CN108104260A - Assembled architecture overhanging component construction method - Google Patents

Assembled architecture overhanging component construction method Download PDF

Info

Publication number
CN108104260A
CN108104260A CN201711482111.0A CN201711482111A CN108104260A CN 108104260 A CN108104260 A CN 108104260A CN 201711482111 A CN201711482111 A CN 201711482111A CN 108104260 A CN108104260 A CN 108104260A
Authority
CN
China
Prior art keywords
overhanging component
component
suspension
assembled architecture
overhanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711482111.0A
Other languages
Chinese (zh)
Other versions
CN108104260B (en
Inventor
张恒铭
周克家
李飞
宁娜娜
赵海成
林萌
李希文
高云峰
王树军
魏新新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Prosperous Large Building Science And Technology Ltd
Original Assignee
Prosperous Large Building Science And Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Prosperous Large Building Science And Technology Ltd filed Critical Prosperous Large Building Science And Technology Ltd
Priority to CN201711482111.0A priority Critical patent/CN108104260B/en
Publication of CN108104260A publication Critical patent/CN108104260A/en
Application granted granted Critical
Publication of CN108104260B publication Critical patent/CN108104260B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/003Balconies; Decks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/142Means in or on the elements for connecting same to handling apparatus

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of assembled architecture overhanging component construction methods, belong to assembled architecture technical field, including preparation of construction step;Lifting component step;Hang Suspension and by the Suspension and component Connection Step;Adjustment member absolute altitude, verticality and flatness step;The establishment fixing step of component reserved steel bar and plate muscle;Board concrete pours step;Concrete removes the Suspension step after reaching design strength.Assembled architecture overhanging component construction method provided in an embodiment of the present invention, based on steel reinforced concrete fabricated construction system, without using conventional support system so that construction site neat and tidy, safe and unimpeded;And short construction period, operating expenses are low.

Description

Assembled architecture overhanging component construction method
Technical field
The invention belongs to assembled architecture technical field more particularly to a kind of assembled architecture overhanging component construction methods.
Background technology
Steel construction is known as steel-mixed mixed structure with concrete composite structure.This structure type is good, whole with anti-seismic performance The advantages that body is strong.
According to supply side structural reform and the requirement of new Urbanization Progress is promoted, steel construction, concrete are greatly developed Assembled architectures are waited, there are development energy conservation and environmental protection NPD projects, improve building safety level, promote neutralizing superfluous production capacity etc. more at one stroke The benefits of obtaining.In the case where policy guide is vigorously supported, assembled architecture gradually comes into the visual field of people, and assembled architecture does not also bear everybody It is hoped, is applicable in it, the development pattern of economy, safety, green, beauty changes, promotes people life quality.Wherein, prefabricated dress Refer to that the part or all of component of building is prefabricated in the factory completion with formula building, then transport to construction site, component is passed through The building that reliable connection mode is assembled and built up.The advantages of this building is that construction speed is fast, and climate conditionality is small, section About labour, and construction quality can be improved.
At present, during assembled architecture is greatly developed, there are many problems, wherein assembled architecture building site not Expect uniform, clean environment firendly like that, still needed in the prefabricated components installation process of assembled architecture among these substantial amounts of Support system, causes live confusion, and the especially outer overhanging component of some assembled architectures combines the supporting way of the full hall frame of tradition, applies Work scene still makes people difficult to move even one step, and there are larger security risks.Certainly, also to have adjoint assembled architecture to come into being only Vertical support system makes entire building site become clean salubrious very much, but substantial amounts of gusseted but also building site make an inspection tour, check into Go out inconvenient, also occur security incident often.
In addition, the prefabricated overhanging component installation process of existing assembled architecture is typically progressively to be applied upwards successively from bottom Work, until the top layer of building, also causes long construction period.
The content of the invention
The technical problems to be solved by the invention are:A kind of assembled architecture overhanging component construction method is provided, based on steel Mixed assembled structural system, such method is without using conventional support system so that construction site neat and tidy, safety and smooth It is logical.
In order to solve the above technical problems, the technical scheme is that:Assembled architecture overhanging component construction method, including Following steps:
(a) preparation of construction:Determine overhanging component installation site;
(b) lifting component:The overhanging component is hung by installation site, the suspension hook of the lifting equipment using lifting equipment Under need to hang a chain block;
(c) hang Suspension and be connected the Suspension with component:In the upper strata beam of the overhanging component installation site Upper suspension Suspension is provided with adjustment structure on the Suspension, the Suspension and the overhanging component is linked together;
(d) adjustment member absolute altitude, verticality and flatness:Using chain block and the adjustment structure to the overhanging structure It is levelling that part carries out absolute altitude, verticality, the essence of flatness;
(e) component reserved steel bar and the establishment of plate muscle are fixed:The overhanging component absolute altitude, verticality and flatness are adjusted Afterwards, by the plate muscle banding fixed of the reserved steel bar of the overhanging component and the assembled architecture;
(f) board concrete pours:The plate muscle banding fixed of the overhanging component reserved steel bar and the assembled architecture is complete Into after examination, pouring for concrete is carried out;
(g) concrete removes the Suspension after reaching design strength:After the age of concrete reaches requirement, reach after testing After design strength, the Suspension is removed.
As an improvement after the step (d), further include the suspension hook of the lifting equipment and the overhanging structure Part separating step.
As an improvement the upper strata beam is I-steel.
As an improvement the Suspension is steel wire rope.
As a further improvement, the adjustment structure is flower basket bolt.
As an improvement it is additionally provided with locating groove on the overhanging component.
After employing above-mentioned technical proposal, the beneficial effects of the invention are as follows:
(1) due to assembled architecture overhanging component construction method using lifting equipment, chain block and Suspension come to outstanding It chooses component to be installed, thus traditional support system is converted into suspension system, in the situation without using conventional support system Under, realize the installation of assembled architecture overhanging component;
(2) overhanging component construction method provided by the invention can accelerate speed of application, conventional construction method overhanging component Installation needs could be carried out after support system is set up, and frame is not required in overhanging component construction method provided by the invention If support system, as long as major structure of construction construction finishes, lifting equipment lifts and hangs Suspension on the beam of upper strata can To be carried out at the same time, hardly holding time saves erection time of support system;
(3) overhanging component construction method provided by the invention can shorten the construction period, and traditional overhanging component construction method is It is successively supported, reaches design strength, then carry out next layer of support system and set, then construct;But this hair The overhanging component construction method of bright offer can simultaneously be constructed with multilayer;
(4) overhanging component construction method mounting cost provided by the invention lowers significantly, and traditional installs support system, needs Installation personnel, Master Cost are wanted, general building site support system is rents, and cost is higher, and overhanging component provided by the invention is applied Personnel's installation is not required in work method, and Suspension is more using the number of turnover of steel wire rope, and cost is relatively low, and saves substantial amounts of artificial Expense;
(5) overhanging component construction method construction site neat and tidy provided by the invention really avoids full hall frame support System allows building site to become safer, more unimpeded.
Description of the drawings
Fig. 1 is the relative position schematic diagram of overhanging component and upper strata beam, steel wire rope and flower basket bolt in the embodiment of the present invention;
In figure:1- overhanging components, 11- lifting lugs, 12- locating grooves, 2- upper stratas beam, 3- steel wire ropes, 4- flower basket bolts.
Specific embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to the accompanying drawings and embodiments, it is right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
As shown in Figure 1, a kind of assembled architecture overhanging component construction method, includes the following steps:
(a) preparation of construction:Determine 1 installation site of overhanging component;
(b) lifting component:Overhanging component 1 is hung by installation site, lifting equipment using lifting equipment (not shown) Suspension hook under need to hang a chain block (not shown), it is necessary to explanation, is preset with lifting lug 11 on overhanging component 1, side Just lift, lifting equipment is when lifting overhanging component 1 generally by the way of 4 points of liftings;
(c) hang Suspension and be connected Suspension with component:It is hung on the upper strata beam 2 of 1 installation site of overhanging component Suspension is provided with adjustment structure on Suspension, Suspension and overhanging component 1 is linked together;Upper strata beam 2 is preferably I-shaped Steel, certainly, upper strata beam 2 can also be using other shaped steel that those skilled in the art can realize etc., and details are not described herein;It is outstanding Hanging piece is preferably steel wire rope 3, certainly, the other manner that Suspension can also can be realized using chain or those skilled in the art Etc., details are not described herein;Adjustment structure is preferably flower basket bolt 4, and certainly, adjustment structure can also use people in the art Other adjustment structures that member can realize etc., details are not described herein;
(d) adjustment member absolute altitude, verticality and flatness:Overhanging component 1 is carried out using chain block and flower basket bolt 4 Absolute altitude, verticality, the essence of flatness are levelling;Preferably, it is levelling in order to facilitate the essence of overhanging component 1, it can be set on overhanging component 1 Locating groove 12 is put, it is convenient to be attached with building body;
(e) suspension hook of lifting equipment is separated with overhanging component 1;
(f) component reserved steel bar and the establishment of plate muscle are fixed:After 1 absolute altitude of overhanging component, verticality and flatness are adjusted, By the reserved steel bar (not shown) of overhanging component 1 and the plate muscle (not shown) banding fixed of assembled architecture;
(g) board concrete pours:The plate muscle banding fixed of 1 reserved steel bar of overhanging component and assembled architecture is completed to check and accept Afterwards, pouring for concrete is carried out;
(h) concrete removes the Suspension after reaching design strength:After the age of concrete reaches requirement, reach after testing After design strength, steel wire rope 3 is removed.
It should be noted that it is hung in above-mentioned steps (b) and step (c) on the upper strata beam 2 of 1 installation site of overhanging component Suspension, which is preferably a step, to be carried out at the same time, and certainly, hangs suspention in step (c) on the upper strata beam 2 of 1 installation site of overhanging component Part step can also carry out before step (b).Above-mentioned steps (e) only need to be after step (d).
Assembled architecture overhanging component construction method provided in an embodiment of the present invention is using lifting equipment, chain block and hangs Traditional support system is converted into suspension system by hanging piece to be installed to overhanging component, without using traditional support In the case of system, the installation of assembled architecture overhanging component is realized.
Overhanging component construction method provided in an embodiment of the present invention can accelerate speed of application, conventional construction method overhanging structure The installation needs of part could carry out after support system is set up, and overhanging component construction method provided in an embodiment of the present invention Support system need not be set up, as long as major structure of construction construction finishes, lifting equipment is lifted and hung on the beam of upper strata Suspension can be carried out at the same time, hardly holding time, save the erection time of support system.
Overhanging component construction method provided in an embodiment of the present invention can shorten the construction period, traditional overhanging component construction method To be successively supported, reach design strength, then carry out next layer of support system and set, then construct;But this The overhanging component construction method that inventive embodiments provide can simultaneously be constructed with multilayer.
Overhanging component construction method mounting cost provided in an embodiment of the present invention lowers significantly, and traditional installs support system System is, it is necessary to installation personnel, Master Cost, and for general building site support system to rent, cost is higher, and provided in an embodiment of the present invention Personnel's installation is not required in overhanging component construction method, and Suspension is more using the number of turnover of steel wire rope, and cost is relatively low, and saves Substantial amounts of labour cost.
Overhanging component construction method construction site neat and tidy provided in an embodiment of the present invention, really avoids full hall frame branch Support system allows building site to become safer, more unimpeded.
To sum up, assembled architecture overhanging component construction method provided in an embodiment of the present invention, based on steel reinforced concrete fabricated construction System, without using conventional support system so that construction site neat and tidy, safe and unimpeded;And short construction period, construction cost With low.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention All any modification, equivalent and improvement made within refreshing and principle etc., should all be included in the protection scope of the present invention.

Claims (6)

1. assembled architecture overhanging component construction method, which is characterized in that include the following steps:
(a) preparation of construction:Determine overhanging component installation site;
(b) lifting component:The overhanging component is hung by installation site using lifting equipment, is needed under the suspension hook of the lifting equipment Hang a chain block;
(c) hang Suspension and be connected the Suspension with component:It is hanged on the upper strata beam of the overhanging component installation site Hanging hanging piece is provided with adjustment structure on the Suspension, the Suspension and the overhanging component is linked together;
(d) adjustment member absolute altitude, verticality and flatness:Using chain block and the adjustment structure to the overhanging component into Rower height, verticality, the essence of flatness are levelling;
(e) component reserved steel bar and the establishment of plate muscle are fixed:After the overhanging component absolute altitude, verticality and flatness are adjusted, By the plate muscle banding fixed of the reserved steel bar of the overhanging component and the assembled architecture;
(f) board concrete pours:The plate muscle banding fixed completion of the overhanging component reserved steel bar and the assembled architecture is tested After receipts, pouring for concrete is carried out;
(g) concrete removes the Suspension after reaching design strength:After the age of concrete reaches requirement, reach design after testing After intensity, the Suspension is removed.
2. assembled architecture overhanging component construction method according to claim 1, which is characterized in that in the step (d) Afterwards, further include the suspension hook of the lifting equipment and the overhanging component separating step.
3. assembled architecture overhanging component construction method according to claim 1, which is characterized in that the upper strata Liang Weigong Word steel.
4. assembled architecture overhanging component construction method according to claim 1, which is characterized in that the Suspension is steel Cord.
5. assembled architecture overhanging component construction method according to claim 4, which is characterized in that the adjustment structure is Flower basket bolt.
6. the assembled architecture overhanging component construction method according to any one claim in claim 1 to 5, special Sign is, locating groove is additionally provided on the overhanging component.
CN201711482111.0A 2017-12-29 2017-12-29 Construction method of cantilever component of fabricated building Active CN108104260B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711482111.0A CN108104260B (en) 2017-12-29 2017-12-29 Construction method of cantilever component of fabricated building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711482111.0A CN108104260B (en) 2017-12-29 2017-12-29 Construction method of cantilever component of fabricated building

Publications (2)

Publication Number Publication Date
CN108104260A true CN108104260A (en) 2018-06-01
CN108104260B CN108104260B (en) 2020-04-21

Family

ID=62214839

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711482111.0A Active CN108104260B (en) 2017-12-29 2017-12-29 Construction method of cantilever component of fabricated building

Country Status (1)

Country Link
CN (1) CN108104260B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403533A (en) * 2018-12-06 2019-03-01 中国建筑装饰集团有限公司 A kind of extensive high-altitude suspended-cable structure aluminum veneer moulding furred ceiling and its construction method
CN110206167A (en) * 2019-06-17 2019-09-06 中国十七冶集团有限公司 A kind of assembly concrete building element tenon riveting formula design and construction method
CN112726812A (en) * 2020-12-29 2021-04-30 浙江经纬装配式建筑科技有限公司 Assembly type building cantilever member and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104674992A (en) * 2015-01-29 2015-06-03 中国建筑第八工程局有限公司 Supporting method and structure of suspended steel bar truss deck
CN104746884A (en) * 2015-04-10 2015-07-01 华东建筑设计研究院有限公司 Method for hoisting prefabricated parts of assembled building
CN205367457U (en) * 2016-02-19 2016-07-06 龙信建设集团有限公司 Cast member installs special hoist
CN106013811A (en) * 2016-05-13 2016-10-12 李藏柱 Mounting method of prefabricated building
CN205675990U (en) * 2016-06-15 2016-11-09 北京城建建设工程有限公司 A kind of building prefabricated components hanging apparatus

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104674992A (en) * 2015-01-29 2015-06-03 中国建筑第八工程局有限公司 Supporting method and structure of suspended steel bar truss deck
CN104746884A (en) * 2015-04-10 2015-07-01 华东建筑设计研究院有限公司 Method for hoisting prefabricated parts of assembled building
CN205367457U (en) * 2016-02-19 2016-07-06 龙信建设集团有限公司 Cast member installs special hoist
CN106013811A (en) * 2016-05-13 2016-10-12 李藏柱 Mounting method of prefabricated building
CN205675990U (en) * 2016-06-15 2016-11-09 北京城建建设工程有限公司 A kind of building prefabricated components hanging apparatus

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403533A (en) * 2018-12-06 2019-03-01 中国建筑装饰集团有限公司 A kind of extensive high-altitude suspended-cable structure aluminum veneer moulding furred ceiling and its construction method
CN110206167A (en) * 2019-06-17 2019-09-06 中国十七冶集团有限公司 A kind of assembly concrete building element tenon riveting formula design and construction method
CN112726812A (en) * 2020-12-29 2021-04-30 浙江经纬装配式建筑科技有限公司 Assembly type building cantilever member and construction method

Also Published As

Publication number Publication date
CN108104260B (en) 2020-04-21

Similar Documents

Publication Publication Date Title
CN105604334B (en) A kind of rapid constructing method for large span steel truss integral installation
CN103669845B (en) High-altitude long-span overhung cornice formwork bracing system and construction method thereof
CN108104260A (en) Assembled architecture overhanging component construction method
CN205489264U (en) Hydraulic pressure assembled crossing structure
CN104234200B (en) A kind of suspen-shell structure rope leverage is by ring lifting installation method
CN209052240U (en) A kind of tool for super high-rise building duplex elevator vertical transport
CN106013419B (en) Long-span Cantilever abnormity transfinites structural steel corridor construction engineering method
CN206692235U (en) A kind of steel structure dome lifts by crane erecting device
CN203080400U (en) Extra-large span suspension bridge with uniparted hyperboloid space cable net main cables
CN208899886U (en) Cantilever frame platform
CN103352576A (en) Externally expanding, assembling, converting and lifting method for medium/small span steel structure roof net rack
CN106437123A (en) Supporting leg automatic turnover type overall lifting elevator well operation platform
CN201288415Y (en) Subsection gradual change overhanging type external scaffold for tall building
CN106567542A (en) Super high-rise double tower building steel structure corridor assembling method
CN109162447A (en) Steel platform of climbing support device and its application method
CN107575032A (en) A kind of bolt-ball net frame roofing installation method
CN109826082A (en) A kind of construction method for installing decorating structure in cable-stayed bridge multitower column combination space
CN112943549A (en) Concrete tower cylinder steel strand pulling construction method
CN105625732B (en) Superelevation overhanging steel structure truss support free construction method
CN102720360B (en) Combination device of secondary high building supported lifted and poured cement formwork and building material lifting and lifting box
CN209211877U (en) Steel platform of climbing support device
CN203755173U (en) Formwork device used for hydraulic climbing of bridge high pier
CN114134991B (en) High-rise building construction method with conversion structure
CN106120573A (en) Multispan cable-carried arch bridge self-balancing button over strait hangs construction method
CN110130644A (en) A kind of construction method of high-altitude steel structure bottom metal curtain wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant