CN203924371U - Infilled wall teeming slurry joint filling structure - Google Patents

Infilled wall teeming slurry joint filling structure Download PDF

Info

Publication number
CN203924371U
CN203924371U CN201420326388.XU CN201420326388U CN203924371U CN 203924371 U CN203924371 U CN 203924371U CN 201420326388 U CN201420326388 U CN 201420326388U CN 203924371 U CN203924371 U CN 203924371U
Authority
CN
China
Prior art keywords
infilled wall
concrete beam
gap
wall
iron wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420326388.XU
Other languages
Chinese (zh)
Inventor
高宝钦
马伟建
吴建宝
杨海青
袁建
俞廷标
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BAOYE HUBEI CONSTRUCTION ENGINEERING GROUP Co Ltd
Original Assignee
BAOYE HUBEI CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BAOYE HUBEI CONSTRUCTION ENGINEERING GROUP Co Ltd filed Critical BAOYE HUBEI CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority to CN201420326388.XU priority Critical patent/CN203924371U/en
Application granted granted Critical
Publication of CN203924371U publication Critical patent/CN203924371U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Building Environments (AREA)

Abstract

Infilled wall teeming slurry joint filling structure, the utility model relates to technical field of buildings, the gap that some bar dowels are pressed between infilled wall and concrete beam is located on the body of wall of a side, pvc pipe is pressed on the body of wall of the gap opening place opposite side between infilled wall and concrete beam and is blocking up the gap between infilled wall and concrete beam, iron wire line is fastened the middle part that is screwed in bar dowel, iron wire line entangles pvc pipe and is tightened in together through the gap between infilled wall and concrete beam and two the end of a thread of iron wire line, and mortar injection is filled in the gap between infilled wall and concrete beam.After it can guarantee slip casting, free from flaw produces, and all recyclable recyclings of pvc pipe used and bar dowel head, meet the requirement of green construction.

Description

Infilled wall teeming slurry joint filling structure
Technical field:
The utility model relates to technical field of buildings, more specifically to the slip casting joint filling constructing structure between a kind of concrete beam and infilled wall, particularly for framework or frame structure, builds the prophylactico-therapeutic measures that infilled wall top common cracks problem is taked.
Background technology:
Conventionally the joint filling method on infilled wall top has three kinds: 1, adopt oblique brick top to build and aerated blocks block system; 2, take directly to use mortar filleting; 3, adopt interval to play timber wedge and fix and beat the foaming flexible material joint fillings such as UP.Its weak point is: with oblique brick top, build or mortar filleting, often because of mortar drying shrinkage or leakiness generation crack; With flexible material joint fillings such as UP, may become fragile because open-assembly time is long and aging, especially when using exterior wall.
Utility model content:
The purpose of this utility model is exactly the deficiency for prior art, and a kind of infilled wall teeming slurry joint filling structure is provided, and after it can guarantee slip casting, free from flaw produces, and all recyclable recyclings of pvc pipe used and bar dowel head, meet the requirement of green construction.
Technology solution of the present utility model is as follows:
Infilled wall teeming slurry joint filling structure, comprise infilled wall and concrete beam, the gap that some bar dowels are pressed between infilled wall and concrete beam is located on the body of wall of a side, pvc pipe is pressed on the body of wall of the gap opening place opposite side between infilled wall and concrete beam and is blocking up the gap between infilled wall and concrete beam, iron wire line is fastened the middle part that is screwed in bar dowel, iron wire line entangles pvc pipe and is tightened in together through the gap between infilled wall and concrete beam and two the end of a thread of iron wire line, and mortar injection is filled in the gap between infilled wall and concrete beam.
The diameter of described bar dowel is 8~10mm, and iron wire line adopts 18~20# iron wire.
Spacing between described adjacent two bar dowels and iron wire line is 450~550mm.
The beneficial effects of the utility model are:
After it can guarantee slip casting, free from flaw produces, and all recyclable recyclings of pvc pipe used and bar dowel head, meet the requirement of green construction.
Accompanying drawing explanation:
Fig. 1 is structural representation of the present utility model;
In figure: 1, infilled wall; 2, concrete beam; 3, bar dowel; 4, pvc pipe; 5, iron wire line; 6, mortar.
The specific embodiment:
Embodiment: as shown in Figure 1, infilled wall teeming slurry joint filling structure, comprise infilled wall 1 and concrete beam 2, the gap that some bar dowels 3 are pressed between infilled wall 1 and concrete beam 2 is located on the body of wall of a side, pvc pipe 4 is pressed on the body of wall of the gap opening place opposite side between infilled wall 1 and concrete beam 2 and is blocking up the gap between infilled wall 1 and concrete beam 2, iron wire line 5 is fastened the middle part that is screwed in bar dowel 3, iron wire line 5 entangles pvc pipe 4 and is tightened in together through the gap between infilled wall 1 and concrete beam 2 and two the end of a thread of iron wire line 5, mortar 6 perfusions are filled in the gap between infilled wall 1 and concrete beam 2.
The diameter of described bar dowel 3 is 8~10mm, and iron wire line 5 adopts 18~20# iron wire.
Spacing between described adjacent two bar dowels 3 and iron wire line 5 is 450~550mm.
Construction method of the present utility model is as follows: first length is greater than to iron wire line 5 doublings of 2 times of infilled wall 1 thickness, and iron wire line 5 is fastened to the middle part of twisting bar dowel 3, make bar dowel 3 block gap one side between infilled wall 1 and concrete beam 2, two the end of a thread of iron wire line 5 pass between gap, again pvc pipe 4 is blocked to the opening of the gap opposite side between infilled wall 1 and concrete beam 2, and entangle pvc pipe 4 and tighten two the end of a thread with two the end of a thread of iron wire line 5, the spacing between each bar dowel 3 and iron wire line 5 is 500mm left and right.Fix after pvc pipe, with grouting pump, special-purpose grout and mortar is injected in the gap between infilled wall 1 and concrete beam 2, slurry injection nozzle can adopt tabular nozzle.
Operating principle: because pvc pipe is blocking up the gap between infilled wall 1 and concrete beam 2, so free from flaw produces after slip casting.

Claims (3)

1. joint filling structure is starched in infilled wall teeming, comprise infilled wall (1) and concrete beam (2), it is characterized in that: the gap that some bar dowels (3) are pressed between infilled wall (1) and concrete beam (2) is located on the body of wall of a side, pvc pipe (4) is pressed on the body of wall of the gap opening place opposite side between infilled wall (1) and concrete beam (2) and is blocking up the gap between infilled wall (1) and concrete beam (2), iron wire line (5) is fastened the middle part that is screwed in bar dowel (3), iron wire line (5) entangles pvc pipe (4) and is tightened in together through the gap between infilled wall (1) and concrete beam (2) and two the end of a thread of iron wire line (5), mortar (6) perfusion is filled in the gap between infilled wall (1) and concrete beam (2).
2. infilled wall teeming slurry joint filling structure according to claim 1, is characterized in that: the diameter of bar dowel (3) is 8~10mm, and iron wire line (5) adopts 18~20# iron wire.
3. infilled wall teeming slurry joint filling structure according to claim 1, is characterized in that: the spacing between adjacent two bar dowels (3) and iron wire line (5) is 450~550mm.
CN201420326388.XU 2014-06-18 2014-06-18 Infilled wall teeming slurry joint filling structure Expired - Lifetime CN203924371U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420326388.XU CN203924371U (en) 2014-06-18 2014-06-18 Infilled wall teeming slurry joint filling structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420326388.XU CN203924371U (en) 2014-06-18 2014-06-18 Infilled wall teeming slurry joint filling structure

Publications (1)

Publication Number Publication Date
CN203924371U true CN203924371U (en) 2014-11-05

Family

ID=51820221

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420326388.XU Expired - Lifetime CN203924371U (en) 2014-06-18 2014-06-18 Infilled wall teeming slurry joint filling structure

Country Status (1)

Country Link
CN (1) CN203924371U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105587053A (en) * 2015-12-31 2016-05-18 中国十七冶集团有限公司 Industrialized residential wall bottom grouting construction method
CN106049869A (en) * 2016-06-29 2016-10-26 浙江省建工集团有限责任公司 Construction method aiming at subsequently built filling wall beam bottom seam plugging
CN111502327A (en) * 2020-05-08 2020-08-07 中国十七冶集团有限公司 Equipment and method for building top seam of wall
CN113700301A (en) * 2021-08-27 2021-11-26 山东建科特种建筑工程技术中心有限公司 Grouting layer plugging method for assembly type component and assembly type component connection construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105587053A (en) * 2015-12-31 2016-05-18 中国十七冶集团有限公司 Industrialized residential wall bottom grouting construction method
CN105587053B (en) * 2015-12-31 2018-01-02 中国十七冶集团有限公司 A kind of industrialization house wall bottom grouting construction method
CN106049869A (en) * 2016-06-29 2016-10-26 浙江省建工集团有限责任公司 Construction method aiming at subsequently built filling wall beam bottom seam plugging
CN111502327A (en) * 2020-05-08 2020-08-07 中国十七冶集团有限公司 Equipment and method for building top seam of wall
CN113700301A (en) * 2021-08-27 2021-11-26 山东建科特种建筑工程技术中心有限公司 Grouting layer plugging method for assembly type component and assembly type component connection construction method

Similar Documents

Publication Publication Date Title
CN203924371U (en) Infilled wall teeming slurry joint filling structure
CN206956565U (en) A kind of steel box girder bridge hogging moment area pre-stress system
CN104047625A (en) Reinforcement anchor rod and rock mass reinforcement method applying anchor rod
CN103993753A (en) Angle hoop tie reinforcement system of traditional stone masonry house and construction technology
CN206233596U (en) Building block exterior wall constructional column concrete casting device
CN208777675U (en) A kind of overhanging scaffold erection structure
CN103696802A (en) Gob-side entry retaining lane-side filling device and method of using same to construct lane-side filler
CN204626467U (en) The steel form the complete sets of equipment that a kind of ater-casting is closed in advance
CN202925561U (en) Bearing platform template structure
CN107975249A (en) A kind of crack repairing method of concrete walls or terrace
CN202689302U (en) Putlog hole building block
CN210827921U (en) Vertical dislocation connection structure of prefabricated shear wall
CN107916797B (en) Construction method for improving bearing performance of old building
CN104989100A (en) Construction method for crack prevention on connecting portion of masonry wall and concrete wall column
CN104631820A (en) Device for fixing concrete formwork through opposite pulling of steel strand
CN204327134U (en) A kind of prestressing force balance anchor cable
CN203515623U (en) Reinforcing anchor rod
CN207176411U (en) One kind is applied to the reusable combined type base board of soft soil foundation
CN203594050U (en) Novel internal bracing wall
CN201224951Y (en) Constructional column reinforcing steel bar fixing clamp
CN205591554U (en) Template position control device
CN212507346U (en) Concrete splicing formwork for road and bridge construction
CN205955208U (en) Multi -functional split bolt sleeve pipe
CN204626773U (en) A kind of rapidly-assembled Z-type lightweight inner partition wall plate
CN205637590U (en) Template fixed knot of wrong platform constructs between anti -shear power wall floor

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20141105