CN212294729U - Steel construction outsourcing column foot structure - Google Patents
Steel construction outsourcing column foot structure Download PDFInfo
- Publication number
- CN212294729U CN212294729U CN202020692634.9U CN202020692634U CN212294729U CN 212294729 U CN212294729 U CN 212294729U CN 202020692634 U CN202020692634 U CN 202020692634U CN 212294729 U CN212294729 U CN 212294729U
- Authority
- CN
- China
- Prior art keywords
- column
- box
- stirrup
- muscle
- basic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Foundations (AREA)
Abstract
The utility model discloses a steel construction outsourcing column foot structure, indulge muscle, case type post, vice muscle, middle level stirrup, bottom slip casting hole including basic bed course, basic cushion, bottom stirrup, main, the basic bed course is the cuboid structure, basic cushion is pour in basic bed course top center department, the bottom stirrup is pricked inside basic bed course, four the main muscle of indulging passes basic cushion and ties up on the stirrup of bottom, the case type post is fixed and is indulged inside the muscle, many four sides at case type post are encircleed to vice muscle of indulging, and the bottom is tied up on the stirrup of bottom, the middle level stirrup is tied up and is two in case type post and vice muscle center department of indulging two bottom slip casting hole is seted up in case type post below both sides, this construction process easy operation, easily promotes, application scope is extensive. No relevant quality problem is found in the consolidation period, the practical effect of the process is good, and the purpose of popularization and application is achieved.
Description
Technical Field
The utility model relates to a steel construction outsourcing column base structure.
Background
At present, along with the development of the construction industry, production workshops with high size and ultra-long span are more and more, and in a steel structure building, although the constructed bearing capacity is important, the node part is particularly important for the safety of the structure. In the column shoe of the steel structure, not the lower end of the column member but the lower end of the lowermost column member and the connection portion of the foundation concrete are referred to. The column foot effectively transmits the axial force, bending moment and shearing force borne by the lower end of the lowermost column to the foundation. The type in which the rigid nodes can be embedded, encased, exposed and buried in the whole assembly is called plug-in.
The existing mainstream foot injection construction mode is an embedded type, an embedded column foot is higher in fixation degree compared with other two column foot modes, and the bearing capacity is easier to ensure. If the steel column is designed to yield first, its restoring force characteristics exhibit stable full elastoplasticity. The length of the steel column in which the embedded column shoe is embedded in the foundation is increased, and the main beads within the width of the foundation beam cannot intersect with the inserted steel column and expand or bend into diagonal beads, etc., and the steel column shoe must be installed before the reinforcement of the foundation beam.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a steel construction outsourcing column base structure to solve above-mentioned technical problem.
In order to realize the purpose, the utility model adopts the following technical scheme:
the utility model provides a steel construction outsourcing column base structure, includes basic bed course, basic cushion cap, bottom stirrup, main muscle, box type post, vice muscle, middle level stirrup, bottom slip casting hole of indulging, the basic cushion layer is the cuboid structure, basic cushion cap is pour in basic bed course top center department, the bottom stirrup is pricked inside the basic cushion layer, four main muscle of indulging is passed basic cushion cap and is tied up on the bottom stirrup, the box type post is fixed and is indulged inside the muscle at four main, and many vice muscle of indulging encircles four sides at box type post, and the bottom is tied up on the bottom stirrup, the middle level stirrup is tied up and is two in box type post and vice muscle center department of indulging two the bottom slip casting hole is seted up in box type post below both sides.
On the basis of the technical scheme, the bottom stirrups are composed of a plurality of stirrups, the top steel plate is welded at the top, and four foundation bolts are welded at four corners of the top steel plate.
On the basis of the technical scheme, the box-type column comprises a top structure and top grouting holes, the top structure is fixedly connected to the top of the box-type column, and the two top grouting holes are formed in two side faces of the top structure.
On the basis of the technical scheme, the outer side of the box-type column is fixed with a short fixing column, a short column template and a protective film before shaping, the short column template is installed on the outer side of the box-type column, four short fixing columns are installed above the outer side of the short column template, and after all working procedures are finished, the outer side of the column is covered with the protective film for protection.
Compared with the prior art, the utility model has the advantages of it is following: the construction process is simple to operate, easy to popularize and wide in application range. No relevant quality problem is found in the consolidation period, the practical effect of the process is good, and the purpose of popularization and application is achieved.
Drawings
Fig. 1 is a schematic view of the appearance structure of the present invention.
Fig. 2 is the structural schematic diagram of the bottom stirrup of the present invention.
Fig. 3 is a schematic view of the structure of the box column of the present invention.
Fig. 4 is a schematic structural diagram of the outer side of the box column of the present invention.
In the figure: 1. the concrete structure comprises a foundation cushion layer, 2 a foundation cushion cap, 3 a bottom stirrup, 4 a main longitudinal rib, 5 a box-shaped column, 6 an auxiliary longitudinal rib, 7 a middle layer stirrup, 8 a bottom grouting hole, 9 a stirrup, 10 a top steel plate, 11 a foundation bolt, 12 a top structure, 13 a top grouting hole, 14 a fixing short column, 15 a short column template and 16 a protective film.
Detailed Description
The invention is explained in further detail below with reference to the figures and the embodiments.
As shown in fig. 1-4, a steel structure outsourcing column base structure, including basic cushion 1, basic cushion 2, bottom stirrup 3, main longitudinal reinforcement 4, box type post 5, vice longitudinal reinforcement 6, middle level stirrup 7, bottom slip casting hole 8, basic cushion 1 is the cuboid structure, basic cushion 2 is pour in 1 top center department of basic cushion, bottom stirrup 3 is pricked inside basic cushion 1, four main longitudinal reinforcement 4 passes basic cushion 2 and ties up on bottom stirrup 3, box type post 5 is fixed and is indulged inside muscle 4 at four main longitudinal reinforcements, many vice longitudinal reinforcement 6 encircles at four sides of box type post 5, and the bottom is tied up on bottom stirrup 3, middle level stirrup 7 is tied up at box type post 5 and vice longitudinal reinforcement 6 center department two bottom slip casting hole 8 is seted up in box type post 5 below both sides.
3 many stirrups of bottom stirrup 9 are constituteed, and the welding of top has top steel sheet 10, and four corner welding of top steel sheet 10 have four rag bolt 11.
The box column 5 comprises a top structure 12 and top grouting holes 13, the top structure is fixedly connected to the top of the box column 5, and the top grouting holes 13 are formed in two side faces of the top structure 12.
Before the box-type column 5 is shaped, a short column fixing template 14, a short column template 15 and a protective film 16 are fixed on the outer side of the box-type column 5, the short column template 15 is installed on the outer side of the box-type column 5, four short column fixing templates 14 are installed above the outer side of the short column template 15, and after all working procedures are finished, the outer side of the column is covered with the protective film 16 for protection.
The utility model discloses a theory of operation:
firstly, accurately positioning and paying off a foundation cushion layer after the foundation cushion layer is poured, facilitating binding of a bottom reinforcement of a steel bar and binding and mounting of a longitudinal reinforcement of a short column, and binding a stirrup of the short column to a foundation top for smooth hoisting and fixing of a steel structure box column;
the height of the outer wrapping column base is 1.5m-1.8 m on average, in order that the strength of concrete in the area can meet the design requirement, a circular grouting hole with the diameter of 200mm is formed in the position, measured on the column foot plate and out of the ground, of the column foot plate, so that the concrete in the steel structure box-type column can be closed conveniently, and the strength can meet the requirement;
in order to ensure the accuracy of the bolt position and ensure that the hoisting speed is influenced by the position problem during hoisting, steel plate with the thickness of about 5mm is adopted by steel structure construction teams to position and perforate the bolt according to drawings and related data (more than 5 perforating positioning plates are manufactured for each type of perforating positioning plate, so that the perforating positioning plates can be conveniently and alternately arranged);
the outsourcing column base conveying mode: the fine stone mortar pump adopts self-compacting concrete as concrete; during pouring, the pump pipe is inserted into a grouting hole on the ground, so that the aggregate is overflowed from the bottom to the top; then the template is beaten by manpower or a small vibrator is adopted.
The foregoing is a preferred embodiment of the present invention, and for those skilled in the art to understand the teaching of the present invention, the changes, modifications, replacements and variations to the embodiments will still fall within the protection scope of the present invention without departing from the principle and spirit of the present invention.
Claims (4)
1. The utility model provides a steel construction outsourcing column foot structure, includes basic bed course (1), basic cushion cap (2), bottom stirrup (3), main muscle (4), box column (5), vice muscle (6), middle level stirrup (7), bottom injected hole (8) of indulging, its characterized in that: the foundation cushion layer (1) is of a cuboid structure, the foundation cushion layer (2) is poured at the center of the top of the foundation cushion layer (1), the bottom stirrups (3) are tied inside the foundation cushion layer (1), four main longitudinal reinforcements (4) penetrate through the foundation cushion layer (2) and are tied up on the bottom stirrups (3), the box-shaped columns (5) are fixed inside the four main longitudinal reinforcements (4), a plurality of auxiliary longitudinal reinforcements (6) are surrounded on four sides of the box-shaped columns (5), the bottom of the box-shaped columns is tied up on the bottom stirrups (3), the middle-layer stirrups (7) are tied up at the centers of the box-shaped columns (5) and the auxiliary longitudinal reinforcements (6), and the bottom grouting holes (8) are formed in two sides below the box-shaped columns (5).
2. The steel structure outer covering column foot structure as claimed in claim 1, wherein: many stirrups (9) of bottom stirrup (3) are constituteed, and the top welding has top steel sheet (10), and four corner welding of top steel sheet (10) have four rag bolt (11).
3. The steel structure outer covering column foot structure as claimed in claim 1, wherein: the box column (5) comprises a top structure (12) and top grouting holes (13), wherein the top structure is fixedly connected to the top of the box column (5), and the top grouting holes (13) are formed in two side faces of the top structure (12).
4. The steel structure outer covering column foot structure as claimed in claim 1, wherein: the box type column is characterized in that a fixed short column (14), a short column template (15) and a protective film (16) are fixed on the outer side of the box type column (5) before shaping, the short column template (15) is installed on the outer side of the box type column (5), four fixed short columns (14) are installed above the outer side of the short column template (15), and after all working procedures are finished, the outer side of the column is covered with the protective film (16) for protection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020692634.9U CN212294729U (en) | 2020-04-30 | 2020-04-30 | Steel construction outsourcing column foot structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020692634.9U CN212294729U (en) | 2020-04-30 | 2020-04-30 | Steel construction outsourcing column foot structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212294729U true CN212294729U (en) | 2021-01-05 |
Family
ID=73964501
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020692634.9U Active CN212294729U (en) | 2020-04-30 | 2020-04-30 | Steel construction outsourcing column foot structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212294729U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115233750A (en) * | 2022-08-10 | 2022-10-25 | 中国十七冶集团有限公司 | Steel construction assembled basis short column measures positioner |
-
2020
- 2020-04-30 CN CN202020692634.9U patent/CN212294729U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115233750A (en) * | 2022-08-10 | 2022-10-25 | 中国十七冶集团有限公司 | Steel construction assembled basis short column measures positioner |
CN115233750B (en) * | 2022-08-10 | 2023-08-29 | 中国十七冶集团有限公司 | Steel construction assembled basis short column measurement positioner |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104831639A (en) | Consolidation and release construction method for 0# blocks of ultra-wide non-uniform continuous beam | |
CN212294729U (en) | Steel construction outsourcing column foot structure | |
CN107724540A (en) | Steel plate shear force wall and the attachment structure and its construction method of steel bar girder floor plates | |
CN104929047A (en) | V-shaped pier outer support construction method | |
CN108374522B (en) | Protective layer framework of building structure and plate member construction scheme thereof | |
CN104947853B (en) | A kind of Inner standpipe formula cast-in-situ reinforced concrete column and construction method | |
CN112376400B (en) | Wet joint structure of precast concrete beam and construction process thereof | |
CN204780635U (en) | Super wide nonprismatic continuous beam 0# piece concreties and relieves construction structures | |
CN201671063U (en) | Movable steel base for construction precast beams and standard knot thereof | |
CN112277153A (en) | Cavity wall and production method thereof | |
CN207121926U (en) | Pattern foundation pit supporting structure retaining wall | |
CN206825668U (en) | A kind of stretching bed seat of the bidirectional pre-tensioned prestressing force fragment-free track slab of high-speed railway | |
CN212426706U (en) | Fully-prefabricated light large cantilever preflex combined bent cap beam structure | |
CN206941628U (en) | A kind of construction site enclosing prefabricated foundation | |
CN212176547U (en) | Building floor bathroom falls board construction template device in building | |
JPH1161845A (en) | Building structure utilizing pile for column | |
CN208267093U (en) | A kind of Precast Concrete Frame | |
TWM608166U (en) | Precast column pile structure with combined component | |
CN111719417A (en) | Fully-prefabricated light large cantilever pre-bending combined bent cap beam structure and construction method | |
CN105297758A (en) | Prestressed square pile and steel latticed column integrated stand column | |
CN221371866U (en) | Support base for bridge construction | |
CN110656581A (en) | Temporary bridge construction process | |
CN210976691U (en) | Reinforcing structure for reinforcing steel bar embedded steel bar for old building reconstruction | |
CN218541534U (en) | UPVC pipe concrete column supporting system for post-cast strip of top plate of warehouse | |
CN216811117U (en) | Assembling and stacking type support system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |