CN109162447A CN201811182252.5A CN201811182252A CN109162447A CN 109162447 A CN109162447 A CN 109162447A CN 201811182252 A CN201811182252 A CN 201811182252A CN 109162447 A CN109162447 A CN 109162447A
Authority
CN
China
Prior art keywords
steel
wall
support device
platform support
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811182252.5A
Other languages
Chinese (zh)
Inventor
朱敏毅
徐磊
陈逯浩
申青峰
张星波
陆庆华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 1 Group Co Ltd
Original Assignee
Shanghai Construction No 1 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 1 Group Co Ltd filed Critical Shanghai Construction No 1 Group Co Ltd
Priority to CN201811182252.5A priority Critical patent/CN109162447A/en
Publication of CN109162447A publication Critical patent/CN109162447A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/28Climbing forms, i.e. forms which are not in contact with the poured concrete during lifting from layer to layer and which are anchored in the hardened concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Abstract

For the fixed installation for the steel column that solves the problems, such as to climb, rapid-assembling/disassembling, the recycling of the steel column that climbs being realized, avoiding the unstability hidden danger occurred during steel platform is climbed of climbing, the present invention provides several steel platform support device and its application methods of climbing.One kind is climbed steel platform support device, it is installed on the top of wall, prefabricated bolt is buried in the wall, the prefabricated bolt stretches out at the top of wall, the steel platform support device of climbing includes the steel column that climbs, and the steel column that climbs is set to the top of wall and is fixedly connected by prefabricated bolt with wall.

Description

Steel platform of climbing support device and its application method
Technical field
The present invention relates to a kind of device of construction, in particular to one kind is climbed steel platform support device and its user Method.
Background technique
Steel column drum rack alternating supporting type hydraulic climbs integral steel platform mould bases equipment as a kind of novel construction equipment, in height It is widely used in layer and super high-rise building core tube construction.The equipment is supported by tub and is climbed with the steel column girder steel that climbs System alternating supporting role realizes that Core Walls Structure wall is efficiently built.
It climbs process in steel platform, the steel column that climbs is fixed at the top of the main structure Core Walls Structure wall for pouring completion, tradition Way is that the steel column that climbs is fixed in wall body structure by the way that casing is embedding, the self weight of steel platform system, construction live load and side The Core Walls Structure of main structure is transferred to by the steel column that climbs to load, thus climb steel column and the connection of Core Walls Structure wall top it is reliable Property directly influence steel platform system climb during safety.
For Reinforced Concrete Core Walls Structure, the steel column that climbs directly sets aside to its safety under Core Walls Structure state and is easy To guarantee, but for steel plate shear wall structure, since steel plate therein, sleeper and peg thereon make the steel column that climbs Can not be directly embedding or set aside to wall, the installation difficulty for the steel column that is added significantly to climb, this reduces the steel columns that climbs Bundle pillar overall stability, and then influenced the overall security of steel platform system.In addition, being buried in the shear wall of super high rise structure The shape of steel construction (sleeper, steel plate) is more complex, and changes greatly from top to bottom, and thickness of wall body also tends to gradually become from bottom to top It is thin, and due to the process requirement of Steel Structure Installation and welding, the segmentation of steel construction is normally at the above 500- in structural floor face At 1000mm, this all brings great difficulty to the installation for the steel column that climbs.
Based on this consideration, the steel platform support device of climbing of a kind of tool-type, seriation need to be researched and developed, for different steel knots Structure protective layer thickness, steel construction height of lift, the fixed installation for the steel column that solves the problems, such as to climb, during the steel platform that avoids climbing is climbed The unstability hidden danger of appearance, and realize the rapid-assembling/disassembling for the steel column that climbs, recycling.
Summary of the invention
For the fixed installation for the steel column that solves the problems, such as to climb, realizes rapid-assembling/disassembling, the recycling of the steel column that climbs, avoid climbing The unstability hidden danger that lift steel platform occurs during climbing, the present invention provide several steel platform support device and its application methods of climbing.
A kind of technical solution of steel platform support device of climbing of the invention is as follows:
One kind is climbed steel platform support device, is installed on the top of wall (9), is buried prefabricated bolt in the wall (9) (8), the prefabricated bolt (8) is stretched out at the top of wall (9), and the steel platform support device of climbing includes climbing steel column (1), described The steel column (1) that climbs is set to the top of wall (9) and is fixedly connected by prefabricated bolt (8) with wall (9).
A kind of steel platform support device of climbing of the invention has the beneficial effect that:
One kind of the invention is climbed steel platform support device, and the steel column that climbs (1) is solid by prefabricated bolt (8) and wall (9) Fixed connection, the fixed installation for the steel column that solves the problems, such as to climb, avoids the unstability hidden danger occurred during steel platform is climbed of climbing.Separately Outside, steel column (1) installation of climbing is simple, and will can easily climb steel column (1) dismounting after the completion of construction, to realize the steel that climbs The rapid-assembling/disassembling of platform supporting device, recycling.
Further, for steel platform support device installation strength of reinforcing climbing, in the steel platform support device of climbing, It further include template (3), the template (3) is respectively arranged at the two sides of wall (9).
Further, specifically, in the steel platform support device of climbing, bottom is welded in the bottom of the steel column that climbs (1) Plate (5), the prefabricated bolt (8) pass through bottom plate (5) steel column (1) that will climb and are fixed at the top of wall (9).
The present invention also provides a kind of application method of above-mentioned steel platform support device of climbing, technical solution is as follows:
A kind of application method of above-mentioned steel platform support device of climbing, includes the following steps:
The first step smoothes out the top surface of wall (9);
The steel column that climbs (1) is fixedly installed on the top of wall (9) by second step;
A kind of application method of steel platform support device of climbing of the invention has the beneficial effect that:
A kind of application method of steel platform support device of climbing of the invention, the steel column that climbs (1) by prefabricated bolt (8) with Wall (9) is fixedly connected, the fixed installation for the steel column that solves the problems, such as to climb, and avoids the unstability occurred during steel platform is climbed of climbing Hidden danger.In addition, the steel column that climbs (1) installation is simple, will can easily climb steel column (1) dismounting after the completion of construction, to realize The rapid-assembling/disassembling of steel platform support device of climbing, recycling.
It climbs steel platform support device and its application method the present invention also provides another kind.
Another kind of the invention climb steel platform support device technical solution it is as follows:
One kind is climbed steel platform support device, is installed on the top of wall (9), is buried prefabricated bolt in the wall (9) (8) it is stretched out at the top of wall (9) with shearing steel plate (7), the prefabricated bolt (8) and shearing steel plate (7), the steel platform branch of climbing Support arrangement includes climb steel column (1) and fashioned iron supporting leg (2), and the fashioned iron supporting leg (2) is set to the top of wall (9) and leads to Prefabricated bolt (8) to be crossed to be fixedly connected with wall (9), the height of the fashioned iron supporting leg (2) is identical as the shearing height of steel plate (7), Steel column (1) is climbed in the fixed setting of the top of the fashioned iron supporting leg (2) and shearing steel plate (7).
Another kind of the invention climbs the having the beneficial effect that of steel platform support device:
Another kind of the invention climbs steel platform support device, and the steel column (1) that will climb is fixed on fashioned iron supporting leg (2) and shearing The top of steel plate (7) sufficiently combines the shearing steel plate (7) at the top of wall (9), solves the presence because shearing steel plate (7), leads The problem of cause lacks installation space, and the steel platform support device that makes to climb can not be installed.In addition, the steel column that climbs (1) and fashioned iron supporting leg (2) installation is simple, and will can easily climb steel column (1) and fashioned iron supporting leg (2) dismounting after the completion of construction, climbs to realize The rapid-assembling/disassembling of steel platform support device, recycling.
Further, for steel platform support device installation strength of reinforcing climbing, in the steel platform support device of climbing, It further include template (3), the template (3) is respectively arranged at the two sides of wall (9).
Further, for steel platform support device installation strength of reinforcing climbing, in the steel platform support device of climbing, The prefabricated bolt (8) and fashioned iron supporting leg (2) be two groups, the prefabricated bolt (8) is respectively arranged at fashioned iron supporting leg (2) cuts The two sides of power steel plate (7).
Further, in order to improve the verticality of the steel column that climbs (1) installation, in the steel platform support device of climbing, institute The top welding top plate (4) of prefabricated bolt (8) Yu fashioned iron supporting leg (2) is stated, bottom plate (5) are welded in the bottom of the steel column that climbs (1), Slot is opened up around the top plate (4) and bottom plate (5) respectively, the top plate (4) and the slot of bottom plate (5) correspond simultaneously It is mutually perpendicular to along its length, the top plate (4) is bolted with bottom plate (5).
The present invention also provides a kind of application method of above-mentioned steel platform support device of climbing, technical solution is as follows:
The first step smoothes out the top surface of wall (9);
Fashioned iron supporting leg (2) is set to the top of wall (9) and is fixed by prefabricated bolt (8) and wall (9) by second step Connection;
The steel column that climbs (1) is fixedly installed on fashioned iron supporting leg (2) and shears the top of steel plate (7) by third step.
A kind of application method of steel platform support device of climbing of the invention has the beneficial effect that:
Another kind of the invention climbs the application method of steel platform support device, and the steel column (1) that will climb is fixed on fashioned iron branch The top of leg (2) and shearing steel plate (7), sufficiently combines the shearing steel plate (7) at the top of wall (9), solves because shearing steel plate (7) the problem of presence causes to lack installation space, and the steel platform support device that makes to climb can not be installed.In addition, the steel column that climbs (1) simple with fashioned iron supporting leg (2) installation, will can easily climb steel column (1) and fashioned iron supporting leg (2) dismounting after the completion of construction, To realize rapid-assembling/disassembling, the recycling of steel platform support device of climbing.
Further, in order to improve the steel column that climbs (1) installation verticality, the use of the steel platform support device of climbing In method, in third step, the top welding top plate (4) of the prefabricated bolt (8) and fashioned iron supporting leg (2), the steel column that climbs (1) Bottom weld bottom plate (5), open up slot around the top plate (4) and bottom plate (5) respectively, the top plate (4) and bottom plate (5) Slot correspond and be mutually perpendicular to along its length, the top plate (4) is bolted with bottom plate (5), and climb steel When column (1) is connect with fashioned iron supporting leg (2), shearing steel plate (7), carried out by the slot that top plate (4) and bottom plate (5) are correspondingly arranged Positioning guarantees the verticality of steel column (1) of climbing.
Detailed description of the invention
Fig. 1 is a kind of schematic diagram of steel platform support device of climbing of the invention;
Fig. 2 is that another kind of the invention climbs the schematic diagram of steel platform support device;
Fig. 3 is that another kind of the invention climbs the schematic diagram of steel platform support device;
Fig. 4 is a kind of schematic diagram of the top plate of steel platform support device of climbing of the invention;
Fig. 5 is a kind of schematic diagram of the bottom plate of steel platform support device of climbing of the invention;
Specific embodiment
The present invention is described in further detail below in conjunction with the drawings and specific embodiments.It is wanted according to following explanation and right Book is sought, advantages and features of the invention will become apparent from.It should be noted that attached drawing is all made of very simplified form and using non- Accurately ratio, only for the purpose of facilitating and clarifying the purpose of the embodiments of the invention.
Embodiment 1:
With reference to Fig. 1, climbs steel platform support device the present embodiment provides one kind, be installed on the top of wall 9, the wall Prefabricated bolt 8 is buried in 9, the prefabricated bolt 8 stretches out 9 top of wall, and the steel platform support device of climbing includes the steel that climbs Column 1, the steel column 1 that climbs are set to the top of wall 9 and are fixedly connected by prefabricated bolt 8 with wall 9.
One kind of the present embodiment is climbed steel platform support device, the steel column 1 that climbs by prefabricated bolt 8 with wall 9 is fixed connects It connects, the fixed installation for the steel column that solves the problems, such as to climb, avoids the unstability hidden danger occurred during steel platform is climbed of climbing.In addition, climbing It rises steel column 1 to install simply, the steel column 1 that will can easily climb after the completion of construction is removed, to realize steel platform support of climbing The rapid-assembling/disassembling of device, recycling.
As preferable embodiment, for steel platform support device installation strength of reinforcing climbing, the steel platform of climbing It further include template 3 in support device, the template 3 is respectively arranged at the two sides of wall 9.
As preferable embodiment, specifically, in the steel platform support device of climbing, the steel column that climbs (1) Bottom plate (5) are welded in bottom, and the prefabricated bolt (8) passes through bottom plate (5) steel column (1) that will climb and is fixed at the top of wall (9).
Embodiment 2:
With reference to Fig. 1, the present embodiment provides a kind of application method of steel platform support device described in embodiment 1 of climbing, skills Art scheme is as follows:
A kind of application method of above-mentioned steel platform support device of climbing, includes the following steps:
The first step smoothes out the top surface of wall 9;
The steel column 1 that climbs is fixedly installed on the top of wall 9 by second step;
A kind of application method of steel platform support device of climbing of the present embodiment, the steel column 1 that climbs pass through prefabricated bolt 8 and wall Body 9 is fixedly connected, the fixed installation for the steel column that solves the problems, such as to climb, and the unstability occurred during steel platform is climbed that avoids climbing is hidden Suffer from.In addition, the steel column 1 that climbs is installed simply, the steel column 1 that will can easily climb after the completion of construction is removed, and is climbed to realize The rapid-assembling/disassembling of steel platform support device, recycling.
Embodiment 3:
With reference to Fig. 2, a kind of technical solution for steel platform support device of climbing provided in this embodiment is as follows, and one kind is climbed steel Platform supporting device is installed on the top of wall 9, and prefabricated bolt 8 and shearing steel plate 7, the prefabricated spiral shell are buried in the wall 9 Bolt 8 and shearing steel plate 7 stretch out 9 top of wall, and the steel platform support device of climbing includes climb steel column 1 and fashioned iron supporting leg 2, the fashioned iron supporting leg 2 is set to the top of wall 9 and is fixedly connected by prefabricated bolt 8 with wall 9, the fashioned iron supporting leg 2 Height it is identical as the shearing height of steel plate 7, the top fixed setting of the fashioned iron supporting leg 2 and shearing steel plate 7 is climbed steel column 1.
One kind of the present embodiment is climbed steel platform support device, and the steel column 1 that will climb is fixed on fashioned iron supporting leg 2 and shearing steel plate 7 top sufficiently combines the shearing steel plate 7 at 9 top of wall, solves the presence because shearing steel plate 7, causes to lack installation sky Between, the problem of steel platform support device that makes to climb can not be installed.In addition, the steel column 1 that climbs is installed simply with fashioned iron supporting leg 2, construction The steel column 1 that will can easily climb after the completion is removed with fashioned iron supporting leg 2, to realize the quick of steel platform support device that climb Assembly and disassembly, recycling.
It is described to climb for steel platform support device installation strength of reinforcing climbing as preferable embodiment with reference to Fig. 2 It further include template 3 in lift steel platform support device, the template 3 is respectively arranged at the two sides of wall 9.
It is described to climb for steel platform support device installation strength of reinforcing climbing as preferable embodiment with reference to Fig. 3 In lift steel platform support device, the prefabricated bolt 8 and fashioned iron supporting leg 2 be two groups, the prefabricated bolt 8 and fashioned iron supporting leg 2 It is respectively arranged at the two sides of shearing steel plate 7.
It is described to climb in order to improve the verticality for the installation of steel column 1 of climbing as preferable embodiment referring to figs. 2 to Fig. 5 In lift steel platform support device, the top welding top plate 4 of the prefabricated bolt 8 and fashioned iron supporting leg 2, the bottom of the steel column 1 that climbs Bottom plate 5 is welded in portion, and the top plate 4 opens up slot with 5 surrounding of bottom plate respectively, and the slot one of the top plate 4 and bottom plate 5 is a pair of It should and be mutually perpendicular to along its length, the top plate 4 is bolted with bottom plate 5.
Embodiment 4:
Referring to figs. 2 to Fig. 3, the present embodiment provides a kind of users of steel platform support device described in embodiment 3 of climbing Method, technical solution are as follows:
The first step smoothes out the top surface of wall 9;
Fashioned iron supporting leg 2 is set to the top of wall 9 and is fixedly connected by prefabricated bolt 8 with wall 9 by second step;
The steel column 1 that climbs is fixedly installed on fashioned iron supporting leg 2 and shears the top of steel plate 7 by third step.
A kind of application method of steel platform support device of climbing of the present embodiment, the steel column 1 that will climb are fixed on fashioned iron supporting leg 2 With the top of shearing steel plate 7, the shearing steel plate 7 at 9 top of wall is sufficiently combined, the presence because shearing steel plate 7 is solved, causes Lack installation space, the problem of steel platform support device that makes to climb can not be installed.In addition, climb steel column 1 and the installation of fashioned iron supporting leg 2 Simply, the steel column 1 that will can easily climb after the completion of construction is removed with fashioned iron supporting leg 2, to realize steel platform support of climbing The rapid-assembling/disassembling of device, recycling.
It is described to climb in order to improve the verticality for the installation of steel column 1 of climbing as preferable embodiment referring to figs. 2 to Fig. 5 In the application method of lift steel platform support device, in third step, the top welding top plate of the prefabricated bolt 8 and fashioned iron supporting leg 2 4, bottom plate 5 is welded in the bottom of the steel column 1 that climbs, and the top plate 4 and 5 surrounding of bottom plate open up slot respectively, the top plate 4 with The slot of bottom plate 5 is corresponded and is mutually perpendicular to along its length, and the top plate 4 is bolted with bottom plate 5, and climb steel When column 1 is connect with fashioned iron supporting leg 2, shearing steel plate 7, is positioned, guaranteed by the slot that top plate 4 is correspondingly arranged with bottom plate 5 It climbs the verticality of steel column 1.
Embodiment 5:
Referring to figs. 1 to Fig. 5, the present embodiment provides a kind of usage scenarios of steel platform support device of climbing.
Embodiment 1 can use simultaneously as needed with the steel platform support device of climbing in embodiment 3.
When wall 9 is without shearing steel plate 7 or has shearing steel plate 7 but very thick wall, described in embodiment 1 climb can be used The steel column 1 that climbs is supported directly upon the top of wall 9 by steel platform support device;
When wall 9 have shearing steel plate 7, but shear steel plate 7 influence climb steel column 1 install when, can be used described in embodiment 3 Steel platform support device of climbing, by the steel column 1 that climbs be fixed on fashioned iron supporting leg 2 and shear steel plate 7 top;
When wall 9 has shearing steel plate 7, and wall 9 is relatively thin, the steel platform support dress described in embodiment 3 that climbs can be used Set, the prefabricated bolt 8 and fashioned iron supporting leg 2 be two groups, the prefabricated bolt 8 is respectively arranged at shearing steel with fashioned iron supporting leg 2 Then the steel column 1 that climbs is fixed on fashioned iron supporting leg 2 and shears the top of steel plate 7 by the two sides of plate 7.
Foregoing description is only the description to present pre-ferred embodiments, not to any restriction of the scope of the invention, this hair Any change, the modification that the those of ordinary skill in bright field does according to the disclosure above content, belong to the protection of claims Range.

Claims (10)

  1. The steel platform support device 1. one kind is climbed, is installed on the top of wall (9), which is characterized in that buries in the wall (9) Prefabricated bolt (8), the prefabricated bolt (8) are stretched out at the top of wall (9), and the steel platform support device of climbing includes the steel column that climbs (1), the steel column that climbs (1) is set to the top of wall (9) and is fixedly connected by prefabricated bolt (8) with wall (9).
  2. 2. steel platform support device of climbing as described in claim 1, which is characterized in that further include template (3), the template (3) two sides of wall (9) are respectively arranged at.
  3. 3. steel platform support device of climbing as described in claim 1, which is characterized in that weld the bottom of the steel column that climbs (1) It connects bottom plate (5), the prefabricated bolt (8) passes through bottom plate (5) steel column (1) that will climb and is fixed at the top of wall (9).
  4. 4. the application method of any one steel platform support device of climbing in a kind of such as claims 1 to 3, which is characterized in that packet Include following steps:
    The first step smoothes out the top surface of wall (9);
    The steel column that climbs (1) is fixedly installed on the top of wall (9) by second step.
  5. The steel platform support device 5. one kind is climbed, is installed on the top of wall (9), which is characterized in that buries in the wall (9) Prefabricated bolt (8) and shearing steel plate (7), the prefabricated bolt (8) and shearing steel plate (7) stretch out at the top of wall (9), described to climb Steel platform support device includes climb steel column (1) and fashioned iron supporting leg (2), and the fashioned iron supporting leg (2) is set to wall (9) Top is simultaneously fixedly connected by prefabricated bolt (8) with wall (9), the height of the fashioned iron supporting leg (2) and the height of shearing steel plate (7) Spend it is identical, the fashioned iron supporting leg (2) and shearing steel plate (7) top fixed setting climbs steel column (1).
  6. 6. steel platform support device of climbing as claimed in claim 5, which is characterized in that further include template (3), the template (3) two sides of wall (9) are respectively arranged at.
  7. 7. steel platform support device of climbing as claimed in claim 5, which is characterized in that the prefabricated bolt (8) and fashioned iron branch Leg (2) be two groups, the prefabricated bolt (8) and fashioned iron supporting leg (2) are respectively arranged at the two sides of shearing steel plate (7).
  8. 8. steel platform support device of climbing as claimed in claim 5, which is characterized in that the prefabricated bolt (8) and fashioned iron branch Bottom plate (5) are welded in the bottom of the top welding top plate (4) of leg (2), the steel column that climbs (1), the top plate (4) and bottom plate (5) Around open up slot respectively, the slot one-to-one correspondence of the top plate (4) and bottom plate (5) is simultaneously mutually perpendicular to along its length, The top plate (4) is bolted with bottom plate (5).
  9. 9. the application method of any one steel platform support device of climbing in a kind of such as claim 5 to 8, which is characterized in that packet Include following steps:
    The first step smoothes out the top surface of wall (9);
    Fashioned iron supporting leg (2) is set to the top of wall (9) and connected by the way that prefabricated bolt (8) and wall (9) are fixed by second step It connects;
    The steel column that climbs (1) is fixedly installed on fashioned iron supporting leg (2) and shears the top of steel plate (7) by third step.
  10. 10. a kind of application method for steel platform support device of climbing as claimed in claim 9, which is characterized in that in third step, Weld bottom plate in the bottom of the top welding top plate (4) of the prefabricated bolt (8) and fashioned iron supporting leg (2), the steel column that climbs (1) (5), slot, one a pair of slot of the top plate (4) and bottom plate (5) are opened up respectively around the top plate (4) and bottom plate (5) It should and be mutually perpendicular to along its length, the top plate (4) is bolted with bottom plate (5), the steel column that climbs (1) and fashioned iron supporting leg (2), it when shearing steel plate (7) connection, is positioned by the slot that top plate (4) is correspondingly arranged with bottom plate (5), guarantees the steel that climbs The verticality of column (1).
CN201811182252.5A 2018-10-11 2018-10-11 Steel platform of climbing support device and its application method Pending CN109162447A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811182252.5A CN109162447A (en) 2018-10-11 2018-10-11 Steel platform of climbing support device and its application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811182252.5A CN109162447A (en) 2018-10-11 2018-10-11 Steel platform of climbing support device and its application method

Publications (1)

Publication Number Publication Date
CN109162447A true CN109162447A (en) 2019-01-08

Family

ID=64877771

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811182252.5A Pending CN109162447A (en) 2018-10-11 2018-10-11 Steel platform of climbing support device and its application method

Country Status (1)

Country Link
CN (1) CN109162447A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111058618A (en) * 2019-12-27 2020-04-24 上海建工集团股份有限公司 Combined type telescopic sleeve jacking device and method thereof
CN111058617A (en) * 2019-12-27 2020-04-24 上海建工集团股份有限公司 Automatic jacking barrel frame template system for concrete structure construction and method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102677889A (en) * 2012-05-11 2012-09-19 上海建工集团股份有限公司 System for alternatively supporting whole lifting steel platform formwork by steel column casing rack and construction method
CN102912972A (en) * 2012-10-31 2013-02-06 中建三局第二建设工程有限责任公司 Multifunctional lifting steel platform switching jig and construction method
CN206599881U (en) * 2016-12-30 2017-10-31 上海建工四建集团有限公司 Integral prefabricated individual layer steel plate concrete combined shear wall
CN107989228A (en) * 2017-12-20 2018-05-04 中冶建筑研究总院有限公司 A kind of prefabricated steel reinforced concrete shear wall structure and its preparation and installation method
CN108457401A (en) * 2018-06-07 2018-08-28 中通钢构股份有限公司 A kind of the splicing node and its construction method of precast concrete shear wall
CN209211877U (en) * 2018-10-11 2019-08-06 上海建工一建集团有限公司 Steel platform of climbing support device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102677889A (en) * 2012-05-11 2012-09-19 上海建工集团股份有限公司 System for alternatively supporting whole lifting steel platform formwork by steel column casing rack and construction method
CN102912972A (en) * 2012-10-31 2013-02-06 中建三局第二建设工程有限责任公司 Multifunctional lifting steel platform switching jig and construction method
CN206599881U (en) * 2016-12-30 2017-10-31 上海建工四建集团有限公司 Integral prefabricated individual layer steel plate concrete combined shear wall
CN107989228A (en) * 2017-12-20 2018-05-04 中冶建筑研究总院有限公司 A kind of prefabricated steel reinforced concrete shear wall structure and its preparation and installation method
CN108457401A (en) * 2018-06-07 2018-08-28 中通钢构股份有限公司 A kind of the splicing node and its construction method of precast concrete shear wall
CN209211877U (en) * 2018-10-11 2019-08-06 上海建工一建集团有限公司 Steel platform of climbing support device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111058618A (en) * 2019-12-27 2020-04-24 上海建工集团股份有限公司 Combined type telescopic sleeve jacking device and method thereof
CN111058617A (en) * 2019-12-27 2020-04-24 上海建工集团股份有限公司 Automatic jacking barrel frame template system for concrete structure construction and method thereof
CN111058617B (en) * 2019-12-27 2021-08-31 上海建工集团股份有限公司 Automatic jacking barrel frame template system for concrete structure construction and method thereof

Similar Documents

Publication Publication Date Title
CN105971274A (en) Overhanging support frame formwork system and construction method thereof
CN103510702B (en) Steel core concrete column pin type concrete pouring construction method
CN104947926B (en) A kind of Core Walls Structure inner core top formwork system hard protection device and its construction method
CN102535845A (en) Construction method of bearing frame of corridor structure
CN106436573B (en) Superelevation Sarasota large span upper beam bracket steel truss stand construction method
CN103104091B (en) Sliding mold whole lifting platform and construction method
CN105298100A (en) Construction method of cantilever construction platform with ultrahigh cast-in-place flaring structure in cylindrical building
CN104389419A (en) Cantilevered formwork platform installation structure and construction method
CN105442839A (en) Erecting method of cantilever structure formwork bent
CN209211877U (en) Steel platform of climbing support device
CN109457951A (en) Contracture shear wall form frame system and its construction method
CN109162447A (en) Steel platform of climbing support device and its application method
CN109162437A (en) Integral steel platform and its construction method for more steel plate shear force walls
CN205502551U (en) Platform is suspended in midair in high altitude large -span vestibule construction
CN105484165B (en) Integrated prestress tensioning frame structure and manufacturing and using methods thereof
CN106522541B (en) A kind of template suspension centre spandrel girder of steel platform and the hanging method of template system
CN204876516U (en) Hard protector of core section of thick bamboo inner tube upper portion die carrier system
CN108104260A (en) Assembled architecture overhanging component construction method
CN205777489U (en) A kind of support system of high and big die plate
CN105370027B (en) The construction method of steel supporting platform structure is integrally lifted in high-rise hanging structure
CN104831928B (en) High-altitude long-span concrete conjoined structure shuttering supporting steel platform construction method
CN209523198U (en) A kind of underpinning structure supporting lattice column
CN201714056U (en) Truss-type operating platform
CN105464215A (en) Reverse construction method construction method of hanging structure incapable of being provided with vertical temporary support
CN203547125U (en) Column type overall steel platform hydraulic creeping formwork

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination