CN201770981U - Tube-side injection grouting apparatus for simultaneous drilling pipe pile - Google Patents

Tube-side injection grouting apparatus for simultaneous drilling pipe pile Download PDF

Info

Publication number
CN201770981U
CN201770981U CN2010205330768U CN201020533076U CN201770981U CN 201770981 U CN201770981 U CN 201770981U CN 2010205330768 U CN2010205330768 U CN 2010205330768U CN 201020533076 U CN201020533076 U CN 201020533076U CN 201770981 U CN201770981 U CN 201770981U
Authority
CN
China
Prior art keywords
grouting
pipe
pile
high pressure
pipe pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205330768U
Other languages
Chinese (zh)
Inventor
唐孟雄
胡贺松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU MUNICIPAL CONSTRUCTION GROUP CO Ltd
NEW TECHNOLOGY DEVELOPMENT CENTER Co Ltd OF GUANGZHOU INSTITUTE OF BUILDING SCIENCE Co Ltd
Guangzhou Institute of Building Science Co Ltd
Original Assignee
GUANGZHOU MUNICIPAL CONSTRUCTION GROUP CO Ltd
NEW TECHNOLOGY DEVELOPMENT CENTER Co Ltd OF GUANGZHOU INSTITUTE OF BUILDING SCIENCE Co Ltd
Guangzhou Institute of Building Science Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU MUNICIPAL CONSTRUCTION GROUP CO Ltd, NEW TECHNOLOGY DEVELOPMENT CENTER Co Ltd OF GUANGZHOU INSTITUTE OF BUILDING SCIENCE Co Ltd, Guangzhou Institute of Building Science Co Ltd filed Critical GUANGZHOU MUNICIPAL CONSTRUCTION GROUP CO Ltd
Priority to CN2010205330768U priority Critical patent/CN201770981U/en
Application granted granted Critical
Publication of CN201770981U publication Critical patent/CN201770981U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a tube-side injection grouting apparatus for simultaneous drilling pipe pile comprising a prestressed concrete pipe pile so disposed that the sidewall of the outer wall of the pipe pile is fixedly provided with at least one or more than ore symmetrically-disposed high pressure grouting pipe, one end of the grouting pipe and a high pressure injection pump and a pressure gauge being connected, the other end of the grouting pipe being provided with grouting holes, the grouting holes end being movably closed, the grouting pipe being fixed to the side wall of the outer wall of the pipe pile by an annular coupler or iron wire, the grouting hole of the grouting pipe being disposed in the lower part of the pipe pile, the grouting pipe being provided with plural grouting holes. The grouting holes can be respectively disposed in the upper, middle, and lower part of the pipe pile as required by the project. Before construction, a rubber belt is tightly wound so as to lay out grouting pipe in grouting hole section, and the high pressure grouting injection pump injects high pressure water or cement slurry to pile side through the high pressure grouting pipe, and the pressure gauge is used for measuring pressure of water or cement slurry. After three or fives days after concrete is injected to the pile core of the simultaneous drilling pipe pile or within a certain range of height close to the bottom of the pile, the grouting channel is opened, and one-time high pressure grouting or twice high pressure grouting is to be chosen according to stratum condition. The utility model injects cement slurry to the gap between the outer wall of the prestressed concrete pipe pile and the circumferential rock and oil layer, which can in crease friction resistance of side pile body and resistance at pile end, combined with simple and reliable construction method.

Description

A kind of stake side grouting device of drilling follow pile tube
Technical field
The present invention relates to build or the stake side grouting device of bridge pile foundation plinth particularly a kind of stake side grouting device of drilling follow pile tube.
Background technology
The drilling follow pile tube (CN200710029023) that a kind of building or bridge foundation are used is a kind of novel stake; the drilling follow pile tube combines hand excavated pile; bore (dashing) hole pouring pile; the advantage of pile for prestressed pipe; overcome and adopted the mud off contaminated environment in the bored pile construction method; the hole of easily collapsing in the drilling process; the unsettled shortcoming of concrete casting quality; and the formula pile for prestressed pipe of squeezing into shortcoming such as easily cause that the soil body has fallen; strong to geological conditions compliance; speed of application is fast; reliable in quality; material consumption is few; the bearing capacity height of stake; mechanized; there is not construction mud emission problem, the protection environment.But during the drilling follow tube pile construction, drilling diameter is greater than the diameter of prestressed concrete pipe pile, and prestressed concrete pipe pile and have certain space on every side between the geotechnical body has influenced the performance of the pile side friction and the stake bottom resistance of pile tube.
The utility model content
The purpose of this utility model is at the problems referred to above weak point, a kind of stake side grouting device of drilling follow pile tube is provided, this device can be effectively in the space of prestressed concrete pipe pile outer wall and rock-soil layer on every side grout injection, reach the effect that improves pile body side friction and stake bottom resistance.
In order to achieve the above object, the utility model is by the following technical solutions:
A kind of stake side grouting device of drilling follow pile tube, comprise prestressed concrete pipe pile, the fixing at least one or more high-pressure slip-casting pipe that is symmetrically distributed on the external diameter sidewall of pile tube, Grouting Pipe one end is connected with high-pressure injection pump, pressure meter, the other end is provided with slurry outlet, and the movable sealing of pulp nose end.
The above Grouting Pipe is fixed on the pile tube external diameter sidewall by loop fasteners or iron wire.
The slurry outlet of the above Grouting Pipe is positioned at the pile tube bottom.
Grouting Pipe slurry outlet described in the utility model can be provided with slurry outlet respectively in the upper, middle and lower of pile tube portion by engineering is required.
The utility model the elongated concrete perfusion of drilling follow pile tube stake core or near the stake end certain altitude scope concrete perfusion.By high-pressure injection pump by the high-pressure slip-casting pipe to prestressed concrete pipe pile and injection water mud or clear water in the space between the geotechnical body on every side.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Fig. 2 is the structure sectional view of prestressed concrete pipe pile and high-pressure slip-casting pipe among Fig. 1.
Below in conjunction with the drawings and specific embodiments the utility model is further described.
The specific embodiment
As shown in Figure 1 and Figure 2, four high-pressure slip-casting pipes 1 described in the utility model are symmetrically distributed on the prestressed concrete pipe pile 3 external diameter sidewalls, Grouting Pipe 1 and pile tube 3 both be fixedly connected on the sidewall of pile tube 3 Grouting Pipe 1 by loop fasteners (as stirrup) or iron wire 6, Grouting Pipe 1 is provided with some slurry outlets, the slurry outlet port needs movable sealing before construction, Grouting Pipe 1 end that bassets is connected with high-pressure injection pump 2, and high-pressure injection pump also is connected with pressure meter 7, is used to measure cement paste or water pressure.
The utility model is in the specific embodiment of work progress;
1) laid slurry outlet on the high-pressure slip-casting pipe 1 after, earlier closely twine slurry outlet with adhesive tape, make slurry outlet be in closed state, prevent that sandy soil from pouring in down a chimney; High-pressure slip-casting pipe 1 is fixed on the external diameter sidewall of prestressed concrete pipe pile 3 with annular stirrup or iron wire 6, carries out the drilling follow tube pile construction then; After prestressed concrete pipe pile 3 arrives the projected depth positions, stop to creep into, at this moment certain space 4 is arranged between pile tube 3 and the drilling diameter, to the elongated concrete perfusion 5 of drilling follow pile tube stake core or near the stake end certain altitude scope concrete perfusion 5.
2) after concrete 5 to be poured into solidifies 3 to 5 days, inject clear water successively to the high-pressure slip-casting pipe of laying 1, get through slip casting passage and grout outlet by high-pressure injection pump 2.And then to high-pressure slip-casting pipe 1 injection water mud successively.In slip casting (water) process, observe slip casting (water) pressure by pressure meter 7 according to designing requirement; Guarantee that the cement paste injected fills full prestressed concrete pipe pile outer wall and the drilling diameter space 4 of rock-soil layer on every side.
3) for guaranteeing slip casting effect, behind the certain hour of the interval of slip casting first, carry out secondary grouting, improve pile side friction and end resistance.
Above disclosed only is preferred embodiment of the present utility model, can not limit the interest field of the utility model certainly with this, and therefore the equivalent variations of being done according to the utility model claim still belongs to the scope that the utility model is contained.

Claims (4)

1. A kind of stake side grouting device of drilling follow pile tube, comprise prestressed concrete pipe pile, it is characterized in that: the fixing at least one or more high-pressure slip-casting pipe that is symmetrically distributed on the external diameter sidewall of pile tube, Grouting Pipe one end is connected with high-pressure injection pump, pressure meter, the other end is provided with slurry outlet, and the movable sealing of pulp nose end.
2. The stake side grouting device of drilling follow pile tube according to claim 1 is characterized in that: Grouting Pipe is fixed on the pile tube external diameter sidewall by loop fasteners or iron wire.
3. The stake side grouting device of drilling follow pile tube according to claim 1, it is characterized in that: the slurry outlet of Grouting Pipe is positioned at the pile tube bottom.
4. The stake side grouting device of drilling follow pile tube according to claim 1, it is characterized in that: Grouting Pipe is provided with a plurality of slurry outlets.
CN2010205330768U 2010-09-17 2010-09-17 Tube-side injection grouting apparatus for simultaneous drilling pipe pile Expired - Fee Related CN201770981U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205330768U CN201770981U (en) 2010-09-17 2010-09-17 Tube-side injection grouting apparatus for simultaneous drilling pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205330768U CN201770981U (en) 2010-09-17 2010-09-17 Tube-side injection grouting apparatus for simultaneous drilling pipe pile

Publications (1)

Publication Number Publication Date
CN201770981U true CN201770981U (en) 2011-03-23

Family

ID=43750824

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205330768U Expired - Fee Related CN201770981U (en) 2010-09-17 2010-09-17 Tube-side injection grouting apparatus for simultaneous drilling pipe pile

Country Status (1)

Country Link
CN (1) CN201770981U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102337858A (en) * 2011-08-31 2012-02-01 中国地质大学(武汉) Tool for grouting in loose coal seam section during drilling
CN102433878A (en) * 2011-09-29 2012-05-02 广州市建筑科学研究院有限公司 Post-grouting device and construction method for pipe pile foundation
CN102691296A (en) * 2012-05-22 2012-09-26 广州市建筑科学研究院有限公司 Pipe pile foundation for static-pressure grouting on pile side and rotary jet grouting at pile bottom and construction method thereof
CN102828509A (en) * 2012-09-26 2012-12-19 长沙学院 Joint grouting method from bottom and side of prestressed pipe pile
CN102852141A (en) * 2012-09-05 2013-01-02 广州市建筑科学研究院有限公司 Rock-socketed pipe pile foundation with pile core by concrete pouring and pile side by static pressure grouting and construction method for rock-socketed pipe pile foundation
CN102864775A (en) * 2012-08-28 2013-01-09 福建省大地管桩有限公司 Method for producing prestressed uplift tubular pile by utilizing secondary grouting method
CN103924584A (en) * 2014-03-14 2014-07-16 浙江新邦建设有限公司 Cast-in-situ bored pile construction method
CN106703024A (en) * 2017-01-18 2017-05-24 安徽省经工建设集团有限公司 Construction technique for composite pile formed through broken stone consolidation by slurry

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102337858A (en) * 2011-08-31 2012-02-01 中国地质大学(武汉) Tool for grouting in loose coal seam section during drilling
CN102337858B (en) * 2011-08-31 2014-04-09 中国地质大学(武汉) Tool for grouting in loose coal seam section during drilling
CN102433878A (en) * 2011-09-29 2012-05-02 广州市建筑科学研究院有限公司 Post-grouting device and construction method for pipe pile foundation
CN102691296A (en) * 2012-05-22 2012-09-26 广州市建筑科学研究院有限公司 Pipe pile foundation for static-pressure grouting on pile side and rotary jet grouting at pile bottom and construction method thereof
CN102864775A (en) * 2012-08-28 2013-01-09 福建省大地管桩有限公司 Method for producing prestressed uplift tubular pile by utilizing secondary grouting method
CN102852141B (en) * 2012-09-05 2014-10-22 广州市建筑科学研究院有限公司 Rock-socketed pipe pile foundation with pile core by concrete pouring and pile side by static pressure grouting and construction method for rock-socketed pipe pile foundation
CN102852141A (en) * 2012-09-05 2013-01-02 广州市建筑科学研究院有限公司 Rock-socketed pipe pile foundation with pile core by concrete pouring and pile side by static pressure grouting and construction method for rock-socketed pipe pile foundation
CN102828509A (en) * 2012-09-26 2012-12-19 长沙学院 Joint grouting method from bottom and side of prestressed pipe pile
CN102828509B (en) * 2012-09-26 2014-11-05 长沙学院 Joint grouting method from bottom and side of prestressed pipe pile
CN103924584A (en) * 2014-03-14 2014-07-16 浙江新邦建设有限公司 Cast-in-situ bored pile construction method
CN103924584B (en) * 2014-03-14 2016-02-03 浙江新邦建设有限公司 The construction method of bored pile
CN106703024A (en) * 2017-01-18 2017-05-24 安徽省经工建设集团有限公司 Construction technique for composite pile formed through broken stone consolidation by slurry
CN106703024B (en) * 2017-01-18 2020-02-28 安徽省经工建设集团有限公司 Construction process of slurry-solidified gravel composite pile

Similar Documents

Publication Publication Date Title
CN201770981U (en) Tube-side injection grouting apparatus for simultaneous drilling pipe pile
CN105298518B (en) A kind of profound cavern bridging of hidden-type blocks the administering method of water burst
CN201883435U (en) Preburied pipe pile grouting device
CN207739264U (en) A kind of Grouting Pipe
CN107513995A (en) A kind of bridge struction pile post grouting construction method
CN103866762A (en) Pile body longitudinal multipoint grouting device
CN107386274A (en) Wear the compound isolation pile and its reinforced construction method of bridge pier in tunnel side
CN103669346A (en) Sleeve valve pipe and application to landslide control
CN104912065A (en) Underwater anchor pile construction method
CN101793027A (en) Core-grouted static pressure anchor rod pile
CN206971247U (en) Concrete toe board foundation reinforcing structure arranged on unloading rock mass
CN108487250A (en) Uplift pile stake side post-grouting device and construction method
CN105297737A (en) Grouting scope-controllable bag type micro bearing pile
CN203440820U (en) Improved pouring pile end post-grouting device
CN105544547B (en) A kind of cover type segmentation strengthening fill and soft soil layer device and method
CN104563111A (en) Construction method for rock embedding of inclined pile
CN208346822U (en) grouting device
CN207109805U (en) Wear the compound isolation pile of bridge pier in a kind of tunnel side
CN110485481A (en) A kind of miniature steel pipe pile and cement slurry interfacial pressure on-site testing device and method
CN201635072U (en) Centrally grouted static-pressured anchor pile former
CN108755694A (en) Grout stopping device and complete opening grouting method for multiple solution cavities
CN105625303A (en) Post-grouting technology for cast-in-situ bored pile
CN211446931U (en) Grouting pipe structure of post-grouting bored pile in desert area
CN210529780U (en) Miniature steel-pipe pile and grout interface pressure field test device
CN203878568U (en) Longitudinal multi-point pile body grouting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110323

Termination date: 20180917

CF01 Termination of patent right due to non-payment of annual fee