CN107989398A - The reinforcing construction construction method of wall - Google Patents

The reinforcing construction construction method of wall Download PDF

Info

Publication number
CN107989398A
CN107989398A CN201711246564.3A CN201711246564A CN107989398A CN 107989398 A CN107989398 A CN 107989398A CN 201711246564 A CN201711246564 A CN 201711246564A CN 107989398 A CN107989398 A CN 107989398A
Authority
CN
China
Prior art keywords
deformed bar
wall
reinforcing rib
grouting pipe
slurries
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711246564.3A
Other languages
Chinese (zh)
Other versions
CN107989398B (en
Inventor
朱奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Zhonglin Engineering Construction Co ltd
Qiaozhi Construction Co ltd
Fuzhou University
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711246564.3A priority Critical patent/CN107989398B/en
Publication of CN107989398A publication Critical patent/CN107989398A/en
Application granted granted Critical
Publication of CN107989398B publication Critical patent/CN107989398B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0203Arrangements for filling cracks or cavities in building constructions
    • E04G23/0211Arrangements for filling cracks or cavities in building constructions using injection
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • E04G23/0222Replacing or adding wall ties

Abstract

The invention discloses a kind of reinforcing construction construction method of wall, it is characterized in that wall reinforcement construction procedure is using as follows:(1) rendering layer, the embedded hole of preboring Grouting Pipe are peeled off;(2) deformed bar is hung;(3) reinforcing rib is hung on deformed bar;(4) prestressed stretch-draw is carried out to deformed bar;(5) deformed bar is subjected to welding grappling with fixing muscle after prestressed stretch-draw, deformed bar and reinforcing rib is welded and fixed;(6) Grouting Pipe is buried, Grouting Pipe and the gap in embedded hole are closed using structure glue;(7) slip casting is carried out to wall.

Description

The reinforcing construction construction method of wall
Technical field
The present invention relates to a kind of reinforcing construction construction method, the reinforcing construction construction method of more particularly to a kind of wall.
Background technology
Old building by long-term use after the phenomenon of depression of bearing force occurs because of a variety of causes, be mainly manifested in Old building The wall of thing is because crack occur in the reasons such as sedimentation, or bearing capacity of wall body cannot meet the requirement of existing load.Therefore for old Building, the overall load effect of reinforcement structure, improves the mechanical property of structure.
The content of the invention
The present invention is to provide a kind of ruggedized construction construction method of wall, solves the problems, such as bearing capacity of wall body.
The present invention is inadequate for strength of wall body, takes following ruggedized construction:Wall is arranged after peeling off rendering in surface of wall One skin deformed bar, a diameter of 12~14mm of deformed bar, deformed bar spacing are 150~300mm, deformed bar Arrange non-prestressed reinforcing rib again above, deformed bar is welded to connect with reinforcing rib, a diameter of 12~14mm of reinforcing rib, Reinforcing rib bar spacing is 150~300mm.Just arranged direction and horizontal sextant angle are 45 degree to deformed bar, reinforcing rib arrangement side To vertical with arranged direction at the beginning of deformed bar.Deformed bar is consolidated by fixing muscle after deformed bar tensioning Fixed, fixing muscle is welded and fixed with deformed bar, a diameter of 14~16mm of fixing muscle.Fixing muscle spacing for 150~ 300mm, each tensioned unit length are 150~300mm, and reinforcing rib is set in two terminations of tensioned unit.Deformed bar Grouting Pipe is arranged in the tensioned unit formed with non-prestressed reinforcing rib, and slip casting tube spacing is 350~450mm, and Grouting Pipe is straight The stainless-steel pipe of footpath 10mm, Grouting Pipe embedment wall mortar joint, length of embedment 60mm, is fixed with structure glue.Grouting Pipe Three-way valve is set between slurry can.
Following ruggedized construction can also be used:A skin deformed bar is arranged in surface of wall, in advance after wall stripping rendering Stress bar diameter is 12~14mm, and deformed bar spacing is 150~300mm, arranged again above deformed bar it is non-it is pre- should Power reinforcing rib, deformed bar are welded to connect with reinforcing rib, a diameter of 12~14mm of reinforcing rib, and reinforcing rib bar spacing is 150~300mm.Just arranged direction is level to deformed bar, and reinforcing rib arranged direction is to be vertically arranged.Deformed bar tensioning After deformed bar is fixed by fixing muscle, fixing muscle is welded and fixed with deformed bar, and fixing muscle is straight Footpath is 14~16mm.Fixing muscle spacing is 300~600mm, and each tensioned unit length is 300~600mm, in tensioned unit Two terminations set reinforcing rib, and row's reinforcing rib is arranged between termination vertical strengthening ribs and vertical fixing muscle.Deformed bar Grouting Pipe is arranged in the tensioned unit formed with non-prestressed reinforcing rib, and slip casting tube spacing is 350~450mm, and Grouting Pipe is straight The stainless-steel pipe of footpath 10mm, Grouting Pipe embedment wall mortar joint, length of embedment 60mm, is fixed with structure glue.Grouting Pipe Three-way valve is set between slurry can.
After surface of wall sets deformed bar, wall body structure performance can have greatly improved, even structural damage Form also can be very big improvement, from plastic failure can be transitioned into elastic break-down, obvious action is had safely to structure.
Wall reinforcement construction procedure is using as follows:
(1) rendering layer is peeled off, the embedded hole of preboring Grouting Pipe, the embedded bore dia of Grouting Pipe is 12mm;Preboring buries hole Using electronic rotation diamond core drill, it is water-cooled drill bit and is considered to be worth doing with brick output;Using steel wire cleaning surface of wall dust and Scum silica frost or loose position simultaneously keep drying;
(2) deformed bar is hung, deformed bar is fixed on by wall, U-iron button insertion wall ash by U-iron button Seam;
(3) reinforcing rib is hung on deformed bar, is tentatively connected deformed bar with reinforcing rib with steel wire;
(4) prestressed stretch-draw is carried out to deformed bar, deformed bar tensioning uses lever type clamping instrument, lever The resistance arm of clamping tool and the ratio of power arm are 0.05~0.15.Tensioning process is using as follows:Deformed bar is just opened Tension is pulled to 10% control tension stress, holds lotus 3min and establishes primary stress, then is stretched to control tension stress, holds lotus 5min Establish prestressing force.
(5) deformed bar is subjected to welding grappling with fixing muscle after prestressed stretch-draw, by deformed bar with adding Strengthening tendons is welded and fixed;
(6) Grouting Pipe is buried, Grouting Pipe and the gap in embedded hole are closed using structure glue;
(7) slip casting is carried out to wall;With slip casing by pressure machinery slurries injection wall body, slip casting since being put most lower ranking, by Step develops to both sides upwards and symmetrically, reaches expecting pressure or slurries in neighbouring injection point free flow in each injection point Go out, injection can terminate, injection hole plug.
If slurries have leakage, leakage channel is such as can not find, slurries incorporation accelerator is continued a small amount of injections makes leakage Passage gradually precipitates blocking.
After slurries solidification completely, remove Grouting Pipe and carry out sealing of hole.
If wall has crack, following handle is carried out before step (7):
1) grout nipple is buried in the middle part of crack, perfusion point spacing is integrated according to fracture width and the penetration of fracture to be determined, spacing For 200~300mm;
2) dead-end fracture, grout nipple are closed after burying using epoxy mortar, form a confined space, reserve slurries disengaging Mouthful, then slurries are pressed into gap with syringe, fill it.
3) leakage check, applies one layer of soap along crack, is passed through compressed air from grout nipple, air leak position is repaired sealing Untill not leaking.
4) it is in the milk, when fracture width is less than 0.3mm, after epoxy mortar dead-end fracture, then using methacrylic acid Lipid slurry filling;When fracture width is greater than or equal to 0.3mm and is less than 1mm, using epoxy resin slurry filling;When splitting When slit width degree is greater than or equal to 1mm, irrigated using cement grout.
Structural behaviour of the present invention is good, securely and reliably.
Brief description of the drawings
Fig. 1 is wall reinforcement structure diagram one, and Fig. 2 is wall reinforcement structure diagram two.
In each attached drawing:1st, deformed bar, 2, reinforcing rib, 3, fixing muscle, 4, Grouting Pipe, 5, angle steel, 6, fastening screw, 7, Steel plate, 8, batten plate.
Embodiment
Embodiment one
The present embodiment is inadequate for strength of wall body, takes following ruggedized construction:In surface of wall cloth after wall stripping rendering Put a skin deformed bar 1,1 a diameter of 12mm of deformed bar, 1 spacing of deformed bar is 200mm, on deformed bar 1 Non-prestressed reinforcing rib 2 is arranged in face again, and deformed bar 1 is welded to connect with reinforcing rib 2, and 2 a diameter of 12mm of reinforcing rib, adds 2 bar spacing of strengthening tendons is 200mm.Just arranged direction and horizontal sextant angle are 45 degree to deformed bar 1,2 arranged direction of reinforcing rib and Just arranged direction is vertical for deformed bar 1, and deformed bar 1 is just arranged as Fig. 1 dotted line positions, and deformed bar 1 is after tensioning Become solid line position.Deformed bar 1 is fixed by fixing muscle 3 after 1 tensioning of deformed bar, fixing muscle 3 with Deformed bar 1 is welded and fixed, 3 a diameter of 14mm of fixing muscle.3 spacing of fixing muscle is 200mm, each tensioned unit length For 200mm, reinforcing rib 2 is set in two terminations of tensioned unit.That deformed bar 1 is formed with non-prestressed reinforcing rib 2 It is 400mm to draw arrangement Grouting Pipe 4,4 spacing of Grouting Pipe in unit, and Grouting Pipe 4 is the stainless-steel pipe of diameter 10mm, Grouting Pipe 4 Wall mortar joint is embedded to, length of embedment 60mm, is fixed with structure glue.Three-way valve is set between Grouting Pipe 4 and slurry can.
Following ruggedized construction can also be used:A skin deformed bar 1 is arranged in surface of wall, in advance after wall stripping rendering 1 a diameter of 12mm of stress reinforcing bar, 1 spacing of deformed bar are 200mm, and deformed bar 1 arranges non-prestressed reinforcement again above Muscle 2, deformed bar 1 are welded to connect with reinforcing rib 2,2 a diameter of 12mm of reinforcing rib, and 2 bar spacing of reinforcing rib is 200mm.Just arranged direction is level to deformed bar 1, and 2 arranged direction of reinforcing rib to be vertically arranged, just arrange by deformed bar 1 For Fig. 2 dotted line positions, deformed bar 1 becomes solid line position after tensioning.By prestress steel after 1 tensioning of deformed bar Muscle 1 is fixed by fixing muscle 3, and fixing muscle 3 is welded and fixed with deformed bar 1, and fixing muscle 3 a diameter of 14~ 16mm.3 spacing of fixing muscle is 400mm, and each tensioned unit length is 400mm, sets and strengthens in two terminations of tensioned unit Muscle 2, row's reinforcing rib 2 is arranged between termination vertical strengthening ribs 2 and vertical fixing muscle 3.Deformed bar 1 adds with non-prestressed Arrangement Grouting Pipe 4 in the tensioned unit that strengthening tendons 2 is formed, 4 spacing of Grouting Pipe are 400mm, and Grouting Pipe 4 is the stainless steel of diameter 10mm Steel pipe, Grouting Pipe 4 are embedded to wall mortar joint, and length of embedment 60mm, is fixed with structure glue.Between Grouting Pipe 4 and slurry can Three-way valve is set.
Wall reinforcement construction procedure is using as follows:
(1) rendering layer is peeled off, the embedded hole of preboring Grouting Pipe 4, the embedded bore dia of Grouting Pipe 4 is 12mm;Preboring is buried Hole uses electronic rotation diamond core drill, is water-cooled drill bit and is considered to be worth doing with brick output;Using the dust of steel wire cleaning surface of wall And scum silica frost or loose position and keep drying;
(2) deformed bar 1 is hung, deformed bar 1 is fixed on by wall, U-iron button insertion wall by U-iron button Mortar joint;
(3) reinforcing rib 2 is hung on deformed bar 1, is carried out deformed bar 1 and reinforcing rib 2 tentatively with steel wire Connection;
(4) prestressed stretch-draw is carried out to deformed bar 1,1 tensioning of deformed bar uses lever type clamping instrument, lever The resistance arm of formula clamping tool and the ratio of power arm are 0.05~0.15.Tensioning process is using as follows:By at the beginning of deformed bar 1 Tensioning is stretched to 10% control tension stress, holds lotus 3min and establishes primary stress, then is stretched to control tension stress, holds lotus 5min establishes prestressing force.
(5) deformed bar 1 is subjected to welding grappling with fixing muscle 3 after prestressed stretch-draw, by deformed bar 1 with Reinforcing rib 2 is welded and fixed;
(6) Grouting Pipe 4 is buried, Grouting Pipe 4 and the gap in embedded hole are closed using structure glue;
(7) slip casting is carried out to wall;With slip casing by pressure machinery slurries injection wall body, slip casting since being put most lower ranking, by Step develops to both sides upwards and symmetrically, reaches expecting pressure or slurries in neighbouring injection point free flow in each injection point Go out, injection can terminate, injection hole plug.
If slurries have leakage, leakage channel is such as can not find, slurries incorporation accelerator is continued a small amount of injections makes leakage Passage gradually precipitates blocking.
After slurries solidification completely, remove Grouting Pipe 4 and carry out sealing of hole.
If wall has crack, following handle is carried out before step (7):
1) grout nipple is buried in the middle part of crack, perfusion point spacing is integrated according to fracture width and the penetration of fracture to be determined, spacing For 200~300mm;
2) dead-end fracture, grout nipple are closed after burying using epoxy mortar, form a confined space, reserve slurries disengaging Mouthful, then slurries are pressed into gap with syringe, fill it.
3) leakage check, applies one layer of soap along crack, is passed through compressed air from grout nipple, air leak position is repaired sealing Untill not leaking.
4) it is in the milk, when fracture width is less than 0.3mm, after epoxy mortar dead-end fracture, then using methacrylic acid Lipid slurry filling;When fracture width is greater than or equal to 0.3mm and is less than 1mm, using epoxy resin slurry filling;When splitting When slit width degree is greater than or equal to 1mm, irrigated using cement grout.
Embodiment two
The present embodiment uses following ruggedized construction:After wall stripping rendering a skin deformed bar 1 is arranged in surface of wall, 1 a diameter of 12mm of deformed bar, 1 spacing of deformed bar are 200mm, and deformed bar 1 arranges non-prestressed add again above Strengthening tendons 2, deformed bar 1 are welded to connect with reinforcing rib 2,2 a diameter of 12mm of reinforcing rib, and 2 bar spacing of reinforcing rib is 200mm.Just arranged direction is level to deformed bar 1, and 2 arranged direction of reinforcing rib to be vertically arranged, just arrange by deformed bar 1 For Fig. 2 dotted line positions, deformed bar 1 becomes solid line position after tensioning.By prestress steel after 1 tensioning of deformed bar Muscle 1 is fixed by fixing muscle 3, and fixing muscle 3 is welded and fixed with deformed bar 1, and fixing muscle 3 a diameter of 14~ 16mm.3 spacing of fixing muscle is 400mm, and each tensioned unit length is 400mm, sets and strengthens in two terminations of tensioned unit Muscle 2, row's reinforcing rib 2 is arranged between termination vertical strengthening ribs 2 and vertical fixing muscle 3.Deformed bar 1 adds with non-prestressed Arrangement Grouting Pipe 4 in the tensioned unit that strengthening tendons 2 is formed, 4 spacing of Grouting Pipe are 400mm, and Grouting Pipe 4 is the stainless steel of diameter 10mm Steel pipe, Grouting Pipe 4 are embedded to wall mortar joint, and length of embedment 60mm, is fixed with structure glue.Between Grouting Pipe 4 and slurry can Three-way valve is set.
Wall reinforcement construction procedure is using as follows:
(1) rendering layer is peeled off, the embedded hole of preboring Grouting Pipe 4, the embedded bore dia of Grouting Pipe 4 is 12mm;Preboring is buried Hole uses electronic rotation diamond core drill, is water-cooled drill bit and is considered to be worth doing with brick output;Using the dust of steel wire cleaning surface of wall And scum silica frost or loose position and keep drying;
(2) deformed bar 1 is hung, deformed bar 1 is fixed on by wall, U-iron button insertion wall by U-iron button Mortar joint;
(3) reinforcing rib 2 is hung on deformed bar 1, is carried out deformed bar 1 and reinforcing rib 2 tentatively with steel wire Connection;
(4) prestressed stretch-draw is carried out to deformed bar 1,1 tensioning of deformed bar uses lever type clamping instrument, lever The resistance arm of formula clamping tool and the ratio of power arm are 0.05~0.15.Tensioning process is using as follows:By at the beginning of deformed bar 1 Tensioning is stretched to 10% control tension stress, holds lotus 3min and establishes primary stress, then is stretched to control tension stress, holds lotus 5min establishes prestressing force.
(5) deformed bar 1 is subjected to welding grappling with fixing muscle 3 after prestressed stretch-draw, by deformed bar 1 with Reinforcing rib 2 is welded and fixed;
(6) Grouting Pipe 4 is buried, Grouting Pipe 4 and the gap in embedded hole are closed using structure glue;
(7) slip casting is carried out to wall;With slip casing by pressure machinery slurries injection wall body, slip casting since being put most lower ranking, by Step develops to both sides upwards and symmetrically, reaches expecting pressure or slurries in neighbouring injection point free flow in each injection point Go out, injection can terminate, injection hole plug.
If slurries have leakage, leakage channel is such as can not find, slurries incorporation accelerator is continued a small amount of injections makes leakage Passage gradually precipitates blocking.
After slurries solidification completely, remove Grouting Pipe 4 and carry out sealing of hole.
If wall has crack, following handle is carried out before step (7):
1) grout nipple is buried in the middle part of crack, perfusion point spacing is integrated according to fracture width and the penetration of fracture to be determined, spacing For 200~300mm;
2) dead-end fracture, grout nipple are closed after burying using epoxy mortar, form a confined space, reserve slurries disengaging Mouthful, then slurries are pressed into gap with syringe, fill it.
3) leakage check, applies one layer of soap along crack, is passed through compressed air from grout nipple, air leak position is repaired sealing Untill not leaking.
4) it is in the milk, when fracture width is less than 0.3mm, after epoxy mortar dead-end fracture, then using methacrylic acid Lipid slurry filling;When fracture width is greater than or equal to 0.3mm and is less than 1mm, using epoxy resin slurry filling;When splitting When slit width degree is greater than or equal to 1mm, irrigated using cement grout.

Claims (1)

1. a kind of reinforcing construction construction method of wall, it is characterized in that wall reinforcement take it is as follows:In wall after wall stripping rendering One skin deformed bar of body surface layout, a diameter of 12~14mm of deformed bar, deformed bar spacing are 150~300mm, Non-prestressed reinforcing rib is arranged above deformed bar again, deformed bar is welded to connect with reinforcing rib, reinforcing rib diameter For 12~14mm, reinforcing rib bar spacing is 150~300mm;Just arranged direction is horizontal to deformed bar, reinforcing rib arrangement side To be vertically arranged;Deformed bar is fixed by fixing muscle after deformed bar tensioning, fixing muscle is with advance should Power reinforcing bar is welded and fixed, a diameter of 14~16mm of fixing muscle;Fixing muscle spacing is 300~600mm, each tensioned unit length Spend for 300~600mm, reinforcing rib be set in two terminations of tensioned unit, in termination vertical strengthening ribs and vertical fixing muscle it Between arrange row's reinforcing rib;Arrangement Grouting Pipe, Grouting Pipe in the tensioned unit that deformed bar is formed with non-prestressed reinforcing rib Spacing is 350~450mm, and Grouting Pipe is the stainless-steel pipe of diameter 10mm, and Grouting Pipe is embedded to wall mortar joint, and length of embedment is 60mm, is fixed with structure glue;Three-way valve is set between Grouting Pipe and slurry can;
Wall reinforcement construction procedure is using as follows:
(1) rendering layer is peeled off, the embedded hole of preboring Grouting Pipe, the embedded bore dia of Grouting Pipe is 12mm;Preboring buries hole use Electronic rotation diamond core drill, is water-cooled drill bit and is considered to be worth doing with brick output;Using the dust and scum silica frost of steel wire cleaning surface of wall Or loose position and keep drying;
(2) deformed bar is hung, deformed bar is fixed on by wall, U-iron button insertion wall mortar joint by U-iron button;
(3) reinforcing rib is hung on deformed bar, is tentatively connected deformed bar with reinforcing rib with steel wire;
(4) prestressed stretch-draw is carried out to deformed bar, deformed bar tensioning uses lever type clamping instrument, lever type clamping The resistance arm of instrument and the ratio of power arm are 0.05~0.15;Tensioning process is using as follows:By deformed bar initial tensioning 10% control tension stress is pulled to, lotus 3min is held and establishes primary stress, then is stretched to control tension stress, holds lotus 5min foundation Prestressing force;
(5) deformed bar is subjected to welding grappling with fixing muscle after prestressed stretch-draw, by deformed bar and reinforcing rib It is welded and fixed;
(6) Grouting Pipe is buried, Grouting Pipe and the gap in embedded hole are closed using structure glue;
(7) slip casting is carried out to wall;With slip casing by pressure machinery slurries injection wall body, slip casting since being put most lower ranking, progressively to Above and symmetrically develop to both sides, reach expecting pressure or slurries in each injection point freely flows out in neighbouring injection point, notes Penetrating to terminate, injection hole plug;
If slurries have leakage, leakage channel is such as can not find, slurries incorporation accelerator is continued a small amount of injections makes leakage channel Gradually precipitation blocks;
After slurries solidification completely, remove Grouting Pipe and carry out sealing of hole;
If wall has crack, following handle is carried out before step (7):
1) grout nipple is buried in the middle part of crack, perfusion point spacing is integrated according to fracture width and the penetration of fracture to be determined, spacing 200 ~300mm;
2) dead-end fracture, grout nipple are closed after burying using epoxy mortar, form a confined space, reserve slurries inlet and outlet, Slurries are pressed into gap with syringe again, fill it;
3) leakage check, one layer of soap is applied along crack, is passed through compressed air from grout nipple, air leak position is repaired sealing to not Untill leakage;
4) it is in the milk, when fracture width is less than 0.3mm, after epoxy mortar dead-end fracture, then using methacrylic acid lipid Slurry filling;When fracture width is greater than or equal to 0.3mm and is less than 1mm, using epoxy resin slurry filling;When crack is wide When degree is greater than or equal to 1mm, irrigated using cement grout.
CN201711246564.3A 2016-05-21 2016-05-21 Construction method for wall reinforcing structure Active CN107989398B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711246564.3A CN107989398B (en) 2016-05-21 2016-05-21 Construction method for wall reinforcing structure

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610442373.3A CN106088646B (en) 2016-05-21 2016-05-21 The ruggedized construction of old building
CN201711246564.3A CN107989398B (en) 2016-05-21 2016-05-21 Construction method for wall reinforcing structure

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201610442373.3A Division CN106088646B (en) 2016-05-21 2016-05-21 The ruggedized construction of old building

Publications (2)

Publication Number Publication Date
CN107989398A true CN107989398A (en) 2018-05-04
CN107989398B CN107989398B (en) 2020-05-12

Family

ID=57237314

Family Applications (7)

Application Number Title Priority Date Filing Date
CN201711245752.4A Active CN107989397B (en) 2016-05-21 2016-05-21 The reinforcing construction construction method of old building
CN201711245677.1A Active CN107916797B (en) 2016-05-21 2016-05-21 Construction method for improving bearing performance of old building
CN201711245741.6A Active CN107905551B (en) 2016-05-21 2016-05-21 Construction method for wall reinforcing structure
CN201810184634.5A Active CN108360835B (en) 2016-05-21 2016-05-21 Construction method for reinforcing structure of old building
CN201711245575.XA Active CN107916796B (en) 2016-05-21 2016-05-21 A kind of structure promoting old building load-carrying properties
CN201610442373.3A Active CN106088646B (en) 2016-05-21 2016-05-21 The ruggedized construction of old building
CN201711246564.3A Active CN107989398B (en) 2016-05-21 2016-05-21 Construction method for wall reinforcing structure

Family Applications Before (6)

Application Number Title Priority Date Filing Date
CN201711245752.4A Active CN107989397B (en) 2016-05-21 2016-05-21 The reinforcing construction construction method of old building
CN201711245677.1A Active CN107916797B (en) 2016-05-21 2016-05-21 Construction method for improving bearing performance of old building
CN201711245741.6A Active CN107905551B (en) 2016-05-21 2016-05-21 Construction method for wall reinforcing structure
CN201810184634.5A Active CN108360835B (en) 2016-05-21 2016-05-21 Construction method for reinforcing structure of old building
CN201711245575.XA Active CN107916796B (en) 2016-05-21 2016-05-21 A kind of structure promoting old building load-carrying properties
CN201610442373.3A Active CN106088646B (en) 2016-05-21 2016-05-21 The ruggedized construction of old building

Country Status (1)

Country Link
CN (7) CN107989397B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577500A (en) * 2018-12-04 2019-04-05 富思特新材料科技发展股份有限公司 A kind of loose insulation board base treatment technique of exterior insulation engineering construction
CN110185277A (en) * 2019-04-19 2019-08-30 上海市建筑装饰工程集团有限公司 The restorative procedure of existing building external wall seepage point
CN112065000B (en) * 2020-08-05 2021-08-06 业之峰诺华家居装饰集团股份有限公司 Thin tile pasting method layer structure and construction process thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0089861A1 (en) * 1982-03-22 1983-09-28 CAMPENON BERNARD, Société Anonyme dite: Method of reinforcing arches or similar constructions
JP2003193420A (en) * 2001-12-28 2003-07-09 Kajima Corp Reinforcing construction method for loading metal pipe
CN102041849A (en) * 2010-12-03 2011-05-04 同济大学 Double-angle spliced buckling-restrained brace
CN202509792U (en) * 2012-03-31 2012-10-31 西安工业大学 Cement mortar surface layer reinforcing mesh for reinforcing brick-concrete structural wall
CN102900242A (en) * 2012-11-16 2013-01-30 南京工业大学 Steel bar concrete beam reinforcing structure with partially restrained steel truss
CN103352581A (en) * 2013-07-09 2013-10-16 北京筑福国际工程技术有限责任公司 Method for strengthening sintering clay brick masonry structure through internal prestressed steel anchor rods
CN105421808A (en) * 2015-12-03 2016-03-23 四川省大卫建筑设计有限公司 Method for repairing crack in historic building wall

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100564720C (en) * 2006-03-10 2009-12-02 湖南高岭建设集团股份有限公司 Crack resistant steel concrete wall
CN102704698B (en) * 2012-05-04 2015-10-28 南京盛圆土木工程高科技有限公司 A kind of full prestressing composite integrated reinforced steel concrete structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0089861A1 (en) * 1982-03-22 1983-09-28 CAMPENON BERNARD, Société Anonyme dite: Method of reinforcing arches or similar constructions
JP2003193420A (en) * 2001-12-28 2003-07-09 Kajima Corp Reinforcing construction method for loading metal pipe
CN102041849A (en) * 2010-12-03 2011-05-04 同济大学 Double-angle spliced buckling-restrained brace
CN202509792U (en) * 2012-03-31 2012-10-31 西安工业大学 Cement mortar surface layer reinforcing mesh for reinforcing brick-concrete structural wall
CN102900242A (en) * 2012-11-16 2013-01-30 南京工业大学 Steel bar concrete beam reinforcing structure with partially restrained steel truss
CN103352581A (en) * 2013-07-09 2013-10-16 北京筑福国际工程技术有限责任公司 Method for strengthening sintering clay brick masonry structure through internal prestressed steel anchor rods
CN105421808A (en) * 2015-12-03 2016-03-23 四川省大卫建筑设计有限公司 Method for repairing crack in historic building wall

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
中国建筑第七工程局: "《建设工程施工技术标准4》", 31 January 2008, 中国建筑工业出版社 *
杨永起: "《建筑防水施工技术》", 31 October 2015, 中国建筑工业出版社 *
肖翔等: "《病险水工程裂缝修补技术》", 31 May 2009, 中国水利水电出版社 *

Also Published As

Publication number Publication date
CN107916797B (en) 2020-05-15
CN107989397B (en) 2019-03-05
CN107916797A (en) 2018-04-17
CN107989398B (en) 2020-05-12
CN107905551B (en) 2020-02-04
CN106088646B (en) 2018-07-24
CN107916796A (en) 2018-04-17
CN108360835B (en) 2020-02-04
CN106088646A (en) 2016-11-09
CN107916796B (en) 2019-03-05
CN107989397A (en) 2018-05-04
CN108360835A (en) 2018-08-03
CN107905551A (en) 2018-04-13

Similar Documents

Publication Publication Date Title
CN101205724B (en) Prefabricated concrete box culvert using grouting method and bidirectional anchoring system as well as mounting structure and method thereof
CN107989398A (en) The reinforcing construction construction method of wall
CN104976424B (en) Anchor cable construction method for rectangular top pipe joint connecting and strengthening
CN101139836A (en) Drilling grout pile end follow-up grouting construction method
CN105625742B (en) Brick wall reinforcement structure
CN201883435U (en) Preburied pipe pile grouting device
CN201770981U (en) Tube-side injection grouting apparatus for simultaneous drilling pipe pile
CN106838463B (en) The fastener inserts and usage of longitudinal overall stiffness after raising rectangular top plumber
CN105672205B (en) A kind of rock leakage preventing structure
CN203334285U (en) Underground concrete structure engineering seam waterproof preparation grouting system
CN106480880B (en) Recoverable soil nailing and the construction method for using recoverable soil nail
CN204533836U (en) Pipeline through-flooring leakage-resistant device
JP5334379B2 (en) Hollow steel pipe reinforcement method for power transmission tower
CN201292528Y (en) Grouting machine
CN105926650A (en) Concrete layer landslide prevention fixing device for slope building
CN206521773U (en) Tapered end leak plugging structure after a kind of prestressed anchor cable stretching
CN112324055B (en) Prefabricated vertical component and sleeve grouting construction method thereof
CN205777645U (en) A kind of ruggedized construction of body of wall
CN208072393U (en) A kind of pile pile of the built-in slip casting pipe with piecing devices
KR20110029424A (en) Foundation construction method of micro pile and pile used in the same
CN211646989U (en) A go out thick liquid hole connecting device for preventing mud jacking backward flow
CN219973209U (en) Grouting pipe reinforcing device
CN220704528U (en) Grouting device and grouting structure
CN214220276U (en) Tie bar connecting device for masonry wall
CN208251149U (en) A kind of hydraulic engineering retaining wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 325000, No. 48, Jingshan Hill Road, Ouhai District, Wenzhou, Zhejiang

Applicant after: Ye Changqing

Address before: 325000 No. 4, Jinchuan Road, Tianhe street, Wenzhou economic and Technological Development Zone, Zhejiang, China

Applicant before: Ye Changqing

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201229

Address after: 537100 Comprehensive Economic Development Zone of Three-invested Enterprises in Gangnan District, Guigang City, Guangxi Zhuang Autonomous Region (near the traffic lights of Jiangnan Industrial Zone)

Patentee after: Guangxi Xin Bin Cheng Machinery Co.,Ltd.

Address before: 325000 No. 48 Xinghai Road, Jingshan Street, Ouhai District, Wenzhou City, Zhejiang Province

Patentee before: Ye Changqing

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221012

Address after: 353500 No. 275, Gongnong East Road, Songyuan street, Songxi County, Nanping City, Fujian Province

Patentee after: Fujian Zhonglin Engineering Construction Co.,Ltd.

Patentee after: Qiaozhi Construction Co.,Ltd.

Patentee after: FUZHOU University

Address before: 537100 Comprehensive Economic Development Zone of Three-invested Enterprises in Gangnan District, Guigang City, Guangxi Zhuang Autonomous Region (near the traffic lights of Jiangnan Industrial Zone)

Patentee before: Guangxi Xin Bin Cheng Machinery Co.,Ltd.

TR01 Transfer of patent right