CN108978938B - Prefabricated reinforced concrete shear wall and construction method - Google Patents
Prefabricated reinforced concrete shear wall and construction method Download PDFInfo
- Publication number
- CN108978938B CN108978938B CN201810802514.7A CN201810802514A CN108978938B CN 108978938 B CN108978938 B CN 108978938B CN 201810802514 A CN201810802514 A CN 201810802514A CN 108978938 B CN108978938 B CN 108978938B
- Authority
- CN
- China
- Prior art keywords
- shear wall
- sleeve
- grouting
- wallboard
- bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Load-Bearing And Curtain Walls (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
Description
技术领域technical field
本发明涉及装配式钢筋混凝土结构中的预制剪力墙领域。The invention relates to the field of prefabricated shear walls in fabricated reinforced concrete structures.
背景技术Background technique
目前,装配式结构得到广泛应用,剪力墙作为高层建筑的重要构件,其预制化水平影响着整个结构的预制化水平。已有的预制钢筋混凝土剪力墙,在构造、受力和施工方面都存在一定的问题。钢筋混凝土剪力墙一般按楼层预制,即上下两层楼板间的墙体作为一个单元进行预制,预制构件在楼板与剪力墙的交接处进行拆分,因此,节点部位的质量难以保证,对结构的抗震不利。两片预制剪力墙之间的竖向连接主要依靠灌浆料,竖向钢筋之间没有很好地连接,影响其抗拉性能。预制钢筋混凝土剪力墙的现场施工较为困难,剪力墙的竖向钢筋较多,由于制作误差、运输变形、振捣变位等原因,竖向钢筋会产生一定的错位,不容易插入到连接套筒内,施工较困难。因此,需要新型的预制钢筋混凝土剪力墙及其相应的施工方法,确保预制钢筋混凝土剪力墙的力学性能和施工性能。At present, prefabricated structures are widely used. As an important component of high-rise buildings, the prefabrication level of shear walls affects the prefabrication level of the entire structure. The existing prefabricated reinforced concrete shear walls have certain problems in structure, stress and construction. The reinforced concrete shear wall is generally prefabricated by floor, that is, the wall between the upper and lower floors is prefabricated as a unit, and the prefabricated components are split at the junction of the floor and the shear wall. Therefore, the quality of the joints is difficult to guarantee. The seismic resistance of the structure is disadvantageous. The vertical connection between the two prefabricated shear walls mainly depends on the grouting material, and the vertical steel bars are not well connected, which affects their tensile performance. The on-site construction of prefabricated reinforced concrete shear walls is relatively difficult. There are many vertical steel bars in the shear wall. Due to manufacturing errors, transportation deformation, vibration displacement and other reasons, the vertical steel bars will have a certain dislocation, and it is not easy to insert into the connection. Inside the sleeve, construction is more difficult. Therefore, a new type of prefabricated reinforced concrete shear wall and its corresponding construction method are needed to ensure the mechanical properties and construction performance of the prefabricated reinforced concrete shear wall.
发明内容SUMMARY OF THE INVENTION
为了解决预制钢筋混凝土剪力墙的受力和连接等问题,本发明公开一种预制钢筋混凝土剪力墙及施工方法,所述预制钢筋混凝土剪力墙具有传力可靠、连接牢固、施工方便、抗震性能好等优点,所述施工方法使两片剪力墙能很好地竖向对接,确保竖向钢筋连接可靠。In order to solve the problems of force bearing and connection of prefabricated reinforced concrete shear walls, the present invention discloses a prefabricated reinforced concrete shear wall and a construction method. The prefabricated reinforced concrete shear walls have the advantages of reliable force transmission, firm connection, convenient construction, The construction method has the advantages of good seismic performance and the like, and the construction method enables the two shear walls to be well connected vertically and ensures the reliable connection of vertical steel bars.
本发明的预制钢筋混凝土剪力墙的技术方案是:由墙板、牛腿、套筒、套管、插筋、钢板和锚栓组成;牛腿位于墙板的侧面,牛腿顶面距墙板顶面不小于600毫米;套筒预埋在墙板的上部,套筒顶面距墙板顶面10毫米,套筒上部是墙板的喇叭孔,套筒为两排;套管预埋在墙板的侧面,套管和牛腿在墙板的同一个侧面,套管的位置高于牛腿的位置,牛腿顶面距套管中心的距离根据楼板厚度确定,不小于100毫米,套管为一排;插筋从墙板的底面伸出,伸出长度不小于200毫米,插筋为两排,插筋上部与套筒连接,连接方式为螺纹连接;钢板从墙板的底面伸出,钢板位于两排插筋之间,钢板的伸出长度小于插筋的伸出长度;锚栓预埋在墙板的两个侧面上,锚栓有两组,一组在牛腿的上方,一组在牛腿的下方,两个侧面上共有16根锚栓。墙板的顶部有两排喇叭孔,喇叭孔的上口大、下口小,喇叭孔的下口直径与套筒的内径相同,喇叭孔下部是套筒,喇叭孔的高度为10毫米;墙板的顶部有一个承插槽,承插槽位于两排喇叭孔之间,承插槽的位置与钢板的位置相对应,承插槽的深度比钢板的伸出长度大5毫米;灌浆槽位于墙板的两个侧面上,灌浆槽的位置与套筒的位置相对应,套筒的一个侧面与灌浆槽相连。套筒由外管、压片和螺栓组成;压片的断面为月牙形,压片位于外管内部,压片与外管形成圆形孔道,用于锚固上片剪力墙外伸的插筋,压片上有多个凹孔和一个灌浆眼,凹孔和灌浆眼都为圆形,凹孔不穿透压片,灌浆眼穿透压片,灌浆眼内有螺纹;外管的上部为不规则形状,上面有多个螺栓孔和一个灌浆孔,螺栓孔和灌浆孔都为圆形,螺栓孔内有螺纹,灌浆孔内无螺纹,外管的下部为圆管,圆管内有螺纹,用于连接本片剪力墙内的插筋;外管螺栓孔的位置与压片凹孔的位置相对应,形成圆形孔道,外管灌浆孔的位置与压片灌浆眼的位置相对应,形成圆形孔道;永久锚固用螺栓固定在外管的螺栓孔内,临时固定用螺栓固定在压片的灌浆眼内。套管的内部有螺纹,将钢筋拧入,形成螺纹套管连接,用于连接楼板的上层钢筋。The technical scheme of the prefabricated reinforced concrete shear wall of the present invention is: it is composed of a wall panel, a corbel, a sleeve, a casing, a reinforcing bar, a steel plate and an anchor bolt; the corbel is located on the side of the wall panel, and the top surface of the corbel is away from the wall The top surface of the board is not less than 600 mm; the sleeve is pre-buried in the upper part of the wall board, the top surface of the sleeve is 10 mm away from the top surface of the wall board, the upper part of the sleeve is the horn hole of the wall board, and the sleeve is two rows; the sleeve is pre-buried On the side of the wall panel, the bushing and the corbel are on the same side of the wall panel, the position of the bushing is higher than that of the corbel, and the distance from the top surface of the corbel to the center of the bushing is determined according to the thickness of the floor, not less than 100 mm. The pipes are in one row; the insert bars protrude from the bottom surface of the wall panel, and the extension length is not less than 200 mm, the insert bars are in two rows, the upper part of the insert bars is connected with the sleeve, and the connection method is screw connection; the steel plate extends from the bottom surface of the wall panel. Out, the steel plate is located between the two rows of insertion bars, and the extension length of the steel plate is less than the extension length of the insertion reinforcement; the anchor bolts are pre-buried on the two sides of the wall plate, and there are two sets of anchor bolts, one above the corbel. , a group is under the corbel, there are a total of 16 anchor bolts on both sides. There are two rows of horn holes on the top of the wall panel. The upper mouth of the horn hole is large and the lower mouth is small. The diameter of the lower mouth of the horn hole is the same as the inner diameter of the sleeve. The lower part of the horn hole is the sleeve, and the height of the horn hole is 10 mm; There is a socket on the top of the plate, the socket is located between the two rows of horn holes, the position of the socket corresponds to the position of the steel plate, and the depth of the socket is 5 mm larger than the protruding length of the steel plate; the grouting groove is located at On the two sides of the wallboard, the position of the grouting groove corresponds to the position of the sleeve, and one side of the sleeve is connected with the grouting groove. The sleeve is composed of an outer tube, a pressing piece and a bolt; the section of the pressing piece is crescent-shaped, and the pressing piece is located inside the outer tube. , there are multiple concave holes and a grouting eye on the pressing sheet, the concave holes and the grouting eye are round, the concave hole does not penetrate the pressing sheet, the grouting eye penetrates the pressing sheet, and there are threads in the grouting eye; the upper part of the outer tube is not Regular shape, there are multiple bolt holes and a grouting hole on it, both the bolt holes and the grouting hole are round, there are threads in the bolt holes, no threads in the grouting holes, the lower part of the outer pipe is a round pipe, and there are threads in the round pipe. It is used to connect the inserted reinforcement in the shear wall of this piece; the position of the bolt hole of the outer tube corresponds to the position of the concave hole of the tablet, forming a circular channel, and the position of the grouting hole of the outer tube corresponds to the position of the grouting hole of the tablet, forming a Circular channel; permanent anchors are bolted in the bolt holes of the outer tube, and temporary bolts are bolted in the grouting holes of the tablet. The inside of the casing is threaded, and the reinforcement is screwed in to form a threaded casing connection for connecting the upper reinforcement of the floor.
本发明的预制钢筋混凝土剪力墙,不在楼板与剪力墙的节点区拆分,在高于楼板的位置拆分,剪力墙在节点区不断开,预制钢筋混凝土楼板支承在牛腿上,现浇楼板的上层钢筋通过螺纹锚固在剪力墙的套管上,因此,节点区力学性能较好。本发明的预制钢筋混凝土剪力墙适用于建筑物的外墙,钢筋混凝土内墙在楼板位置拆分,使整个建筑的剪力墙不在同一高度上断开,避免缺陷出现在同一高度,并且可以使每层楼板连成整体。The prefabricated reinforced concrete shear wall of the present invention is not split at the joint area between the floor slab and the shear wall, but is split at a position higher than the floor slab, the shear wall is not disconnected in the node area, and the prefabricated reinforced concrete floor slab is supported on the corbel. The upper reinforcement of the cast-in-place floor slab is anchored to the casing of the shear wall through threads, so the mechanical properties of the joint area are better. The prefabricated reinforced concrete shear wall of the invention is suitable for the outer wall of the building, and the reinforced concrete inner wall is split at the floor position, so that the shear wall of the whole building is not broken at the same height, so that defects can be avoided at the same height, and it can be Connect each floor as a whole.
本发明的预制钢筋混凝土剪力墙的竖向钢筋通过套筒连接。在本片剪力墙内,插筋一端拧入套筒下部,形成螺纹套管连接,另一端伸出墙板;在两片剪力墙之间,上片剪力墙的插筋插入到下片剪力墙的套筒内,拧紧套筒的螺栓,推动压片挤压插筋,并产生一定的塑形变形,卡住插筋,形成挤压连接,竖向钢筋的连接更加可靠;通过套筒上的灌浆孔和灌浆眼,将具有流动性的灌浆料压入到套筒内,起到粘结锚固作用,并且保护插筋和套筒免受腐蚀。灌浆料具有流动性,可以采用水泥浆、聚合物水泥浆、植筋用胶粘剂等。制作钢筋混凝土剪力墙时,拧紧压片灌浆眼位置上的螺栓,将压片固定在外管上,两片剪力墙连接时,拧掉压片灌浆眼处的螺栓,松开压片,拧紧外管螺栓孔处的螺栓,使压片卡住上片剪力墙的插筋。拧紧螺栓和灌浆操作都在灌浆槽内完成。The vertical steel bars of the prefabricated reinforced concrete shear wall of the present invention are connected by sleeves. In this shear wall, one end of the rib is screwed into the lower part of the sleeve to form a threaded casing connection, and the other end extends out of the wallboard; between the two shear walls, the rib of the upper shear wall is inserted into the lower part. In the sleeve of the shear wall, tighten the bolts of the sleeve, push the tablet to squeeze the insert, and produce a certain plastic deformation, jam the insert to form an extrusion connection, and the connection of the vertical steel is more reliable; The grouting holes and grouting holes on the sleeve press the fluid grouting material into the sleeve, which plays the role of bonding and anchoring, and protects the rib and the sleeve from corrosion. The grouting material has fluidity, and can use cement slurry, polymer cement slurry, adhesive for planting bars, etc. When making a reinforced concrete shear wall, tighten the bolts at the grouting eye of the tablet, and fix the tablet on the outer pipe. When the two shear walls are connected, unscrew the bolt at the grouting eye of the tablet, loosen the tablet, and tighten it. The bolts at the bolt holes of the outer pipe make the pressing piece clamp the inserting bar of the upper shear wall. Bolting and grouting are all done in the grouting tank.
本发明的预制钢筋混凝土剪力墙,其墙板底部伸出钢板,用于承担剪力,提高连接处的抗剪能力。墙板的顶部留有喇叭孔,可以克服一定的插筋位置偏差影响,使插筋更容易插入到套筒内,便于施工。In the prefabricated reinforced concrete shear wall of the invention, a steel plate protrudes from the bottom of the wall plate to bear the shear force and improve the shear resistance capacity of the joint. There are horn holes on the top of the wall panel, which can overcome the influence of the position deviation of the inserting bars, and make the inserting bars easier to insert into the sleeve, which is convenient for construction.
本发明的预制钢筋混凝土剪力墙的施工方法是:在下片剪力墙墙体的承插槽内灌入具有流动性的灌浆料;对齐上片剪力墙和下片剪力墙的位置,将上片剪力墙的插筋插入到下片剪力墙的套筒内,同时上片剪力墙的钢板插入到下片剪力墙的承插槽内,将支撑一端的连接头固定在上片剪力墙的下层锚栓上,支撑另一端的连接头固定在下片剪力墙的上层锚栓上,在墙体的两个侧面上都安装支撑,同时调节两根支撑的长度,对上片剪力墙施加向下的压力,使上片剪力墙墙体的底面与下片剪力墙墙体的顶面紧密接触;拧掉下片剪力墙套筒上灌浆孔位置的螺栓,松开压片,拧紧套筒螺栓孔上的螺栓,使压片卡住上片剪力墙的插筋;松开牛腿一侧支撑下部的连接头,调节支撑的长度,将支撑下部的连接头固定在楼板上;在下片剪力墙套筒的灌浆孔上插入灌浆管,加压灌入具有流动性的灌浆料,灌浆料凝固后,采用砂浆封堵下片剪力墙的灌浆槽。The construction method of the prefabricated reinforced concrete shear wall of the present invention is as follows: pouring fluid grout into the socket of the lower shear wall; aligning the positions of the upper shear wall and the lower shear wall, Insert the rib of the upper shear wall into the sleeve of the lower shear wall, and at the same time insert the steel plate of the upper shear wall into the socket of the lower shear wall, and fix the connector at the supporting end in On the lower anchor bolt of the upper shear wall, the other end of the support is fixed on the upper anchor bolt of the lower shear wall, and supports are installed on both sides of the wall, and the length of the two supports is adjusted at the same time. Apply downward pressure on the upper shear wall, so that the bottom surface of the upper shear wall is in close contact with the top surface of the lower shear wall; unscrew the bolts at the grouting hole on the sleeve of the lower shear wall , loosen the pressing piece, and tighten the bolts on the bolt holes of the sleeve, so that the pressing piece is stuck on the inserting bar of the upper shear wall; loosen the connecting joint of the lower part of the support on one side of the corbel, adjust the length of the support, and put the lower part of the support The connector is fixed on the floor; insert a grouting pipe into the grouting hole of the lower shear wall sleeve, and pressurize the grouting material with fluidity. After the grouting material solidifies, use mortar to seal the grouting groove of the lower shear wall. .
本发明的预制钢筋混凝土剪力墙,其拆分位置不在剪力墙与楼板的节点区,节点区整体性、力学性能和抗震性能好,并且易于施工;剪力墙的顶部留有喇叭孔,可以克服一定的插筋位置偏差影响,使插筋更容易插入到套筒内,便于施工;剪力墙的竖向钢筋通过套筒连接,套筒下端为螺纹连接,上端为挤压连接,竖向钢筋的连接效果好,传力性能较好。所述施工方法使两片剪力墙能很好地竖向对接,确保竖向钢筋连接可靠。本发明能解决预制钢筋混凝土剪力墙的受力及施工问题,节点区受力性能和抗震性能好,竖向钢筋连接牢固,并且易于施工,具有一定的经济效益和社会效益。The prefabricated reinforced concrete shear wall of the present invention is not at the joint area between the shear wall and the floor slab, the joint area has good integrity, mechanical performance and seismic performance, and is easy to construct; the top of the shear wall is provided with a horn hole, It can overcome the influence of a certain position deviation of the inserting bar, making the inserting bar easier to insert into the sleeve, which is convenient for construction; the vertical steel bar of the shear wall is connected by the sleeve, the lower end of the sleeve is threaded connection, the upper end is squeezed connection, vertical The connection effect to the steel bar is good, and the force transmission performance is good. The construction method enables two shear walls to be well butted vertically, and ensures reliable connection of vertical steel bars. The invention can solve the stress and construction problems of the prefabricated reinforced concrete shear wall, has good stress performance and seismic performance in the node area, firm vertical steel bar connection, easy construction, and has certain economic and social benefits.
附图说明Description of drawings
下面结合附图对本发明进一步说明。The present invention will be further described below with reference to the accompanying drawings.
图1是本发明的预制剪力墙的正面轴测图。FIG. 1 is a front axonometric view of a prefabricated shear wall of the present invention.
图2是本发明的预制剪力墙的背面轴测图。Fig. 2 is a rear axonometric view of the prefabricated shear wall of the present invention.
图3是本发明的预制剪力墙的墙板顶面局部放大图。3 is a partial enlarged view of the top surface of the wall panel of the prefabricated shear wall of the present invention.
图4是本发明的预制剪力墙的套筒详图。Figure 4 is a detailed view of the sleeve of the prefabricated shear wall of the present invention.
图5是本发明的预制剪力墙的压片详图。Fig. 5 is a detailed view of the pressed sheet of the prefabricated shear wall of the present invention.
图6是本发明的预制剪力墙的插筋与套筒的连接图。Fig. 6 is the connection diagram of the insert bar and the sleeve of the prefabricated shear wall of the present invention.
图7是本发明的预制剪力墙的施工过程图。Fig. 7 is a construction process diagram of the prefabricated shear wall of the present invention.
图中:1—墙板,2—牛腿,3—套筒,4—套管,5—插筋,6—钢板,7—锚栓,8—灌浆料,9—支撑,10—楼板,11—砂浆,101—喇叭孔,102—承插槽,103—灌浆槽,301—外管,302—压片,303—螺栓,304—螺栓孔,305—灌浆孔,306—凹孔,307—灌浆眼。In the picture: 1—wall panel, 2—corbel, 3—sleeve, 4—casing, 5—insert bar, 6—steel plate, 7—anchor bolt, 8—grouting material, 9—support, 10—floor slab, 11—mortar, 101—horn hole, 102—socket slot, 103—grouting groove, 301—outer pipe, 302—pressing sheet, 303—bolt, 304—bolt hole, 305—grouting hole, 306—recess hole, 307 - Grout eye.
具体实施方式Detailed ways
如图1-图3所示,一种预制钢筋混凝土剪力墙,由墙板(1)、牛腿(2)、套筒(3)、套管(4)、插筋(5)、钢板(6)和锚栓(7)组成;牛腿(2)位于墙板(1)的侧面,牛腿(2)顶面距墙板(1)顶面不小于600毫米;套筒(3)预埋在墙板(1)的上部,套筒(3)顶面距墙板(1)顶面10毫米,套筒(3)上部是墙板(1)的喇叭孔(101),套筒(3)为两排;套管(4)预埋在墙板(1)的侧面,套管(4)与牛腿(2)在墙板(1)的同一个侧面,套管(4)的位置高于牛腿(2)的位置,牛腿(2)顶面距套管(4)中心的距离根据楼板厚度确定,不小于100毫米,套管(4)为一排;插筋(5)从墙板(1)的底面伸出,伸出长度不小于200毫米,插筋(5)为两排,插筋(5)上部与套筒(3)连接,连接方式为螺纹连接;钢板(6)从墙板(1)的底面伸出,钢板(6)位于两排插筋(5)之间,钢板(6)的伸出长度小于插筋(5)的伸出长度;锚栓(7)预埋在墙板(1)的两个侧面上,锚栓(7)有两组,一组在牛腿(2)的上方,一组在牛腿(2)的下方,两个侧面上共有16根锚栓(7)。墙板(1)的顶部有两排喇叭孔(101),喇叭孔(101)的上口大、下口小,喇叭孔(101)的下口直径与套筒(3)的内径相同,喇叭孔(101)下部是套筒(3),喇叭孔(101)的高度为10毫米;墙板(1)的顶部有一个承插槽(102),承插槽(102)位于两排喇叭孔(101)之间,承插槽(102)的位置与钢板(6)的位置相对应,承插槽(102)的深度比钢板(6)的伸出长度大5毫米;灌浆槽(103)位于墙板(1)的两个侧面上,灌浆槽(103)的位置与套筒(3)的位置相对应,套筒(3)的一个侧面与灌浆槽(103)相连。As shown in Figures 1-3, a prefabricated reinforced concrete shear wall consists of a wall panel (1), a corbel (2), a sleeve (3), a casing (4), a rib (5), a steel plate (6) and the anchor bolt (7); the corbel (2) is located on the side of the wall panel (1), and the top surface of the corbel (2) is not less than 600 mm from the top surface of the wall panel (1); the sleeve (3) Embedded in the upper part of the wall panel (1), the top surface of the sleeve (3) is 10 mm away from the top surface of the wall panel (1), and the upper part of the sleeve (3) is the horn hole (101) of the wall panel (1). (3) is two rows; the sleeve (4) is pre-buried on the side of the wall panel (1), the sleeve (4) and the corbel (2) are on the same side of the wall panel (1), and the sleeve (4) The position is higher than the position of the corbel (2), the distance between the top surface of the corbel (2) and the center of the casing (4) is determined according to the thickness of the floor, not less than 100 mm, and the casing (4) is in a row; 5) It protrudes from the bottom surface of the wall panel (1), and the protruding length is not less than 200 mm. The rib (5) is in two rows, and the upper part of the rib (5) is connected with the sleeve (3), and the connection method is screw connection; The steel plate (6) protrudes from the bottom surface of the wall panel (1), the steel plate (6) is located between the two rows of insertion ribs (5), and the extension length of the steel plate (6) is less than the extension length of the insertion reinforcement (5); The bolts (7) are pre-buried on the two sides of the wall panel (1), and there are two sets of anchor bolts (7), one is above the corbel (2), the other is below the corbel (2), and the other two are There are 16 anchor bolts (7) on each side. There are two rows of horn holes (101) on the top of the wall plate (1). The upper mouth of the horn hole (101) is large and the lower mouth is small. The diameter of the lower mouth of the horn hole (101) is the same as the inner diameter of the sleeve (3). The lower part of the hole (101) is the sleeve (3), and the height of the horn hole (101) is 10 mm; the top of the wall plate (1) has a socket (102), and the socket (102) is located in the two rows of horn holes Between (101), the position of the bearing slot (102) corresponds to the position of the steel plate (6), and the depth of the bearing slot (102) is 5 mm greater than the protruding length of the steel plate (6); the grouting groove (103) On both sides of the wall panel (1), the position of the grouting groove (103) corresponds to the position of the sleeve (3), and one side of the sleeve (3) is connected with the grouting groove (103).
如图4-图5所示,套筒(3)由外管(301)、压片(302)和螺栓(303)组成;压片(302)的断面为月牙形,压片(302)位于外管(301)内部,压片(302)与外管(301)形成圆形孔道,压片(302)上有多个凹孔(306)和一个灌浆眼(307),凹孔(306)和灌浆眼(307)都为圆形,凹孔(306)不穿透压片(302),灌浆眼(307)穿透压片(302),灌浆眼(307)内有螺纹;外管(301)的上部为不规则形状,上面有多个螺栓孔(304)和一个灌浆孔(305),螺栓孔(304)和灌浆孔(305)都为圆形,螺栓孔(304)内有螺纹,灌浆孔(305)内无螺纹,外管(301)的下部为圆管,圆管内有螺纹,用于连接本片剪力墙内的插筋;永久锚固用螺栓(303)固定在外管(301)的螺栓孔(304)内,临时固定用螺栓(303)固定在压片(302)的灌浆眼(307)内;外管(301)螺栓孔(304)的位置与压片(302)凹孔(306)的位置相对应,形成圆形孔道,外管(301)灌浆孔(305)的位置与压片(302)灌浆眼(307)的位置相对应,形成圆形孔道。As shown in Figures 4-5, the sleeve (3) consists of an outer tube (301), a pressing piece (302) and a bolt (303); the pressing piece (302) has a crescent-shaped section, and the pressing piece (302) is located at the Inside the outer tube (301), the pressing sheet (302) and the outer tube (301) form a circular channel, and the pressing sheet (302) is provided with a plurality of concave holes (306) and a grouting eye (307), and the concave holes (306) and the grouting eye (307) are round, the concave hole (306) does not penetrate the pressing sheet (302), the grouting eye (307) penetrates the pressing sheet (302), and there is a thread in the grouting eye (307); the outer pipe ( The upper part of 301) is irregular in shape, and there are multiple bolt holes (304) and a grouting hole (305) on it. , there is no thread in the grouting hole (305), the lower part of the outer pipe (301) is a round pipe, and there are threads in the round pipe, which are used to connect the insert bars in the shear wall of this piece; the permanent anchoring bolts (303) are fixed on the outer pipe ( 301) in the bolt hole (304), the temporary fixing bolt (303) is fixed in the grouting hole (307) of the pressing piece (302); the position of the bolt hole (304) of the outer tube (301) is the same as the pressing piece (302) The positions of the concave holes (306) correspond to the positions of the grouting holes (305) of the outer tube (301) and the positions of the grouting holes (307) of the pressing sheet (302) correspond to form circular channels.
图6所示为插筋与套筒的连接示意图,插筋(5)插入到套筒(3)内,拧紧外管(301)螺栓孔(304)处的螺栓(303),使压片(302)卡住插筋(5)。Figure 6 shows a schematic diagram of the connection between the rib and the sleeve. The rib (5) is inserted into the sleeve (3), and the bolts (303) at the bolt holes (304) of the outer tube (301) are tightened, so that the pressing plate ( 302) Stuck the rib (5).
图7所示为预制钢筋混凝土剪力墙的施工过程图,整个施工过程分为a、b、c、d、e五个步骤,具体的施工过程为:施工步骤a,在下片剪力墙墙体(1)的承插槽(102)内灌入具有流动性的灌浆料(8);施工步骤b,对齐上片剪力墙和下片剪力墙的位置,将上片剪力墙的插筋(5)插入到下片剪力墙的套筒(3)内,同时上片剪力墙的钢板(6)插入到下片剪力墙的承插槽(102)内,将支撑(9)一端的连接头固定在上片剪力墙的下层锚栓(7)上,支撑(9)另一端的连接头固定在下片剪力墙的上层锚栓(7)上,在墙体(1)的两个侧面上都安装支撑(9),同时调节两根支撑(9)的长度,对上片剪力墙施加向下的压力,使上片剪力墙墙体(1)的底面与下片剪力墙墙体(1)的顶面紧密接触;施工步骤c,拧掉下片剪力墙套筒(3)上灌浆孔(305)位置的螺栓(303),松开压片(302),拧紧套筒(3)螺栓孔(304)上的螺栓(303),使压片(302)卡住上片剪力墙的插筋(5);施工步骤d,松开牛腿(2)一侧支撑(9)下部的连接头,调节支撑(9)的长度,将支撑(9)下部的连接头固定在楼板(10)上;施工步骤e,在下片剪力墙套筒(3)的灌浆孔(305)上插入灌浆管,加压灌入具有流动性的灌浆料(8),灌浆料(8)凝固后,采用砂浆(11)封堵下片剪力墙的灌浆槽(103)。Figure 7 shows the construction process diagram of the prefabricated reinforced concrete shear wall. The whole construction process is divided into five steps: a, b, c, d, and e. The specific construction process is: construction step a, in the lower shear wall wall The fluid grouting material (8) is poured into the socket (102) of the body (1); in construction step b, the positions of the upper shear wall and the lower shear wall are aligned, and the Insert the rib (5) into the sleeve (3) of the lower shear wall, and at the same time insert the steel plate (6) of the upper shear wall into the socket (102) of the lower shear wall. 9) The connector at one end is fixed on the lower anchor bolt (7) of the upper shear wall, and the connector at the other end of the support (9) is fixed on the upper anchor bolt (7) of the lower shear wall. 1) Install supports (9) on both sides, adjust the length of the two supports (9) at the same time, and apply downward pressure to the upper shear wall, so that the bottom surface of the upper shear wall (1) It is in close contact with the top surface of the lower shear wall body (1); in construction step c, unscrew the bolt (303) at the position of the grouting hole (305) on the lower shear wall sleeve (3), and loosen the pressing sheet (302), tighten the bolts (303) on the bolt holes (304) of the sleeve (3), so that the pressing piece (302) is stuck on the insertion rib (5) of the upper shear wall; construction step d, loosen the corbel (2) One side supports the connector at the lower part of (9), adjust the length of the support (9), and fix the connector at the lower part of the support (9) on the floor (10); construction step e, in the lower shear wall sleeve A grouting pipe is inserted into the grouting hole (305) of (3), and the fluid grouting material (8) is poured under pressure. After the grouting material (8) is solidified, the grouting of the lower shear wall is sealed with mortar (11). Slot (103).
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810802514.7A CN108978938B (en) | 2018-07-20 | 2018-07-20 | Prefabricated reinforced concrete shear wall and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810802514.7A CN108978938B (en) | 2018-07-20 | 2018-07-20 | Prefabricated reinforced concrete shear wall and construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108978938A CN108978938A (en) | 2018-12-11 |
CN108978938B true CN108978938B (en) | 2020-06-23 |
Family
ID=64550512
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810802514.7A Expired - Fee Related CN108978938B (en) | 2018-07-20 | 2018-07-20 | Prefabricated reinforced concrete shear wall and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108978938B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112627391A (en) * | 2020-12-16 | 2021-04-09 | 河海大学 | Construction process of prefabricated double-steel-plate-concrete combined shear wall |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109723142A (en) * | 2019-02-21 | 2019-05-07 | 汉尔姆建筑科技有限公司 | A kind of building structure |
CN109944354B (en) * | 2019-04-17 | 2021-01-05 | 中冶建工集团有限公司 | Fabricated concrete shear wall and mounting method thereof |
CN110056092B (en) * | 2019-05-23 | 2023-09-22 | 福建工程学院 | Bolted plug-in upper and lower prefabricated shear walls and composite panels connection structure and construction method |
CN110872872A (en) * | 2019-11-19 | 2020-03-10 | 辽宁省城乡市政工程集团有限责任公司 | Built-in steel plate concrete and reinforced concrete spliced shear wall and construction process |
CN111663676B (en) * | 2020-06-08 | 2022-02-11 | 浙江大道建设工程有限公司 | Heat-insulating wall and construction method thereof |
CN113585528A (en) * | 2021-09-07 | 2021-11-02 | 华侨大学 | Grouting joint bar compaction grouting sleeve precast concrete wall and construction method |
CN114293681A (en) * | 2022-01-17 | 2022-04-08 | 重庆恒昇大业建筑科技集团有限公司 | Installation and construction method of composite wallboard and composite wallboard |
CN115559449A (en) * | 2022-11-23 | 2023-01-03 | 中国二十二冶集团有限公司 | Assembled light partition plate |
CN118345949B (en) * | 2024-06-14 | 2024-09-27 | 广东省建科建筑设计院有限公司 | Concrete modularized system based on novel fully assembled shear wall and construction method |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105442727B (en) * | 2015-12-09 | 2017-08-04 | 浙江大学 | Composite connection shear wall structure and its assembly method |
CN205399733U (en) * | 2016-03-03 | 2016-07-27 | 大连三川建筑科技有限公司 | 2 structures of slip casting simultaneously of assembly steel bars of shear wall muffjoint |
CN205857448U (en) * | 2016-06-28 | 2017-01-04 | 中国建筑第七工程局有限公司 | A kind of assembly concrete shear wall structure |
CN205917915U (en) * | 2016-08-25 | 2017-02-01 | 中启胶建集团有限公司 | Assembled shear force wall (post) component of installation is connected to method of inserting |
CN106381923A (en) * | 2016-11-04 | 2017-02-08 | 四川省建筑科学研究院 | Multilayer architectural structure adopting prefabricated panel and construction method thereof |
-
2018
- 2018-07-20 CN CN201810802514.7A patent/CN108978938B/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112627391A (en) * | 2020-12-16 | 2021-04-09 | 河海大学 | Construction process of prefabricated double-steel-plate-concrete combined shear wall |
Also Published As
Publication number | Publication date |
---|---|
CN108978938A (en) | 2018-12-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108978938B (en) | Prefabricated reinforced concrete shear wall and construction method | |
CN101613995B (en) | Reinforced concrete pier assembled with prefabricated concrete blocks and its construction method | |
CN110700420A (en) | Prefabricated wall body and assembly structure of a prefabricated building and construction method thereof | |
CN201817939U (en) | Connecting structure of cement formworks | |
CN108547217A (en) | Unit construction bridge formed precast concrete pier stud and bent cap bell and spigot frame and construction method | |
CN202391019U (en) | End part thickened grouting connector of steel bar | |
CN105908871A (en) | Light-weight partition wall structure and installing method thereof | |
CN110528950A (en) | A kind of assembled hidden bracket type beam column node connection device | |
CN111255065B (en) | A connection node of prefabricated beam-column with pre-embedded connection member | |
CN112681117A (en) | Connecting device and construction method for connecting part of bridge pier column and bearing platform | |
CN101356318A (en) | Precast concrete block with connection structure using steel pipes and connection structure thereof | |
CN212129617U (en) | A kind of prefabricated floor dry connection node | |
CN107989397B (en) | The reinforcing construction construction method of old building | |
CN211171671U (en) | Reinforced structure of bridge veneer atress | |
CN211201169U (en) | Prefabricated assembled window that wafts | |
CN114856060B (en) | Connecting device and method for assembled floor slab | |
CN111549970A (en) | Prefabricated wall body of assembled PC | |
CN209011364U (en) | A prefabricated wall vertical connector | |
CN215670176U (en) | Detachable outer wall waterproof deformation joint construction structures | |
CN216640665U (en) | Prefabricated retaining wall superimposed sheet and assembled retaining wall structure | |
KR100775676B1 (en) | Plywood formwork reinforcing stripe strip, plywood formwork reinforcement structure and plywood formwork reinforcement structure | |
CN111155365B (en) | Assembled floating unit plate and assembly connection construction method | |
CN212405501U (en) | Stress-adjustable autoclaved aerated concrete plate mounting node | |
CN211816995U (en) | Evaporate and press aerated concrete panel installation node | |
CN208280964U (en) | A kind of telescoping steel form zigzag end head formwork device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200623 |
|
CF01 | Termination of patent right due to non-payment of annual fee |