station of setting, mouth is placed in setting on end template, place mouth size and upper pre-embedded steel slab
Outer dimension is consistent;
Step 1.4: upper pre-embedded steel slab being placed in the placement mouth on end template, adjustment bed die top mark height and upper pre-embedded steel slab top
Absolute altitude is consistent.
As advanced optimizing for scheme, step 4 is further comprising the steps of:
Step 4.4: embedded bar is installed on built-in bolt sleeve.
Compared with prior art, the beneficial effects of the present invention are:
Prefabricated shock isolating pedestal uses prefabrication, has more reliable concrete quality, due to using standardized designs, component
Process velocity can also be improved compared with site operation speed.
Upper stud special tectonic, it is cast-in-place concrete region that joint cores, which may be implemented, still, guarantees beam longitudinal stress steel
Muscle and slab muscle are penetrated through or are anchored at support, are provided with rough surface, support between precast concrete and cast-in-place concrete in addition
Overall construction can guarantee that node area is equal to cast-in-place concrete node, to realize the reliable delivery of component internal force.
Shock isolating pedestal is the finished product of prefabrication, and support assembly wet construction in construction site is few, can be with effective solution pop-up
Spillage pollutes the problem of shock isolating pedestal when column concrete cast-in-situ operation.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of the prefabricated assembled shock isolating pedestal applied to shear wall structure provided by the invention
One of;
Fig. 2 be a kind of structural schematic diagram of the prefabricated assembled shock isolating pedestal applied to shear wall structure provided by the invention it
Two;
Fig. 3 is the partial enlarged view of a-quadrant in Fig. 2;
Fig. 4 is a kind of top view of the prefabricated assembled shock isolating pedestal applied to shear wall structure provided by the invention;
Fig. 5 be a kind of structural schematic diagram of the prefabricated assembled shock isolating pedestal applied to shear wall structure provided by the invention it
Three;
Fig. 6 is the partial enlarged view of B area in Fig. 5.
Specific embodiment
The present invention is described in detail for each embodiment shown in reference to the accompanying drawing, but it should be stated that, these
Embodiment is not limitation of the present invention, those of ordinary skill in the art according to these embodiments made by function, method,
Or equivalent transformation or substitution in structure, all belong to the scope of protection of the present invention within.
In the description of the present embodiment, it is to be understood that term " center ", " longitudinal direction ", " transverse direction ", "upper", "lower",
The orientation or positional relationship of the instructions such as "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" is
It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of description the invention and simplifies description, rather than indicate
Or imply that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore cannot understand
For the limitation to the invention.
In addition, term " first ", " second ", " third " etc. are used for description purposes only, it is not understood to indicate or imply
Relative importance or the quantity for implicitly indicating indicated technical characteristic.The feature of " first ", " second " etc. is defined as a result,
It can explicitly or implicitly include one or more of the features.In the description of the invention, unless otherwise indicated,
The meaning of " plurality " is two or more.
Term " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, be also possible to removable
Connection is unloaded, or is integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, it can also be in
Between medium be indirectly connected, can be the connection inside two elements.For the ordinary skill in the art, can pass through
Concrete condition understands concrete meaning of the above-mentioned term in the invention.
Embodiment 1:
Referring to shown in attached drawing 1-6, a kind of preparation engineering method of prefabricated assembled shock isolating pedestal, comprising the following steps:
Step 1: built-in bolt sleeve 5 is fixed on the top surface of upper pre-embedded steel slab 3 by pre-embedded steel slab 3 in preparation;
Step 2: Reinforcement 41 and lateral stressed stirrup 42 are arranged on upper pre-embedded steel slab 3;
Step 3: installation formwork for placing forms column tenon pouring molding chamber and cross groove pouring molding chamber;
Step 4: casting concrete is completed upper stud 1 on upper pre-embedded steel slab 3 and is poured, carries out in concrete initial set period coarse
Wheat flour is made;
Step 5: prefabricated upper stud 1 will be completed and installed on shock isolating pedestal 2 by upper pre-embedded steel slab 3 with built-in bolt sleeve 5.
By above-mentioned engineering method, a kind of upper stud 1 taking pre-embedded steel slab 3 is prepared using a kind of method of prefabrication,
It can be directly installed on existing shock isolating pedestal 2, so that the simplification that upper stud 1 is constructed at the scene, reduces site operation
Wet construction solves spillage and the pollution problem of cast-in-place operation, while realizing the standardized designs of upper stud 1, improves construction speed
Degree.
As advanced optimizing for scheme, step 4 the following steps are included:
Step 4.1: casting concrete at the top of the column tenon 11 is vibrated, is conserved;
Step 4.2: rough surface being set in 11 top surface of column tenon, 11 medial surface of column tenon and 12 top surface of cross groove, guarantees rough surface
Area be greater than or equal to the 80% of faying face, the concave-convex depth of rough surface is more than or equal to 6mm.
By the way that rough surface appropriate is arranged, the cohesive force between precast concrete and cast-in-place concrete can be increased, guaranteed
Reliable power transmission at conjunction old and new concret face is of great significance to the bearing capacity and stiffness for guaranteeing bean column node, when setting is thick
When matte reaches the two indexes, support overall construction can guarantee that node area is equal to cast-in-place concrete node, adopt structure design
Computation model and actual conditions are more coincide.
As advanced optimizing for scheme, step 4.2 the following steps are included:
Step 4.2.1: rough surface is made using plucking method in 11 top surface of column tenon, using plucking equipment construction, handles plucking mistake
Dross in journey;
Step 4.2.2: 11 medial surface of column tenon and 12 top surface of cross groove are using undisguisedly expecting that legal system makees rough surface, in the position mould
Appropriate retarder is brushed on the inside of plate;After concrete initial set, demoulding, take measures to rinse out non-condensing cement mortar.
Rough surface setting is carried out using distinct methods for different contact surfaces.
As advanced optimizing for scheme, step 3 the following steps are included:
Step 3.1: installing 1 side form of stud, 11 inside side form of column tenon, form column tenon pouring molding chamber;
Step 3.2: 12 backform of cross groove being installed, it is recessed to form cross for 1 side form of stud and 11 inside side form of column tenon in cooperation
12 forming cavity of slot.
It is attached using tenon structure and shear wall bottom joist, increases the shared part of connection, improve connection effect.
As advanced optimizing for scheme, step 2 the following steps are included:
Step 2.1: arranging lateral stressed stirrup 42 and Reinforcement 41 in 11 region of column tenon, form column tenon hog frame 43;
Step 2.2: arranging Reinforcement 41 in 12 region of cross groove.
Column tenon hog frame 43 is arranged on column tenon 11, it is ensured that the intensity after molding of column tenon 11,12 region of cross groove
Reinforcement 41 can improve and the bonding strength of shear wall bottom joist.
As advanced optimizing for scheme, step 3.2 the following steps are included:
Step 3.2.1: the Reinforcement 41 in 12 region of cross groove is passed through into 12 backform of cross groove.
12 backform of cross groove is equipped with the through-hole stepped down for Reinforcement 41, passes through the size and use to through-hole
The method that rubber ring blocks, guarantee will not lead to the problem of spillage, guarantee the density of concrete formation.
As advanced optimizing for scheme, step 4 is further comprising the steps of:
Step 4.3: removing formwork for placing, arrange criss-cross transverse direction on the Reinforcement 41 in 12 region of cross groove
Stress stirrup 42 forms cross hog frame 44.
By forming cross hog frame 44, the bonding strength with shear wall bottom joist is further increased.
As advanced optimizing for scheme, step 5 the following steps are included:
Step 5.1: the upper stud 1 for completing cohesion is placed on the upper junction steel plate 22 of shock isolating pedestal 2;
Step 5.2: upper junction steel plate 22 being mounted on upper pre-embedded steel slab 3 in built-in bolt sleeve 5 by bolt.
As advanced optimizing for scheme, step 1 the following steps are included:
Step 1.1: built-in bolt sleeve 5 is located on the top surface of upper pre-embedded steel slab 3 by pre-embedded steel slab 3 in preparation;
Step 1.2: using welding manner, built-in bolt sleeve 5 is fixed on upper pre-embedded steel slab 3;
Step 1.3: the vertical fixed die station of setting, mouth is placed in setting on end template, place mouth size and upper pre-embedded steel slab 3
Outer dimension is consistent;
Step 1.4: upper pre-embedded steel slab 3 being placed in the placement mouth on end template, adjustment bed die top mark height and upper pre-embedded steel slab 3
Top mark is high consistent.
As advanced optimizing for scheme, step 4 is further comprising the steps of:
Step 4.4: embedded bar 6 is installed on built-in bolt sleeve 5.
The connection that installation embedded bar 6 can enhance upper stud 1 and upper pre-embedded steel slab 3 by built-in bolt sleeve 5 is strong
Degree.
In traditional technology, at the bottom of the shear wall in the work progress of joist, shock isolating pedestal 2 is in the subiculum poured
Continue to install on column, carries out pouring for pop-up column 1, wherein spillage, pollution and pop-up after being installed on shock isolating pedestal 2 again
The steam-cured of column 1 is all difficult point in industry, and construction quality is often not so good as the desired level of design.For this purpose, pacifying for cast in situs
The problem of dress, the invention proposes a kind of prefabricated assembled shock isolating pedestal applied to shear wall structure and its prepares engineering method,
In upper stud 1 and shock isolating pedestal 2 be prefabrication, its consistency and ratio of precision in-site installation, the raising for having poured matter, and
And energy batch making, the construction time is greatly reduced, while avoiding the Concrete contamination problem of shock-insulation rubber cushion 21.
The prefabricated assembled shock isolating pedestal prepared by above-mentioned engineering method, upper stud 1 is precast concrete quadrangular, along beam axis
Groove is arranged in line direction, tetragonous capital, and groove penetrates through quadrangular.It is still cast-in-place concrete that joint cores, which may be implemented, in the construction
Region guarantees that Reinforcement 41 and slab muscle are penetrated through or anchored at support;Quadrangular after groove is arranged is in groove height
Degree range forms four detached column tenons 11 as shown in the figure, and the independent longitudinal reinforcement of configuration and stirrup, column tenon 11 are recessed in column tenon 11
Rough surface is arranged on the inside of slot and top, and support overall construction can guarantee that node area is equal to cast-in-place concrete node, set structure
The computation model used and actual conditions are counted more to coincide.Lateral stressed longitudinal direction stirrup 42 and be in U-shape should be configured in upper stud 1
Steel bar stress 41, Reinforcement 41 do not turn off at groove interface, the lateral stressed stirrup 42, In of cast-in-place part " ten " font
It is installed after the solidification of stud 1 and rough surface setting in completion, arrangement of reinforcement can guarantee joint cores resistance to compression and shearing resistance carrying in stud
Power has preferable deposit.
Built-in bolt sleeve 5 is connected to pre-embedded steel slab 3 using fillet weld, and the side of welding built-in bolt sleeve 5 should court
To concrete side, the top surface of upper pre-embedded steel slab 3 and upper 1 bottom of stud are flat, embedded bar 6 and built-in bolt sleeve 5 one end upward
Using threaded connection.
Upper junction steel plate 22, shock-insulation rubber cushion and lower junction steel plate form vibration isolator rubber bearing, using the side of prefabrication
Formula production, guarantees consistency, and vibration isolator rubber bearing is connected by sleeve connection bolt in factory with prefabricated upper stud 1
It connects.
After the prefabricated shock isolating pedestal embodiment lifts in place at the construction field (site), using company identical with upper junction steel plate 22
It connects method sleeve connection bolt and shock isolating pedestal 2 is connect to the prefabricated shock isolating pedestal of completion with the lower pre-embedded steel slab in lower stud under
The assembly of portion's structure.
When prefabricated shock isolating pedestal and shear wall bottom joist carry out assembled connection, Prefabricated superposed beam or existing is can be used in joist
Beam is poured, beam bottom Bar Anchorage is pushed up in the cast-in-place region of the cross groove 12 of upper stud 1, beam bottom and floor bar in upper stud 1
Portion's perforation or anchoring, by cast-in-place concrete, joist and upper 1 node area of stud form cast-in-place core space, the top of column tenon 11 and side wall
The setting of rough surface can effectively increase the bite force of cast-in-place concrete and precast concrete, guarantee cast-in-place area's concrete and pre-
Concrete collective effect processed.
Conversion platform of the joist of prefabricated shock isolating pedestal support as top shear wall structure, in guarantee horizontal force and vertically
While the reliable delivery of power, from the suitable platform structurally provided for the anchoring of bottom shear force wall reinforcing steel bar again.
Embodiment 2:
It please refers to shown in Fig. 1-6, the difference of the present embodiment and embodiment 1 is that this gives a kind of using embodiment 1
The concrete structure design of the shock isolating pedestal 2 of engineering method preparation, shows the practical effect using above-mentioned construction method.
A kind of prefabricated assembled shock isolating pedestal applied to shear wall structure, including upper stud 1, upper pre-embedded steel slab 3 and every
Shake support 2, upper pre-embedded steel slab 3 is set to and upper 1 bottom of stud and connect with upper stud 1, shock isolating pedestal 2 including upper junction steel plate 22,
Lower junction steel plate 23 and shock-insulation rubber cushion 21, shock-insulation rubber cushion 21 be set between upper junction steel plate 22 and lower junction steel plate 23 and with
The two connection, upper junction steel plate 22 are connect with upper pre-embedded steel slab 3.
In traditional technology, at the bottom of the shear wall in the work progress of joist, shock isolating pedestal 2 is in the subiculum poured
Continue to install on column, carries out pouring for pop-up column 1, wherein spillage, pollution and pop-up after being installed on shock isolating pedestal 2 again
The steam-cured of column 1 is all difficult point in industry, and construction quality is often not so good as the desired level of design.For this purpose, pacifying for cast in situs
The problem of dress, the invention proposes a kind of prefabricated assembled shock isolating pedestals applied to shear wall structure, wherein upper stud 1 with every
Shake support 2 is prefabrication, its consistency and ratio of precision in-site installation, the raising for having poured matter, and can batch making,
The construction time is greatly reduced, while avoiding the Concrete contamination problem of shock-insulation rubber cushion 21.
In the present invention, effective, fast and accurate company is realized using the connection of upper junction steel plate 22 and upper pre-embedded steel slab 3
It connects, lower junction steel plate 23 is connect with the lower pre-embedded steel slab of lower stud, realizes live continuous, quickly installation.
The bracket of prefabricated can obtain better effect more steam-cured than scene in steam curing process, improve holding for bracket
Loading capability.The overall performance of bracket improves, and can effectively improve the overall performance of shear wall bottom joist.
Through the above scheme, in-site installation is carried out using the good bracket of pre-production and shock isolating pedestal 2, avoids tradition
Cast in situs the problem of bringing, shock-insulation rubber cushion 21 is connect with cylinder and is converted into upper pre-embedded steel slab 3 and upper junction steel plate 22
Connection, improves the precision of connection, while steel plate processing consistency is good, is especially suitable for industrial mass production.The type branch
Seat structure is simple, convenient for standardized designs, batch production batch production, assembled in situization construction, while can solve shock insulation
The job site problems such as 21 deviations of rubber pad, spillage pollution shock-insulation rubber cushion 21, to effectively solve to deposit in the prior art
The problem of.
As advanced optimizing for scheme, upper stud 1 further includes several lateral stressed stirrups 42 and several longitudinal stress steel
Muscle 41, lateral stressed stirrup 42 form hog frame 4 built in frame-type with Reinforcement 41, and built-in 4 part of hog frame is exposed
In the top of upper stud 1.Built-in hog frame 4 can increase the intensity of stud 1, carries out shear wall bottom joist in upper stud 1 and applies
Good connection structure is provided when work, is conducive to the connection of cast-in-place concrete Yu upper stud 1, exposed parts can enhance cast-in-place
The connection of concrete and upper stud 1 guarantees the structural stability after the completion of integral construction.
In the present embodiment, cross groove 12 is equipped at the top of upper stud 1,12 surrounding of cross groove forms four column tenons
11.Cross groove 12 and column tenon 11 can increase the contact area of stud 1 Yu shear wall bottom joist, improve connection effect,
Improve structural stability.Joinery and its construction can effectively improve the bonding strength of two connecting components, than directly carrying out coagulation on the whole
Soil has poured apparent connection effect and has been promoted, while cross groove 12 increases the exposed reinforcing bar part of built-in hog frame 4,
Be exactly shear wall bottom joist and bracket apokoinou construction more, connection effect between the two is obviously improved.All cross
It is not turned off at cross groove 12 to stress stirrup 42 and Reinforcement 41, arrangement of reinforcement can guarantee node in upper stud 1
Core space resistance to compression and shear-carrying capacity have preferable deposit.
As advanced optimizing for scheme, built-in hog frame 4 includes column tenon hog frame 43 and cross hog frame 44, column tenon
Hog frame 43 is set in column tenon 11, and cross hog frame 44 is set in cross groove 12.Cross hog frame 44 surrounds cross
12 periphery of connected in star is arranged, for enhancing and the bonding strength of shear wall bottom joist.It is directed to column tenon 11 and is provided with column
Tenon hog frame 43 realizes that upper stud 1 is held in the palm with shear wall bottom using cross hog frame 44 for enhancing 11 body structures of column tenon
The shared part of beam carries out reinforcement connection, guarantees that bonding strength between the two is sufficiently strong.
As advanced optimizing for scheme, upper stud 1 is cuboid, and the top surface of upper stud 1 is square;Column tenon 11 is length
The top surface of cube, column tenon 11 is square.The cylinder symmetry that cross section is square is strong, and force stability is strong, prefabrication process
The stress of middle generation is small.Using the upper stud 1 and column tenon 11 of symmetrical structure, when stress, the transmitting of power and the production of stress
It is raw uniform, it effectively prevent defect caused by local stress to generate.Symmetrical structure simultaneously, during concreting is molding
The stress of itself is few, and coagulation result is good.
As advanced optimizing for scheme, the size of 11 top surface of column tenon is the 1/3 of the size of upper 1 top surface of stud.Column tenon 11
With the equivalent width of cross groove 12, guarantee the constitutional balance of the two.It is closed by the size of control column tenon 11 and upper stud 1
System, so that integrally-built symmetry further strengthens, overall structure is balanced, and is guaranteeing that it is enough that cross groove 12 has
Connection area is used for while further pouring connection of shear wall bottom joist, guarantees that 11 size of column tenon will not be too small, guarantees
It is not easily damaged during the installation process.
In the present embodiment, the top surface of column tenon is equipped with medial surface and cross groove top surface and 12 top surface of cross groove
Rough surface, rough surface are evenly distributed with protrusion and pit.Cast-in-place concrete and pop-up of the rough surface for more shear wall bottom joist
The contact area of column 1, further increases connection effect.This support overall construction can guarantee that node area is equal to cast-in-place concrete section
Point, the computation model and actual conditions for using structure design more coincide, and realize the reliable power transmission of structure.Rough surface can also be protected
Card relies on rough contact surface also and can provide significantly even if gluing with bracket bad after cast-in-place concrete solidification
Connection function.
As advanced optimizing for scheme, protrusion and the depth of pit are more than or equal to 6mm.Too small depth can not accommodate existing
Rubble in pouring concrete, connection effect is not good enough, and increased contact area is not big enough.11 inside of column tenon and top setting are coarse
Face, rough surface and area are not less than the 80% of faying face, and rough surface bumps depth is not less than 6mm.
It in the present embodiment, further include built-in bolt sleeve 5, built-in bolt sleeve 5 is set to upper 3 top surface of pre-embedded steel slab, on
Pre-embedded steel slab 3 be equipped with the first mounting hole, upper junction steel plate 22 be equipped with the second mounting hole, built-in bolt sleeve 5, the first mounting hole and
The center line of second mounting hole three is overlapped.Using the sleeve of built-in type, can be completed when installation at the scene using bolt
The connection of upper stud 1 and shock isolating pedestal 2, without additional equipment such as welding.Using threaded connection, installation essence can be effectively improved
Degree, the quantity and type of equipment and tool that scene needs reduce, and construction site is cleaner and tidier, and construction efficiency is higher.
In summary, the prefabricated assembled shock isolating pedestal 2 that the present invention designs, it is contemplated that the shock design of frame structure is usual
It is position setting shock isolating pedestal 2 corresponding in frame column, internal force is transmitted with point-to-point simple form.The shock insulation of shear wall structure
Design is then to need to carry out Structure Calculation according to internal force transitive relation of the relative complex line to point.Realize this mentality of designing
Major section is exactly to pass through setting support wall conversion beam at the bottom of the shear wall, the beam often while bearing superstructure vertical force,
The significant horizontal power generated under geological process and wind action, the beam play a significant role for total.This hair
The groove that bright prefabricated shock isolating pedestal 2 is arranged can guarantee that the joist to cross forms cast-in-place region in support node core space, indulge
Can also be kept in groove continuously to steel bar stress 41, after the completion of floor and joist concrete cast in situs, joist with it is prefabricated
Shock isolating pedestal 2 can collective effect, form complete shear wall converting system, realize shear wall structure shock insulation.
The series of detailed descriptions listed above only for feasible embodiment of the invention specifically
Protection scope bright, that they are not intended to limit the invention, it is all without departing from equivalent implementations made by technical spirit of the present invention
Or change should all be included in the protection scope of the present invention.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie
In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter
From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power
Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims
Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped
Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should
It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
The other embodiments being understood that.
Claims (10)
1. a kind of preparation engineering method of prefabricated assembled shock isolating pedestal, which comprises the following steps:
Step 1: built-in bolt sleeve (5) is fixed on the top surface of upper pre-embedded steel slab (3) by pre-embedded steel slab (3) in preparation;
Step 2: Reinforcement (41) and lateral stressed stirrup (42) are arranged on upper pre-embedded steel slab (3);
Step 3: installation formwork for placing forms column tenon pouring molding chamber and cross groove pouring molding chamber;
Step 4: casting concrete is completed upper stud (1) on upper pre-embedded steel slab (3) and is poured, carries out in concrete initial set period
Rough surface production;
Step 5: prefabricated upper stud (1) will be completed by upper pre-embedded steel slab (3) and built-in bolt sleeve (5), shock isolating pedestal is installed
(2) on.
2. a kind of preparation engineering method of prefabricated assembled shock isolating pedestal according to claim 1, which is characterized in that the step
4 the following steps are included:
Step 4.1: the casting concrete since column tenon (11) top is vibrated, is conserved;
Step 4.2: rough surface being set in column tenon (11) top surface, column tenon (11) medial surface and cross groove (12) top surface, is guaranteed
The area of rough surface is greater than or equal to the 80% of faying face, and the concave-convex depth of rough surface is more than or equal to 6mm.
3. a kind of preparation engineering method of prefabricated assembled shock isolating pedestal according to claim 2, which is characterized in that the step
4.2 the following steps are included:
Step 4.2.1: rough surface is made using plucking method in column tenon (11) top surface, using plucking equipment construction, handles plucking
Dross in the process;
Step 4.2.2: column tenon (11) medial surface and cross groove (12) top surface are using undisguisedly expecting that legal system makees rough surface, in the portion
Appropriate retarder is brushed on the inside of the template of position;After concrete initial set, demoulding, take measures to rinse out non-condensing cement mortar.
4. a kind of preparation engineering method of prefabricated assembled shock isolating pedestal according to claim 3, which is characterized in that the step
3 the following steps are included:
Step 3.1: installing stud (1) side form, column tenon (11) inside side form, form column tenon pouring molding chamber;
Step 3.2: cross groove (12) backform being installed, stud (1) side form and column tenon (11) inside side form form ten in cooperation
Font groove (12) forming cavity.
5. a kind of preparation engineering method of prefabricated assembled shock isolating pedestal according to claim 4, which is characterized in that the step
2 the following steps are included:
Step 2.1: arranging lateral stressed stirrup (42) and Reinforcement (41) in column tenon (11) region, form column tenon and reinforce
Frame (43);
Step 2.2: arranging Reinforcement (41) in cross groove (12) region.
6. a kind of preparation engineering method of prefabricated assembled shock isolating pedestal according to claim 5, which is characterized in that the step
3.2 the following steps are included:
Step 3.2.1: the Reinforcement (41) in cross groove (12) region is passed through into cross groove (12) backform.
7. a kind of preparation engineering method of prefabricated assembled shock isolating pedestal according to claim 6, which is characterized in that the step
4 is further comprising the steps of:
Step 4.3: removing formwork for placing, arranged on the Reinforcement (41) in cross groove (12) region criss-cross
Lateral stressed stirrup (42) is formed cross hog frame (44).
8. a kind of preparation engineering method of prefabricated assembled shock isolating pedestal according to claim 7, which is characterized in that the step
5 the following steps are included:
Step 5.1: the upper stud (1) for completing cohesion is placed on the upper junction steel plate (22) of shock isolating pedestal (2);
Step 5.2: upper junction steel plate (22) being mounted on upper pre-embedded steel slab (3) in built-in bolt sleeve (5) by bolt.
9. a kind of preparation engineering method of prefabricated assembled shock isolating pedestal according to claim 8, which is characterized in that the step
1 the following steps are included:
Step 1.1: built-in bolt sleeve (5) is located on the top surface of upper pre-embedded steel slab (3) by pre-embedded steel slab (3) in preparation;
Step 1.2: using welding manner, built-in bolt sleeve (5) is fixed on upper pre-embedded steel slab (3);
Step 1.3: the vertical fixed die station of setting, mouth is placed in setting on end template, places size and upper pre-embedded steel slab (3) of mouth
Outer dimension it is consistent;
Step 1.4: upper pre-embedded steel slab (3) being placed in the placement mouth on end template, adjustment bed die top mark height and upper pre-buried steel
Plate (3) top mark is high consistent.
10. a kind of preparation engineering method of prefabricated assembled shock isolating pedestal according to claim 9, which is characterized in that the step
Rapid 4 is further comprising the steps of:
Step 4.4: embedded bar (6) being installed on built-in bolt sleeve (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910701721.8A CN110388116B (en) | 2019-07-31 | 2019-07-31 | Preparation method of prefabricated assembly type shock insulation support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910701721.8A CN110388116B (en) | 2019-07-31 | 2019-07-31 | Preparation method of prefabricated assembly type shock insulation support |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110388116A true CN110388116A (en) | 2019-10-29 |
CN110388116B CN110388116B (en) | 2024-04-30 |
Family
ID=68288083
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910701721.8A Active CN110388116B (en) | 2019-07-31 | 2019-07-31 | Preparation method of prefabricated assembly type shock insulation support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110388116B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113684929A (en) * | 2021-09-01 | 2021-11-23 | 中国建筑一局(集团)有限公司 | Seismic isolation support upper buttress node type steel stiff column overhead fixing structure and construction method |
Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002276196A (en) * | 2001-03-14 | 2002-09-25 | Nishimatsu Constr Co Ltd | Seismically isolated structure |
JP2004036086A (en) * | 2002-06-28 | 2004-02-05 | Takeyoshi Uematsu | Base isolation structuring method for existing building from ground |
JP2008002263A (en) * | 2006-05-22 | 2008-01-10 | Toshiyuki Kato | Base isolation device |
JP2010174569A (en) * | 2009-01-30 | 2010-08-12 | Sumitomo Forestry Co Ltd | Seismic response control bearing wall structure of building, and building |
CN102261129A (en) * | 2011-05-05 | 2011-11-30 | 杨东佐 | Beam column connecting piece used for building |
CN103850350A (en) * | 2014-03-14 | 2014-06-11 | 南京工业大学 | Prefabricated, assembled and integrated type special-shaped column structure and jointing construction method thereof |
CN106337503A (en) * | 2016-10-11 | 2017-01-18 | 云南震安减震科技股份有限公司 | Prefabricated compound shock isolation member for assembling type building |
CN206127746U (en) * | 2016-10-10 | 2017-04-26 | 中煤建设集团工程有限公司 | Isolation bearing handles accurate location structure of pre -buried steel sheet in back |
CN107620386A (en) * | 2017-10-23 | 2018-01-23 | 南京百西思建筑科技有限公司 | The installation constitution and construction method of shock isolating pedestal in existing building base isolation reinforcement |
CN207211412U (en) * | 2017-08-24 | 2018-04-10 | 上海昂创建筑减震科技有限公司 | A kind of assembled wall isolation structure |
CN108277889A (en) * | 2018-03-12 | 2018-07-13 | 西安建筑科技大学 | A kind of prefabrication and assembly construction steel reinforced concrete intercolumniation fast joint structure and method |
CN109267805A (en) * | 2018-09-28 | 2019-01-25 | 西北民族大学 | A kind of assembly node that rubber support is connect with up-down structure and construction method |
CN109322386A (en) * | 2018-11-30 | 2019-02-12 | 沈阳建筑大学 | Assembly concrete beam column dry type connector |
CN210768051U (en) * | 2019-07-31 | 2020-06-16 | 西部建筑抗震勘察设计研究院有限公司 | Be applied to prefabricated assembled isolation bearing of shear wall structure |
CN112523348A (en) * | 2020-12-17 | 2021-03-19 | 张延东 | Quick erection column connecting piece |
CN219033571U (en) * | 2023-01-09 | 2023-05-16 | 江苏华泰路桥建设集团有限公司 | Mortise and tenon type shock insulation support and wood column connection structure |
-
2019
- 2019-07-31 CN CN201910701721.8A patent/CN110388116B/en active Active
Patent Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002276196A (en) * | 2001-03-14 | 2002-09-25 | Nishimatsu Constr Co Ltd | Seismically isolated structure |
JP2004036086A (en) * | 2002-06-28 | 2004-02-05 | Takeyoshi Uematsu | Base isolation structuring method for existing building from ground |
JP2008002263A (en) * | 2006-05-22 | 2008-01-10 | Toshiyuki Kato | Base isolation device |
JP2010174569A (en) * | 2009-01-30 | 2010-08-12 | Sumitomo Forestry Co Ltd | Seismic response control bearing wall structure of building, and building |
CN102261129A (en) * | 2011-05-05 | 2011-11-30 | 杨东佐 | Beam column connecting piece used for building |
CN103850350A (en) * | 2014-03-14 | 2014-06-11 | 南京工业大学 | Prefabricated, assembled and integrated type special-shaped column structure and jointing construction method thereof |
CN206127746U (en) * | 2016-10-10 | 2017-04-26 | 中煤建设集团工程有限公司 | Isolation bearing handles accurate location structure of pre -buried steel sheet in back |
CN106337503A (en) * | 2016-10-11 | 2017-01-18 | 云南震安减震科技股份有限公司 | Prefabricated compound shock isolation member for assembling type building |
CN207211412U (en) * | 2017-08-24 | 2018-04-10 | 上海昂创建筑减震科技有限公司 | A kind of assembled wall isolation structure |
CN107620386A (en) * | 2017-10-23 | 2018-01-23 | 南京百西思建筑科技有限公司 | The installation constitution and construction method of shock isolating pedestal in existing building base isolation reinforcement |
CN108277889A (en) * | 2018-03-12 | 2018-07-13 | 西安建筑科技大学 | A kind of prefabrication and assembly construction steel reinforced concrete intercolumniation fast joint structure and method |
CN109267805A (en) * | 2018-09-28 | 2019-01-25 | 西北民族大学 | A kind of assembly node that rubber support is connect with up-down structure and construction method |
CN109322386A (en) * | 2018-11-30 | 2019-02-12 | 沈阳建筑大学 | Assembly concrete beam column dry type connector |
CN210768051U (en) * | 2019-07-31 | 2020-06-16 | 西部建筑抗震勘察设计研究院有限公司 | Be applied to prefabricated assembled isolation bearing of shear wall structure |
CN112523348A (en) * | 2020-12-17 | 2021-03-19 | 张延东 | Quick erection column connecting piece |
CN219033571U (en) * | 2023-01-09 | 2023-05-16 | 江苏华泰路桥建设集团有限公司 | Mortise and tenon type shock insulation support and wood column connection structure |
Non-Patent Citations (3)
Title |
---|
廖述江;: "叠层橡胶隔震支座与SRC柱脚连接研究与应用", 建筑结构, no. 22 * |
张苏玲;: "钢筋密集隔震下支墩施工质量控制", 山西建筑, no. 05 * |
马俊;葛杰;: "橡胶隔震支座施工难点及关键技术", 四川建筑科学研究, no. 02 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113684929A (en) * | 2021-09-01 | 2021-11-23 | 中国建筑一局(集团)有限公司 | Seismic isolation support upper buttress node type steel stiff column overhead fixing structure and construction method |
Also Published As
Publication number | Publication date |
---|---|
CN110388116B (en) | 2024-04-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103938864B (en) | Infilled wall Constructional Col-umn Construction engineering method | |
CN105442727A (en) | Compound type connection shear wall structure and assembling method thereof | |
CN106401207B (en) | The overlapping connection structure and its construction method on pillar basis are added for existing building | |
CN104963289B (en) | A kind of abnormity pier stud mass concrete overall time pouring construction method | |
CN106592440B (en) | A kind of construction method of prefabricated subsection type bridge pier | |
CN104631677B (en) | Super thick concrete hollow terrace gradation construction technology | |
CN211036679U (en) | Socket joint connection structure of prefabricated pier stud of assembled bridge and cushion cap | |
CN110273359A (en) | A kind of prefabricated bent cap and construction method of packaged type bridges | |
KR101274481B1 (en) | Pre-embedded anchor frame equipped with coupler and anchoring method of steel column thereof | |
CN201310150Y (en) | Constructional column for masonry structure and special precast blocks thereof | |
CN108755972B (en) | Foot pad for prefabricated part and using method thereof | |
CN103603435B (en) | A kind of assembly concrete antidetonation beam column frame and construction method thereof | |
CN206408515U (en) | Precast pier section assembling structure | |
CN110388116A (en) | A kind of preparation engineering method of prefabricated assembled shock isolating pedestal | |
CN210768051U (en) | Be applied to prefabricated assembled isolation bearing of shear wall structure | |
CN205677070U (en) | A kind of building frame construction | |
CN210421568U (en) | Assembled beam and plate structure | |
CN211143393U (en) | Frame for preparing assembly type concrete core-filled wall and assembly type concrete core-filled wall | |
CN105442855B (en) | A kind of high-precision buried equipment, method of large scale embedded board | |
CN101327614A (en) | Method for manufacturing pre-fabricated reinforced concrete plate with rib | |
CN206554428U (en) | A kind of precast stair connecting node | |
CN206016099U (en) | A kind of light prefabricated shears ladder of configuration butterfly beam | |
CN108775086A (en) | The additional assembled integral beam-column node structure and construction method for being closed connection reinforcing bar | |
CN212294729U (en) | Steel construction outsourcing column foot structure | |
CN208763207U (en) | The assembled integral beam-column node structure of additional closure connection reinforcing bar |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |