CN107916796A - A kind of structure for lifting old building load-carrying properties - Google Patents

A kind of structure for lifting old building load-carrying properties Download PDF

Info

Publication number
CN107916796A
CN107916796A CN201711245575.XA CN201711245575A CN107916796A CN 107916796 A CN107916796 A CN 107916796A CN 201711245575 A CN201711245575 A CN 201711245575A CN 107916796 A CN107916796 A CN 107916796A
Authority
CN
China
Prior art keywords
deformed bar
reinforcing rib
steel
wall
angle steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711245575.XA
Other languages
Chinese (zh)
Other versions
CN107916796B (en
Inventor
朱奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tancheng Economic Development Zone Pharmaceutical Development Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711245575.XA priority Critical patent/CN107916796B/en
Publication of CN107916796A publication Critical patent/CN107916796A/en
Application granted granted Critical
Publication of CN107916796B publication Critical patent/CN107916796B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0203Arrangements for filling cracks or cavities in building constructions
    • E04G23/0211Arrangements for filling cracks or cavities in building constructions using injection
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • E04G23/0222Replacing or adding wall ties

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses it is a kind of lifted old building load-carrying properties structure, it is characterized in that wall reinforcement take it is as follows:Wall arranges non-prestressed reinforcing rib again after peeling off rendering on surface of wall one skin deformed bar of arrangement, deformed bar.Deformed bar is fixed by fixing muscle after deformed bar tensioning.Arrangement Grouting Pipe in the tensioned unit that deformed bar is formed with non-prestressed reinforcing rib, concrete beam strengthening is taken as follows:Angle steel is bent at 1/3 and 2/3, angle steel bending place cuts out triangular gap, triangular gap back side welding steel is strengthened, angle steel bending place sets fastening screw, beams of concrete following two corner is evenly distributed with angle setting steel, batten plate is welded between two corner angle steel, batten plate thickness is 10~12mm, and batten plate width is 100~120mm.

Description

A kind of structure for lifting old building load-carrying properties
Technical field
The present invention relates to a kind of old building structure, more particularly to a kind of structure for lifting old building load-carrying properties.
Background technology
Old building by long-term use after the phenomenon of depression of bearing force occurs because of a variety of causes, be mainly manifested in Old building The wall of thing is because crack occur in the reasons such as sedimentation, or bearing capacity of wall body cannot meet the requirement of existing load;Old building Beams of concrete is because depression of bearing force occurs in concrete carbonization, or bearing capacity occurs because of the lifting using standard and cannot reach It is required that.Therefore for old building, the overall load effect of reinforcement structure, improves the mechanical property of structure.
The content of the invention
The present invention is to provide a kind of structure for lifting old building load-carrying properties, solves bearing capacity of wall body and concrete joist support Carry the problem of power is inadequate.
The present invention is inadequate for strength of wall body, takes following ruggedized construction:Wall is arranged after peeling off rendering in surface of wall One skin deformed bar, a diameter of 12~14mm of deformed bar, deformed bar spacing are 150~300mm, deformed bar Arrange non-prestressed reinforcing rib again above, deformed bar is welded to connect with reinforcing rib, a diameter of 12~14mm of reinforcing rib, Reinforcing rib bar spacing is 150~300mm.Just arranged direction and horizontal sextant angle are 45 degree to deformed bar, reinforcing rib arrangement side To vertical with arranged direction at the beginning of deformed bar.Deformed bar is consolidated by fixing muscle after deformed bar tensioning Fixed, fixing muscle is welded and fixed with deformed bar, a diameter of 14~16mm of fixing muscle.Fixing muscle spacing for 150~ 300mm, each tensioned unit length are 150~300mm, and reinforcing rib is set in two terminations of tensioned unit.Deformed bar Grouting Pipe is arranged in the tensioned unit formed with non-prestressed reinforcing rib, and slip casting tube spacing is 350~450mm, and Grouting Pipe is straight The stainless-steel pipe of footpath 10mm, Grouting Pipe embedment wall mortar joint, length of embedment 60mm, is fixed with structure glue.Grouting Pipe Three-way valve is set between slurry can.
Following ruggedized construction can also be used:A skin deformed bar is arranged in surface of wall, in advance after wall stripping rendering Stress bar diameter is 12~14mm, and deformed bar spacing is 150~300mm, arranged again above deformed bar it is non-it is pre- should Power reinforcing rib, deformed bar are welded to connect with reinforcing rib, a diameter of 12~14mm of reinforcing rib, and reinforcing rib bar spacing is 150~300mm.Just arranged direction is level to deformed bar, and reinforcing rib arranged direction is to be vertically arranged.Deformed bar tensioning After deformed bar is fixed by fixing muscle, fixing muscle is welded and fixed with deformed bar, and fixing muscle is straight Footpath is 14~16mm.Fixing muscle spacing is 300~600mm, and each tensioned unit length is 300~600mm, in tensioned unit Two terminations set reinforcing rib, and row's reinforcing rib is arranged between termination vertical strengthening ribs and vertical fixing muscle.Deformed bar Grouting Pipe is arranged in the tensioned unit formed with non-prestressed reinforcing rib, and slip casting tube spacing is 350~450mm, and Grouting Pipe is straight The stainless-steel pipe of footpath 10mm, Grouting Pipe embedment wall mortar joint, length of embedment 60mm, is fixed with structure glue.Grouting Pipe Three-way valve is set between slurry can.
After surface of wall sets deformed bar, wall body structure performance can have greatly improved, even structural damage Form also can be very big improvement, from plastic failure can be transitioned into elastic break-down, obvious action is had safely to structure.
Wall reinforcement construction procedure is using as follows:
(1) rendering layer is peeled off, the embedded hole of preboring Grouting Pipe, the embedded bore dia of Grouting Pipe is 12mm;Preboring buries hole Using electronic rotation diamond core drill, it is water-cooled drill bit and is considered to be worth doing with brick output;Using steel wire cleaning surface of wall dust and Scum silica frost or loose position simultaneously keep drying;
(2) deformed bar is hung, deformed bar is fixed on by wall, U-iron button insertion wall ash by U-iron button Seam;
(3) reinforcing rib is hung on deformed bar, is tentatively connected deformed bar with reinforcing rib with steel wire;
(4) prestressed stretch-draw is carried out to deformed bar, deformed bar tensioning uses lever type clamping instrument, lever The resistance arm of clamping tool and the ratio of power arm are 0.05~0.15.Tensioning process is using as follows:Deformed bar is just opened Tension is pulled to 10% control tension stress, holds lotus 3min and establishes primary stress, then is stretched to control tension stress, holds lotus 5min Establish prestressing force.
(5) deformed bar is subjected to welding grappling with fixing muscle after prestressed stretch-draw, by deformed bar with adding Strengthening tendons is welded and fixed;
(6) Grouting Pipe is buried, Grouting Pipe and the gap in embedded hole are closed using structure glue;
(7) slip casting is carried out to wall;With slip casing by pressure machinery slurries injection wall body, slip casting since being put most lower ranking, by Step develops to both sides upwards and symmetrically, reaches expecting pressure or slurries in neighbouring injection point free flow in each injection point Go out, injection can terminate, injection hole plug.
If slurries have leakage, leakage channel is such as can not find, slurries incorporation accelerator is continued a small amount of injections makes leakage Passage gradually precipitates blocking.
After slurries solidification completely, remove Grouting Pipe and carry out sealing of hole.
If wall has crack, following handle is carried out before step (7):
1) grout nipple is buried in the middle part of crack, perfusion point spacing is integrated according to fracture width and the penetration of fracture to be determined, spacing For 200~300mm;
2) dead-end fracture, grout nipple are closed after burying using epoxy mortar, form a confined space, reserve slurries disengaging Mouthful, then slurries are pressed into gap with syringe, fill it.
3) leakage check, applies one layer of soap along crack, is passed through compressed air from grout nipple, air leak position is repaired sealing Untill not leaking.
4) it is in the milk, when fracture width is less than 0.3mm, after epoxy mortar dead-end fracture, then using methacrylic acid Lipid slurry filling;When fracture width is greater than or equal to 0.3mm and is less than 1mm, using epoxy resin slurry filling;When splitting When slit width degree is greater than or equal to 1mm, irrigated using cement grout.
According to the loading characteristic of beams of concrete, concrete beam strengthening is taken as follows:Applied at the 1/3 of beams of concrete and 2/3 Upward prestressing force is added to alleviate the maximal bending moment of beams of concrete significantly, so angle steel is bent at 1/3 and 2/3 in the present invention, Angle steel bending place cuts out triangular gap, and triangular gap back side welding steel is strengthened, and welding steel weld width is 150 ~200mm, steel plate thickness are 12~14mm.Angle steel bending place sets fastening screw, a diameter of 18~22mm of fastening screw, nut Highly it is more than 1.5 times of screw diameter.Beams of concrete following two corner is evenly distributed with angle setting steel, left comer portion angle steel and right corner portion angle steel Between weld batten plate, batten plate thickness is 10~12mm, and batten plate width is 100~120mm.
Beams of concrete construction procedure is using as follows:
(1) temporary support is provided below in beams of concrete;
(2) 250~300mm of brick wall of supporting beams of concrete is cut, for angle steel construction indwelling operating space;
(3) inserted angle steel after beams of concrete removing surface;
(4) fastening screw is installed, diagonal steel carries out prestressed stretch-draw;
(5) welding steel and batten plate.
Structural behaviour of the present invention is good, securely and reliably.
Brief description of the drawings
Fig. 1 is wall reinforcement structure diagram one, and Fig. 2 is wall reinforcement structure diagram two, and Fig. 3 is before concrete strengthening Structure diagram, Fig. 4 are concrete strengthening structure diagram.
In each attached drawing:1st, deformed bar, 2, reinforcing rib, 3, fixing muscle, 4, Grouting Pipe, 5, angle steel, 6, fastening screw, 7, Steel plate, 8, batten plate.
Embodiment
Embodiment one
The present embodiment is inadequate for strength of wall body, takes following ruggedized construction:In surface of wall cloth after wall stripping rendering Put a skin deformed bar 1,1 a diameter of 12mm of deformed bar, 1 spacing of deformed bar is 200mm, on deformed bar 1 Non-prestressed reinforcing rib 2 is arranged in face again, and deformed bar 1 is welded to connect with reinforcing rib 2, and 2 a diameter of 12mm of reinforcing rib, adds 2 bar spacing of strengthening tendons is 200mm.Just arranged direction and horizontal sextant angle are 45 degree to deformed bar 1,2 arranged direction of reinforcing rib and Just arranged direction is vertical for deformed bar 1, and deformed bar 1 is just arranged as Fig. 1 dotted line positions, and deformed bar 1 is after tensioning Become solid line position.Deformed bar 1 is fixed by fixing muscle 3 after 1 tensioning of deformed bar, fixing muscle 3 with Deformed bar 1 is welded and fixed, 3 a diameter of 14mm of fixing muscle.3 spacing of fixing muscle is 200mm, each tensioned unit length For 200mm, reinforcing rib 2 is set in two terminations of tensioned unit.That deformed bar 1 is formed with non-prestressed reinforcing rib 2 It is 400mm to draw arrangement Grouting Pipe 4,4 spacing of Grouting Pipe in unit, and Grouting Pipe 4 is the stainless-steel pipe of diameter 10mm, Grouting Pipe 4 Wall mortar joint is embedded to, length of embedment 60mm, is fixed with structure glue.Three-way valve is set between Grouting Pipe 4 and slurry can.
Following ruggedized construction can also be used:A skin deformed bar 1 is arranged in surface of wall, in advance after wall stripping rendering 1 a diameter of 12mm of stress reinforcing bar, 1 spacing of deformed bar are 200mm, and deformed bar 1 arranges non-prestressed reinforcement again above Muscle 2, deformed bar 1 are welded to connect with reinforcing rib 2,2 a diameter of 12mm of reinforcing rib, and 2 bar spacing of reinforcing rib is 200mm.Just arranged direction is level to deformed bar 1, and 2 arranged direction of reinforcing rib to be vertically arranged, just arrange by deformed bar 1 For Fig. 2 dotted line positions, deformed bar 1 becomes solid line position after tensioning.By prestress steel after 1 tensioning of deformed bar Muscle 1 is fixed by fixing muscle 3, and fixing muscle 3 is welded and fixed with deformed bar 1, and fixing muscle 3 a diameter of 14~ 16mm.3 spacing of fixing muscle is 400mm, and each tensioned unit length is 400mm, sets and strengthens in two terminations of tensioned unit Muscle 2, row's reinforcing rib 2 is arranged between termination vertical strengthening ribs 2 and vertical fixing muscle 3.Deformed bar 1 adds with non-prestressed Arrangement Grouting Pipe 4 in the tensioned unit that strengthening tendons 2 is formed, 4 spacing of Grouting Pipe are 400mm, and Grouting Pipe 4 is the stainless steel of diameter 10mm Steel pipe, Grouting Pipe 4 are embedded to wall mortar joint, and length of embedment 60mm, is fixed with structure glue.Between Grouting Pipe 4 and slurry can Three-way valve is set.
Wall reinforcement construction procedure is using as follows:
(1) rendering layer is peeled off, the embedded hole of preboring Grouting Pipe 4, the embedded bore dia of Grouting Pipe 4 is 12mm;Preboring is buried Hole uses electronic rotation diamond core drill, is water-cooled drill bit and is considered to be worth doing with brick output;Using the dust of steel wire cleaning surface of wall And scum silica frost or loose position and keep drying;
(2) deformed bar 1 is hung, deformed bar 1 is fixed on by wall, U-iron button insertion wall by U-iron button Mortar joint;
(3) reinforcing rib 2 is hung on deformed bar 1, is carried out deformed bar 1 and reinforcing rib 2 tentatively with steel wire Connection;
(4) prestressed stretch-draw is carried out to deformed bar 1,1 tensioning of deformed bar uses lever type clamping instrument, lever The resistance arm of formula clamping tool and the ratio of power arm are 0.05~0.15.Tensioning process is using as follows:By at the beginning of deformed bar 1 Tensioning is stretched to 10% control tension stress, holds lotus 3min and establishes primary stress, then is stretched to control tension stress, holds lotus 5min establishes prestressing force.
(5) deformed bar 1 is subjected to welding grappling with fixing muscle 3 after prestressed stretch-draw, by deformed bar 1 with Reinforcing rib 2 is welded and fixed;
(6) Grouting Pipe 4 is buried, Grouting Pipe 4 and the gap in embedded hole are closed using structure glue;
(7) slip casting is carried out to wall;With slip casing by pressure machinery slurries injection wall body, slip casting since being put most lower ranking, by Step develops to both sides upwards and symmetrically, reaches expecting pressure or slurries in neighbouring injection point free flow in each injection point Go out, injection can terminate, injection hole plug.
If slurries have leakage, leakage channel is such as can not find, slurries incorporation accelerator is continued a small amount of injections makes leakage Passage gradually precipitates blocking.
After slurries solidification completely, remove Grouting Pipe 4 and carry out sealing of hole.
If wall has crack, following handle is carried out before step (7):
1) grout nipple is buried in the middle part of crack, perfusion point spacing is integrated according to fracture width and the penetration of fracture to be determined, spacing For 200~300mm;
2) dead-end fracture, grout nipple are closed after burying using epoxy mortar, form a confined space, reserve slurries disengaging Mouthful, then slurries are pressed into gap with syringe, fill it.
3) leakage check, applies one layer of soap along crack, is passed through compressed air from grout nipple, air leak position is repaired sealing Untill not leaking.
4) it is in the milk, when fracture width is less than 0.3mm, after epoxy mortar dead-end fracture, then using methacrylic acid Lipid slurry filling;When fracture width is greater than or equal to 0.3mm and is less than 1mm, using epoxy resin slurry filling;When splitting When slit width degree is greater than or equal to 1mm, irrigated using cement grout.
Concrete beam strengthening is taken as follows:Apply upward prestressing force at the 1/3 of beams of concrete and 2/3 can significantly alleviate The maximal bending moment of beams of concrete, so angle steel 5 is bent at 1/3 and 2/3 in the present invention, 5 bending place of angle steel cuts out triangle and lacks Mouthful, triangular gap back side welding steel 7 is strengthened, and 7 weld width of welding steel is 180mm, and 7 thickness of steel plate is 12mm. 5 bending place of angle steel sets fastening screw 6, and 6 a diameter of 20mm of fastening screw, nut is highly 40mm.Beams of concrete following two Corner is evenly distributed with angle setting steel 5, and since moment of flexure is larger in the middle part of beams of concrete, batten plate 8,8 thickness of batten plate are welded between two corner angle steel 5 For 10mm, 8 width of batten plate is 100mm.
Beams of concrete construction procedure is using as follows:
(1) temporary support is provided below in beams of concrete;
(2) the brick wall 280mm of supporting beams of concrete is cut, for the construction indwelling of angle steel 5 operating space;
(3) inserted angle steel 5 after beams of concrete removing surface;
(4) fastening screw 6 is installed, diagonal steel 5 carries out prestressed stretch-draw;
(5) welding steel 7 and batten plate 8.
Embodiment two
The present embodiment uses following ruggedized construction:After wall stripping rendering a skin deformed bar 1 is arranged in surface of wall, 1 a diameter of 12mm of deformed bar, 1 spacing of deformed bar are 200mm, and deformed bar 1 arranges non-prestressed add again above Strengthening tendons 2, deformed bar 1 are welded to connect with reinforcing rib 2,2 a diameter of 12mm of reinforcing rib, and 2 bar spacing of reinforcing rib is 200mm.Just arranged direction is level to deformed bar 1, and 2 arranged direction of reinforcing rib to be vertically arranged, just arrange by deformed bar 1 For Fig. 2 dotted line positions, deformed bar 1 becomes solid line position after tensioning.By prestress steel after 1 tensioning of deformed bar Muscle 1 is fixed by fixing muscle 3, and fixing muscle 3 is welded and fixed with deformed bar 1, and fixing muscle 3 a diameter of 14~ 16mm.3 spacing of fixing muscle is 400mm, and each tensioned unit length is 400mm, sets and strengthens in two terminations of tensioned unit Muscle 2, row's reinforcing rib 2 is arranged between termination vertical strengthening ribs 2 and vertical fixing muscle 3.Deformed bar 1 adds with non-prestressed Arrangement Grouting Pipe 4 in the tensioned unit that strengthening tendons 2 is formed, 4 spacing of Grouting Pipe are 400mm, and Grouting Pipe 4 is the stainless steel of diameter 10mm Steel pipe, Grouting Pipe 4 are embedded to wall mortar joint, and length of embedment 60mm, is fixed with structure glue.Between Grouting Pipe 4 and slurry can Three-way valve is set.
Wall reinforcement construction procedure is using as follows:
(1) rendering layer is peeled off, the embedded hole of preboring Grouting Pipe 4, the embedded bore dia of Grouting Pipe 4 is 12mm;Preboring is buried Hole uses electronic rotation diamond core drill, is water-cooled drill bit and is considered to be worth doing with brick output;Using the dust of steel wire cleaning surface of wall And scum silica frost or loose position and keep drying;
(2) deformed bar 1 is hung, deformed bar 1 is fixed on by wall, U-iron button insertion wall by U-iron button Mortar joint;
(3) reinforcing rib 2 is hung on deformed bar 1, is carried out deformed bar 1 and reinforcing rib 2 tentatively with steel wire Connection;
(4) prestressed stretch-draw is carried out to deformed bar 1,1 tensioning of deformed bar uses lever type clamping instrument, lever The resistance arm of formula clamping tool and the ratio of power arm are 0.05~0.15.Tensioning process is using as follows:By at the beginning of deformed bar 1 Tensioning is stretched to 10% control tension stress, holds lotus 3min and establishes primary stress, then is stretched to control tension stress, holds lotus 5min establishes prestressing force.
(5) deformed bar 1 is subjected to welding grappling with fixing muscle 3 after prestressed stretch-draw, by deformed bar 1 with Reinforcing rib 2 is welded and fixed;
(6) Grouting Pipe 4 is buried, Grouting Pipe 4 and the gap in embedded hole are closed using structure glue;
(7) slip casting is carried out to wall;With slip casing by pressure machinery slurries injection wall body, slip casting since being put most lower ranking, by Step develops to both sides upwards and symmetrically, reaches expecting pressure or slurries in neighbouring injection point free flow in each injection point Go out, injection can terminate, injection hole plug.
If slurries have leakage, leakage channel is such as can not find, slurries incorporation accelerator is continued a small amount of injections makes leakage Passage gradually precipitates blocking.
After slurries solidification completely, remove Grouting Pipe 4 and carry out sealing of hole.
If wall has crack, following handle is carried out before step (7):
1) grout nipple is buried in the middle part of crack, perfusion point spacing is integrated according to fracture width and the penetration of fracture to be determined, spacing For 200~300mm;
2) dead-end fracture, grout nipple are closed after burying using epoxy mortar, form a confined space, reserve slurries disengaging Mouthful, then slurries are pressed into gap with syringe, fill it.
3) leakage check, applies one layer of soap along crack, is passed through compressed air from grout nipple, air leak position is repaired sealing Untill not leaking.
4) it is in the milk, when fracture width is less than 0.3mm, after epoxy mortar dead-end fracture, then using methacrylic acid Lipid slurry filling;When fracture width is greater than or equal to 0.3mm and is less than 1mm, using epoxy resin slurry filling;When splitting When slit width degree is greater than or equal to 1mm, irrigated using cement grout.
Concrete beam strengthening is taken as follows:Apply upward prestressing force at the 1/3 of beams of concrete and 2/3 can significantly alleviate The maximal bending moment of beams of concrete, so angle steel 5 is bent at 1/3 and 2/3 in the present invention, 5 bending place of angle steel cuts out triangle and lacks Mouthful, triangular gap back side welding steel 7 is strengthened, and 7 weld width of welding steel is 180mm, and 7 thickness of steel plate is 12mm. 5 bending place of angle steel sets fastening screw 6, and 6 a diameter of 20mm of fastening screw, nut is highly 40mm.Beams of concrete following two Corner is evenly distributed with angle setting steel 5, batten plate 8 is welded between left comer portion angle steel 5 and right corner portion angle steel 5,8 thickness of batten plate is 10mm, and batten plate 8 is wide Spend for 100mm.
Beams of concrete construction procedure is using as follows:
(1) temporary support is provided below in beams of concrete;
(2) the brick wall 280mm of supporting beams of concrete is cut, for the construction indwelling of angle steel 5 operating space;
(3) inserted angle steel 5 after beams of concrete removing surface;
(4) fastening screw 6 is installed, diagonal steel 5 carries out prestressed stretch-draw;
(5) welding steel 7 and batten plate 8.

Claims (1)

1. it is a kind of lifted old building load-carrying properties structure, it is characterized in that wall reinforcement take it is as follows:After wall peels off rendering Arrange a skin deformed bar in surface of wall, a diameter of 12~14mm of deformed bar, deformed bar spacing for 150~ 300mm, arranges non-prestressed reinforcing rib above deformed bar again, and deformed bar is welded to connect with reinforcing rib, strengthens A diameter of 12~the 14mm of muscle, reinforcing rib bar spacing are 150~300mm;By deformed bar after deformed bar tensioning It is fixed by fixing muscle, fixing muscle is welded and fixed with deformed bar, a diameter of 14~16mm of fixing muscle;Prestressing force Arrangement Grouting Pipe in the tensioned unit that reinforcing bar and non-prestressed reinforcing rib are formed, slip casting tube spacing are 350~450mm, Grouting Pipe For the stainless-steel pipe of diameter 10mm, Grouting Pipe embedment wall mortar joint, length of embedment 60mm, is fixed with structure glue;Note Three-way valve is set between slurry pipe and slurry can;
Just arranged direction and horizontal sextant angle are 45 degree to deformed bar, reinforcing rib arranged direction and the first arranged direction of deformed bar Vertically;Fixing muscle spacing is 150~300mm, and each tensioned unit length is 150~300mm, in two terminations of tensioned unit Reinforcing rib is set;
Concrete beam strengthening is taken as follows:Angle steel is bent at 1/3 and 2/3, and angle steel bending place cuts out triangular gap, triangle Notch back side welding steel is strengthened, and welding steel weld width is 150~200mm, and steel plate thickness is 12~14mm;Angle steel Bending place sets fastening screw, a diameter of 18~22mm of fastening screw, and nut is highly more than 1.5 times of screw diameter;Concrete Beam following two corner is evenly distributed with angle setting steel, welds batten plate between left comer portion angle steel and right corner portion angle steel, batten plate thickness for 10~ 12mm, batten plate width are 100~120mm.
CN201711245575.XA 2016-05-21 2016-05-21 A kind of structure promoting old building load-carrying properties Active CN107916796B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711245575.XA CN107916796B (en) 2016-05-21 2016-05-21 A kind of structure promoting old building load-carrying properties

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201711245575.XA CN107916796B (en) 2016-05-21 2016-05-21 A kind of structure promoting old building load-carrying properties
CN201610442373.3A CN106088646B (en) 2016-05-21 2016-05-21 The ruggedized construction of old building

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201610442373.3A Division CN106088646B (en) 2016-05-21 2016-05-21 The ruggedized construction of old building

Publications (2)

Publication Number Publication Date
CN107916796A true CN107916796A (en) 2018-04-17
CN107916796B CN107916796B (en) 2019-03-05

Family

ID=57237314

Family Applications (7)

Application Number Title Priority Date Filing Date
CN201711245752.4A Active CN107989397B (en) 2016-05-21 2016-05-21 The reinforcing construction construction method of old building
CN201711245677.1A Active CN107916797B (en) 2016-05-21 2016-05-21 Construction method for improving bearing performance of old building
CN201711245741.6A Active CN107905551B (en) 2016-05-21 2016-05-21 Construction method for wall reinforcing structure
CN201810184634.5A Active CN108360835B (en) 2016-05-21 2016-05-21 Construction method for reinforcing structure of old building
CN201711245575.XA Active CN107916796B (en) 2016-05-21 2016-05-21 A kind of structure promoting old building load-carrying properties
CN201610442373.3A Active CN106088646B (en) 2016-05-21 2016-05-21 The ruggedized construction of old building
CN201711246564.3A Active CN107989398B (en) 2016-05-21 2016-05-21 Construction method for wall reinforcing structure

Family Applications Before (4)

Application Number Title Priority Date Filing Date
CN201711245752.4A Active CN107989397B (en) 2016-05-21 2016-05-21 The reinforcing construction construction method of old building
CN201711245677.1A Active CN107916797B (en) 2016-05-21 2016-05-21 Construction method for improving bearing performance of old building
CN201711245741.6A Active CN107905551B (en) 2016-05-21 2016-05-21 Construction method for wall reinforcing structure
CN201810184634.5A Active CN108360835B (en) 2016-05-21 2016-05-21 Construction method for reinforcing structure of old building

Family Applications After (2)

Application Number Title Priority Date Filing Date
CN201610442373.3A Active CN106088646B (en) 2016-05-21 2016-05-21 The ruggedized construction of old building
CN201711246564.3A Active CN107989398B (en) 2016-05-21 2016-05-21 Construction method for wall reinforcing structure

Country Status (1)

Country Link
CN (7) CN107989397B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577500A (en) * 2018-12-04 2019-04-05 富思特新材料科技发展股份有限公司 A kind of loose insulation board base treatment technique of exterior insulation engineering construction
CN110185277A (en) * 2019-04-19 2019-08-30 上海市建筑装饰工程集团有限公司 The restorative procedure of existing building external wall seepage point
CN112065000B (en) * 2020-08-05 2021-08-06 业之峰诺华家居装饰集团股份有限公司 Thin tile pasting method layer structure and construction process thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0089861A1 (en) * 1982-03-22 1983-09-28 CAMPENON BERNARD, Société Anonyme dite: Method of reinforcing arches or similar constructions
JP2003193420A (en) * 2001-12-28 2003-07-09 Kajima Corp Reinforcing construction method for loading metal pipe
CN102041849A (en) * 2010-12-03 2011-05-04 同济大学 Double-angle spliced buckling-restrained brace
CN102900242A (en) * 2012-11-16 2013-01-30 南京工业大学 Steel bar concrete beam reinforcing structure with partially restrained steel truss
CN103352581A (en) * 2013-07-09 2013-10-16 北京筑福国际工程技术有限责任公司 Method for strengthening sintering clay brick masonry structure through internal prestressed steel anchor rods
CN105421808A (en) * 2015-12-03 2016-03-23 四川省大卫建筑设计有限公司 Method for repairing crack in historic building wall

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100564720C (en) * 2006-03-10 2009-12-02 湖南高岭建设集团股份有限公司 Crack resistant steel concrete wall
CN202509792U (en) * 2012-03-31 2012-10-31 西安工业大学 Cement mortar surface layer reinforcing mesh for reinforcing brick-concrete structural wall
CN102704698B (en) * 2012-05-04 2015-10-28 南京盛圆土木工程高科技有限公司 A kind of full prestressing composite integrated reinforced steel concrete structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0089861A1 (en) * 1982-03-22 1983-09-28 CAMPENON BERNARD, Société Anonyme dite: Method of reinforcing arches or similar constructions
JP2003193420A (en) * 2001-12-28 2003-07-09 Kajima Corp Reinforcing construction method for loading metal pipe
CN102041849A (en) * 2010-12-03 2011-05-04 同济大学 Double-angle spliced buckling-restrained brace
CN102900242A (en) * 2012-11-16 2013-01-30 南京工业大学 Steel bar concrete beam reinforcing structure with partially restrained steel truss
CN103352581A (en) * 2013-07-09 2013-10-16 北京筑福国际工程技术有限责任公司 Method for strengthening sintering clay brick masonry structure through internal prestressed steel anchor rods
CN105421808A (en) * 2015-12-03 2016-03-23 四川省大卫建筑设计有限公司 Method for repairing crack in historic building wall

Also Published As

Publication number Publication date
CN107916797B (en) 2020-05-15
CN107989397B (en) 2019-03-05
CN107916797A (en) 2018-04-17
CN107989398B (en) 2020-05-12
CN107989398A (en) 2018-05-04
CN107905551B (en) 2020-02-04
CN106088646B (en) 2018-07-24
CN108360835B (en) 2020-02-04
CN106088646A (en) 2016-11-09
CN107916796B (en) 2019-03-05
CN107989397A (en) 2018-05-04
CN108360835A (en) 2018-08-03
CN107905551A (en) 2018-04-13

Similar Documents

Publication Publication Date Title
CN106088646B (en) The ruggedized construction of old building
CN108978938B (en) Prefabricated reinforced concrete shear wall and construction method
CN202899637U (en) Enlarged section reinforced structure for circular reinforced concrete column
CN105625742B (en) Brick wall reinforcement structure
CN107013040A (en) The construction method of floor is poured after a kind of sleeve built-in type
CN104532860B (en) Recoverable soil nail
CN113123332A (en) Post-tensioned slow-setting main reinforcement pressure type uplift action pile and preparation method thereof
CN204435906U (en) Planting reinforced bar into concrete device
CN106567554A (en) Reinforcing construction method of masonry structural building
CN203924371U (en) Infilled wall teeming slurry joint filling structure
CN105926650A (en) Concrete layer landslide prevention fixing device for slope building
CN210163848U (en) External reinforcing apparatus of reinforced concrete roof beam
CN214062078U (en) Prefabricated assembly type non-reinforced concrete shear wall-floor slab joint
CN205777645U (en) A kind of ruggedized construction of body of wall
GB2382096A (en) Debonding sheath for piles
CN210369424U (en) Adopt precast concrete shear force wallboard of vertical connection of prestressing force steel strand wires
CN219973209U (en) Grouting pipe reinforcing device
CN204475352U (en) Recoverable soil nail
CN214220276U (en) Tie bar connecting device for masonry wall
CN219033273U (en) Pool leakage repairing system
CN217204695U (en) Outer wall bolt hole plugging structure
CN219638087U (en) Large-scale pond prevention of seepage prevents structure of ftracturing
CN219344141U (en) Concrete member surface thin layer reinforced structure
CN212896961U (en) Precast concrete shear wall component
CN218540677U (en) Anchor rod with anchoring section provided with anti-cracking reinforcing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 325000 No. 48 Xinghai Road, Jingshan Street, Ouhai District, Wenzhou City, Zhejiang Province

Applicant after: Ye Changqing

Address before: 325000 Jinchuan Road, Tianhe street, Wenzhou economic and Technological Development Zone, Zhejiang, 4

Applicant before: Ye Changqing

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201119

Address after: No. 100, North Ring Road, Hede Town, Sheyang County, Yancheng City, Jiangsu Province

Patentee after: Gu Yaobin

Address before: 325000, No. 48, Jingshan Hill Road, Ouhai District, Wenzhou, Zhejiang

Patentee before: Ye Changqing

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20231208

Address after: Room 707, Administrative Committee of Tancheng Economic Development Zone, Linyi City, Shandong Province, 276100

Patentee after: Tancheng Economic Development Zone Pharmaceutical Development Co.,Ltd.

Address before: No. 100, North Ring Road, Hede Town, Sheyang County, Yancheng City, Jiangsu Province

Patentee before: Gu Yaobin