CN108360835A - The ruggedized construction construction method of old building - Google Patents

The ruggedized construction construction method of old building Download PDF

Info

Publication number
CN108360835A
CN108360835A CN201810184634.5A CN201810184634A CN108360835A CN 108360835 A CN108360835 A CN 108360835A CN 201810184634 A CN201810184634 A CN 201810184634A CN 108360835 A CN108360835 A CN 108360835A
Authority
CN
China
Prior art keywords
deformed bar
wall
reinforcing rib
grouting pipe
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810184634.5A
Other languages
Chinese (zh)
Other versions
CN108360835B (en
Inventor
朱奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Heyi Engineering Technology Co.,Ltd.
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810184634.5A priority Critical patent/CN108360835B/en
Publication of CN108360835A publication Critical patent/CN108360835A/en
Application granted granted Critical
Publication of CN108360835B publication Critical patent/CN108360835B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0203Arrangements for filling cracks or cavities in building constructions
    • E04G23/0211Arrangements for filling cracks or cavities in building constructions using injection
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • E04G23/0222Replacing or adding wall ties

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of ruggedized construction construction methods of old building, it is characterized in that wall reinforcement construction procedure is using as follows:(1) rendering layer, the embedded hole of preboring Grouting Pipe are removed;(2) deformed bar is hung;(3) reinforcing rib is hung on deformed bar, is tentatively connect deformed bar with reinforcing rib with steel wire;(4) prestressed stretch-draw is carried out to deformed bar;(5) deformed bar is subjected to welding anchoring with fixing muscle after prestressed stretch-draw, deformed bar and reinforcing rib is welded and fixed;(6) Grouting Pipe is buried, Grouting Pipe and the gap in embedded hole are closed using structure glue;(7) slip casting is carried out to wall.

Description

The ruggedized construction construction method of old building
Technical field
The present invention relates to a kind of construction method of old building, more particularly to the ruggedized construction construction party of a kind of old building Method.
Background technology
Old building by long-term use after the phenomenon that will appear depression of bearing force because of a variety of causes, be mainly manifested in Old building The wall of object cannot meet the requirement of existing load because crack or bearing capacity of wall body occur in the reasons such as sedimentation;Old building Beams of concrete is because concrete carbonization will appear depression of bearing force, or bearing capacity occurs because using the promotion of standard and cannot reach It is required that.Therefore for old building, the whole load effect of reinforcement structure, the mechanical property of structure is improved.
Invention content
The present invention is to provide a kind of ruggedized construction construction method of old building, solves bearing capacity of wall body and concrete joist support Carry the inadequate problem of power.
The present invention is inadequate for strength of wall body, takes following ruggedized construction:It is arranged in surface of wall after wall stripping painting One skin deformed bar, a diameter of 12~14mm of deformed bar, deformed bar spacing are 150~300mm, deformed bar Arrange that non-prestressed reinforcing rib, deformed bar are welded to connect with reinforcing rib again above, a diameter of 12~14mm of reinforcing rib, Reinforcing rib bar spacing is 150~300mm.Just arranged direction and horizontal sextant angle are 45 degree to deformed bar, reinforcing rib arrangement side To vertical with arranged direction at the beginning of deformed bar.Deformed bar is consolidated by fixing muscle after deformed bar tensioning Fixed, fixing muscle is welded and fixed with deformed bar, a diameter of 14~16mm of fixing muscle.Fixing muscle spacing be 150~ 300mm, each tensioned unit length are 150~300mm, and reinforcing rib is arranged in two ends of tensioned unit.Deformed bar Arrange that Grouting Pipe, slip casting tube spacing are 350~450mm in the tensioned unit formed with non-prestressed reinforcing rib, Grouting Pipe is straight The stainless-steel pipe of diameter 10mm, Grouting Pipe are embedded to wall mortar joint, and length of embedment 60mm is fixed with structure glue.Grouting Pipe Three-way valve is set between slurry can.
Following ruggedized construction can also be used:A skin deformed bar is arranged in surface of wall, in advance after wall stripping painting Stress bar diameter is 12~14mm, and deformed bar spacing is 150~300mm, arranges non-pre- answer above deformed bar again Power reinforcing rib, deformed bar are welded to connect with reinforcing rib, a diameter of 12~14mm of reinforcing rib, and reinforcing rib bar spacing is 150~300mm.Just arranged direction is level to deformed bar, and reinforcing rib arranged direction is to be vertically arranged.Deformed bar tensioning After deformed bar is fixed by fixing muscle, fixing muscle is welded and fixed with deformed bar, and fixing muscle is straight Diameter is 14~16mm.Fixing muscle spacing is 300~600mm, and each tensioned unit length is 300~600mm, in tensioned unit Reinforcing rib is arranged in two ends, and row's reinforcing rib is arranged between end vertical strengthening ribs and vertical fixing muscle.Deformed bar Arrange that Grouting Pipe, slip casting tube spacing are 350~450mm in the tensioned unit formed with non-prestressed reinforcing rib, Grouting Pipe is straight The stainless-steel pipe of diameter 10mm, Grouting Pipe are embedded to wall mortar joint, and length of embedment 60mm is fixed with structure glue.Grouting Pipe Three-way valve is set between slurry can.
After deformed bar is arranged in surface of wall, wall body structure performance can have greatly improved, even structural damage Form prodigious can also improve, and can be transitioned into elastic break-down from plastic failure, obvious action is had safely to structure.
Wall reinforcement construction procedure is using as follows:
(1) rendering layer is removed, the embedded bore dia in the embedded hole of preboring Grouting Pipe, Grouting Pipe is 12mm;Preboring buries hole Using electronic rotation diamond core drill, it is water-cooled drill bit and is considered to be worth doing with brick output;Using steel wire clear up surface of wall dust and Dross or loose position simultaneously keep drying;
(2) deformed bar is hung, deformed bar is fixed on by wall by U-iron button, U-iron button is inserted into wall ash Seam;
(3) reinforcing rib is hung on deformed bar, is tentatively connect deformed bar with reinforcing rib with steel wire;
(4) prestressed stretch-draw is carried out to deformed bar, deformed bar tensioning uses lever type clamping tool, lever The resistance arm of clamping tool and the ratio of power arm are 0.05~0.15.Tensioning process is using as follows:Deformed bar is just opened Tension is pulled to 10% control tension stress, holds lotus 3min and establishes primary stress, then be stretched to control tension stress, holds lotus 5min Establish prestressing force.
(5) deformed bar is subjected to welding anchoring with fixing muscle after prestressed stretch-draw, by deformed bar and added Strengthening tendons are welded and fixed;
(6) Grouting Pipe is buried, Grouting Pipe and the gap in embedded hole are closed using structure glue;
(7) slip casting is carried out to wall;With slip casing by pressure machinery slurries injection wall body, slip casting since being set most lower ranking, by Step develops to both sides upwards and symmetrically, reaches expecting pressure or slurries in neighbouring injection point free flow in each injection point Go out, injection can terminate, injection hole plug.
If slurries have leakage, leakage channel is such as can not find, slurries incorporation accelerator, which is continued a small amount of injections, makes leakage Gradually precipitate blocking in channel.
After slurries solidification completely, removes Grouting Pipe and carry out sealing of hole.
If wall has crack, following handle is carried out before step (7):
1) grout nipple is buried in the middle part of crack, perfusion point spacing is determined according to fracture width and penetration of fracture synthesis, spacing For 200~300mm;
2) dead-end fracture is closed using epoxy mortar after grout nipple is embedded, forms a confined space, and slurries disengaging is reserved Mouthful, then slurries are pressed into gap with syringe, so that it is filled.
3) leakage check applies one layer of soap along crack, is passed through compressed air from grout nipple, air leak position is repaired sealing Until not leaking.
4) it is in the milk, when fracture width is less than 0.3mm, after epoxy mortar dead-end fracture, then uses methacrylic acid Lipid slurry filling;When fracture width is greater than or equal to 0.3mm and is less than 1mm, using epoxy resin slurry filling;When splitting When slit width degree is greater than or equal to 1mm, it is perfused using cement grout.
According to the loading characteristic of beams of concrete, concrete beam strengthening is taken as follows:It is applied at the 1/3 of beams of concrete and 2/3 Add upward prestressing force that can alleviate the maximal bending moment of beams of concrete significantly, so angle steel is bent at 1/3 and 2/3 in the present invention, Angle steel bending place cuts out vee, and vee back side welding steel is reinforced, and welding steel weld width is 150 ~200mm, steel plate thickness are 12~14mm.Fastening screw, a diameter of 18~22mm of fastening screw, nut is arranged in angle steel bending place Height is more than 1.5 times of screw diameter.Beams of concrete following two corner is evenly distributed with angle setting steel, left comer portion angle steel and right corner portion angle steel Between weld batten plate, batten plate thickness is 10~12mm, and batten plate width is 100~120mm.
Beams of concrete construction procedure is using as follows:
(1) in beams of concrete following settings temporary support;
(2) 250~300mm of brick wall for cutting bearing beams of concrete, for angle steel construction indwelling operating space;
(3) inserted angle steel after beams of concrete removing surface;
(4) fastening screw is installed, diagonal steel carries out prestressed stretch-draw;
(5) welding steel and batten plate.
Structure of the invention performance is good, securely and reliably.
Description of the drawings
Fig. 1 is wall reinforcement structural schematic diagram one, and Fig. 2 is wall reinforcement structural schematic diagram two, and Fig. 3 is before concrete strengthening Structural schematic diagram, Fig. 4 are concrete strengthening structural schematic diagram.
In each attached drawing:1, deformed bar, 2, reinforcing rib, 3, fixing muscle, 4, Grouting Pipe, 5, angle steel, 6, fastening screw, 7, Steel plate, 8, batten plate.
Specific implementation mode
Embodiment one
The present embodiment is inadequate for strength of wall body, takes following ruggedized construction:In surface of wall cloth after wall stripping painting Set a skin deformed bar 1,1 a diameter of 12mm of deformed bar, 1 spacing of deformed bar is 200mm, on deformed bar 1 Face arranges that non-prestressed reinforcing rib 2, deformed bar 1 are welded to connect with reinforcing rib 2 again, and 2 a diameter of 12mm of reinforcing rib adds 2 bar spacing of strengthening tendons is 200mm.Just arranged direction and horizontal sextant angle are 45 degree to deformed bar 1,2 arranged direction of reinforcing rib and Just arranged direction is vertical for deformed bar 1, and deformed bar 1 is just arranged as Fig. 1 dotted line positions, and deformed bar 1 is after tensioning Become solid line position.Deformed bar 1 is fixed by fixing muscle 3 after 1 tensioning of deformed bar, fixing muscle 3 with Deformed bar 1 is welded and fixed, 3 a diameter of 14mm of fixing muscle.3 spacing of fixing muscle is 200mm, each tensioned unit length For 200mm, reinforcing rib 2 is set in two ends of tensioned unit.That deformed bar 1 is formed with non-prestressed reinforcing rib 2 It draws and arranges Grouting Pipe 4 in unit, 4 spacing of Grouting Pipe is 400mm, and Grouting Pipe 4 is the stainless-steel pipe of diameter 10mm, Grouting Pipe 4 It is embedded to wall mortar joint, length of embedment 60mm is fixed with structure glue.Three-way valve is set between Grouting Pipe 4 and slurry can.
Following ruggedized construction can also be used:A skin deformed bar 1 is arranged in surface of wall, in advance after wall stripping painting 1 a diameter of 12mm of stress reinforcing bar, 1 spacing of deformed bar are 200mm, and deformed bar 1 arranges non-prestressed reinforcement again above Muscle 2, deformed bar 1 are welded to connect with reinforcing rib 2,2 a diameter of 12mm of reinforcing rib, and 2 bar spacing of reinforcing rib is 200mm.Just arranged direction is level to deformed bar 1, and 2 arranged direction of reinforcing rib is to be vertically arranged, and deformed bar 1 is just arranged For Fig. 2 dotted line positions, deformed bar 1 becomes solid line position after tensioning.By prestress steel after 1 tensioning of deformed bar Muscle 1 is fixed by fixing muscle 3, and fixing muscle 3 is welded and fixed with deformed bar 1, and fixing muscle 3 a diameter of 14~ 16mm.3 spacing of fixing muscle is 400mm, and each tensioned unit length is 400mm, is arranged in two ends of tensioned unit and reinforces Muscle 2 arranges row's reinforcing rib 2 between end vertical strengthening ribs 2 and vertical fixing muscle 3.Deformed bar 1 adds with non-prestressed Arrange that Grouting Pipe 4,4 spacing of Grouting Pipe are 400mm in the tensioned unit that strengthening tendons 2 are formed, Grouting Pipe 4 is the stainless steel of diameter 10mm Steel pipe, Grouting Pipe 4 are embedded to wall mortar joint, and length of embedment 60mm is fixed with structure glue.Between Grouting Pipe 4 and slurry can Three-way valve is set.
Wall reinforcement construction procedure is using as follows:
(1) rendering layer is removed, the embedded bore dia in the embedded hole of preboring Grouting Pipe 4, Grouting Pipe 4 is 12mm;Preboring is embedded Hole uses electronic rotation diamond core drill, is water-cooled drill bit and is considered to be worth doing with brick output;The dust of surface of wall is cleared up using steel wire And dross or loose position and keep drying;
(2) deformed bar 1 is hung, deformed bar 1 is fixed on by wall by U-iron button, U-iron button is inserted into wall Mortar joint;
(3) reinforcing rib 2 is hung on deformed bar 1, is carried out deformed bar 1 and reinforcing rib 2 tentatively with steel wire Connection;
(4) prestressed stretch-draw is carried out to deformed bar 1,1 tensioning of deformed bar uses lever type clamping tool, lever The resistance arm of formula clamping tool and the ratio of power arm are 0.05~0.15.Tensioning process is using as follows:It will be at the beginning of deformed bar 1 Tensioning is stretched to 10% control tension stress, holds lotus 3min and establishes primary stress, then be stretched to control tension stress, holds lotus 5min establishes prestressing force.
(5) deformed bar 1 is subjected to welding anchoring with fixing muscle 3 after prestressed stretch-draw, by deformed bar 1 with Reinforcing rib 2 is welded and fixed;
(6) Grouting Pipe 4 is buried, Grouting Pipe 4 and the gap in embedded hole are closed using structure glue;
(7) slip casting is carried out to wall;With slip casing by pressure machinery slurries injection wall body, slip casting since being set most lower ranking, by Step develops to both sides upwards and symmetrically, reaches expecting pressure or slurries in neighbouring injection point free flow in each injection point Go out, injection can terminate, injection hole plug.
If slurries have leakage, leakage channel is such as can not find, slurries incorporation accelerator, which is continued a small amount of injections, makes leakage Gradually precipitate blocking in channel.
After slurries solidification completely, removes Grouting Pipe 4 and carry out sealing of hole.
If wall has crack, following handle is carried out before step (7):
1) grout nipple is buried in the middle part of crack, perfusion point spacing is determined according to fracture width and penetration of fracture synthesis, spacing For 200~300mm;
2) dead-end fracture is closed using epoxy mortar after grout nipple is embedded, forms a confined space, and slurries disengaging is reserved Mouthful, then slurries are pressed into gap with syringe, so that it is filled.
3) leakage check applies one layer of soap along crack, is passed through compressed air from grout nipple, air leak position is repaired sealing Until not leaking.
4) it is in the milk, when fracture width is less than 0.3mm, after epoxy mortar dead-end fracture, then uses methacrylic acid Lipid slurry filling;When fracture width is greater than or equal to 0.3mm and is less than 1mm, using epoxy resin slurry filling;When splitting When slit width degree is greater than or equal to 1mm, it is perfused using cement grout.
Concrete beam strengthening is taken as follows:Apply upward prestressing force at the 1/3 of beams of concrete and 2/3 can significantly alleviate The maximal bending moment of beams of concrete, so angle steel 5 is bent at 1/3 and 2/3 in the present invention, 5 bending place of angle steel cuts out triangle and lacks Mouthful, vee back side welding steel 7 is reinforced, and 7 weld width of welding steel is 180mm, and 7 thickness of steel plate is 12mm. Fastening screw 6,6 a diameter of 20mm of fastening screw is arranged in 5 bending place of angle steel, and nut height is 40mm.Beams of concrete following two Corner is evenly distributed with angle setting steel 5, and since moment of flexure is larger in the middle part of beams of concrete, batten plate 8,8 thickness of batten plate are welded between two corner angle steel 5 For 10mm, 8 width of batten plate is 100mm.
Beams of concrete construction procedure is using as follows:
(1) in beams of concrete following settings temporary support;
(2) the brick wall 280mm for cutting bearing beams of concrete, for the construction indwelling of angle steel 5 operating space;
(3) inserted angle steel 5 after beams of concrete removing surface;
(4) fastening screw 6 is installed, diagonal steel 5 carries out prestressed stretch-draw;
(5) welding steel 7 and batten plate 8.
Embodiment two
The present embodiment uses following ruggedized construction:After wall stripping painting a skin deformed bar 1 is arranged in surface of wall, 1 a diameter of 12mm of deformed bar, 1 spacing of deformed bar are 200mm, and deformed bar 1 arranges non-prestressed add again above Strengthening tendons 2, deformed bar 1 are welded to connect with reinforcing rib 2,2 a diameter of 12mm of reinforcing rib, and 2 bar spacing of reinforcing rib is 200mm.Just arranged direction is level to deformed bar 1, and 2 arranged direction of reinforcing rib is to be vertically arranged, and deformed bar 1 is just arranged For Fig. 2 dotted line positions, deformed bar 1 becomes solid line position after tensioning.By prestress steel after 1 tensioning of deformed bar Muscle 1 is fixed by fixing muscle 3, and fixing muscle 3 is welded and fixed with deformed bar 1, and fixing muscle 3 a diameter of 14~ 16mm.3 spacing of fixing muscle is 400mm, and each tensioned unit length is 400mm, is arranged in two ends of tensioned unit and reinforces Muscle 2 arranges row's reinforcing rib 2 between end vertical strengthening ribs 2 and vertical fixing muscle 3.Deformed bar 1 adds with non-prestressed Arrange that Grouting Pipe 4,4 spacing of Grouting Pipe are 400mm in the tensioned unit that strengthening tendons 2 are formed, Grouting Pipe 4 is the stainless steel of diameter 10mm Steel pipe, Grouting Pipe 4 are embedded to wall mortar joint, and length of embedment 60mm is fixed with structure glue.Between Grouting Pipe 4 and slurry can Three-way valve is set.
Wall reinforcement construction procedure is using as follows:
(1) rendering layer is removed, the embedded bore dia in the embedded hole of preboring Grouting Pipe 4, Grouting Pipe 4 is 12mm;Preboring is embedded Hole uses electronic rotation diamond core drill, is water-cooled drill bit and is considered to be worth doing with brick output;The dust of surface of wall is cleared up using steel wire And dross or loose position and keep drying;
(2) deformed bar 1 is hung, deformed bar 1 is fixed on by wall by U-iron button, U-iron button is inserted into wall Mortar joint;
(3) reinforcing rib 2 is hung on deformed bar 1, is carried out deformed bar 1 and reinforcing rib 2 tentatively with steel wire Connection;
(4) prestressed stretch-draw is carried out to deformed bar 1,1 tensioning of deformed bar uses lever type clamping tool, lever The resistance arm of formula clamping tool and the ratio of power arm are 0.05~0.15.Tensioning process is using as follows:It will be at the beginning of deformed bar 1 Tensioning is stretched to 10% control tension stress, holds lotus 3min and establishes primary stress, then be stretched to control tension stress, holds lotus 5min establishes prestressing force.
(5) deformed bar 1 is subjected to welding anchoring with fixing muscle 3 after prestressed stretch-draw, by deformed bar 1 with Reinforcing rib 2 is welded and fixed;
(6) Grouting Pipe 4 is buried, Grouting Pipe 4 and the gap in embedded hole are closed using structure glue;
(7) slip casting is carried out to wall;With slip casing by pressure machinery slurries injection wall body, slip casting since being set most lower ranking, by Step develops to both sides upwards and symmetrically, reaches expecting pressure or slurries in neighbouring injection point free flow in each injection point Go out, injection can terminate, injection hole plug.
If slurries have leakage, leakage channel is such as can not find, slurries incorporation accelerator, which is continued a small amount of injections, makes leakage Gradually precipitate blocking in channel.
After slurries solidification completely, removes Grouting Pipe 4 and carry out sealing of hole.
If wall has crack, following handle is carried out before step (7):
1) grout nipple is buried in the middle part of crack, perfusion point spacing is determined according to fracture width and penetration of fracture synthesis, spacing For 200~300mm;
2) dead-end fracture is closed using epoxy mortar after grout nipple is embedded, forms a confined space, and slurries disengaging is reserved Mouthful, then slurries are pressed into gap with syringe, so that it is filled.
3) leakage check applies one layer of soap along crack, is passed through compressed air from grout nipple, air leak position is repaired sealing Until not leaking.
4) it is in the milk, when fracture width is less than 0.3mm, after epoxy mortar dead-end fracture, then uses methacrylic acid Lipid slurry filling;When fracture width is greater than or equal to 0.3mm and is less than 1mm, using epoxy resin slurry filling;When splitting When slit width degree is greater than or equal to 1mm, it is perfused using cement grout.
Concrete beam strengthening is taken as follows:Apply upward prestressing force at the 1/3 of beams of concrete and 2/3 can significantly alleviate The maximal bending moment of beams of concrete, so angle steel 5 is bent at 1/3 and 2/3 in the present invention, 5 bending place of angle steel cuts out triangle and lacks Mouthful, vee back side welding steel 7 is reinforced, and 7 weld width of welding steel is 180mm, and 7 thickness of steel plate is 12mm. Fastening screw 6,6 a diameter of 20mm of fastening screw is arranged in 5 bending place of angle steel, and nut height is 40mm.Beams of concrete following two Corner is evenly distributed with angle setting steel 5, and batten plate 8 is welded between left comer portion angle steel 5 and right corner portion angle steel 5, and 8 thickness of batten plate is 10mm, and batten plate 8 is wide Degree is 100mm.
Beams of concrete construction procedure is using as follows:
(1) in beams of concrete following settings temporary support;
(2) the brick wall 280mm for cutting bearing beams of concrete, for the construction indwelling of angle steel 5 operating space;
(3) inserted angle steel 5 after beams of concrete removing surface;
(4) fastening screw 6 is installed, diagonal steel 5 carries out prestressed stretch-draw;
(5) welding steel 7 and batten plate 8.

Claims (1)

1. a kind of ruggedized construction construction method of old building, it is characterized in that wall reinforcement take it is as follows:After wall stripping painting Surface of wall arrange a skin deformed bar, a diameter of 12~14mm of deformed bar, deformed bar spacing be 150~ 300mm arranges that non-prestressed reinforcing rib, deformed bar are welded to connect with reinforcing rib above deformed bar again, reinforces A diameter of 12~the 14mm of muscle, reinforcing rib bar spacing are 150~300mm;By deformed bar after deformed bar tensioning It is fixed by fixing muscle, fixing muscle is welded and fixed with deformed bar, a diameter of 14~16mm of fixing muscle;Prestressing force Arrange that Grouting Pipe, slip casting tube spacing are 350~450mm, Grouting Pipe in the tensioned unit that reinforcing bar is formed with non-prestressed reinforcing rib For the stainless-steel pipe of diameter 10mm, Grouting Pipe is embedded to wall mortar joint, and length of embedment 60mm is fixed with structure glue;Note Three-way valve is set between slurry pipe and slurry can;
Wall reinforcement construction procedure is using as follows:
(1) rendering layer is removed, the embedded bore dia in the embedded hole of preboring Grouting Pipe, Grouting Pipe is 12mm;Preboring is buried hole and is used Electronic rotation diamond core drill is water-cooled drill bit and is considered to be worth doing with brick output;The dust and dross of surface of wall are cleared up using steel wire Or loose position and keep drying;
(2) deformed bar is hung, deformed bar is fixed on by wall by U-iron button, U-iron button is inserted into wall mortar joint;
(3) reinforcing rib is hung on deformed bar, is tentatively connect deformed bar with reinforcing rib with steel wire;
(4) prestressed stretch-draw is carried out to deformed bar, deformed bar tensioning uses lever type clamping tool, lever type clamping The resistance arm of tool and the ratio of power arm are 0.05~0.15;Tensioning process is using as follows:By deformed bar initial tensioning It is pulled to 10% control tension stress, lotus 3min is held and establishes primary stress, then be stretched to control tension stress, lotus 5min is held and establishes Prestressing force;
(5) deformed bar is subjected to welding anchoring with fixing muscle after prestressed stretch-draw, by deformed bar and reinforcing rib It is welded and fixed;
(6) Grouting Pipe is buried, Grouting Pipe and the gap in embedded hole are closed using structure glue;
(7) slip casting is carried out to wall;With slip casing by pressure machinery slurries injection wall body, slip casting since being set most lower ranking, gradually to Above and symmetrically develop to both sides, reach expecting pressure or slurries in each injection point freely flows out in neighbouring injection point, notes Penetrating can terminate, injection hole plug;
If slurries have leakage, leakage channel is such as can not find, slurries incorporation accelerator, which is continued a small amount of injections, makes leakage channel Gradually precipitation blocks;
After slurries solidification completely, removes Grouting Pipe and carry out sealing of hole;
Concrete beam strengthening is taken as follows:Angle steel is bent at 1/3 and 2/3, and angle steel bending place cuts out vee, triangle Notch back side welding steel is reinforced, and welding steel weld width is 150~200mm, and steel plate thickness is 12~14mm;Angle steel Fastening screw, a diameter of 18~22mm of fastening screw is arranged in bending place, and nut height is more than 1.5 times of screw diameter;Concrete Beam following two corner is evenly distributed with angle setting steel, welds batten plate between left comer portion angle steel and right corner portion angle steel, and batten plate thickness is 10~ 12mm, batten plate width are 100~120mm.
CN201810184634.5A 2016-05-21 2016-05-21 Construction method for reinforcing structure of old building Active CN108360835B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810184634.5A CN108360835B (en) 2016-05-21 2016-05-21 Construction method for reinforcing structure of old building

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201810184634.5A CN108360835B (en) 2016-05-21 2016-05-21 Construction method for reinforcing structure of old building
CN201610442373.3A CN106088646B (en) 2016-05-21 2016-05-21 The ruggedized construction of old building

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201610442373.3A Division CN106088646B (en) 2016-05-21 2016-05-21 The ruggedized construction of old building

Publications (2)

Publication Number Publication Date
CN108360835A true CN108360835A (en) 2018-08-03
CN108360835B CN108360835B (en) 2020-02-04

Family

ID=57237314

Family Applications (7)

Application Number Title Priority Date Filing Date
CN201711245575.XA Active CN107916796B (en) 2016-05-21 2016-05-21 A kind of structure promoting old building load-carrying properties
CN201610442373.3A Active CN106088646B (en) 2016-05-21 2016-05-21 The ruggedized construction of old building
CN201711245677.1A Active CN107916797B (en) 2016-05-21 2016-05-21 Construction method for improving bearing performance of old building
CN201810184634.5A Active CN108360835B (en) 2016-05-21 2016-05-21 Construction method for reinforcing structure of old building
CN201711245741.6A Active CN107905551B (en) 2016-05-21 2016-05-21 Construction method for wall reinforcing structure
CN201711245752.4A Active CN107989397B (en) 2016-05-21 2016-05-21 The reinforcing construction construction method of old building
CN201711246564.3A Expired - Fee Related CN107989398B (en) 2016-05-21 2016-05-21 Construction method for wall reinforcing structure

Family Applications Before (3)

Application Number Title Priority Date Filing Date
CN201711245575.XA Active CN107916796B (en) 2016-05-21 2016-05-21 A kind of structure promoting old building load-carrying properties
CN201610442373.3A Active CN106088646B (en) 2016-05-21 2016-05-21 The ruggedized construction of old building
CN201711245677.1A Active CN107916797B (en) 2016-05-21 2016-05-21 Construction method for improving bearing performance of old building

Family Applications After (3)

Application Number Title Priority Date Filing Date
CN201711245741.6A Active CN107905551B (en) 2016-05-21 2016-05-21 Construction method for wall reinforcing structure
CN201711245752.4A Active CN107989397B (en) 2016-05-21 2016-05-21 The reinforcing construction construction method of old building
CN201711246564.3A Expired - Fee Related CN107989398B (en) 2016-05-21 2016-05-21 Construction method for wall reinforcing structure

Country Status (1)

Country Link
CN (7) CN107916796B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112065000A (en) * 2020-08-05 2020-12-11 业之峰诺华家居装饰集团股份有限公司 Thin tile pasting method layer structure and construction process thereof

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577500A (en) * 2018-12-04 2019-04-05 富思特新材料科技发展股份有限公司 A kind of loose insulation board base treatment technique of exterior insulation engineering construction
CN110185277A (en) * 2019-04-19 2019-08-30 上海市建筑装饰工程集团有限公司 The restorative procedure of existing building external wall seepage point

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0089861A1 (en) * 1982-03-22 1983-09-28 CAMPENON BERNARD, Société Anonyme dite: Method of reinforcing arches or similar constructions
JP2003193420A (en) * 2001-12-28 2003-07-09 Kajima Corp Reinforcing construction method for loading metal pipe
CN102041849A (en) * 2010-12-03 2011-05-04 同济大学 Double-angle spliced buckling-restrained brace
CN202509792U (en) * 2012-03-31 2012-10-31 西安工业大学 Cement mortar surface layer reinforcing mesh for reinforcing brick-concrete structural wall
CN102900242A (en) * 2012-11-16 2013-01-30 南京工业大学 Steel truss part restraint reinforced concrete roof beam reinforced structure
CN103352581A (en) * 2013-07-09 2013-10-16 北京筑福国际工程技术有限责任公司 Method for strengthening sintering clay brick masonry structure through internal prestressed steel anchor rods
CN105421808A (en) * 2015-12-03 2016-03-23 四川省大卫建筑设计有限公司 Method for repairing crack in historic building wall

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100564720C (en) * 2006-03-10 2009-12-02 湖南高岭建设集团股份有限公司 Crack resistant steel concrete wall
CN102704698B (en) * 2012-05-04 2015-10-28 南京盛圆土木工程高科技有限公司 A kind of full prestressing composite integrated reinforced steel concrete structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0089861A1 (en) * 1982-03-22 1983-09-28 CAMPENON BERNARD, Société Anonyme dite: Method of reinforcing arches or similar constructions
JP2003193420A (en) * 2001-12-28 2003-07-09 Kajima Corp Reinforcing construction method for loading metal pipe
CN102041849A (en) * 2010-12-03 2011-05-04 同济大学 Double-angle spliced buckling-restrained brace
CN202509792U (en) * 2012-03-31 2012-10-31 西安工业大学 Cement mortar surface layer reinforcing mesh for reinforcing brick-concrete structural wall
CN102900242A (en) * 2012-11-16 2013-01-30 南京工业大学 Steel truss part restraint reinforced concrete roof beam reinforced structure
CN103352581A (en) * 2013-07-09 2013-10-16 北京筑福国际工程技术有限责任公司 Method for strengthening sintering clay brick masonry structure through internal prestressed steel anchor rods
CN105421808A (en) * 2015-12-03 2016-03-23 四川省大卫建筑设计有限公司 Method for repairing crack in historic building wall

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
杨永起: "《建筑防水施工技术》", 31 October 2015, 中国建筑工业出版社 *
肖翔等: "《病险水工程裂缝修补技术》", 31 May 2009, 中国水利水电出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112065000A (en) * 2020-08-05 2020-12-11 业之峰诺华家居装饰集团股份有限公司 Thin tile pasting method layer structure and construction process thereof

Also Published As

Publication number Publication date
CN107989398B (en) 2020-05-12
CN107989398A (en) 2018-05-04
CN107916796B (en) 2019-03-05
CN106088646B (en) 2018-07-24
CN107989397B (en) 2019-03-05
CN107989397A (en) 2018-05-04
CN107916797A (en) 2018-04-17
CN107916796A (en) 2018-04-17
CN107916797B (en) 2020-05-15
CN106088646A (en) 2016-11-09
CN107905551B (en) 2020-02-04
CN108360835B (en) 2020-02-04
CN107905551A (en) 2018-04-13

Similar Documents

Publication Publication Date Title
CN106088646B (en) The ruggedized construction of old building
CN104976424B (en) Anchor cable construction method for rectangular top pipe joint connecting and strengthening
CN109457993A (en) A kind of concrete column restoring and fastening method
CN107013040A (en) The construction method of floor is poured after a kind of sleeve built-in type
CN113123332B (en) Post-tensioned slow-setting main reinforcement pressure type uplift action pile and preparation method thereof
CN104532860B (en) Recoverable soil nail
CN105625742B (en) Brick wall reinforcement structure
CN204435906U (en) Planting reinforced bar into concrete device
JP5384310B2 (en) Fall bridge prevention device
JP2005068931A (en) Reinforcing construction method of concrete structure
CN113152535B (en) Rear-inserted unbonded steel strand pressure-bearing type uplift pile construction method and assembly used in same
CN205954675U (en) Prefabricated pipeline concrete buttress
CN204023527U (en) A kind of reinforcement leakage preventing structure of pressure diversion tunnel
CN103643804A (en) Corroded reinforced concrete beam repairing and strengthening method based on arch effect
CN105926650A (en) Concrete layer landslide prevention fixing device for slope building
CN109024249B (en) Socket type structure prefabricated assembly pier with joint made of cast-in-situ UHPC material
CN112982395A (en) Stiff composite pile body anchor rod device and construction process
CN204475352U (en) Recoverable soil nail
CN216811108U (en) Reinforced structure for additionally arranging reinforced concrete columns on masonry wall
CN205777645U (en) A kind of ruggedized construction of body of wall
CN210369424U (en) Adopt precast concrete shear force wallboard of vertical connection of prestressing force steel strand wires
CN110130333B (en) BFRP (bidirectional Forwarding resistance) reinforcement anti-floating anchor rod design method
CN218462543U (en) Prestressed tensioning and recovering device for concrete prefabricated part
CN105986622A (en) U-shaped rebar set grouting lap joint component
CN115519668A (en) Prestressed tensioning and recycling device and method for concrete prefabricated part

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 325000, No. 48, Jingshan Hill Road, Ouhai District, Wenzhou, Zhejiang

Applicant after: Ye Changqing

Address before: 325000 No. 4, Jinchuan Road, Tianhe street, Wenzhou economic and Technological Development Zone, Zhejiang, China

Applicant before: Ye Changqing

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201231

Address after: 537100 Comprehensive Economic Development Zone of Three-invested Enterprises in Gangnan District, Guigang City, Guangxi Zhuang Autonomous Region (near the traffic lights of Jiangnan Industrial Zone)

Patentee after: Guangxi Xin Bin Cheng Machinery Co.,Ltd.

Address before: 325000 No. 48 Xinghai Road, Jingshan Street, Ouhai District, Wenzhou City, Zhejiang Province

Patentee before: Ye Changqing

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211213

Address after: 310000 room 225, unit 4, building 1, qianjiangyuan, Shangcheng District, Hangzhou, Zhejiang

Patentee after: Hangzhou Heyi Construction Engineering Co.,Ltd.

Address before: 537100 Comprehensive Economic Development Zone of Three-invested Enterprises in Gangnan District, Guigang City, Guangxi Zhuang Autonomous Region (near the traffic lights of Jiangnan Industrial Zone)

Patentee before: Guangxi Xin Bin Cheng Machinery Co.,Ltd.

TR01 Transfer of patent right
CP03 Change of name, title or address

Address after: Room 440, 4th Floor, Jinjiang Group Building, No. 280 Qingjiang Road, Shangcheng District, Hangzhou City, Zhejiang Province, 310000

Patentee after: Zhejiang Heyi Engineering Technology Co.,Ltd.

Country or region after: China

Address before: 310000 room 225, unit 4, building 1, qianjiangyuan, Shangcheng District, Hangzhou, Zhejiang

Patentee before: Hangzhou Heyi Construction Engineering Co.,Ltd.

Country or region before: China

CP03 Change of name, title or address