CN107907180A - Closed coal mine underground reservoir analog simulation experimental rig and method - Google Patents

Closed coal mine underground reservoir analog simulation experimental rig and method Download PDF

Info

Publication number
CN107907180A
CN107907180A CN201711361374.6A CN201711361374A CN107907180A CN 107907180 A CN107907180 A CN 107907180A CN 201711361374 A CN201711361374 A CN 201711361374A CN 107907180 A CN107907180 A CN 107907180A
Authority
CN
China
Prior art keywords
water
underground reservoir
coal mine
mine underground
bag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711361374.6A
Other languages
Chinese (zh)
Other versions
CN107907180B (en
Inventor
马文强
王士革
张伟
尹晓萌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinyang Normal University
Original Assignee
Xinyang Normal University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinyang Normal University filed Critical Xinyang Normal University
Priority to CN201711361374.6A priority Critical patent/CN107907180B/en
Priority claimed from CN201711361374.6A external-priority patent/CN107907180B/en
Publication of CN107907180A publication Critical patent/CN107907180A/en
Application granted granted Critical
Publication of CN107907180B publication Critical patent/CN107907180B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01FMEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
    • G01F17/00Methods or apparatus for determining the capacity of containers or cavities, or the volume of solid bodies
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/18Water

Abstract

The present invention proposes a kind of closed coal mine underground reservoir analog simulation experimental rig and method, adjusting grooves are opened up on the base of device, two left columns and two right columns are set on base, more block baffles are detachably connected between the left column and right column of base homonymy, crossbeam is set between the upper end of left column and the upper end of right column, loading pressure head is set on crossbeam, before submounts are set, behind and above slotted material case, the lifting groove of stuffing-box is placed with polylith elevator, lifting groove is threaded with multiple threaded posts, stuffing-box is nested with the water proof bag of upper opening, water bag and several hydraulic gages are placed with water proof bag, water bag is connected with water supplying unit through water inlet pipe, hydraulic gage is connected with monitoring unit through signal wire.Beneficial effects of the present invention:It can relatively accurately simulate and the process of closed coal mine underground reservoir is formed after the single working face mining in colliery simultaneously can relatively accurately calculate the storage capacity of reservoir.

Description

Closed coal mine underground reservoir analog simulation experimental rig and method
Technical field
The present invention relates to mineral engineering modelling technique field, more particularly to a kind of closed coal mine underground reservoir phase Like simulation test device and method.
Background technology
Coal scale exploitation often turns on aquifer and aquifuge and forms conduit pipe, causes underground water leakage migration well Lower formation mine water.To ensure downhole production safety, mine water is usually drained into ground, causes a large amount of evaporation losses of mine water, Surface soil salinization of soil is caused at the same time, which shows particularly evident in west droughty area.Often it is only because coal is opened in China Adopt and produce about 8,000,000,000 t of mine water, and utilization rate only 25% or so, the mine water resource lost in coal mining is every equivalent to China Year industry and the 60% of domestic consumption.To protect mine of western preciousness water resource, Shenhua Group proposes coal mine underground reservoir (underground water in water-bearing layer is dredged to goaf and stored up by the migration of top plate after coal mining with the theory using mine water for storage Deposit), coal mine underground reservoir demonstration project has successfully been built, the modern exploitation of coal has been realized and the coordination of mine water resource protection is sent out Exhibition.The goaf formed after seam mining is coal mine underground reservoir, and reservoir capacity and reservoir water pressure are determined to colliery water The storage capacity in storehouse and the security evaluation and test of reservoir dam are of great significance.
Notification number is that the Chinese patent literature of CN102778215B discloses a kind of storage capacity side of determining in mine groundwater storehouse Method, this method comprises the following steps:1. measure the rock mass strength in mine groundwater storehouse to be measured, coal seam buried depth, coal seam thickness And exploitation size;2. setting benchmark mine groundwater storehouse, the rock mass strength of the reservoir, coal seam buried depth, coal seam thickness and open It is consistent with mine groundwater storehouse to be measured to adopt size;3. measure moisture storage capacity V2, reservoir surface area S and the water in benchmark mine groundwater storehouse Head H, calculates water storage and washes one's face and rinses one's mouth R=V2/SH;4. measuring the reservoir volume V1 in mine groundwater storehouse to be measured, reservoir capacity V to be measured is calculated =V1 × R.The program is determined the storage capacity of coal mine underground reservoir with the method calculated by field measurement, though calculate more smart Really, but workload is very big, extremely inefficient.
Notification number is that the Chinese patent literature of CN103866736B discloses a kind of ore deposit shake to the influence of coal mine underground reservoir Physical simulation experiment system and method, the stent molding box first on bumper, be put into model casing model formation material with Each rock stratum is simulated, makes model coal column, is put into air cushion simulation coal seam goaf domain;To shake table input-to-state stabilization, and record micro- The data of U-tube manometer and displacement meter, by observing vibrations rear mold type profile acceleration change rule, model surface displacement settles The change that the variation of stress of rule, the change in displacement rule of model roof and coal column carrys out Study of The Underground reservoir capacity is asked Topic.The program is put into model formation material to simulate each rock stratum and make model coal column in the model casing of system, but goaf Domain is simulated by being put into air cushion, and the water in actual coal mine underground reservoir is present in the gap of broken sillar, uses gas Pad can not simulate, this is larger with actual groundwater reservoir difference, it is impossible to the storage capacity of accurate simulation measuring and calculating reservoir.
The content of the invention
It is an object of the invention to provide a kind of closed coal mine underground reservoir analog simulation experimental rig and method, solves At present simulation test cannot relatively accurately simulate closed coal mine underground reservoir forming process and cannot be compared with accurate measure water The problem of storage capacity in storehouse.
The present invention provides a kind of closed coal mine underground reservoir analog simulation experimental rig, closed coal mine underground reservoir phase Include base, left column, right column, baffle, crossbeam, loading pressure head, stuffing-box and water proof bag like simulation test device;On base The centre position in face offers adjusting grooves, and the left side of submounts sets two left columns, and the right side of submounts sets two Root right column, closely more block baffles are detachably connected between the left column and right column of base homonymy side by side successively from top to bottom, Crossbeam is set between the upper end of left column and the upper end of right column, multiple loading pressure heads are set on crossbeam, submounts set material Hopper, before stuffing-box, behind and above be open, the centre position of the bottom surface of stuffing-box opens up lifting groove, lifts groove Inside from left to right closely placed side by side successively to have polylith elevator, the upper surface of elevator is concordant with the bottom surface of stuffing-box, lifting Groove opens up the threaded hole of multiple perforation stuffing-box bottom surfaces, and threaded hole internal thread is connected with threaded post, and the top of threaded post is located at In adjusting grooves, stuffing-box is nested with the water proof bag of upper opening, and water bag and several hydraulic gages, water bag are placed with water proof bag On open up several leakage holes, water bag is connected with water supplying unit through water inlet pipe, and hydraulic gage is connected with monitoring unit through signal wire.
Further, adjusting grooves include preceding adjusting grooves from base to the posterior direction of base that opened up before and from The rear adjusting grooves opened up behind base to the front direction of base.
Further, the front end of elevator corresponds to two threaded holes side by side, and the rear end of elevator corresponds to side by side two Threaded hole.
Further, it is the hydraulic pressure head being hydraulically operated to load pressure head.
Further, monitoring unit is computer.
Further, water bag is made of plastic material.
Further, water bag shape is flat.
Further, water proof bag is made of waterproof material.
Further, the side of the bottom surface of stuffing-box is provided with apopore.
The present invention also provides a kind of closed coal mine underground reservoir analog simulation test method, using above-mentioned closed coal Ore deposit groundwater reservoir analog simulation experimental rig, comprises the following steps:
Step 1: according to the geological formations prototype of engineering site and closed coal mine underground reservoir analog simulation experimental rig Size, select the rational likelihood ratio, obtain the size of similarity model test model, and determine coal in similarity model test model The laying height and material mixture ratio of layer and each rock stratum;
Step 2: threaded post, spiral shell are rotated forward according to the laying in coal seam height and the likelihood ratio, the adjusted groove of testing crew Elevator is jacked up height h by line column from initial positionm, while assemble some block baffles respectively before and after device, the height of baffle Slightly larger than hm, elevator, stuffing-box bottom surface, stuffing-box left and right side and baffle surround groove, toward water proof bag in and in groove Coal seam analog material is laid with simulating boundary coal column, is laid with coal seam analog material with along concordant, making simulating boundary coal column on groove It is h to be laid with heightm
Step 3: the bottom surface in water proof bag is laid with directly top analog material to simulate direct top, by several hydraulic gages It is embedded in directly top, the signal wire of hydraulic gage draws connection monitoring unit, continues to be laid with each rock stratum analog material on direct top To simulate each rock stratum, as rock stratum is laid with the increase of height, also constantly assemble baffle from bottom to top before and after device at the same time, determine The height h of rear top plate water flowing fractured zone and warp damage intersection is adopted in coal seam in similarity model test modeld, it is being laid with rock stratum Analog material highly reaches hdWhen, water bag is layed on rock stratum to simulate water-bearing layer, water bag draws connection water supply list through water pipe Member, and continue to be laid with the design height formation similarity model test model that rock stratum analog material reaches similarity model test model, Remaining stratum load is loaded to similarity model test model compensation by loading pressure head;
Step 4: according to the likelihood ratio, the adjusted groove of testing crew reversely rotates threaded post, from side each elevator by Gradually land by definite time interval to simulate the exploitation to coal seam, different degrees of broken inbreak occurs in roof strata, and coal seam is opened After adopting, by mining influence, the roof strata above production zone can form halfpace shape " three bands " structure, three with it is bottom-up according to Secondary is caving zone, water flowing fractured zone and warp damage, and water space is also gradually reduced from bottom to top, wherein, water flowing fractured zone " halfpace " space with caving zone composition is the water space of groundwater reservoir, and original is laid on direct hydraulic gage in pushing up with direct The broken of top enters in caving zone sillar gap;
Step 5: first pass through monitoring unit carries out monitoring and timing t in real time to the data of hydraulic gage0, then pass through water supply Unit injects mine water with flow q through water pipe to water bag, and leakage hole of the mine water through water bag enters water flowing fractured zone, mine water into And along the crack of water flowing fractured zone, seepage flow enters caving zone gradually downward, and the water level in caving zone constantly raises, and forms storage The closed coal mine underground reservoir of water;
Step 6: with the continuous rise of water level in coal mine underground reservoir, the data of hydraulic gage can constantly increase, but with Water level is risen at the top of water flowing fractured zone, when piezometer data tends to balance and timing t1, then reservoir capacity V=q (t1-t0);
Step 7: after coal mine underground reservoir hydraulic pressure tends towards stability, stop injection mine water, place a period of time, with simulation Inbreak sillar drills through stuffing-box bottom surface side, water proof bag, border coal column after to the purification process of mine water and to form water outlet Hole, coal mine underground reservoir are flowed out from apopore, and water quality detection is carried out to the mine water of outflow.
Compared with prior art, closed coal mine underground reservoir analog simulation experimental rig of the invention and method have with Lower feature and advantage:
The closed coal mine underground reservoir analog simulation experimental rig and method of the present invention, can relatively accurately simulate colliery The process of closed coal mine underground reservoir is formed after single working face mining, can relatively accurately calculate the storage capacity of reservoir, and Purge cases of the closed coal mine underground reservoir to mine water can be evaluated, be closed coal mine underground reservoir storage capacity and The Security Testing of reservoir dam provides more accurate test data.
After the embodiment of the present invention is read in conjunction with the figure, the features and advantages of the invention will become clearer.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, bottom surface will be to embodiment or existing There is attached drawing needed in technology description to be briefly described, it should be apparent that, the attached drawing in the description of bottom surface is the present invention Some embodiments, for those of ordinary skill in the art, without creative efforts, can also basis These attached drawings obtain other attached drawings.
Fig. 1 is the front view of closed coal mine underground reservoir analog simulation experimental rig in the embodiment of the present invention;
Fig. 2 is the right view of closed coal mine underground reservoir analog simulation experimental rig in the embodiment of the present invention;
Fig. 3 is the A-A profiles in Fig. 1;
Fig. 4 is the structure during closed coal mine underground reservoir analog simulation experimental rig experiment in the embodiment of the present invention Schematic diagram;
Fig. 5 is that closed coal mine underground reservoir analog simulation experimental rig tests the signal of reservoir water storage in the embodiment of the present invention Figure;
Fig. 6 is that piezometer data is at any time in closed coal mine underground reservoir analog simulation test method in the embodiment of the present invention Between change curve;
Wherein, 11, base, 111, preceding adjusting grooves, 112, rear adjusting grooves, 121, left column, 122, right column, 13, Baffle, 131, left plate, 132, right plate, 14, crossbeam, 15, loading pressure head, 16, stuffing-box, 17, elevator, 18, threaded post, 19th, water proof bag, 21, water bag, 22, water inlet pipe, 23, hydraulic gage, 31, border coal, 32, directly push up, 33, " halfpace " space.
Embodiment
As shown in Figures 1 to 5, the present embodiment provides a kind of closed coal mine underground reservoir analog simulation experimental rig, bottom Centre position above seat 11 offers adjusting grooves, and adjusting grooves are included before base 11 to the posterior direction of base 11 The preceding adjusting grooves 111 opened up and the rear adjusting grooves 112 opened up behind base 11 to the front direction of base 11.Preceding tune Section groove 111, rear adjusting grooves 112 are to facilitate testing crew to stretch into spanner rotary threaded column 18.
Two left columns 121 are welded in left side above base 11, and two right columns 122 are welded on the right side above base 11. Left plate 131 is connected between two left columns 121, right plate 132 is connected between two right columns 122.A left side for the front side of base 11 Close block baffles 13 more side by side, baffle 13 are detachably connected a left side through bolt successively from top to bottom between column 121 and right column 122 Column 121 and right column 122;It is close more side by side successively from top to bottom between the left column 121 and right column 122 of the rear side of base 11 Block baffle 13, baffle 13 are detachably connected left column 121 and right column 122 through bolt.The upper end of left column 121 and right column Crossbeam 14 is set between 122 upper end, multiple loading pressure heads 15 are set on crossbeam 14, the loading pressure head 15 in the present embodiment is served as reasons The hydraulic pressure head of hydraulic-driven.Multiple loading pressure heads 15 are evenly distributed on the tops of stuffing-box 16, multiple loadings in the present embodiment Pressure head 15 is in two rows of five row close-packed arrays.
Stuffing-box 16 is set above base 11, before stuffing-box 16, behind and above be open, the bottom surface of stuffing-box 16 Centre position open up lifting groove.It is from left to right closely placed side by side successively in lifting groove to have polylith elevator 17, lifting The upper surface of block 17 is concordant with the bottom surface of stuffing-box 16.The threaded hole of 16 bottom surface of multiple perforation stuffing-boxs is opened up in lifting groove, Threaded hole internal thread is connected with threaded post 18, and the top of threaded post 18 is located in adjusting grooves.In the present embodiment, elevator 17 Front end corresponds to two threaded holes side by side, and the rear end of elevator 17 corresponds to two threaded holes side by side.In synchronous rotary threaded hole Four threaded posts 18, threaded post 18, which rotates forward, can promote elevator 17 to rise, and threaded post 18 reversely rotates then elevator 17 Landing.Apopore is provided with the left of the bottom surface of stuffing-box 16.
The embedded water proof bag 19 for being cased with upper opening of stuffing-box 16, water proof bag 19 is made of waterproof material, in the present embodiment Water proof bag 19 be made of soft transparent plastics, water bag 21 and several hydraulic gages 23 are placed with water proof bag 19.The present embodiment In the shape of water bag 21 be made by flat and by plastic material, open up several leakage holes on water bag 21, water bag 21 through into Water pipe 22 connects water supplying unit.Hydraulic gage 23 connects monitoring unit through signal wire, and the monitoring unit of the present embodiment is computer.
The present embodiment also provides a kind of closed coal mine underground reservoir analog simulation test method, using above-mentioned closed Coal mine underground reservoir analog simulation experimental rig, comprises the following steps:
Step 1: according to the geological formations prototype of engineering site and closed coal mine underground reservoir analog simulation experimental rig Size, select the rational likelihood ratio, obtain the size of similarity model test model, and determine coal in similarity model test model The laying height and material mixture ratio of layer and each rock stratum.
Step 2: according to the laying in coal seam height and the likelihood ratio, the premenstrual adjusting grooves 111 of testing crew, rear adjusting grooves 112 rotate forward threaded post 18, and the bottom of elevator 17 is touched as initial position using 18 rigid connection of threaded post, and threaded post 18 is by elevator 17 jack up height h from initial positionm, spend hmJust it is the height in coal seam.Assemble one piece or two block baffles respectively before and after device at the same time 13, the slightly greater height than h of baffle 13m.Elevator 17,16 bottom surface of stuffing-box, 16 left and right side of stuffing-box and baffle 13 surround recessed Groove, toward coal seam analog material is laid with water proof bag 19 and in groove with simulating boundary coal column 31, be laid with coal seam analog material with Along concordant on groove, it is h simulating boundary coal column 31 is laid with heightm
Step 3: as shown in figure 4, bottom surface in water proof bag 19 is laid with directly top analog material to simulate directly top 32, Several hydraulic gages 23 are embedded in directly top 32, the signal wire of hydraulic gage 23 draws connection monitoring unit.Continuation is directly being pushed up Each rock stratum analog material is laid with 32 to simulate each rock stratum, with rock stratum be laid with height increase, also at the same time before and after device by It is lower constantly to assemble baffle 13 upwards, determine that rear top plate water flowing fractured zone and warp damage are adopted in coal seam in similarity model test model The height h of intersectiond.Highly reach h being laid with rock stratum analog materialdWhen, the water bag 21 of flat is layed on rock stratum with mould Intend water-bearing layer.Water bag 21 draws connection water supplying unit through water pipe 22, and the water inlet of water pipe 22 is higher by similarity model test model, and Continue to be laid with the design height formation similarity model test model that rock stratum analog material reaches similarity model test model.Whole phase Wrapped up like testing of materials model by water proof bag 19, remaining rock stratum is loaded to similarity model test model compensation by loading pressure head 15 Load.
Step 4: model dries a period of time after being laid with, simulation exploitation is carried out to the coal seam in model, will simulate and wait to adopt The elevator 17 in coal seam number consecutively k1, k2, k3, k4, k5, k6, k7 from right to left.According to the likelihood ratio, testing crew is adjusted before menstruation Groove 111, the reverse rotation threaded post 18 of rear adjusting grooves 112 are saved, according to the time likelihood ratio, each elevator 17 is gradual from right to left Land by definite time interval to simulate the exploitation to coal seam, different degrees of broken inbreak, seam mining occurs in roof strata Afterwards, by mining influence, the roof strata above production zone can form halfpace shape " three bands " structure, three with it is bottom-up successively For caving zone, water flowing fractured zone and warp damage, water space is also gradually reduced from bottom to top, wherein, water flowing fractured zone and " halfpace " space 33 of caving zone composition is the water space of groundwater reservoir, as shown in Figure 5.Original is laid in directly top 32 Hydraulic gage 23 enters in caving zone sillar gap with the broken of directly top 32.
Step 5: first pass through monitoring unit carries out monitoring and timing t in real time to the data of hydraulic gage 230, then pass through confession Water unit injects mine water (by mine field sampling), leak of the mine water through water bag 21 with flow q through water pipe 22 to water bag 21 Hole enters water flowing fractured zone, mine water and then seepage flow enters caving zone, caving zone gradually downward along the crack of water flowing fractured zone Interior water level constantly raises, and forms the closed coal mine underground reservoir of water storage.
Step 6: with the continuous rise of water level in coal mine underground reservoir, the data of hydraulic gage 23 can constantly increase, but with Water level to rise at the top of water flowing fractured zone, when 23 data of hydraulic gage tend to balance and timing t1, as shown in Figure 6.Then Reservoir Hold V=q (t1-t0)。
Step 7: after coal mine underground reservoir hydraulic pressure tends towards stability, stop injection mine water, place a period of time, with simulation Inbreak sillar is to the purification process of mine water, and subsequent electricity consumption is drilled through 16 bottom surface of stuffing-box left side, water proof bag 19, border coal column 31 bore Hole forms apopore, and coal mine underground reservoir is flowed out from apopore, and water quality detection is carried out to the mine water of outflow.
The closed coal mine underground reservoir analog simulation test method of the present embodiment, using closed coal mine underground reservoir phase Like simulation test device, the mistake that closed coal mine underground reservoir is formed after the single working face mining in colliery can be relatively accurately simulated Journey, can relatively accurately calculate the storage capacity of reservoir, and can evaluate purification feelings of the closed coal mine underground reservoir to mine water Condition, more accurate test data is provided for the storage capacity of closed coal mine underground reservoir and the Security Testing of reservoir dam.
Certainly, described above is not limitation of the present invention, and the present invention is also not limited to the example above, this technology neck The variations, modifications, additions or substitutions that the technical staff in domain is made in the essential scope of the present invention, should also belong to the present invention's Protection domain.

Claims (10)

  1. A kind of 1. closed coal mine underground reservoir analog simulation experimental rig, it is characterised in that:Closed coal mine underground reservoir phase Include base, left column, right column, baffle, crossbeam, loading pressure head, stuffing-box and water proof bag like simulation test device;On base The centre position in face offers adjusting grooves, and the left side of submounts sets two left columns, and the right side of submounts sets two Root right column, closely more block baffles are detachably connected between the left column and right column of base homonymy side by side successively from top to bottom, Crossbeam is set between the upper end of left column and the upper end of right column, multiple loading pressure heads are set on crossbeam, submounts set material Hopper, before stuffing-box, behind and above be open, the centre position of the bottom surface of stuffing-box opens up lifting groove, lifts groove Inside from left to right closely placed side by side successively to have polylith elevator, the upper surface of elevator is concordant with the bottom surface of stuffing-box, lifting Groove opens up the threaded hole of multiple perforation stuffing-box bottom surfaces, and threaded hole internal thread is connected with threaded post, and the top of threaded post is located at In adjusting grooves, stuffing-box is nested with the water proof bag of upper opening, and water bag and several hydraulic gages, water bag are placed with water proof bag On open up several leakage holes, water bag is connected with water supplying unit through water inlet pipe, and hydraulic gage is connected with monitoring unit through signal wire.
  2. 2. closed coal mine underground reservoir analog simulation experimental rig according to claim 1, it is characterised in that:Adjust recessed Groove includes preceding adjusting grooves from base to the posterior direction of base that opened up before and behind base to before base The rear adjusting grooves that direction opens up.
  3. 3. closed coal mine underground reservoir analog simulation experimental rig according to claim 1, it is characterised in that:Elevator Front end correspond to two threaded holes side by side, the rear end of elevator corresponds to two threaded holes side by side.
  4. 4. closed coal mine underground reservoir analog simulation experimental rig according to claim 1, it is characterised in that:Loading pressure Head is the hydraulic pressure head being hydraulically operated.
  5. 5. closed coal mine underground reservoir analog simulation experimental rig according to claim 1, it is characterised in that:Monitoring is single Member is computer.
  6. 6. closed coal mine underground reservoir analog simulation experimental rig according to claim 1, it is characterised in that:Water bag by Plastic material is made.
  7. 7. closed coal mine underground reservoir analog simulation experimental rig according to claim 1, it is characterised in that:Outside water bag Shape is flat.
  8. 8. closed coal mine underground reservoir analog simulation experimental rig according to claim 1, it is characterised in that:Water proof bag It is made of waterproof material.
  9. 9. closed coal mine underground reservoir analog simulation experimental rig according to claim 1, it is characterised in that:Stuffing-box The side of bottom surface be provided with apopore.
  10. 10. a kind of closed coal mine underground reservoir analog simulation test method, is sealed using claim 1 to 9 any one of them Enclosed coal mine underground reservoir analog simulation experimental rig, it is characterised in that comprise the following steps:
    Step 1: according to the geological formations prototype of engineering site and the ruler of closed coal mine underground reservoir analog simulation experimental rig It is very little, select the rational likelihood ratio, obtain the size of similarity model test model, and determine in similarity model test model coal seam and The laying height and material mixture ratio of each rock stratum;
    Step 2: threaded post, threaded post are rotated forward according to the laying in coal seam height and the likelihood ratio, the adjusted groove of testing crew Elevator is jacked up into height h from initial positionm, while assemble some block baffles respectively before and after device, the height of baffle is slightly larger In hm, elevator, stuffing-box bottom surface, stuffing-box left and right side and baffle surround groove, toward water proof bag in and be laid with groove Coal seam analog material is laid with coal seam analog material with along concordant, making the laying of simulating boundary coal column on groove with simulating boundary coal column Highly it is hm
    Step 3: the bottom surface in water proof bag is laid with directly top analog material to simulate direct top, several hydraulic gages are embedded in In directly pushing up, the signal wire of hydraulic gage draws connection monitoring unit, continues to be laid with each rock stratum analog material on direct top with mould Intend each rock stratum, as rock stratum is laid with the increase of height, also constantly assembles baffle from bottom to top before and after device at the same time, determine similar The height h of rear top plate water flowing fractured zone and warp damage intersection is adopted in coal seam in testing of materials modeld, being laid with, rock stratum is similar Material highly reaches hdWhen, water bag being layed on rock stratum to simulate water-bearing layer, water bag draws connection water supplying unit through water pipe, and Continue to be laid with the design height formation similarity model test model that rock stratum analog material reaches similarity model test model, by adding Carry pressure head and remaining stratum load is loaded to similarity model test model compensation;
    Step 4: according to the likelihood ratio, the adjusted groove of testing crew reversely rotates threaded post, from side each elevator gradually by Time interval landing is determined to simulate the exploitation to coal seam, there is different degrees of broken inbreak in roof strata, after seam mining, By mining influence, the roof strata above production zone can form halfpace shape " three bands " structure, and three are followed successively by with bottom-up Caving zone, water flowing fractured zone and warp damage, water space are also gradually reduced from bottom to top, wherein, water flowing fractured zone and emit Fall the water space that " halfpace " space with composition is groundwater reservoir, the hydraulic gage that original is laid in directly top is with directly pushing up It is broken to enter in caving zone sillar gap;
    Step 5: first pass through monitoring unit carries out monitoring and timing t in real time to the data of hydraulic gage0, then passed through by water supplying unit Water pipe injects mine water with flow q to water bag, and leakage hole of the mine water through water bag enters water flowing fractured zone, mine water so that along Seepage flow enters caving zone gradually downward in the crack of water flowing fractured zone, and the water level in caving zone constantly raises, and forms the envelope of water storage Enclosed coal mine underground reservoir;
    Step 6: with the continuous rise of water level in coal mine underground reservoir, the data of hydraulic gage can constantly increase, but with water level Rise at the top of water flowing fractured zone, when piezometer data tends to balance and timing t1, then reservoir capacity V=q (t1-t0);
    Step 7: after coal mine underground reservoir hydraulic pressure tends towards stability, stop injection mine water, a period of time is placed, to simulate inbreak Sillar drills to form apopore to the purification process of mine water after through stuffing-box bottom surface side, water proof bag, border coal column, coal Ore deposit groundwater reservoir is flowed out from apopore, and water quality detection is carried out to the mine water of outflow.
CN201711361374.6A 2017-12-18 Closed coal mine underground reservoir similarity simulation test device and method Active CN107907180B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711361374.6A CN107907180B (en) 2017-12-18 Closed coal mine underground reservoir similarity simulation test device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711361374.6A CN107907180B (en) 2017-12-18 Closed coal mine underground reservoir similarity simulation test device and method

Publications (2)

Publication Number Publication Date
CN107907180A true CN107907180A (en) 2018-04-13
CN107907180B CN107907180B (en) 2024-04-26

Family

ID=

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110411840A (en) * 2019-08-29 2019-11-05 安徽理工大学 Simulate experimental rig and method that the earth's surface soil body in goaf generates tension crack
CN110987607A (en) * 2019-12-27 2020-04-10 中国矿业大学(北京) Nested multi-coupling model test system and test method for dam body of coal mine underground reservoir
CN111811856A (en) * 2020-07-17 2020-10-23 中国矿业大学 Coal pillar dam body accumulated damage evolution comprehensive experiment device and experiment method thereof
CN112098221A (en) * 2020-05-11 2020-12-18 中国矿业大学(北京) Analog simulation device and experimental method for stability of coal pillar of mine underground reservoir
CN113640494A (en) * 2021-07-27 2021-11-12 清华大学 Hydraulic power coupling disaster simulation device and method for underground reservoir of inclined stratum
CN114199491A (en) * 2021-12-15 2022-03-18 国家能源投资集团有限责任公司 Earthquake-resistant stability test evaluation device, test evaluation method, electronic device, and storage medium
WO2022171006A1 (en) * 2021-02-09 2022-08-18 西安科技大学 Angle-adjustable equivalent coal seam mining three-dimensional physical simulation apparatus, and method
CN116773749A (en) * 2023-06-27 2023-09-19 中国中煤能源股份有限公司 Three-dimensional mining seepage simulation device and method for coal mine engineering

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07270300A (en) * 1994-03-29 1995-10-20 Tetsuo Shoji Method for evaluating water penetration property of underground rock
CN201007871Y (en) * 2007-02-23 2008-01-16 中国矿业大学 Water-keeping mining solid-liquid coupling three-dimensional physical analog test stand
JP2008276050A (en) * 2007-05-02 2008-11-13 East Japan Railway Culture Foundation Apparatus and method for simulating operation
CN101315306A (en) * 2008-06-23 2008-12-03 山东科技大学 Simulation experiment bench for stope mining machinery
CA2689341A1 (en) * 2008-12-31 2010-06-30 Shell Internationale Research Maatschappij B.V. Method and system for simulating fluid flow in an underground formation with uncertain properties
CN103353278A (en) * 2013-07-18 2013-10-16 中国神华能源股份有限公司 Coal mine underground reservoir residual storage capacity detection apparatus, detection equipment and detection method
US20150125209A1 (en) * 2012-04-28 2015-05-07 China Shenhua Energy Company Limited Method for Distributed Storage and Use of Underground Water in Mine
CN204731234U (en) * 2015-07-10 2015-10-28 贵州理工学院 Close-in seams water protection mining solid-liquid coupling analog simulation device
CN204791743U (en) * 2015-07-10 2015-11-18 贵州理工学院 Low coverage coal seam bao shui three -dimensional simulation test testing system that mines
CN105388266A (en) * 2015-11-05 2016-03-09 刘柳平 Simulation test device of pressure-bearing underwater coal mining and application method of simulation test device
CN207515863U (en) * 2017-12-18 2018-06-19 信阳师范学院 Closed coal mine underground reservoir analog simulation experimental rig

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07270300A (en) * 1994-03-29 1995-10-20 Tetsuo Shoji Method for evaluating water penetration property of underground rock
CN201007871Y (en) * 2007-02-23 2008-01-16 中国矿业大学 Water-keeping mining solid-liquid coupling three-dimensional physical analog test stand
JP2008276050A (en) * 2007-05-02 2008-11-13 East Japan Railway Culture Foundation Apparatus and method for simulating operation
CN101315306A (en) * 2008-06-23 2008-12-03 山东科技大学 Simulation experiment bench for stope mining machinery
CA2689341A1 (en) * 2008-12-31 2010-06-30 Shell Internationale Research Maatschappij B.V. Method and system for simulating fluid flow in an underground formation with uncertain properties
US20150125209A1 (en) * 2012-04-28 2015-05-07 China Shenhua Energy Company Limited Method for Distributed Storage and Use of Underground Water in Mine
CN103353278A (en) * 2013-07-18 2013-10-16 中国神华能源股份有限公司 Coal mine underground reservoir residual storage capacity detection apparatus, detection equipment and detection method
CN204731234U (en) * 2015-07-10 2015-10-28 贵州理工学院 Close-in seams water protection mining solid-liquid coupling analog simulation device
CN204791743U (en) * 2015-07-10 2015-11-18 贵州理工学院 Low coverage coal seam bao shui three -dimensional simulation test testing system that mines
CN105388266A (en) * 2015-11-05 2016-03-09 刘柳平 Simulation test device of pressure-bearing underwater coal mining and application method of simulation test device
CN207515863U (en) * 2017-12-18 2018-06-19 信阳师范学院 Closed coal mine underground reservoir analog simulation experimental rig

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张保良;郭惟嘉;张新国;沈宝堂;张涛;孔贺;: "煤层开采底板承压水导升模拟试验系统研制与应用", 煤炭学报, no. 08, 15 August 2016 (2016-08-15), pages 2057 - 2062 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110411840A (en) * 2019-08-29 2019-11-05 安徽理工大学 Simulate experimental rig and method that the earth's surface soil body in goaf generates tension crack
CN110411840B (en) * 2019-08-29 2023-12-26 安徽理工大学 Test device and method for simulating tension fracture generated by goaf earth surface soil body
CN110987607A (en) * 2019-12-27 2020-04-10 中国矿业大学(北京) Nested multi-coupling model test system and test method for dam body of coal mine underground reservoir
CN110987607B (en) * 2019-12-27 2020-10-27 中国矿业大学(北京) Nested multi-coupling model test system and test method for dam body of coal mine underground reservoir
CN112098221A (en) * 2020-05-11 2020-12-18 中国矿业大学(北京) Analog simulation device and experimental method for stability of coal pillar of mine underground reservoir
CN112098221B (en) * 2020-05-11 2022-05-17 中国矿业大学(北京) Analog simulation device and experimental method for stability of coal pillar of mine underground reservoir
CN111811856A (en) * 2020-07-17 2020-10-23 中国矿业大学 Coal pillar dam body accumulated damage evolution comprehensive experiment device and experiment method thereof
CN111811856B (en) * 2020-07-17 2021-04-20 中国矿业大学 Coal pillar dam body accumulated damage evolution comprehensive experiment device and experiment method thereof
WO2022171006A1 (en) * 2021-02-09 2022-08-18 西安科技大学 Angle-adjustable equivalent coal seam mining three-dimensional physical simulation apparatus, and method
CN113640494A (en) * 2021-07-27 2021-11-12 清华大学 Hydraulic power coupling disaster simulation device and method for underground reservoir of inclined stratum
CN114199491A (en) * 2021-12-15 2022-03-18 国家能源投资集团有限责任公司 Earthquake-resistant stability test evaluation device, test evaluation method, electronic device, and storage medium
CN116773749A (en) * 2023-06-27 2023-09-19 中国中煤能源股份有限公司 Three-dimensional mining seepage simulation device and method for coal mine engineering

Similar Documents

Publication Publication Date Title
CN108868770B (en) Filling mining rock stratum position state accurate control design method
CN103996348B (en) The cross-over tunnel construction indoor model test device on operation tunnel impact up and down
CN204791743U (en) Low coverage coal seam bao shui three -dimensional simulation test testing system that mines
CN107831295B (en) For simulating the test method for adopting fault activation catastrophe
CN104265365B (en) A kind of sand simulation test device and test method of bursting
CN205404270U (en) Three -dimensional transparent simulation test test bench
CN201007871Y (en) Water-keeping mining solid-liquid coupling three-dimensional physical analog test stand
CN103063335B (en) Three-dimensional geological survey testing method of deep portion crustal stress based on loading monitoring data
CN105952452B (en) Oil sac formula solid filling coal mining three dimensional physical analog simulation experimental device and method
CN103866736B (en) The shake of a kind of ore deposit is on the physical simulation experiment system and method for coal mine underground reservoir impact
CN104965058B (en) Device and method for anti-dip collapse similar simulation tests on cover rock below slide structural belts
CN103821554B (en) Based on the boring method for arranging without coal pillar mining Y type ventilation goaf
CN101082513A (en) Deep rock mass engineering project disaster model experiment method
CN211602719U (en) Stope mine pressure three-dimensional physical simulation test platform of multi-functional top bottom plate gushing water
CN103591922B (en) Short range seam mining upper Seam Floor Failure degree of depth radon gas detection method
CN107742020A (en) Shale gas reservoir fracturing improvement method for predicting volume
CN202718673U (en) Visual physical simulation device for bottom-water reservoirs
CN103061774A (en) Shield tunnel construction environment simulation unit
CN113433132A (en) Device and method for simulating overlying strata separation layer grouting filling
CN205242462U (en) Research anti -floating pile resists test device that foundation ditch suddenly gushes failure mechanisms
CN113049780A (en) Testing device and testing method for gangue fluidized filling material
CN206907330U (en) A kind of goaf filling analogue experiment installation
Liu et al. Characteristics analysis of roof overburden fracture in thick coal seam in deep mining and engineering application of super high water material in backfill mining
CN106898231A (en) A kind of goaf filling analogue experiment installation and operating method
CN207515863U (en) Closed coal mine underground reservoir analog simulation experimental rig

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant