CN107795121B - 主体结构加高层铝合金模板顶升施工方法 - Google Patents
主体结构加高层铝合金模板顶升施工方法 Download PDFInfo
- Publication number
- CN107795121B CN107795121B CN201711090193.4A CN201711090193A CN107795121B CN 107795121 B CN107795121 B CN 107795121B CN 201711090193 A CN201711090193 A CN 201711090193A CN 107795121 B CN107795121 B CN 107795121B
- Authority
- CN
- China
- Prior art keywords
- shear wall
- concrete
- wall formwork
- roof
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
- E04G11/20—Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
- E04G11/22—Sliding forms raised continuously or step-by-step and being in contact with the poured concrete during raising and which are not anchored in the hardened concrete; Arrangements of lifting means therefor
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
本发明具体为一种主体结构加高层铝合金模板顶升施工方法,解决了现有楼层加高施工时存在施工效率低下、资源消耗大且加固困难、成型混凝土易错台质量缺陷的问题。a、进行剪力墙钢筋的焊接绑扎,随后支设剪力墙模板和顶板模板,待支设完成后进行暗梁钢筋绑扎;b、浇筑剪力墙混凝土至顶板C槽高度顶面;c、待达到可以拆除剪力墙模板条件后,将顶板C槽与剪力墙模板连接的销钉、销片拔出;d、驱动千斤顶将顶板模板顶升至设计顶板标高处,在剪力墙模板与顶板C槽之间放置方木,并安装对拉螺杆固定;e、浇筑顶板混凝土。本发明有效提高施工效率的同时,降低了资源的浪费,而且克服了加固困难且成型混凝土易错台的质量缺陷,保证了施工质量。
Description
技术领域
本发明涉及建筑工程的施工方法,具体为一种主体结构加高层铝合金模板顶升施工方法。
背景技术
建筑工程中使用最多的周转材料,先前以木质模板为多,随着我国倡导的低碳、节能越来越被社会所重视,人们便把眼光投向了应用前景很好的铝合金模板,它的出现便很好地解决了该问题,因其自重比大、钢模板轻、装配与周转方便,结构成型的效果也很好。
通常用铝模施工墙板只配一层模板,当面对层高调整时,由于铝模局部重新加工费用较大,一般层高加高位置采用木模板支设,但工期长,资源消耗大,加固困难,成型的混凝土存在错台等质量缺陷。
发明内容
本发明为了解决现有楼层加高施工时存在施工效率低下、资源消耗大且加固困难、成型混凝土易错台质量缺陷的问题,提供了一种主体结构加高层铝合金模板顶升施工方法。
本发明是采用如下技术方案实现的:主体结构加高层铝合金模板顶升施工方法,采用如下步骤:a、进行剪力墙钢筋的焊接绑扎,随后用铝合金模板支设剪力墙模板和顶板模板,待剪力墙模板和顶板模板支设完成后进行暗梁钢筋绑扎;b、浇筑剪力墙混凝土至顶板C槽高度顶面;c、待剪力墙混凝土强度等级达到可以拆除剪力墙模板条件后,将顶板C槽与剪力墙模板连接的销钉、销片拔出;d、将千斤顶支设在剪力墙模板龙骨与顶板模板之间,驱动千斤顶将顶板模板顶升至设计顶板标高处,在剪力墙模板与顶板C槽之间放置方木,并安装对拉螺杆固定;e、浇筑顶板混凝土,完成主体结构加高层的施工。
主体结构加高层铝合金模板顶升施工方法通过提高剪力墙混凝土浇筑的高度并配合顶板C槽的提升,实现了主体结构加高层的快速施工,省去了采用木模板支设的工序,克服了现有楼层加高施工时存在施工效率低下、资源消耗大且加固困难、成型混凝土易错台质量缺陷的问题。
本发明所述的施工方法省去了采用木模板支设的工序,有效提高施工效率的同时,降低了资源的浪费,而且克服了加固困难且成型混凝土易错台的质量缺陷,保证了施工质量,具有操作方便、省力、安全的优点。
附图说明
图1为本发明的结构示意图;
图2为图1中顶板C槽处的结构示意图;
图3为图1顶升后的结构示意图。
图中:1-剪力墙模板,2-顶板模板,3-顶板C槽,4-销钉,5-销片,6-方木,7-对拉螺杆。
具体实施方式
主体结构加高层铝合金模板顶升施工方法,采用如下步骤:a、进行剪力墙钢筋的焊接绑扎,随后用铝合金模板支设剪力墙模板1和顶板模板2,待剪力墙模板1和顶板模板2支设完成后进行暗梁钢筋绑扎;b、浇筑剪力墙混凝土至顶板C槽3高度顶面;c、待剪力墙混凝土强度等级达到可以拆除剪力墙模板1条件后,将顶板C槽3与剪力墙模板1连接的销钉4、销片5拔出;d、将千斤顶支设在剪力墙模板1龙骨与顶板模板2之间,驱动千斤顶将顶板模板2顶升至设计顶板标高处,在剪力墙模板1与顶板C槽3之间放置方木6,并安装对拉螺杆7固定;e、浇筑顶板混凝土,完成主体结构加高层的施工。
具体实施过程中,顶板C槽3包括直角状铝合金主板,直角状铝合金主板的两端均设置有向其内侧呈90度延伸的两块铝合金连接板。
Claims (1)
1.一种主体结构加高层铝合金模板顶升施工方法,其特征在于:采用如下步骤:a、进行剪力墙钢筋的焊接绑扎,随后用铝合金模板支设剪力墙模板(1)和顶板模板(2),待剪力墙模板(1)和顶板模板(2)支设完成后进行暗梁钢筋绑扎;b、浇筑剪力墙混凝土至顶板C槽(3)高度顶面;c、待剪力墙混凝土强度等级达到可以拆除剪力墙模板(1)条件后,将顶板C槽(3)与剪力墙模板(1)连接的销钉(4)、销片(5)拔出;d、将千斤顶支设在剪力墙模板(1)龙骨与顶板模板(2)之间,驱动千斤顶将顶板模板(2)顶升至设计顶板标高处,在剪力墙模板(1)与顶板C槽(3)之间放置方木(6),并安装对拉螺杆(7)固定;e、浇筑顶板混凝土,完成主体结构加高层的施工。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711090193.4A CN107795121B (zh) | 2017-11-08 | 2017-11-08 | 主体结构加高层铝合金模板顶升施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711090193.4A CN107795121B (zh) | 2017-11-08 | 2017-11-08 | 主体结构加高层铝合金模板顶升施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107795121A CN107795121A (zh) | 2018-03-13 |
CN107795121B true CN107795121B (zh) | 2019-07-26 |
Family
ID=61549258
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711090193.4A Active CN107795121B (zh) | 2017-11-08 | 2017-11-08 | 主体结构加高层铝合金模板顶升施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107795121B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108532950A (zh) * | 2018-05-30 | 2018-09-14 | 广东建星建造集团有限公司 | 木模板与钢模板交接支模 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1048426A (zh) * | 1989-06-28 | 1991-01-09 | 上海建筑施工技术研究所 | 建筑现浇墙体无爬架升模工艺及模具 |
CN103397779A (zh) * | 2013-07-23 | 2013-11-20 | 中国十七冶集团有限公司 | 一种大高度剪力墙模板的支撑方法 |
CN104727553B (zh) * | 2013-12-21 | 2017-01-11 | 中建四局第三建筑工程有限公司 | 一种采用铝合金剪力墙及楼板模板的施工方法及装置 |
CN106351439A (zh) * | 2016-08-29 | 2017-01-25 | 中国建筑第七工程局有限公司 | 铝模板施工工艺及方法 |
CN106869489A (zh) * | 2017-03-21 | 2017-06-20 | 中建三局第建设工程有限责任公司 | 超高层核心筒水平与竖向同步施工顶模系统及施工方法 |
-
2017
- 2017-11-08 CN CN201711090193.4A patent/CN107795121B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1048426A (zh) * | 1989-06-28 | 1991-01-09 | 上海建筑施工技术研究所 | 建筑现浇墙体无爬架升模工艺及模具 |
CN103397779A (zh) * | 2013-07-23 | 2013-11-20 | 中国十七冶集团有限公司 | 一种大高度剪力墙模板的支撑方法 |
CN104727553B (zh) * | 2013-12-21 | 2017-01-11 | 中建四局第三建筑工程有限公司 | 一种采用铝合金剪力墙及楼板模板的施工方法及装置 |
CN106351439A (zh) * | 2016-08-29 | 2017-01-25 | 中国建筑第七工程局有限公司 | 铝模板施工工艺及方法 |
CN106869489A (zh) * | 2017-03-21 | 2017-06-20 | 中建三局第建设工程有限责任公司 | 超高层核心筒水平与竖向同步施工顶模系统及施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN107795121A (zh) | 2018-03-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106320691B (zh) | 铝木模板施工方法 | |
CN204266590U (zh) | 集水坑、电梯井模板底模抗浮装置 | |
CN104763446B (zh) | 地铁车站施工用多功能台车 | |
CN105804395A (zh) | 基于整体式定型模板的楼梯一次连续浇筑成型施工方法 | |
CN108457469A (zh) | 一种带装配式砌体填充墙的混凝土结构施工方法 | |
CN105386538A (zh) | 一种cl复合混凝土剪力墙施工工艺 | |
CN107795121B (zh) | 主体结构加高层铝合金模板顶升施工方法 | |
CN109267585B (zh) | 装配式棱台型基础和柱结构及装配方法 | |
CN219080981U (zh) | 叠合板后浇带无支撑固定装置 | |
CN102912977A (zh) | 一种用于浇筑定型楼梯的模具 | |
CN210421568U (zh) | 一种装配式梁、板结构 | |
CN205712565U (zh) | 一种预制双面墙 | |
CN202509764U (zh) | 构造柱模板支模结构 | |
CN202064636U (zh) | 封闭式楼梯支模装置 | |
CN105275198B (zh) | 一种剪力墙加固模板结构及其施工方法 | |
CN104453235B (zh) | 换流站防火墙施工工艺 | |
CN204609293U (zh) | 便携式可定位支墩浇注模具 | |
CN204059940U (zh) | 一种混凝土楼板铝合金模板 | |
CN207377118U (zh) | 主体结构加高层铝合金模板顶升装置 | |
CN205476468U (zh) | 一种非定型、可周转模板体系预制楼梯梯段模板 | |
CN115126254A (zh) | 装配式叠合楼板支撑的建造方法 | |
CN108193874A (zh) | 一种建筑用楼梯钢模板 | |
CN204876399U (zh) | 一种集吊装定位于一体的预制楼梯 | |
CN204626965U (zh) | 用于建筑楼梯间一次浇筑成形的钢楼梯模板 | |
CN209976013U (zh) | 一种全钢大模板铝合金堵头板结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |