CN104963289B CN201510310497.1A CN201510310497A CN104963289B CN 104963289 B CN104963289 B CN 104963289B CN 201510310497 A CN201510310497 A CN 201510310497A CN 104963289 B CN104963289 B CN 104963289B
Authority
CN
China
Prior art keywords
concrete
pier stud
template
pier
construction
Prior art date
Application number
CN201510310497.1A
Other languages
Chinese (zh)
Other versions
CN104963289A (en
Inventor
高辉
刘鹏飞
李硕
黄海
孙亮
石旭
Original Assignee
沈阳市政集团有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 沈阳市政集团有限公司 filed Critical 沈阳市政集团有限公司
Priority to CN201510310497.1A priority Critical patent/CN104963289B/en
Publication of CN104963289A publication Critical patent/CN104963289A/en
Application granted granted Critical
Publication of CN104963289B publication Critical patent/CN104963289B/en

Links

Abstract

A kind of abnormity pier stud mass concrete overall time pouring construction method, including front preparation of constructing, pier stud reinforcement fabrication and installation, template loft, the Design and Machining of template, installation, concreting, maintenance, form removal, the operation such as crossbeam stretch-draw, mud jacking construction.The present invention uses large area set shaped steel formwork, assembled by pier body formwork overall time, template periphery purlin system integral reinforcing pier body formwork form, it is achieved that finished product pier shaft is without tie rod hole;It is main for using vibrator as a plug in concrete vibrating is constructed, and attached vibrator is auxiliary vibrating method, substantially increases pier stud finished product overall appearance quality and geometric accuracy, has ensured construction safety simultaneously, saved construction cost.

Description

A kind of abnormity pier stud mass concrete overall time pouring construction method

Technical field

The present invention relates to the technical field of construction of the polymorphic structure thing of armored concrete in urban house, bridge and bridge on highway, be specifically related to a kind of abnormity pier stud mass concrete overall time pouring construction method.

Background technology

Along with in modern urban construction, owing to abnormity pier structure is attractive in appearance, strong adaptability, and save material compared with the solid pier stud of concrete and be extensively designed so that use.The complexity constructed due to it so that the installation of reinforcing bar, template to install difficulty relatively big, particularly abnormity pier pier stud outer dip angle is big, and in mould, working place is little, reinforcing bar is dense more increases concrete construction difficulty.Traditional construction method is that the main muscle of pier shaft is on-the-spot by root spreading, horizontal hoop successively colligation, and pier body formwork is installed by several times, and concrete pours by several times, the most not only long construction period, is easily generated faulting of slab ends, aberration, Appearance quality defect at pier stud body segmentation construction by several times.

Summary of the invention

The purpose of the present invention, is to provide a kind of safe and reliable, and speed of application is fast, saves the special-shaped pier stud mass concrete overall time pouring construction method of resource.

The technical scheme is that

A kind of abnormity pier stud mass concrete primary concreting construction method, use large area set shaped steel formwork, template periphery purlin system integral reinforcing pier body formwork form, the reinforcing mode of " wall-penetrating type is to drawing rod-pulling type " is used in changing conventional template, stability is high, achieve finished product pier shaft without tie rod hole, the assembly of pier body formwork overall time.And it is main for using vibrator as a plug in concrete vibrating is constructed, the vibrating method that attached vibrator is auxiliary avoids the long construction period that conventional construction method causes, the diseases such as faulting of slab ends, aberration, Appearance quality defect it are easily generated, it is characterised in that comprise the steps: at construction

1, the pre-buried location of pier stud reinforcing bar

Before cushion cap roof steel bar installs concrete construction, pier stud is measured unwrapping wire, total powerstation is used to release the vertically and horizontally axis of pier stud, determine the pre-buried position of pier stud reinforcing bar, site operation personnel are foundation according to measurement group unwrapping wire, use interim reinforcing bar anchor block post position, prepare for integral hoisting pier stud reinforcing bar.Disposably lift into position with loop wheel machine, and add temporary support, it is ensured that reinforcing bar not flexural deformation.

2, dabbing, setting-out

After 1 cushion cap pours end; after concrete reaches the intensity that design requires; the concrete of pier stud root (cushion cap top) is carried out dabbing process; it should be noted that protection to reinforcing bar during dabbing; reinforcing bar must not be damaged; cut the laitance on surface to fresh concrete surface, and clean out scum silica frost and chip.

2 surveying setting-out: using total powerstation to release Planar Contours inside and outside the longitudinal and transverse axis of pier stud and post mould at cushion cap end face, ink fountain ejects line, measures surrounding absolute altitude at the bottom of pier, installs and formwork erection benchmark.

The Design and Machining of 3 templates, installation:

1) before template construct, carry out stencil design according to pier stud design drawing, change conventional stencil design pattern, take overall peripheral purlin body to replace traditional " wall-penetrating type " pull bar, it is ensured that Surface Quality of Concrete.Template is by specialty steel construction processing and fabricating, and after processing, on-the-spot examination is spelled, and checks its rigidity, intensity, the stability vertically and horizontally connected and formwork structure size, after meeting design specification requirement, can come into operation.

2) model sheetinstallat.Template construct height considers that the height of column, hoisting transportation are convenient, construction and installation are convenient and formulate, to be suitable for the combination of all kinds of stem height.With contact position, cushion cap surface bottom template, fill and lead up embedding reality with after-pouring column concrete with mortar or other soft matters.Pier stud bottom straight-line segment template uses the mode that four sides is assembled, and vertical formwork inner support, with No. 8 elongated settings of channel-section steel, is laterally enclosed purlin and used 2 No. 16 channel-section steel assembly, and spacing 350mm, adjacent forms is enclosed purlin and fixed with oblique 20mm bolt.Pier stud Y type part first spreads the template outside batter post, then inside back cover side template, adds steel pipe Crossing brace same, and set cable wind rope between two batter posts, the stability of rigidity and template to ensure framed bent.After model sheetinstallat terminates, measurement group is to its repetition measurement, and plan-position, elevation and perpendicularity can carry out next step construction after meeting requirement.

4 concretings: owing to abnormity pier gradient is big, reinforcing bar is dense, and inner space is little, causes concrete vibrating operation to produce bigger difficulty.Using vibrator as a plug for this is main, and the mode that attached vibrator is auxiliary is vibrated.Pier stud concrete uses pumping method to enter mould.Often group column concrete material, selects the sand material with the place of production and the cement of same specification, to ensure the solid colour of each group of column.When pouring needs multilamellar, its off time is the longest must not exceed the concrete presetting period.The slump of concrete controls in the range of code requirement, concrete vibrator uses high frequency poker vibrator, fast inserting is pulled out slowly, when pouring upper strata, poker vibrator extend into lower floor 5-10cm, to ensure comprehensive vibration compacting, should prevent the impact of template vibrated device from deforming or collision slab, reinforcing bar, built-in fitting etc., find when reinforcing bar is trampled or support member shifts, revise in time, forbid operating personnel arbitrarily to walk about on reinforcing bar. Considering to install the adhesion type equipment that vibrates outside privileged sites template to strengthen vibrating, vibrating time determines with conventional experience and test simultaneously.Forbid super shake or leak shake.

5, maintenance, form removal.(with gunnysack or Polypropylence Sheet) and watering maintenance should be covered as early as possible, to keep the wetting state of concrete continuous surface after concrete placings completes to receive slurry.The concrete water seasoning date is not less than 7 days, and it is responsible to set special messenger.Template is removed when concrete compressive strength reaches 2.5MPa, notes protecting concrete surface and corner angle during form removal.Should be clean by template surface mortar dirt removal after form removable, it is deposited into appointment position, concrete surface defect should use the method agreed to through engineer to repair, and forbids to use cement wash and cement plaster.

6, crossbeam stretch-draw, mud jacking construction.After the concrete strength of pier stud reaches design requirement, crossbeam is carried out stretch-draw, mud jacking operation.

Advantages of the present invention

The present invention is by using large area set shaped steel formwork, template periphery purlin system integral reinforcing pier body formwork form, it is achieved that finished product pier shaft is without tie rod hole, and pier body formwork overall time is assembled;It is main for using vibrator as a plug in concrete vibrating is constructed, and attached vibrator is auxiliary vibrating method, substantially increases pier stud finished product overall appearance quality and geometric accuracy, has ensured construction safety simultaneously, saved construction cost.

Accompanying drawing illustrates:

Fig. 1 is construction technology process schematic diagram.

Detailed description of the invention

A kind of abnormity pier stud mass concrete overall time pouring construction method, specifically includes following step:

1, the pre-buried location of pier stud reinforcing bar

Before cushion cap roof steel bar installs concrete construction, measurement group measures unwrapping wire to pier stud, with reference to cap design of pile size: long 1050cm, wide 650cm, using total powerstation to release the vertically and horizontally axis of pier stud, determine the pre-buried position of pier stud reinforcing bar, site operation personnel are foundation according to measurement group unwrapping wire, use interim reinforcing bar anchor block post position, prepare for integral hoisting pier stud reinforcing bar.Disposably lift into position with loop wheel machine, and add temporary support, it is ensured that reinforcing bar not flexural deformation.

2, dabbing, setting-out

1) after cushion cap pours end; after concrete reaches the intensity that design requires; the concrete of pier stud root (cushion cap top) is carried out dabbing process; it should be noted that protection to reinforcing bar during dabbing; damage reinforcing bar not; cut the laitance on surface to fresh concrete surface, and clean out scum silica frost and chip.

2) surveying setting-out: use total powerstation, with reference to pier stud bottom design size: long 2 × 190+a(design is given);Wide by 160, unit: cm, release Planar Contours inside and outside the longitudinal and transverse axis of pier stud and post mould at cushion cap end face, ink fountain ejects line, measures surrounding absolute altitude at the bottom of pier, installs and formwork erection benchmark.

The Design and Machining of 3 templates, installation

1) before template construct, according to pier stud design drawing, overall peripheral purlin body mode is taked to carry out stencil design.

Template is by specialty steel construction processing and fabricating, and after processing, on-the-spot examination is spelled, and checks its rigidity, intensity, the stability vertically and horizontally connected and formwork structure size, after meeting design specification requirement, standby.

2) model sheetinstallat: template construct height considers that the height of column, hoisting transportation are convenient, construction and installation are convenient and formulate, to be suitable for the combination of all kinds of stem height.With contact position, cushion cap surface bottom template, fill and lead up embedding reality with after-pouring column concrete with mortar or other soft matters.Pier stud bottom straight-line segment template uses the mode that four sides is assembled, and vertical formwork inner support, with No. 8 elongated settings of channel-section steel, is laterally enclosed purlin and used 2 No. 16 channel-section steel assembly, and spacing 350mm, adjacent forms is enclosed purlin and fixed with oblique 20mm bolt.Pier stud Y type part first spreads the template outside batter post, then inside back cover side template, adds steel pipe Crossing brace same, and set cable wind rope between two batter posts, the stability of rigidity and template to ensure framed bent.After model sheetinstallat terminates, measurement group is to its repetition measurement, and plan-position, elevation and perpendicularity can carry out next step construction after meeting requirement.

4 concretings

It is main for using vibrator as a plug, and the mode that attached vibrator is auxiliary is vibrated.Pier stud concrete uses pumping method to enter mould.Often group column concrete material, selects the sand material with the place of production and the cement of same specification.When pouring needs multilamellar, its off time is the longest must not exceed the concrete presetting period.The slump of concrete controls in the range of code requirement, concrete vibrator uses high frequency poker vibrator, fast inserting is pulled out slowly, when pouring upper strata, poker vibrator extend into lower floor 5-10cm, should prevent the impact of template vibrated device from deforming or collision slab, reinforcing bar, built-in fitting etc., find, when reinforcing bar is trampled or support member shifts, to revise in time, forbid operating personnel arbitrarily to walk about on reinforcing bar. Considering to install the adhesion type equipment that vibrates outside privileged sites template to strengthen vibrating, vibrating time determines with conventional experience and test simultaneously.Forbid super shake or leak shake.

5, maintenance, form removal

(with gunnysack or Polypropylence Sheet) and watering maintenance should be covered as early as possible, to keep the wetting state of concrete continuous surface after concrete placings completes to receive slurry.The concrete water seasoning date is not less than 7 days, and it is responsible to set special messenger.Template is removed when concrete compressive strength reaches 2.5MPa, notes protecting concrete surface and corner angle during form removal.Should be clean by template surface mortar dirt removal after form removable, it is deposited into appointment position, concrete surface defect should use the method agreed to through engineer to repair, and forbids to use cement wash and cement plaster.

6, crossbeam stretch-draw, mud jacking construction

After the concrete strength of pier stud reaches design requirement, crossbeam is carried out stretch-draw, mud jacking operation.

Claims (1)

1. a special-shaped pier stud mass concrete overall time pouring construction method, use large area set shaped steel formwork, template periphery purlin system integral reinforcing pier body formwork form, when concreting is vibrated simultaneously, use plug-in type and the concrete vibrating mode of adhesion type combination, it is characterised in that comprise the steps:
1), the pre-buried location of pier stud reinforcing bar:
Before cushion cap roof steel bar installs concrete construction, measurement group measures unwrapping wire to pier stud, total powerstation is used to release the vertically and horizontally axis of pier stud, determine the pre-buried position of pier stud reinforcing bar, site operation personnel are foundation according to measurement group unwrapping wire, use interim reinforcing bar anchor block post position, prepare for integral hoisting pier stud reinforcing bar;Disposably lift into position with loop wheel machine, and add temporary support;
2), dabbing, setting-out:
(1), after cushion cap pours end, after concrete reaches the intensity that design requires, the concrete of pier stud root is carried out dabbing process, cut the laitance on surface to fresh concrete surface, and clean out scum silica frost and chip;
(2), surveying setting-out, use total powerstation to release Planar Contours inside and outside the longitudinal and transverse axis of pier stud and post mould at cushion cap end face, ink fountain ejects line, measures surrounding absolute altitude at the bottom of pier, installs and formwork erection benchmark;
3), the Design and Machining of template, installation:
(1), before template construct, carry out stencil design according to pier stud design drawing, take overall peripheral purlin body formula;Template is by specialty steel construction processing and fabricating, and after processing, on-the-spot examination is spelled, and checks its rigidity, intensity, the stability vertically and horizontally connected and formwork structure size, after meeting design specification requirement, standby;
(2), model sheetinstallat: template construct height considers that the height of column, hoisting transportation are convenient, construction and installation are convenient and formulate, to be suitable for the combination of all kinds of stem height;With contact position, cushion cap surface bottom template, fill and lead up embedding reality with after-pouring column concrete with mortar or other soft matters;Pier stud bottom straight-line segment template uses the mode that four sides is assembled, and vertical formwork inner support, with No. 8 elongated settings of channel-section steel, is laterally enclosed purlin and used 2 No. 16 channel-section steel assembly, and spacing 350mm, adjacent forms is enclosed purlin and fixed with oblique 20mm bolt;Pier stud Y type part first spreads the template outside batter post, then inside back cover side template, adds steel pipe Crossing brace same, and set cable wind rope between two batter posts;After model sheetinstallat terminates, measurement group is to its repetition measurement, and plan-position, elevation and perpendicularity can carry out next step construction after meeting requirement;
4), concreting: it is main for using vibrator as a plug, and the mode that attached vibrator is auxiliary is vibrated, and pier stud concrete uses pumping method to enter mould;Often group column concrete material, selects with the sand material in the place of production and the cement of same specification, and when pouring needs multilamellar, its off time is the longest must not exceed the concrete presetting period;The slump of concrete controls in the range of code requirement, concrete vibrator uses high frequency poker vibrator, fast inserting is pulled out slowly, when pouring upper strata, poker vibrator extend into lower floor 5-10cm, should prevent the impact of template vibrated device from deforming or collision slab, reinforcing bar, built-in fitting, find, when reinforcing bar is trampled or support member shifts, to revise in time, forbid operating personnel arbitrarily to walk about on reinforcing bar;Considering to install the adhesion type equipment that vibrates outside privileged sites template to strengthen vibrating, vibrating time determines with conventional experience and test simultaneously;Forbid super shake or leak shake;
5), maintenance, form removal: should cover with gunnysack or Polypropylence Sheet as early as possible and watering maintenance after concrete placings completes to receive slurry, keep the wetting state of concrete continuous surface;The concrete water seasoning date is not less than 7 days, and it is responsible to set special messenger;Template is removed when concrete compressive strength reaches 2.5MPa, and after form removable, concrete surface defect should be repaired, and forbids to use cement wash and cement plaster;
6), crossbeam stretch-draw, mud jacking construction: after the concrete strength of pier stud reaches design requirement, crossbeam is carried out stretch-draw, mud jacking operation.
CN201510310497.1A 2015-06-09 2015-06-09 A kind of abnormity pier stud mass concrete overall time pouring construction method CN104963289B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510310497.1A CN104963289B (en) 2015-06-09 2015-06-09 A kind of abnormity pier stud mass concrete overall time pouring construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510310497.1A CN104963289B (en) 2015-06-09 2015-06-09 A kind of abnormity pier stud mass concrete overall time pouring construction method

Publications (2)

Publication Number Publication Date
CN104963289A CN104963289A (en) 2015-10-07
CN104963289B true CN104963289B (en) 2016-11-02

Family

ID=54217364

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510310497.1A CN104963289B (en) 2015-06-09 2015-06-09 A kind of abnormity pier stud mass concrete overall time pouring construction method

Country Status (1)

Country Link
CN (1) CN104963289B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105350777A (en) * 2015-11-27 2016-02-24 中国一冶集团有限公司 Device and method for one-time pouring molding of ultra-high concrete column
CN106049283A (en) * 2016-06-05 2016-10-26 中交路桥建设有限公司 Bridge rectangular pier hanging die construction method
CN106012811B (en) * 2016-06-14 2017-12-29 江苏燕宁建设工程有限公司 Vase type pier pier shaft steel bar overall binding construction method for hanging
CN108952171B (en) * 2018-09-05 2020-10-16 韩春静 Method for carrying out concrete pouring construction by civil engineering pouring device
CN110093852A (en) * 2019-05-15 2019-08-06 平煤神马建工集团有限公司 Shaped form bridge pier Construction technology of fair-faced concrete
CN110578300A (en) * 2019-09-26 2019-12-17 常州市市政建设工程有限公司 Large-volume concrete pouring process for special-shaped bridge pier column

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100832848B1 (en) * 2007-06-01 2008-05-28 원용석 Method for constructing pier and concrete permanent form applied to it
CN101429752B (en) * 2007-11-05 2010-05-12 中交一航局第一工程有限公司 Pier column prefabrication splicing building technology
CN102251481B (en) * 2011-05-06 2013-11-06 中铁七局集团第一工程有限公司 Railway pier layered construction method and construction device
CN102505636B (en) * 2011-10-28 2014-09-10 中铁十六局集团有限公司 Construction method of No.0 block of continuous rigid frame bridge of double-thin-wall pier
CN103255725B (en) * 2013-06-05 2015-03-25 中建七局(上海)有限公司 Construction method for smooth formwork of concrete supporting column

Also Published As

Publication number Publication date
CN104963289A (en) 2015-10-07

Similar Documents

Publication Publication Date Title
CN103410332B (en) A kind of concrete hollow block reinforcement wall construction technology
CN106223360B (en) Using the open cut cast in place and precast construction subway station construction method of stake supporting system
CN101956458B (en) Construction method of overlong and superhigh single-side fair-faced concrete wall
CN100469995C (en) Construction method for after-pouring band beam-slab template
CN100591863C (en) Underwater no-bottom closing concrete boxed cofferdam and method of use thereof
CN102937027B (en) A kind of construction method of edge top arch and bottom arch of concrete pouring tunnel
CN106245674A (en) Hollow wallboard mixes prefabricated assembled pipe gallery and construction method thereof
CN103088844B (en) Reinforced concrete inspection well whole prefabricated hoisting construction method
CN102747677B (en) Bridge and construction method thereof
CN106677069B (en) A kind of construction method of bridge pier integral formwork support one-shot forming structure
CN100476142C (en) Construction method for combined V-shape steel pipe concrete pile
CN101864744B (en) Construction method of novel wall fence for highway
CN103615110B (en) Random oblique netted nine-squares beam Hyperbolic Roof construction method
CN103590602B (en) The construction method of cast-in-place concrete hollow building roof
CN102864737B (en) Steel-structured passenger foot bridge
KR100958014B1 (en) Construction method of steel composite girder bridge
CN103938796B (en) Cast-in-situ reinforced concrete column construction
CN106182359B (en) The horizontal molding die of concrete list storehouse pipe gallery, system and piping lane molding methods
CN101781879B (en) Construction method of single-pylon cable-stayed bridge without dorsal cables
CN107297810A (en) A kind of making of precast wall body component and installation method
TW201100688A (en) Method for producing concrete trestle, concrete trestle, and connecting member
CN104790302B (en) A kind of high pier continuous rigid frame bridge end bay straightway Hanging Basket coordinates bent cap support integral construction method
CN103046746B (en) Construction method of conversion beam reinforcing bars for tall building structure
CN102966114A (en) Tower crane foundation structure and construction method thereof
CN104846744B (en) Construction method for pouring and forming urban viaduct curve type pier stud in one-off mode

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant