CN108118565A - Railway bed karez location pin-connected panel foundation stabilization construction and construction method - Google Patents

Railway bed karez location pin-connected panel foundation stabilization construction and construction method Download PDF

Info

Publication number
CN108118565A
CN108118565A CN201711321477.XA CN201711321477A CN108118565A CN 108118565 A CN108118565 A CN 108118565A CN 201711321477 A CN201711321477 A CN 201711321477A CN 108118565 A CN108118565 A CN 108118565A
Authority
CN
China
Prior art keywords
karez
underpass
construction
precast slab
bed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711321477.XA
Other languages
Chinese (zh)
Inventor
胡会星
吴沛沛
曾永红
李安洪
陈伟志
姚裕春
龚建辉
李楚根
周成
李宁
郭在旭
薛海洋
邱光美
唐第甲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201711321477.XA priority Critical patent/CN108118565A/en
Publication of CN108118565A publication Critical patent/CN108118565A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F5/00Draining the sub-base, i.e. subgrade or ground-work, e.g. embankment of roads or of the ballastway of railways or draining-off road surface or ballastway drainage by trenches, culverts, or conduits or other specially adapted means
    • E01F5/005Culverts ; Head-structures for culverts, or for drainage-conduit outlets in slopes

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

Railway bed karez location pin-connected panel foundation stabilization construction and construction method, to solve that the construction investment that traditional karez location railway engineering measure faced is high, angle too small can not cross over, karez discharge capacity weakens and the technical barriers such as constructional difficulties, meet karez location railway subgrade works and build needs.Reinforcing construction includes:Underpass reinforcing body, rail system are arranged at the top and bottom of karez underpass, and pipe culvert prefabricated subsection is assembled in karez underpass to form pipeline, and gap filling body is filled in the gap between pipeline and karez underpass;Vertical shaft reinforcing body, upper boulder bed, lower boulder bed are respectively arranged at the top and bottom of karez vertical shaft, precast slab with holes is arranged above lower boulder bed, precast slab is arranged at below boulder bed, and lightweight seepy material filling body is arranged between precast slab and precast slab with holes.

Description

Railway bed karez location pin-connected panel foundation stabilization construction and construction method
Technical field
The present invention relates to fields such as railway engineering, highway engineerings, especially suitable for karez location railway subgrade works.
Technical background
Karez is to be commonly distributed in arid, a kind of irrigation system of semiarid zone, by vertical shaft, underpass, ground The problems such as passage and flooded dam composition, railway construction and highway are unavoidably faced across karez on it.If merely with spanning More, will face because raising line position, across angle too small due to using the construction investment increase greatly caused by the problems such as;If with roadbed stake Harden structure is crossed over, and not only increases construction investment, while is collapsed there is also karez and to be caused plat-bottom escape, angle too small can not be across More wait technical barriers;And with pure roadbed by the premise of karez original water-holding capacity is retained, then needing to add karez Gu seepy material backfill can be used or anchor pole carries out hole wall the measure of reinforcing etc., but both reinforcing modes will face karez The problems such as underpass discharge capacity decrease, the narrow anchor bolt construction difficulty of underpass.Therefore, there is an urgent need for propose that one kind is easy to construct Novel reinforced mode solve above-mentioned problem, meet karez location railway subgrade works and build needs, and can with safety Lean on, be easy for construction, investment reduction the features such as.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of railway bed karez location pin-connected panel foundation stabilization structure It makes, with the construction investment that the traditional karez location railway engineering measure of solution is faced is high, angle too small can not cross over, karez The technical barriers such as discharge capacity decrease and constructional difficulties, meet karez location railway subgrade works and build needs.
Technical solution is as follows used by the present invention solves above-mentioned technology:
The railway bed karez location pin-connected panel foundation stabilization construction of the present invention, including filling the road above karez Base, it is characterized in that it is further included:Underpass reinforcing body, by pipe culvert prefabricated subsection, rail system and gap filling with pulley Body is formed, and rail system is arranged at the top and bottom of karez underpass, and pipe culvert prefabricated subsection is in karez underpass Interior assembled formation pipeline, gap filling body are filled in the gap between pipeline and karez underpass;Vertical shaft reinforcing body, by Upper boulder bed, lower boulder bed, lightweight seepy material filling body, precast slab with holes and precast slab are formed, upper ovum Rock layers, lower boulder bed are respectively arranged at the top and bottom of karez vertical shaft, and precast slab with holes is arranged at lower boulder bed Top, precast slab are arranged at below boulder bed, and lightweight seepy material filling body is arranged on precast slab with holes Between precast slab.
Another technical problem to be solved by this invention is with being to provide a kind of above-mentioned railway bed karez location pin-connected panel The construction method of base reinforcing construction, this method comprise the following steps:
1. by track by karez shaft transport to the karez underpass position to be reinforced, in karez underground Channel roof and bottom attachment rail system;
2. being lifted the pipe culvert prefabricated subsection with pulley to karez underpass by karez vertical shaft, pass through track System is assembled to contain prefabricated subsection, and gap obturator of constructing;
After 3. underpass reinforces body construction, lower ovum is filled in karez vertical shaft and karez underpass junction Rock layers, and slot grooving precast slab with holes, backfill lightweight seepy material filling body, slot grooving are pre- successively from lower to upper Concrete slab processed and fill boulder bed;
After the completion of 4. karez vertical shaft is reinforced, construction subgrade.
The invention has the advantages that the pipe culvert prefabricated component segment using rail system and with pulley, is not reducing insinuating language In the case of well underpass discharge capacity, while karez is strengthened, successfully solves karez strengthening construction difficulty The problem of;Reduce karez vertical shaft backfilling material to karez using precast slab with holes and lightweight seepy material filling body The overlying additional force of underpass reinforcing body, while also ensure that karez flood season level can rise to vertical shaft but not influence insinuating language Roadbed safety above well;Efficiently solve construction investment height, the angle that traditional karez location railway engineering measure is faced It is too small can not cross over, karez discharge capacity weakens and the technical barriers such as constructional difficulties, structure novel, securely and reliably, construction party Just, investment reduction, application prospect are extensive.
Description of the drawings
This specification includes following four width attached drawing:
Fig. 1 is the cross-section diagram of pin-connected panel foundation stabilization construction in railway bed karez location of the present invention;
Fig. 2 is the section of underpass reinforcing body in pin-connected panel foundation stabilization construction in railway bed karez location of the present invention Figure;
Fig. 3 is the vertical disconnected of pipe culvert prefabricated component segment in pin-connected panel foundation stabilization construction in railway bed karez location of the present invention Face figure;
Fig. 4 is the vertical of precast slab with holes in pin-connected panel foundation stabilization construction in railway bed karez location of the present invention Body schematic diagram.
The title of main member and corresponding mark are shown in figure:Pipe culvert prefabricated component segment 1, pulley 11, annular tenon Section 12, annular tongue-and-groove section 13, rail system 2, gap filling body 3, upper boulder bed 41, lower boulder bed 42, precast concrete with holes Plate 5, lightweight seepy material filling body 6, precast slab 7, roadbed 8.
Specific embodiment
It is further illustrated the present invention below by specific embodiment and with reference to attached drawing.
Referring to Figures 1 and 2, railway bed karez location pin-connected panel foundation stabilization construction of the invention, including fill in Roadbed 8 above karez, further includes:Underpass reinforcing body, by the pipe culvert prefabricated subsection 1 with pulley, rail system 2 and seam Gap obturator 3 is formed, and rail system 2 is arranged at the top and bottom of karez underpass, and pipe culvert prefabricated subsection 1 is in karez Assembled in underpass to form pipeline, gap filling body 3 is filled in the gap between pipeline and karez underpass;Vertical shaft Reinforcing body, by upper boulder bed 41, lower boulder bed 42, lightweight seepy material filling body 6, precast slab with holes 5 and prefabricated mixed Concrete board 7 is formed, and upper boulder bed 41, lower boulder bed 42 are respectively arranged at the top and bottom of karez vertical shaft, with holes prefabricated mixed Concrete board 5 is arranged at lower 42 top of boulder bed, and precast slab 7 is arranged at 41 lower section of boulder bed, and lightweight seepy material is filled out Building body 6 is arranged between precast slab 5 and precast slab 7 with holes.The present invention is using rail system 2 and with pulley Pipe culvert prefabricated component segment 1, in the case where not reducing karez underpass discharge capacity, strengthening the same of karez When, successfully solve the problems, such as that karez strengthening construction is difficult.It is filled using precast slab 5 with holes and lightweight seepy material Body 6 reduces overlying additional force of the karez vertical shaft backfilling material to karez underpass reinforcing body, while also ensures insinuating language Well flood season level can rise to vertical shaft but not influence the safety of the roadbed above karez.
With reference to Fig. 3, the longitudinally spaced installation pulley 11 in top, lower part of the pipe culvert prefabricated subsection 1.Pipe culvert prefabricated subsection 1 Longitudinal both ends are respectively provided with annular tenon section 12, annular tongue-and-groove section 13, adjacent two pipe culverts prefabricated subsection 1 in karez underpass Assembly is formed by the grafting of corresponding annular tenon section 12, annular tongue-and-groove section 13.It can be 0.5m that length is saved in pipe culvert prefabricated component segment 1, Annular tenon section 12, the length of annular tongue-and-groove section 13 are generally 5~8cm.
With reference to Fig. 1, the upper boulder bed 41, lower boulder bed 42 are filled by cobble of the minimum grain size not less than 6cm, thickness one As be 1.5m.The lightweight seepy material filling body 6 is mixed by coarse aggregate, jointing material, gelling agent and water, permeable system Number is not less than 2.5mm/s.With reference to Fig. 4,5 opening diameter of precast slab with holes is 4cm, and pitch of holes is 20~40cm.
The construction method of pin-connected panel foundation stabilization construction in railway bed karez location of the present invention, comprises the following steps:
1. by track by karez shaft transport to the karez underpass position to be reinforced, in karez underground Channel roof and bottom attachment rail system 2;
2. being lifted the pipe culvert prefabricated subsection 1 with pulley to karez underpass by karez vertical shaft, pass through rail Road system 2 is assembled to contain prefabricated subsection 1, and gap obturator 3 of constructing;
After 3. underpass reinforces body construction, lower ovum is filled in karez vertical shaft and karez underpass junction Rock layers 42, and slot grooving precast slab 5 with holes, backfill lightweight seepy material filling body 6, fluting are applied successively from lower to upper Work precast slab 7 and fill boulder bed 41;
After the completion of 4. karez vertical shaft is reinforced, construction subgrade 8.
Present invention firstly provides railway bed karez location pin-connected panel foundation stabilization construction and construction methods, solve Construction investment that traditional karez location railway engineering measure is faced is high, angle too small can not cross over, karez discharge capacity The technical barriers such as decrease and constructional difficulties, subgrade structure and construction method have structure novel, safe and reliable, easy for construction, section The features such as about investing, application prospect are extensive.
The above simply using illustrate railway bed karez location pin-connected panel foundation stabilization of the present invention construct and Some principles of construction method are not intended to the present invention being confined in shown and described concrete structure and the scope of application, therefore It is every it is possible that the corresponding modification being utilized and equivalent, belong to the apllied the scope of the claims of the present invention.

Claims (6)

1. the pin-connected panel foundation stabilization of railway bed karez location constructs, special including filling the roadbed (8) above karez Sign is that it is further included:Underpass reinforcing body, by the pipe culvert prefabricated subsection (1) with pulley, rail system (2) and gap filling body (3) form, rail system (2) is arranged at the top and bottom of karez underpass, and pipe culvert prefabricated subsection (1) is in karez Assembled in lower channel to form pipeline, gap filling body (3) is filled in the gap between pipeline and karez underpass;Vertical shaft Reinforcing body, by upper boulder bed (41), lower boulder bed (42), lightweight seepy material filling body (6), precast slab with holes (5) It is formed with precast slab (7), upper boulder bed (41), lower boulder bed (42) are respectively arranged at the top and bottom of karez vertical shaft Portion, precast slab (5) with holes are arranged above lower boulder bed (42), and precast slab (7) is arranged at boulder bed (41) lower section, lightweight seepy material filling body (6) are arranged between precast slab with holes (5) and precast slab (7).
2. pin-connected panel foundation stabilization construction in railway bed karez location as described in claim 1, it is characterized in that:The upper ovum Rock layers (41), lower boulder bed (42) are filled by cobble of the minimum grain size not less than 6cm, thickness 1.5m.
3. pin-connected panel foundation stabilization construction in railway bed karez location as described in claim 1, it is characterized in that:The lightweight Seepy material filling body (6) is mixed by coarse aggregate, jointing material, gelling agent and water, and coefficient of permeability is not less than 2.5mm/ s。
4. pin-connected panel foundation stabilization construction in railway bed karez location as described in claim 1, it is characterised in that:The pipe Contain the longitudinal both ends of prefabricated subsection (1) and be respectively provided with annular tenon section (12), annular tongue-and-groove section (13), phase in karez underpass Adjacent two pipe culvert prefabricated subsections (1) form assembly by the grafting of corresponding annular tenon section (12), annular tongue-and-groove section (13).
5. pin-connected panel foundation stabilization construction in railway bed karez location as described in claim 1, it is characterized in that:It is described with holes Precast slab (5) opening diameter is 4cm, and pitch of holes is 20~40cm.
6. the construction party that the railway bed karez location pin-connected panel foundation stabilization as described in claim 1-5 any one constructs Method comprises the following steps:
1. by track by karez shaft transport to the karez underpass position to be reinforced, in karez underpass Top and bottom attachment rail system (2);
2. being lifted the pipe culvert prefabricated subsection (1) with pulley to karez underpass by karez vertical shaft, pass through track System (2) is assembled to contain prefabricated subsection (1), and gap obturator (3) of constructing;
After 3. underpass reinforces body construction, lower boulder bed is filled in karez vertical shaft and karez underpass junction (42), and from lower to upper slot grooving precast slab with holes (5), backfill lightweight seepy material filling body (6), fluting successively Construction precast slab and fills boulder bed (41) at (7);
After the completion of 4. karez vertical shaft is reinforced, construction subgrade (8).
CN201711321477.XA 2017-12-12 2017-12-12 Railway bed karez location pin-connected panel foundation stabilization construction and construction method Pending CN108118565A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711321477.XA CN108118565A (en) 2017-12-12 2017-12-12 Railway bed karez location pin-connected panel foundation stabilization construction and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711321477.XA CN108118565A (en) 2017-12-12 2017-12-12 Railway bed karez location pin-connected panel foundation stabilization construction and construction method

Publications (1)

Publication Number Publication Date
CN108118565A true CN108118565A (en) 2018-06-05

Family

ID=62229706

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711321477.XA Pending CN108118565A (en) 2017-12-12 2017-12-12 Railway bed karez location pin-connected panel foundation stabilization construction and construction method

Country Status (1)

Country Link
CN (1) CN108118565A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110080043A (en) * 2019-04-09 2019-08-02 中国铁路设计集团有限公司 A kind of horizontal lattice precast assembly segment and its assembled high-speed rail roadbed

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1194147A (en) * 1968-03-09 1970-06-10 Richard Heath Rohmer System for the Underground Storage of Liquids.
DE2543997A1 (en) * 1975-10-02 1977-04-07 Polensky & Zoellner Press forwarding tubular structure into embankment - uses sliding tracks for support under shield protection
SU1281632A1 (en) * 1985-06-24 1987-01-07 Ленинградское отделение Всесоюзного проектно-изыскательского и научно-исследовательского института "Гидропроект" им.С.Я.Жука Method of mounting the metal lining of water duct in tunnel
JPH08165665A (en) * 1994-12-14 1996-06-25 Fujita Corp Manhole floating-up preventive construction structure
RU2148716C1 (en) * 1997-08-14 2000-05-10 Репников Леонид Николаевич Method for increasing longitudinal rigidity of underground structure made of prefabricated components
JP2001311109A (en) * 2000-04-28 2001-11-09 Tokyo Gas Co Ltd Temporary back-filling method for excavated shaft
JP2007262848A (en) * 2006-03-30 2007-10-11 Ando Corp Laying method for pipe culvert
JP2012092517A (en) * 2010-10-25 2012-05-17 Taisei Corp Method of transferring and laying precast concrete structure while changing transfer direction
CN202989939U (en) * 2012-12-18 2013-06-12 内蒙古电力勘测设计院 Vertical drainage well of ash storage yard
CN103527213A (en) * 2013-10-11 2014-01-22 中国水利水电科学研究院 Method and device for reinforcing karez tunnel by anchoring self-rotating anchor rod on geogrid
CN106758561A (en) * 2017-02-22 2017-05-31 中铁二院工程集团有限责任公司 Across karez consolidation roadbed of high-speed structure
CN107268676A (en) * 2017-06-30 2017-10-20 上海建工集团股份有限公司 The movement assembling system and method for prefabricated assembled underpass upper segment
CN207672344U (en) * 2017-12-12 2018-07-31 中铁二院工程集团有限责任公司 Railway bed karez location pin-connected panel foundation stabilization construction

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1194147A (en) * 1968-03-09 1970-06-10 Richard Heath Rohmer System for the Underground Storage of Liquids.
DE2543997A1 (en) * 1975-10-02 1977-04-07 Polensky & Zoellner Press forwarding tubular structure into embankment - uses sliding tracks for support under shield protection
SU1281632A1 (en) * 1985-06-24 1987-01-07 Ленинградское отделение Всесоюзного проектно-изыскательского и научно-исследовательского института "Гидропроект" им.С.Я.Жука Method of mounting the metal lining of water duct in tunnel
JPH08165665A (en) * 1994-12-14 1996-06-25 Fujita Corp Manhole floating-up preventive construction structure
RU2148716C1 (en) * 1997-08-14 2000-05-10 Репников Леонид Николаевич Method for increasing longitudinal rigidity of underground structure made of prefabricated components
JP2001311109A (en) * 2000-04-28 2001-11-09 Tokyo Gas Co Ltd Temporary back-filling method for excavated shaft
JP2007262848A (en) * 2006-03-30 2007-10-11 Ando Corp Laying method for pipe culvert
JP2012092517A (en) * 2010-10-25 2012-05-17 Taisei Corp Method of transferring and laying precast concrete structure while changing transfer direction
CN202989939U (en) * 2012-12-18 2013-06-12 内蒙古电力勘测设计院 Vertical drainage well of ash storage yard
CN103527213A (en) * 2013-10-11 2014-01-22 中国水利水电科学研究院 Method and device for reinforcing karez tunnel by anchoring self-rotating anchor rod on geogrid
CN106758561A (en) * 2017-02-22 2017-05-31 中铁二院工程集团有限责任公司 Across karez consolidation roadbed of high-speed structure
CN107268676A (en) * 2017-06-30 2017-10-20 上海建工集团股份有限公司 The movement assembling system and method for prefabricated assembled underpass upper segment
CN207672344U (en) * 2017-12-12 2018-07-31 中铁二院工程集团有限责任公司 Railway bed karez location pin-connected panel foundation stabilization construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110080043A (en) * 2019-04-09 2019-08-02 中国铁路设计集团有限公司 A kind of horizontal lattice precast assembly segment and its assembled high-speed rail roadbed

Similar Documents

Publication Publication Date Title
CN106522037B (en) Side broad way based structures based on existing railway roadbed and its construction method
WO2021223573A1 (en) Construction structure for communication and connection between newly added mined channel and existing station hall layer
CN101270582B (en) Method for setting bracing column in underground cavity
CN107503257B (en) One kind being close to mountain high-filled subgrade stabilization and Deformation control structure and construction method
CN104762955B (en) A kind of Belled Pile construction method based on freezing process
CN209924998U (en) Shallow earthing shield tunnel is worn road reinforcement protection architecture down
CN109371905B (en) Dam and construction method
CN206308569U (en) It is a kind of to reinforce the road structure for punishing the solution cavity that underlies
CN107447613A (en) A kind of deep super embankment on soft soil and construction method
CN111119128B (en) Danger-removing, reinforcing and seepage-proofing method for natural rock-fill dam of barrier lake
CN111851597B (en) Penetration protection structure of pipe jacking close-distance downward-penetrating pipe gallery and construction method
JP7394252B1 (en) Protruding type wind duct structure perpendicular to the vertical direction and construction method at deep subway station
CN110004991A (en) Underground structure anti-floating system and construction method based on raised type tangs plate
CN108457249A (en) A kind of structure design and construction method of novel composite panel sand-gravel dam
CN104631440A (en) Stiffening core lengthening foundation pit support structure for existing large-diameter bored concrete pile and construction method
CN210216254U (en) Concrete guardrail structure
CN108035379A (en) A kind of pipe gallery and its construction method
CN206016853U (en) Base plate anchors restricted type tunnel lining structure
CN105735323B (en) The inverse deep footing groove enclosing structure for making to combine with Percussion Piles of spray anchor and its construction method
CN207672344U (en) Railway bed karez location pin-connected panel foundation stabilization construction
CN114575355A (en) Soil protection and descent construction method
CN109898556A (en) A kind of underground pipe gallery structure and sunk type construction method
CN106567365B (en) Earth and rockfill dam longitudinal reinforcement construction method
CN208293630U (en) A kind of structural system of the antiseismic liquefaction uplifting in subway station
CN108118565A (en) Railway bed karez location pin-connected panel foundation stabilization construction and construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180605