CN107884815A - 适用于隧道地震波法超前地质预报的雷管防脱落装置及方法 - Google Patents
适用于隧道地震波法超前地质预报的雷管防脱落装置及方法 Download PDFInfo
- Publication number
- CN107884815A CN107884815A CN201711328442.9A CN201711328442A CN107884815A CN 107884815 A CN107884815 A CN 107884815A CN 201711328442 A CN201711328442 A CN 201711328442A CN 107884815 A CN107884815 A CN 107884815A
- Authority
- CN
- China
- Prior art keywords
- detonator
- sleeve body
- seismic wave
- sleeve
- wave method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V1/00—Seismology; Seismic or acoustic prospecting or detecting
- G01V1/02—Generating seismic energy
- G01V1/04—Details
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V1/00—Seismology; Seismic or acoustic prospecting or detecting
- G01V1/02—Generating seismic energy
- G01V1/104—Generating seismic energy using explosive charges
Landscapes
- Engineering & Computer Science (AREA)
- Remote Sensing (AREA)
- Physics & Mathematics (AREA)
- Life Sciences & Earth Sciences (AREA)
- Acoustics & Sound (AREA)
- Environmental & Geological Engineering (AREA)
- Geology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- General Physics & Mathematics (AREA)
- Geophysics (AREA)
- Geophysics And Detection Of Objects (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Abstract
本发明公开了适用于隧道地震波法超前地质预报的雷管防脱落装置及方法,包括套筒本体和位于套筒本体前端的钻进头,套筒本体与钻进头均为两部分的分体结构,两个分体结构通过连接件连接嵌合在一起,成为一体,形成一独立的封闭空间;所述套筒本体的末端留有雷管管线口。本发明方便实用、成本低廉,可有效防止隧道地震波法预报中炸药与雷管的脱落问题,增加了工作效率,减少了不必要的成本浪费。
Description
技术领域
本发明涉及一种适用于隧道地震波法超前地质预报的雷管防脱落装置及方法。
背景技术
隧道地震波法超前地质预报超前地质预报系统是专门为隧道与地下工程超前地质预报研制开发的设备,它为方便快捷地预报掌子面前方100~350m范围内的地质情况提供了一种强有力的方法和工具。
地震波法超前地质预报系统是利用地震波在不均匀地质体中产生的反射波特性来预报隧洞掌子面前方及周围临近区域的地质情况,如不规则体、不连续面、断层和破碎带等。地震波法超前地质预报过程中,为使能量向岩层内部传播,增强反射信号的可解析度,对现场乳化炸药和雷管的安装标准提出了很高的要求,失败的安装会导致该道反射信号的失效,造成不必要的时间和成本浪费。而乳化炸药由于其较软的特性以及炮孔内部的粗糙不平,插入炸药的雷管很容易在将炸药推入炮孔的过程中脱落,不仅造成无法引爆,震源失效,尤其因炸药无法取出而造成极大的潜在风险。
目前,仍没有有效的装置解决这一问题,现场施工通常会将雷管插入端朝向炮孔将其推入,这种措施虽然降低了雷管脱落的几率,但仍然没有从根本上解决这个难题,本发明旨在解决这一隧道地震波法预报中常见的问题。
发明内容
本发明为了解决上述问题,提出了一种适用于隧道地震波法超前地质预报的雷管防脱落装置及方法,本发明结构非常简单,成本低廉,可有效防止隧道地震波法预报中炸药与雷管的脱落问题,增加了工作效率,减少了不必要的成本浪费。
为了实现上述目的,本发明采用如下技术方案:
一种适用于隧道地震波法超前地质预报的雷管防脱落装置,包括套筒本体和位于套筒本体前端的钻进头,套筒本体与钻进头均为两部分的分体结构,两个分体结构通过连接件连接嵌合在一起,成为一体,形成一独立的封闭空间;
所述套筒本体的末端留有雷管管线口。
所述连接件为设置在套筒本体一个分体结构内侧的矩形凹槽,以及另一分体结构外侧的长柱状凸起,通过两者的卡合可将套筒本体进行连接锁牢。
所述套筒本体的凹槽与凸起,皆与套筒本体一体成型,套筒本体闭合后,该凸起自动卡入凹槽中,将套筒锁牢。
所述连接件为分别设置在套筒本体两个分体结构的固定栓和卡槽,固定栓和卡槽彼此相配合,通过两者的卡合将套筒本体进行连接锁牢。
所述钻进头分为两部分,与套筒本体一体成型,套筒闭合后,钻进头呈三角锥状,且尖端向外。既能使存有炸药的该装置有效深入炮孔内部,又可以使该装置被推进后稳固的嵌入炮孔前方岩土体中,大幅提高震源激发的可靠性和成功率。
所述尾部管线口,分为上下两部分,套筒闭合后自身成为闭合圆形,直径大于雷管管线直径,小于雷管短边长度,可有效防止雷管脱落。
优选的,所述的套筒本体及钻进头为PP塑料材质。
优选的,所述的套筒规格根据不同地震波法炮孔所需药量,分别设有50g、100g等不同规格。
套筒本体为圆柱体,切合炸药本身形状。
基于上述装置的工作方法,打开套筒本体,将切割好的乳化炸药连同雷管一起放入套筒本体中,雷管管线放置于尾端雷管管线口处,将套筒本体上下两部分闭合,将套筒本体卡牢,雷管管线在尾端雷管管线口引出,将闭合好的装置放入炮孔中,钻进头向前,将套筒推入炮孔深处测定好的位置,保证进孔深度。
与现有技术相比,本发明的有益效果为:
结构简单、成本低廉,通过套筒上的固定栓和卡槽可以将乳化炸药牢牢锁定在套筒内部,尾部管线口由于其直径小于雷管横截面可以有效防止雷管脱落,套筒作为受力结构可以避免乳化炸药在推入炮孔的过程中变形或分解,套筒前端的钻进头可以使套筒更加深入,避免了由于炮孔内部粗糙不平导致的炸药塞入的距离不足的问题,大大增加了工作效率,减少了不必要的成本浪费。
附图说明
构成本申请的一部分的说明书附图用来提供对本申请的进一步理解,本申请的示意性实施例及其说明用于解释本申请,并不构成对本申请的不当限定。
图1为本发明的整体打开结构图;
图2为本发明的整体闭合结构图;
图3为本发明主视图;
图中,套筒(1),雷管管线口(2),套筒结合处(3),套筒外侧凸起(4),套筒内侧凹槽(5),钻进头(6)。
具体实施方式:
下面结合附图与实施例对本发明作进一步说明。
应该指出,以下详细说明都是例示性的,旨在对本申请提供进一步的说明。除非另有指明,本文使用的所有技术和科学术语具有与本申请所属技术领域的普通技术人员通常理解的相同含义。
需要注意的是,这里所使用的术语仅是为了描述具体实施方式,而非意图限制根据本申请的示例性实施方式。如在这里所使用的,除非上下文另外明确指出,否则单数形式也意图包括复数形式,此外,还应当理解的是,当在本说明书中使用术语“包含”和/或“包括”时,其指明存在特征、步骤、操作、器件、组件和/或它们的组合。
在本发明中,术语如“上”、“下”、“左”、“右”、“前”、“后”、“竖直”、“水平”、“侧”、“底”等指示的方位或位置关系为基于附图所示的方位或位置关系,只是为了便于叙述本发明各部件或元件结构关系而确定的关系词,并非特指本发明中任一部件或元件,不能理解为对本发明的限制。
本发明中,术语如“固接”、“相连”、“连接”等应做广义理解,表示可以是固定连接,也可以是一体地连接或可拆卸连接;可以是直接相连,也可以通过中间媒介间接相连。对于本领域的相关科研或技术人员,可以根据具体情况确定上述术语在本发明中的具体含义,不能理解为对本发明的限制。
正如背景技术所介绍的,现有技术中存在乳化炸药由于其较软的特性以及炮孔内部的粗糙不平,插入炸药的雷管很容易在将炸药推入炮孔的过程中脱落,不仅造成无法引爆,震源失效,尤其因炸药无法取出而造成极大的潜在风险不足,为了解决如上的技术问题,本申请提出了一种适用于隧道地震波法预报乳化炸药与雷管防脱落装置及使用方法,包括整体套筒和前端钻进头两大部分,套筒与钻进头皆分为上下两个部分,套筒与钻进头上部分连接在一起,一体成型,下部分亦然。套筒尾部留有雷管管线口,套筒上部分内侧有一矩形凹槽,下部分外侧有一线状凸起,两者闭合可将套筒本身锁牢。
所述套筒,分为上下两部分,前端为钻进头,尾部留有雷管管线口。
所述钻进头分为上下两部分,与套筒本身一体成型,套筒闭合后,钻进头呈三角锥状,既能使存有炸药的该装置有效深入炮孔内部,又可以使该装置被推进后稳固的嵌入炮孔前方岩土体中,大幅提高震源激发的可靠性和成功率。
所述套筒凹槽与套筒凸起,皆与套筒本身一体成型,套筒闭合后,该凸起自动卡入凹槽中,将套筒锁牢。
所述尾部管线口,其直径为3mm,分为上下两部分,套筒闭合后自身成为闭合圆形,直径略大于雷管管线直径,小于雷管短边长度,可有效防止雷管脱落。
优选的,所述的套筒及钻进头选用成本低廉、质量可靠的PP塑料材质。
优选的,所述的套筒规格根据不同地震波法炮孔所需药量,分别设有50g、100g等不同规格。
本申请的一种典型的实施方式中,如图1-图3所示,包括套筒(1),雷管管线口(2),套筒结合处(3),套筒外侧凸起(4),套筒内侧凹槽(5),钻进头(6)。整体皆为一体成型,方便实用。前端钻进头可以保证该装置的进孔深度,尾端管线口可以防止雷管脱落。套筒整体为圆柱体,切合炸药本身形状,套筒依靠上下两侧的凹槽与凸起固定。
本发明的工作过程是:打开套筒(1),将切割好的乳化炸药连同雷管一起放入套筒(1)中,雷管管线放置于尾端雷管管线口(2)处,将套筒上下两部分闭合,通过卡槽(4)(5)将套筒本身卡牢,雷管管线在尾端雷管管线口(2)引出,将闭合好的装置放入炮孔中,钻进头向前,用相应装置将套筒推入炮孔深处测定好的位置,工作结束。
以上所述仅为本申请的优选实施例而已,并不用于限制本申请,对于本领域的技术人员来说,本申请可以有各种更改和变化。凡在本申请的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本申请的保护范围之内。
上述虽然结合附图对本发明的具体实施方式进行了描述,但并非对本发明保护范围的限制,所属领域技术人员应该明白,在本发明的技术方案的基础上,本领域技术人员不需要付出创造性劳动即可做出的各种修改或变形仍在本发明的保护范围以内。
Claims (9)
1.适用于隧道地震波法超前地质预报的雷管防脱落装置,其特征是:包括套筒本体和位于套筒本体前端的钻进头,套筒本体与钻进头均为两部分的分体结构,两个分体结构通过连接件连接嵌合在一起,成为一体,形成一独立的封闭空间;
所述套筒本体的末端留有雷管管线口。
2.如权利要求1所述的适用于隧道地震波法超前地质预报的雷管防脱落装置,其特征是:所述连接件为设置在套筒本体一个分体结构内侧的矩形凹槽,以及另一分体结构外侧的长柱状凸起,通过两者的卡合可将套筒本体进行连接锁牢。
3.如权利要求1所述的适用于隧道地震波法超前地质预报的雷管防脱落装置,其特征是:所述套筒本体的凹槽与凸起,皆与套筒本体一体成型,套筒本体闭合后,该凸起自动卡入凹槽中,将套筒锁牢。
4.如权利要求1所述的适用于隧道地震波法超前地质预报的雷管防脱落装置,其特征是:所述连接件为分别设置在套筒本体两个分体结构的固定栓和卡槽,固定栓和卡槽彼此相配合,通过两者的卡合将套筒本体进行连接锁牢。
5.如权利要求1所述的适用于隧道地震波法超前地质预报的雷管防脱落装置,其特征是:所述钻进头分为两部分,与套筒本体一体成型,套筒闭合后,钻进头呈三角锥状,且尖端向外。
6.如权利要求1所述的适用于隧道地震波法超前地质预报的雷管防脱落装置,其特征是:所述尾部管线口,分为上下两部分,套筒闭合后自身成为闭合圆形,直径大于雷管管线直径,小于雷管短边长度,可有效防止雷管脱落。
7.如权利要求1所述的适用于隧道地震波法超前地质预报的雷管防脱落装置,其特征是:所述的套筒本体的规格根据不同地震波法炮孔所需药量进行调整。
8.如权利要求1所述的适用于隧道地震波法超前地质预报的雷管防脱落装置,其特征是:套筒本体为圆柱体,切合炸药本身形状。
9.基于如权利要求1-8中任一项所述的装置的工作方法,其特征是:打开套筒本体,将切割好的乳化炸药连同雷管一起放入套筒本体中,雷管管线放置于尾端雷管管线口处,将套筒本体上下两部分闭合,将套筒本体卡牢,雷管管线在尾端雷管管线口引出,将闭合好的装置放入炮孔中,钻进头向前,将套筒推入炮孔深处测定好的位置,保证进孔深度。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711328442.9A CN107884815B (zh) | 2017-12-13 | 2017-12-13 | 适用于隧道地震波法超前地质预报的雷管防脱落装置及方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711328442.9A CN107884815B (zh) | 2017-12-13 | 2017-12-13 | 适用于隧道地震波法超前地质预报的雷管防脱落装置及方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107884815A true CN107884815A (zh) | 2018-04-06 |
CN107884815B CN107884815B (zh) | 2023-09-15 |
Family
ID=61774109
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711328442.9A Active CN107884815B (zh) | 2017-12-13 | 2017-12-13 | 适用于隧道地震波法超前地质预报的雷管防脱落装置及方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107884815B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109375255A (zh) * | 2018-09-03 | 2019-02-22 | 山东大学 | 隧道地震波法超前地质预报的放置炸药雷管装置及方法 |
CN112835094A (zh) * | 2021-01-06 | 2021-05-25 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种地震波法隧道超前地质预报炸药包安装装置 |
Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB532091A (en) * | 1939-08-17 | 1941-01-16 | Ernst Schneider | Improvements in means for securing detonators with attached fuzes, or electric detonators, in explosive charges |
GB636792A (en) * | 1948-05-03 | 1950-05-03 | Du Pont | Electric blasting initiators and methods of producing the same |
FR1068900A (fr) * | 1952-09-27 | 1954-07-01 | Cartouche explosive avec dispositif de protection des organes de mise à feu | |
GB913747A (en) * | 1959-10-17 | 1962-12-28 | Suisse Des Explosifs Soc | Equipment for detonating explosive charges |
EP0142717A1 (de) * | 1983-11-17 | 1985-05-29 | Manfred Meul | Sprengwerkzeug für Präzisionssprengungen |
US20060185898A1 (en) * | 2005-02-23 | 2006-08-24 | Dale Seekford | Method and apparatus for stimulating wells with propellants |
AU2009280163A1 (en) * | 2008-08-05 | 2010-02-11 | Global Seismic Solutions Limited | Methodology for waterproofing primed seismic explosive assemblies |
US20100089270A1 (en) * | 2007-02-02 | 2010-04-15 | Mattson Inter Tool Gmbh | Rock-blasting cartridge and blasting method |
CN102893119A (zh) * | 2010-02-03 | 2013-01-23 | 简-阿克.本特森 | 岩石爆破筒和点火雷管 |
CN103983144A (zh) * | 2014-05-19 | 2014-08-13 | 辽宁庆阳民爆器材有限公司 | 防脱落起爆具 |
CN204268980U (zh) * | 2014-11-14 | 2015-04-15 | 辽宁庆阳民爆器材有限公司 | 含能乳化炸药震源药柱 |
CN104613834A (zh) * | 2015-01-23 | 2015-05-13 | 山东大学 | 用于tsp炮孔乳化炸药的放置装置及操作方法 |
CN105509583A (zh) * | 2015-12-25 | 2016-04-20 | 天津宏泰华凯科技有限公司 | 一种防潮炸药托槽 |
CN105547066A (zh) * | 2015-12-15 | 2016-05-04 | 山东大学 | 一种用于tsp炮孔乳化炸药的放置装置及操作方法 |
CN207557496U (zh) * | 2017-12-13 | 2018-06-29 | 山东大学 | 适用于隧道地震波法超前地质预报的雷管防脱落装置 |
-
2017
- 2017-12-13 CN CN201711328442.9A patent/CN107884815B/zh active Active
Patent Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB532091A (en) * | 1939-08-17 | 1941-01-16 | Ernst Schneider | Improvements in means for securing detonators with attached fuzes, or electric detonators, in explosive charges |
GB636792A (en) * | 1948-05-03 | 1950-05-03 | Du Pont | Electric blasting initiators and methods of producing the same |
FR1068900A (fr) * | 1952-09-27 | 1954-07-01 | Cartouche explosive avec dispositif de protection des organes de mise à feu | |
GB913747A (en) * | 1959-10-17 | 1962-12-28 | Suisse Des Explosifs Soc | Equipment for detonating explosive charges |
EP0142717A1 (de) * | 1983-11-17 | 1985-05-29 | Manfred Meul | Sprengwerkzeug für Präzisionssprengungen |
US20060185898A1 (en) * | 2005-02-23 | 2006-08-24 | Dale Seekford | Method and apparatus for stimulating wells with propellants |
US20100089270A1 (en) * | 2007-02-02 | 2010-04-15 | Mattson Inter Tool Gmbh | Rock-blasting cartridge and blasting method |
AU2009280163A1 (en) * | 2008-08-05 | 2010-02-11 | Global Seismic Solutions Limited | Methodology for waterproofing primed seismic explosive assemblies |
CN102893119A (zh) * | 2010-02-03 | 2013-01-23 | 简-阿克.本特森 | 岩石爆破筒和点火雷管 |
CN103983144A (zh) * | 2014-05-19 | 2014-08-13 | 辽宁庆阳民爆器材有限公司 | 防脱落起爆具 |
CN204268980U (zh) * | 2014-11-14 | 2015-04-15 | 辽宁庆阳民爆器材有限公司 | 含能乳化炸药震源药柱 |
CN104613834A (zh) * | 2015-01-23 | 2015-05-13 | 山东大学 | 用于tsp炮孔乳化炸药的放置装置及操作方法 |
CN105547066A (zh) * | 2015-12-15 | 2016-05-04 | 山东大学 | 一种用于tsp炮孔乳化炸药的放置装置及操作方法 |
CN105509583A (zh) * | 2015-12-25 | 2016-04-20 | 天津宏泰华凯科技有限公司 | 一种防潮炸药托槽 |
CN207557496U (zh) * | 2017-12-13 | 2018-06-29 | 山东大学 | 适用于隧道地震波法超前地质预报的雷管防脱落装置 |
Non-Patent Citations (3)
Title |
---|
周轮;李术才;许振浩;李利平;黄鑫;何树江;李国豪;: "隧道综合超前地质预报技术及其工程应用", 山东大学学报(工学版), vol. 47, no. 02, pages 55 - 62 * |
杨冠洲: "用聚能爆破方法处理水井钻具事故", no. 06, pages 60 * |
许振浩;李术才;张庆松;李利平;张霄;高阳;原小帅;: "组合爆破法TSP超前地质预报研究", vol. 39, no. 04, pages 45 - 50 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109375255A (zh) * | 2018-09-03 | 2019-02-22 | 山东大学 | 隧道地震波法超前地质预报的放置炸药雷管装置及方法 |
CN112835094A (zh) * | 2021-01-06 | 2021-05-25 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种地震波法隧道超前地质预报炸药包安装装置 |
Also Published As
Publication number | Publication date |
---|---|
CN107884815B (zh) | 2023-09-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8701775B2 (en) | Completion of lateral bore with high pressure multibore junction assembly | |
CN107884815A (zh) | 适用于隧道地震波法超前地质预报的雷管防脱落装置及方法 | |
CN205102714U (zh) | 伞形结构雷管炮线固定装置 | |
CN109667542A (zh) | 破碎地层中多级分段非连续跟管钻进锚索施工方法 | |
CN104929665A (zh) | 锚固剂推送导管及推送装置 | |
CN109141149A (zh) | 一种隧道开挖水压爆破施工方法 | |
CN109900176A (zh) | 一种新型深孔爆破聚能管及其使用方法 | |
CN207557496U (zh) | 适用于隧道地震波法超前地质预报的雷管防脱落装置 | |
CN105547066B (zh) | 一种用于tsp炮孔乳化炸药的放置装置及操作方法 | |
CN205808267U (zh) | 一种防止地下矿山炮孔装药坠落的堵孔器 | |
CN201159620Y (zh) | 深孔爆破筒 | |
CN205138349U (zh) | 弹簧收缩式雷管炮线固定装置 | |
CN207701101U (zh) | 一种绳索取芯工艺在钻遇特大涌水时内管阻挡装置 | |
US3280742A (en) | Loading and anchoring adaptor for positioning geophysical explosive charges | |
CN209261488U (zh) | 一种锚索多级分段非连续跟管结构 | |
CN205403626U (zh) | 一种工作面深孔爆破预裂炮眼逆止器 | |
CN202304639U (zh) | Tsp炸药安装器 | |
CN104631445B (zh) | 一种在h型钢端部设有椭圆锥型桩头的smw工法 | |
CN102346005A (zh) | Tsp炸药安装器 | |
CN209858564U (zh) | 一种用于原位实验的可回收传感器 | |
CN209673398U (zh) | 一种原状土柱取样器 | |
CN106089246A (zh) | 一种基于注浆锚杆的巷道冒顶灾害修复方法 | |
CN208472720U (zh) | 一种可注浆锚杆定位支架装置 | |
CN204716265U (zh) | 锚固剂推送导管及推送装置 | |
CN206636503U (zh) | 矿井下用多功能奥灰水长观孔装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |