CN201883435U - Preburied pipe pile grouting device - Google Patents

Preburied pipe pile grouting device Download PDF

Info

Publication number
CN201883435U
CN201883435U CN2010205330787U CN201020533078U CN201883435U CN 201883435 U CN201883435 U CN 201883435U CN 2010205330787 U CN2010205330787 U CN 2010205330787U CN 201020533078 U CN201020533078 U CN 201020533078U CN 201883435 U CN201883435 U CN 201883435U
Authority
CN
China
Prior art keywords
grouting
pipe
pile
preburied
prestressed concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205330787U
Other languages
Chinese (zh)
Inventor
唐孟雄
胡贺松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU MUNICIPAL CONSTRUCTION GROUP CO Ltd
NEW TECHNOLOGY DEVELOPMENT CENTER Co Ltd OF GUANGZHOU INSTITUTE OF BUILDING SCIENCE Co Ltd
Guangzhou Institute of Building Science Co Ltd
Original Assignee
GUANGZHOU MUNICIPAL CONSTRUCTION GROUP CO Ltd
NEW TECHNOLOGY DEVELOPMENT CENTER Co Ltd OF GUANGZHOU INSTITUTE OF BUILDING SCIENCE Co Ltd
Guangzhou Institute of Building Science Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU MUNICIPAL CONSTRUCTION GROUP CO Ltd, NEW TECHNOLOGY DEVELOPMENT CENTER Co Ltd OF GUANGZHOU INSTITUTE OF BUILDING SCIENCE Co Ltd, Guangzhou Institute of Building Science Co Ltd filed Critical GUANGZHOU MUNICIPAL CONSTRUCTION GROUP CO Ltd
Priority to CN2010205330787U priority Critical patent/CN201883435U/en
Application granted granted Critical
Publication of CN201883435U publication Critical patent/CN201883435U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a preburied pipe pile grouting device which comprises prestressed concrete pipe piles; at least two symmetrically distributed grouting pipes are preburied in the prestressed concrete pipe piles, grout outlet holes are formed on the grouting pipes, and the grouting pipes extend to the ground and are connected with a grouting pump and a pressure gauge; end boards are arranged at the ends of the pipe piles and connected with the preburied grouting pipes through bolts, and grout stopping sealing gaskets are arranged at the joints of the pipe piles; the ends of the preburied grouting pipes adjacent to a hole bottom are reliably sealed to prevent grout leakage; the two vertically adjacent grouting pipes are correspondingly connected through a hollow bolt and a sealing washer; and the grout outlet holes are movably sealed, so as to avoid being blocked by rock soil. The preburied pipe pile grouting device provided by the utility model has the advantages that after the pipe piles are put in place, grout is poured into the gaps between the external walls of the prestressed concrete pipe piles and the surrounding rock-soil layer, so as to increase the pile body lateral friction resistance and the pipe tip resistance, and achieve a simple and reliable construction method.

Description

A kind of pre-buried type pile tube grouting device
Technical field
The utility model relates to the grouting device of prestressed pipe pile foundation, particularly a kind of pre-buried type pile tube grouting device.
Background technology
The drilling follow pile tube is a kind of novel stake; the drilling follow pile tube combines the advantage of hand excavated pile, brill (dashing) hole pouring pile, pile for prestressed pipe; overcome and adopted easily collapse in mud off contaminated environment, the drilling process hole, the unsettled shortcoming of concrete casting quality in the bored pile construction method; and the formula pile for prestressed pipe of squeezing into shortcoming such as easily cause that the soil body has fallen;, speed of application strong to geological conditions compliance is fast, reliable in quality, material consumption are few, the bearing capacity height of stake, mechanized, nothing construction mud emission problem, the protection environment.
But during the drilling follow tube pile construction, drilling diameter is greater than the diameter of prestressed concrete pipe pile, makes between the geotechnical body of pile tube and hole wall and leaves certain space, mostly present grouting method is the down slip casting from top, fill not full, and difficult monitoring, the carrying dynamics of influence stake.
Behind the same static pressure pipe pile and hammering pile tube pile that generally uses at present, also there are the problems referred to above.
The utility model content
The purpose of this utility model is at the problems referred to above, a kind of pre-buried type pile tube grouting device is provided, this device can be effectively in the space of prestressed concrete pipe pile outer wall and rock-soil layer on every side, stake bottom portion grout injection, reach the effect that improves pile body side friction and end resistance.
In order to achieve the above object, the utility model is by the following technical solutions:
A kind of pre-buried type pile tube grouting device, it comprises at least two above Grouting Pipe that are embedded with symmetrical distribution in the prestressed concrete pipe pile, has slurry outlet on the Grouting Pipe, Grouting Pipe extends to ground and joins with grouting pump, pressure meter.
Described pipe pile end portion is provided with end plate, and is connected by bolt with pre-buried Grouting Pipe, and the pipe pile joint place is provided with only starches gasket seal.
Described pre-buried Grouting Pipe is adopting positiver sealing near the termination of position, bottom, hole, in case the leak-stopping slurry.
Described adjacent two joint Grouting Pipe are up and down joined by hollow bolt, seal washer correspondence.
Described slurry outlet is a movable sealing, stops up slurry outlet to prevent ground.
Slurry outlet described in the utility model can be arranged several by construction requirement, and slurry outlet needs movable sealing before construction, stops up slurry outlet to prevent ground.
The utility model compared with prior art, its beneficial effect is:
(1) the utility model is by pre-buried Grouting Pipe, and injects mud by pre-buried Grouting Pipe to positions such as pile bodies, can fill up the prestressed concrete pipe pile outer wall and the space of rock-soil layer on every side effectively, reaches the effect that improves pile body side friction and end resistance.
(2) have more movable injected hole by the required setting of engineering on the Grouting Pipe, when injecting cement paste, internal pressure is got through injected hole, and cement paste flows out from injected hole, and the pouring in down a chimney of other materials when both having prevented construction can guarantee construction quality again.
Description of drawings
Fig. 1 is the utility model structural representation.
Fig. 2 is the partial structurtes cut-away view of Fig. 1.
Fig. 3 is the partial enlarged drawing of slurry outlet among Fig. 1.
The specific embodiment
As shown in Figure 1 and Figure 2, the utility model comprises: the prestressed concrete pipe pile 3 of pre-buried four symmetrical distribution Grouting Pipe 1, Grouting Pipe 1 extend to ground and join with grouting pump 2 and pressure meter 7.The end plate place that connects Grouting Pipe 1 and prestressed concrete pipe pile 3 tops is provided with hollow bolt, connects adjacently two to save on the prestressed concrete pipe pile 3 pairing Grouting Pipe 1 of pre-buried Grouting Pipe 1 and be respectively equipped with hollow bolt and seal washer up and down.Grouting Pipe 1 near head position, bottom, hole adopts positiver sealing, in case the leak-stopping slurry.Lay some slurry outlets by construction requirement in advance in the appropriate location of Grouting Pipe 1, closely twine layout pulp nose end with adhesive tape before the slip casting, stop up to prevent ground; During construction, utilize the slurry outlet of grouting pump 2 and pressure meter 7 by Grouting Pipe 1 grout injection in the space of prestressed concrete pipe pile 3 outer walls and rock-soil layer on every side, pressure meter 7 is used to measure cement paste or water pressure.
The utility model is in the specific embodiment of work progress;
(a) laid slurry outlet 6 on the high-pressure slip-casting pipe 1 after, the movable earlier prestressed concrete pipe pile 3 that seals slurry outlet 6 (as closely twine the slurry outlet 6 of laying with adhesive tape), Grouting Pipe 1 near head position, bottom, hole is adopted positiver sealing, carry out the drilling follow tube pile construction then, the high-pressure slip-casting pipe 1 usefulness hollow bolt of adjacent two joint prestressed concrete pipe piles, 3 correspondences is connected with gasket seal (not shown).After prestressed concrete pipe pile 3 arrives the projected depth positions, stop to creep into, then to the elongated concrete perfusion 5 of drilling follow pile tube stake core or near the stake end certain altitude scope concrete perfusion 5.
(b) after concrete 5 to be poured into solidifies three to five days, inject clear water successively to the high-pressure slip-casting pipe of laying 1, get through the slip casting passage by high-pressure injection pump 2.And then to high-pressure slip-casting pipe 1 injection water mud successively.In slip casting (water) process, observe slip casting (water) pressure by pressure meter 7 according to designing requirement.Guarantee that the cement paste injected fills the full prestressed concrete pipe pile outer wall and the space of rock-soil layer on every side.
Above disclosed only is preferred embodiment of the present utility model, can not limit the interest field of the utility model certainly with this, and therefore the equivalent variations of being done according to the utility model claim still belongs to the scope that the utility model is contained.
Same static pressure pipe pile that generally uses at present and hammering pile tube pile also can improve the bearing capacity of stake by the utility model.

Claims (6)

1. pre-buried type pile tube grouting device, comprise prestressed concrete pipe pile, it is characterized in that: be embedded with at least two Grouting Pipe of symmetrical distribution in the prestressed concrete pipe pile, have slurry outlet on the Grouting Pipe, Grouting Pipe extends to ground and joins with grouting pump, pressure meter.
2. pre-buried type pile tube grouting device according to claim 1, it is characterized in that: described pipe pile end portion is provided with end plate, and is connected by bolt with pre-buried Grouting Pipe, and the pipe pile joint place is provided with only starches gasket seal.
3. pre-buried type pile tube grouting device according to claim 1 is characterized in that: described adjacent two joint Grouting Pipe are up and down joined by bolt, seal washer correspondence.
4. pre-buried type pile tube grouting device according to claim 1 is characterized in that: described slurry outlet is a movable sealing.
5. according to claim 2 or 3 described pre-buried type pile tube grouting devices, it is characterized in that: described bolt is a hollow bolt.
6. pre-buried type pile tube grouting device according to claim 1 is characterized in that: described Grouting Pipe is more than two or two and is symmetrically distributed in the pile tube.
CN2010205330787U 2010-09-17 2010-09-17 Preburied pipe pile grouting device Expired - Fee Related CN201883435U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205330787U CN201883435U (en) 2010-09-17 2010-09-17 Preburied pipe pile grouting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205330787U CN201883435U (en) 2010-09-17 2010-09-17 Preburied pipe pile grouting device

Publications (1)

Publication Number Publication Date
CN201883435U true CN201883435U (en) 2011-06-29

Family

ID=44180973

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205330787U Expired - Fee Related CN201883435U (en) 2010-09-17 2010-09-17 Preburied pipe pile grouting device

Country Status (1)

Country Link
CN (1) CN201883435U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102433878A (en) * 2011-09-29 2012-05-02 广州市建筑科学研究院有限公司 Post-grouting device and construction method for pipe pile foundation
CN102691296A (en) * 2012-05-22 2012-09-26 广州市建筑科学研究院有限公司 Pipe pile foundation for static-pressure grouting on pile side and rotary jet grouting at pile bottom and construction method thereof
CN103255768A (en) * 2013-05-15 2013-08-21 河北建设勘察研究院有限公司 Grouting construction method of engineering well after bottom wall in pipe is sealed
CN104652440A (en) * 2015-02-16 2015-05-27 中交一航局第一工程有限公司 Pressure grouting structure and pressure grouting method
CN105625303A (en) * 2014-11-28 2016-06-01 大连市市政设计研究院有限责任公司 Post-grouting technology for cast-in-situ bored pile
CN105756065A (en) * 2016-04-22 2016-07-13 广州市建筑科学研究院有限公司 While-drilling casing pile side sectional high-pressure grouting system and method
CN106368215A (en) * 2016-10-09 2017-02-01 上海市政工程设计研究总院(集团)有限公司 Embedded grouting pipe module
CN110565740A (en) * 2019-08-13 2019-12-13 中广核工程有限公司 Method for connecting open hole of submarine tunnel and riser

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102433878A (en) * 2011-09-29 2012-05-02 广州市建筑科学研究院有限公司 Post-grouting device and construction method for pipe pile foundation
CN102691296A (en) * 2012-05-22 2012-09-26 广州市建筑科学研究院有限公司 Pipe pile foundation for static-pressure grouting on pile side and rotary jet grouting at pile bottom and construction method thereof
CN103255768A (en) * 2013-05-15 2013-08-21 河北建设勘察研究院有限公司 Grouting construction method of engineering well after bottom wall in pipe is sealed
CN105625303A (en) * 2014-11-28 2016-06-01 大连市市政设计研究院有限责任公司 Post-grouting technology for cast-in-situ bored pile
CN104652440A (en) * 2015-02-16 2015-05-27 中交一航局第一工程有限公司 Pressure grouting structure and pressure grouting method
CN104652440B (en) * 2015-02-16 2017-01-25 中交一航局第一工程有限公司 Pressure grouting structure and pressure grouting method
CN105756065A (en) * 2016-04-22 2016-07-13 广州市建筑科学研究院有限公司 While-drilling casing pile side sectional high-pressure grouting system and method
CN106368215A (en) * 2016-10-09 2017-02-01 上海市政工程设计研究总院(集团)有限公司 Embedded grouting pipe module
CN106368215B (en) * 2016-10-09 2023-11-10 上海市政工程设计研究总院(集团)有限公司 Pre-buried slip casting pipe assembly
CN110565740A (en) * 2019-08-13 2019-12-13 中广核工程有限公司 Method for connecting open hole of submarine tunnel and riser

Similar Documents

Publication Publication Date Title
CN201883435U (en) Preburied pipe pile grouting device
CN102691296B (en) Pipe pile foundation for static-pressure grouting on pile side and rotary jet grouting at pile bottom and construction method thereof
CN102828509B (en) Joint grouting method from bottom and side of prestressed pipe pile
CN201770981U (en) Tube-side injection grouting apparatus for simultaneous drilling pipe pile
CN104499479A (en) Dig-hole pile construction method based on penetration of sand gravel backfilling layer
CN102839691B (en) Quick sealing method and device for sandless cement pipe deep well dewatering wellhead
CN201486566U (en) Device for pouring concrete continuous wall through gob-side entry retaining of mining working surface
CN111364449A (en) Construction method and structure for penetrating karst cave of precast tubular pile
CN105369799A (en) Concrete precast pile of precast pile underground diaphragm wall and construction method of precast pile underground diaphragm wall
CN102174818A (en) Controlled impermeable leaking stoppage grout-extruding water-stopping technology of strong water permeable stratum of quaternary system
CN202644591U (en) A reinforced bridge pile foundation in tunnel construction under the geological condition of water-rich quicksand
CN106522959A (en) Steel-structure waterproof jointing plate of well wall and construction process of steel-structure waterproof jointing plate
CN101793027B (en) Core-grouted static pressure anchor rod pile
CN101586341B (en) Water sealing method for civil engineering groundwork
CN203440820U (en) Improved pouring pile end post-grouting device
CN205875188U (en) Pressure -bearing precipitation well plugging device
CN201292528Y (en) Grouting machine
CN109914390A (en) It is a kind of to construct the slip casting structure and construction method of cold seam for biting connecions campshed
CN111519647A (en) Novel foundation suitable for marine soft foundation treatment and reinforcement and construction method
CN216078765U (en) Pile foundation post-grouting pipeline joint
CN201635072U (en) Centrally grouted static-pressured anchor pile former
CN204690730U (en) Diaphragm wall skeleton
CN204691255U (en) Diaphragm wall
CN104912057B (en) Construction method of underground continuous wall
CN209816830U (en) A slip casting structure for interlock formula campshed construction cold joint

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110629

Termination date: 20180917

CF01 Termination of patent right due to non-payment of annual fee