CN107700819A - Climbing frame and the king-post construction method using climbing frame in king-post construction in king-post construction - Google Patents

Climbing frame and the king-post construction method using climbing frame in king-post construction in king-post construction Download PDF

Info

Publication number
CN107700819A
CN107700819A CN201711020554.8A CN201711020554A CN107700819A CN 107700819 A CN107700819 A CN 107700819A CN 201711020554 A CN201711020554 A CN 201711020554A CN 107700819 A CN107700819 A CN 107700819A
Authority
CN
China
Prior art keywords
king
post
construction
internal model
climbing frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711020554.8A
Other languages
Chinese (zh)
Other versions
CN107700819B (en
Inventor
李德坤
万慧
李燕青
古宇鹏
周龙
杨大瑜
居敏
程琳刚
王福生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
8th Engineering Co Ltd of MBEC
Original Assignee
China Railway Major Bridge Engineering Group Co Ltd MBEC
8th Engineering Co Ltd of MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Group Co Ltd MBEC, 8th Engineering Co Ltd of MBEC filed Critical China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority to CN201711020554.8A priority Critical patent/CN107700819B/en
Publication of CN107700819A publication Critical patent/CN107700819A/en
Application granted granted Critical
Publication of CN107700819B publication Critical patent/CN107700819B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/24Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons
    • E04G3/246Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons following the inside contour of a building
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/28Climbing forms, i.e. forms which are not in contact with the poured concrete during lifting from layer to layer and which are anchored in the hardened concrete
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Abstract

The invention discloses climbing frame in a kind of construction of king-post, be related to king-post technical field of construction, climbing frame from top to bottom includes reinforcement construction platform successively in the king-post construction, reinforcement construction support body, internal model construction upper frame, internal model construct lower frame with hang platform.Using the present invention, after often completing a section king-post cage bar installation, climbing frame in king-post construction is lifted by crane gear and constructed to next section king-post, working procedure is few, takes short.Meanwhile internal model construction upper frame and internal model are constructed when lower frame is installed for internal model and provide operating platform, while internal model support is also served as, save inner formwork support structure, efficiency of construction height and saving steel resource.The invention also discloses it is a kind of using king-post construct in climbing frame king-post construction method.

Description

Climbing frame and the king-post construction method using climbing frame in king-post construction in king-post construction
Technical field
The present invention relates to king-post technical field of construction, and in particular in climbing frame and use king-post are constructed in a kind of king-post construction The king-post construction method of climbing frame.
Background technology
King-post generally use stiff skeleton coordinates climbing formwork for construction, after the completion of the construction of section king-post, connects high stiff skeleton, pacifies Steel loading muscle, then matched moulds casting concrete, is circulated according to this.Stiff skeleton is designed as permanent Transducers Embedded in Concrete, king-post design stiffness Skeleton is typically not as main body reinforced structure, only as construction ancillary method.One king-post stiff skeleton weight reach it is hundreds of very Supreme kiloton, constructed using the method, steel are caused necessarily to waste.And stiff skeleton often saves processing, connects height and must consume work When.
The content of the invention
For defect present in prior art, it is an object of the invention to provide climbing frame and use in a kind of construction of king-post The king-post construction method of climbing frame in king-post construction, working procedure is few, takes short and saving steel resource.
To achieve the above objectives, the present invention adopts the technical scheme that:Climbing frame in a kind of king-post construction, the king-post construction Interior climbing frame from top to bottom includes reinforcement construction platform, reinforcement construction support body, internal model construction upper frame, internal model construction undercarriage successively Body:
The reinforcement construction platform includes the horizontally disposed system of beam body in length and breadth and the cage bar fastened located at the beam body in length and breadth Positioning component, main ribs positioning component are fastened for king-post cage bar to be positioned at into the beam body in length and breadth;
The reinforcement construction support body includes the first space truss system;
The internal model construction upper frame includes second space girder system;
The internal model construction lower frame includes the 3rd space truss system and hanging seat component, and the hanging seat component is used for will The internal model construction lower frame is fixed on the king-post for part of having constructed.
On the basis of above-mentioned technical proposal, the reinforcement construction platform is connected by bolt and the reinforcement construction support body Connect.
On the basis of above-mentioned technical proposal, climbing frame also includes hanging platform in the king-post construction, and the platform that hangs is located at Below the internal model construction lower frame.
On the basis of above-mentioned technical proposal, the first space truss system is formed by angle splice joint.
On the basis of above-mentioned technical proposal, the second space girder system includes two purlin pieces and between two purlin piece Connect band, the purlin piece is spliced by H profile steel and universal rod body.
On the basis of above-mentioned technical proposal, the 3rd space truss system is spliced by H profile steel and universal rod body.
On the basis of above-mentioned technical proposal, the hanging seat component includes hanging seat, and hanging seat body is used with cone, the hanging seat is climbed In being fixedly connected with the 3rd space truss system and the 3rd space truss system hung on the hanging seat body, The cone of climbing is used to be fixedly connected with the hanging seat body and the hanging seat body is fixed on to the king-post for part of having constructed On.
On the basis of above-mentioned technical proposal, the internal model construction lower frame also includes regulation screw mandrel, the regulation screw mandrel For limiting the rotation of the internal model construction lower frame.
On the basis of above-mentioned technical proposal, the internal model construction lower frame also includes attached wall and supportted, and the attached wall stays at The 3rd space truss system constructed part the king-post between.
The invention also discloses it is a kind of using king-post construct in climbing frame king-post construction method:
S1, before the king-post cage bar installation of king-post section to be onstructed, the hanging seat component is arranged on section king-post of having constructed Design attitude, climbing frame in king-post construction is installed;
S2, king-post cage bar is fixed on the reinforcement construction platform by main ribs positioning component;
S3, after completing the installation of king-post cage bar, the connection between main ribs positioning component and king-post cage bar is released, removes institute Reinforcement construction platform is stated, climbing frame in king-post construction is promoted to next king-post section using crane gear;
S4, utilize internal model construction upper frame installation king-post internal model;
S5, after inner membrance installation, carry out the concreting of section to be onstructed;
S6, the reinforcement construction platform is reinstalled, repeat step S2~S6 is until complete the construction of whole sections.
Compared with prior art, the advantage of the invention is that:
Using the present invention, after often completing a section king-post cage bar installation, climbing frame is lifted in king-post construction extremely by crane gear Next section king-post, working procedure is few, takes short.
Meanwhile internal model construction upper frame and internal model are constructed when lower frame is installed for internal model and provide operating platform, are also served as simultaneously Internal model supports, and saves inner formwork support structure, efficiency of construction height and saving steel resource.
Brief description of the drawings
Fig. 1 is the structural representation of climbing frame in king-post construction in the embodiment of the present invention;
Fig. 2 is the structural representation of the reinforcement construction platform of climbing frame in king-post construction in the embodiment of the present invention;
Fig. 3 is the structural representation of the internal model construction upper frame of climbing frame in king-post construction in the embodiment of the present invention;
Fig. 4 is the structural representation of the internal model construction lower frame of climbing frame in king-post construction in the embodiment of the present invention;
Fig. 5 is the structural representation of the hanging seat component of climbing frame in king-post construction in the embodiment of the present invention.
In figure:1- reinforcement construction platforms, 11- beam body systems in length and breadth, 12- cage bar positioning components, 2- reinforcement construction support bodys, 21- First space truss system, 3- internal models construction upper frame, 31- second space girder systems, 311- purlins piece, 312- connect bands, 4- Internal model construction lower frame, the space truss systems of 41- the 3rd, 42- hanging seat components, 421- hanging seats, 422- hanging seat bodies, 423- are climbed Cone, 43- regulation screw mandrels, the support of 44- attached walls, 5- hang platform, 6- king-posts, 61- king-post cage bars.
Embodiment
The present invention is described in further detail below in conjunction with drawings and Examples.
Referring to shown in Fig. 1 and Fig. 2, the embodiment of the present invention provides a kind of king-post 6 and constructed interior climbing frame, and king-post 6 is constructed interior climbing frame From top to bottom include reinforcement construction platform 1, reinforcement construction support body 2, internal model construction upper frame 3, internal model construction lower frame 4 successively:
Reinforcement construction platform 1 is 11 including horizontally disposed beam body in length and breadth and is the cage bar positioning on 11 located at beam body in length and breadth Component 12, it is 11 that cage bar positioning component 12, which is used to the cage bar of king-post 6 being positioned at beam body in length and breadth,;
Reinforcement construction support body 2 includes the first space truss system 21;Reinforcement construction platform 1 passes through bolt and reinforcement construction frame Body 2 connects;
Internal model construction upper frame 3 includes second space girder system 31;
Internal model construction lower frame 4 includes the 3rd space truss system 31 and hanging seat component 32, and hanging seat component 32 is used for will Internal model construction lower frame 4 is fixed on the king-post 6 for part of having constructed.
King-post 6 constructs interior climbing frame also including hanging platform 5, hangs platform 5 located at the lower section of internal model construction lower frame 4.Platform 5 is hung to use Protective platform is provided in being constructed for king-post 6.
Shown in Figure 1, the first space truss system 21 is formed by angle splice joint.It is shown in Figure 3, second space truss System 31 includes two purlin pieces 311 and the connect band 312 between two purlin pieces 311, and purlin piece 311 is spelled by H profile steel and universal rod body Connect and form.Shown in Figure 4, the 3rd space truss system 31 is spliced by H profile steel and universal rod body.
Shown in Figure 5, hanging seat component 32 includes hanging seat 321, hanging seat body 322 and climbs cone 323, hanging seat 321 be used for 3rd space truss system 31 is fixedly connected and the 3rd space truss system 31 is hung on hanging seat body 322, climbs cone 323 and uses In being fixedly connected with hanging seat body 322 and hanging seat body 322 be fixed on the king-post 6 for part of having constructed.
Shown in Figure 5, internal model construction lower frame 4 also includes regulation screw mandrel 43, and regulation screw mandrel 43 is applied for limiting internal model The rotation of work lower frame 4.Internal model construction lower frame 4 also includes attached wall support 44, and attached wall support 44 is located at the 3rd space truss body Be 31 constructed part king-post 6 between.Attached wall support 44 is used for the rotation for limiting internal model construction lower frame 4.
The embodiment of the invention also discloses a kind of construction method of king-post 6 for interior climbing frame of being constructed using king-post 6, including following step Suddenly:
S1, before the cage bar of 6 section king-post of king-post 6 installation to be onstructed, hanging seat component 32 is arranged on section king-post 6 of having constructed Design attitude, installation king-post 6 are constructed interior climbing frame;
S2, the cage bar of king-post 6 is fixed on reinforcement construction platform 1 by cage bar positioning component 12;
S3, after completing the installation of king-post 6 cage bar, remove reinforcement construction platform 1, lifting king-post 6 constructs interior climbing frame to next tower The section of post 6.Reinforcement construction platform 1, reinforcement construction support body 2, internal model construction upper frame 3, internal model construction lower frame 4 between use Bolt connection, depending on crane gear Lifting Capacity, each support body can be disassembled, separately lift after spelling again, can also Integral hoisting frame Body.Because the every section in general king-tower section differs, cage bar positioning component 12 is fixed with reinforcement construction platform 1 using spot welding, After often completing the installation of the cage bar of a section king-post 6, weld seam is cut off, releases cage bar positioning component 12.
S4, the internal model of king-post 6 is installed using internal model construction upper frame 3;
S5, after inner membrance installation, carry out section concreting to be onstructed;
S6, reinforcement construction platform 1 is reinstalled, repeat step S2~S6 is until complete the construction of whole sections of king-post 6.
The present invention is not limited to the above-described embodiments, for those skilled in the art, is not departing from On the premise of the principle of the invention, some improvements and modifications can also be made, these improvements and modifications are also considered as the protection of the present invention Within the scope of.The content not being described in detail in this specification belongs to prior art known to professional and technical personnel in the field.

Claims (10)

1. climbing frame in a kind of king-post construction, it is characterised in that climbing frame is from top to bottom applied including reinforcing bar successively in the king-post construction Work platform (1), reinforcement construction support body (2), internal model construction upper frame (3), internal model construction lower frame (4):
The reinforcement construction platform (1) includes the horizontally disposed system of beam body in length and breadth (11) and on the system of beam body in length and breadth (11) Cage bar positioning component (12), main ribs positioning component (12) is used to king-post cage bar (61) being positioned at the beam body system in length and breadth (11) on;
The reinforcement construction support body (2) includes the first space truss system (21);
The internal model construction upper frame (3) includes second space girder system (31);
The internal model construction lower frame (4) includes the 3rd space truss system (41) and hanging seat component (42), the hanging seat group Part (42) is used for the king-post (6) that internal model construction lower frame (4) is fixed on to part of having constructed.
2. climbing frame in king-post construction as claimed in claim 1, it is characterised in that:The reinforcement construction platform (1) passes through bolt It is connected with the reinforcement construction support body (2).
3. climbing frame in king-post construction as claimed in claim 1, it is characterised in that:Climbing frame is also flat including hanging in the king-post construction Platform (5), the platform (5) that hangs is below internal model construction lower frame (4).
4. climbing frame in king-post construction as claimed in claim 1, it is characterised in that:The first space truss system (21) is by angle Steel is spliced.
5. climbing frame in king-post construction as claimed in claim 1, it is characterised in that:The second space girder system (31) includes Two purlin pieces (311) and the connect band (312) between two purlin pieces (311), the purlin piece (311) is by H profile steel and universal rod body It is spliced.
6. climbing frame in king-post construction as claimed in claim 1, it is characterised in that:The 3rd space truss system (41) is by H Shaped steel and universal rod body are spliced.
7. climbing frame in king-post construction as claimed in claim 1, it is characterised in that:The hanging seat component (42) includes hanging seat (421), hanging seat body (422) and cone (423) is climbed, the hanging seat (421) is used for solid with the 3rd space truss system (41) Fixed to connect and the 3rd space truss system (41) is hung on the hanging seat body (422), the cone (423) of climbing is used for It is fixedly connected with the hanging seat body (422) and the hanging seat body (422) is fixed on to the king-post (6) for part of having constructed On.
8. climbing frame in king-post construction as claimed in claim 1, it is characterised in that:The internal model construction lower frame (4) also includes Screw mandrel (43) is adjusted, the regulation screw mandrel (43) is used for the rotation for limiting the internal model construction lower frame (4).
9. climbing frame in king-post construction as claimed in claim 1, it is characterised in that:The internal model construction lower frame (4) also includes Attached wall supports (44), and attached wall support (44) has been constructed the king-post (6) of part located at the 3rd space truss system (41) Between.
10. a kind of king-post construction method using climbing frame in king-post as claimed in any one of claims 1 to 9 wherein construction, it is special Sign is:
S1, before king-post cage bar (61) installation of king-post section to be onstructed, the hanging seat component (42) is arranged on section of having constructed The design attitude of king-post, climbing frame in the king-post construction is installed;
S2, king-post cage bar (61) is fixed on the reinforcement construction platform (1) by main ribs positioning component (12);
S3, after completing king-post cage bar (61) installation, release the company between main ribs positioning component (12) and king-post cage bar (61) Connect, remove the reinforcement construction platform (1), climbing frame in king-post construction is promoted to next king-post section using crane gear Section;
S4, utilize internal model construction upper frame (3) installation king-post (6) internal model;
S5, after inner membrance installation, carry out the concreting of section to be onstructed;
S6, the reinforcement construction platform (1) is reinstalled, repeat step S2~S6 is until complete the construction of whole sections.
CN201711020554.8A 2017-10-26 2017-10-26 Tower column construction internal climbing frame and tower column construction method adopting same Active CN107700819B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711020554.8A CN107700819B (en) 2017-10-26 2017-10-26 Tower column construction internal climbing frame and tower column construction method adopting same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711020554.8A CN107700819B (en) 2017-10-26 2017-10-26 Tower column construction internal climbing frame and tower column construction method adopting same

Publications (2)

Publication Number Publication Date
CN107700819A true CN107700819A (en) 2018-02-16
CN107700819B CN107700819B (en) 2023-01-17

Family

ID=61182834

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711020554.8A Active CN107700819B (en) 2017-10-26 2017-10-26 Tower column construction internal climbing frame and tower column construction method adopting same

Country Status (1)

Country Link
CN (1) CN107700819B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110644373A (en) * 2019-10-14 2020-01-03 中交武汉港湾工程设计研究院有限公司 Automatic positioning bearing platform for inner cavity of inclined tower column

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2143647Y (en) * 1992-12-03 1993-10-13 北京市比尔特施工新技术研究所 Movable multifunction form device
JPH1018589A (en) * 1996-07-04 1998-01-20 Kabuki Kensetsu Kk Construction device for concrete structure
CN201236619Y (en) * 2008-07-24 2009-05-13 周开文 Frame climbing structure of triangular self-support column
CN103743581A (en) * 2013-12-06 2014-04-23 中联重科股份有限公司 Internal-climbing tower crane test platform apparatus and test method
CN105755959A (en) * 2016-03-11 2016-07-13 广东省长大公路工程有限公司 Auxiliary bracket system suitable for construction of cable towers with different sections and building method
CN207332305U (en) * 2017-10-26 2018-05-08 中铁大桥局集团第八工程有限公司 Climbing frame in a kind of king-post construction

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2143647Y (en) * 1992-12-03 1993-10-13 北京市比尔特施工新技术研究所 Movable multifunction form device
JPH1018589A (en) * 1996-07-04 1998-01-20 Kabuki Kensetsu Kk Construction device for concrete structure
CN201236619Y (en) * 2008-07-24 2009-05-13 周开文 Frame climbing structure of triangular self-support column
CN103743581A (en) * 2013-12-06 2014-04-23 中联重科股份有限公司 Internal-climbing tower crane test platform apparatus and test method
CN105755959A (en) * 2016-03-11 2016-07-13 广东省长大公路工程有限公司 Auxiliary bracket system suitable for construction of cable towers with different sections and building method
CN207332305U (en) * 2017-10-26 2018-05-08 中铁大桥局集团第八工程有限公司 Climbing frame in a kind of king-post construction

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
余定军: "奉节长江大桥下塔柱施工", 《科技咨询导报》 *
沪汉蓉铁路湖北有限责任公司: "《武汉天兴洲公铁两用长江大桥工程建设总结》", 30 April 2011, 中国铁道出版社 *
纪尊众等: "重庆长江鹅公岩大桥悬索桥西塔施工技术", 《铁道建筑技术》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110644373A (en) * 2019-10-14 2020-01-03 中交武汉港湾工程设计研究院有限公司 Automatic positioning bearing platform for inner cavity of inclined tower column

Also Published As

Publication number Publication date
CN107700819B (en) 2023-01-17

Similar Documents

Publication Publication Date Title
CN101886468B (en) Construction method of suspension type template support in high-position conjoined structure
CN106437130A (en) Inner roof external climbing type formwork construction platform for super high-rise building construction
CN106400951B (en) A kind of level and vertical structure method for synchronously constructing of super high-rise building
CN105586833B (en) Stiff skeleton steel reinforcement cage global formation large-scale cast-in-place tall pier and thin wall construction method
CN101481944A (en) Method for mounting high pier, tower over-form construction reinforced bar and movable support thereof
CN105298100A (en) Construction method of cantilever construction platform with ultrahigh cast-in-place flaring structure in cylindrical building
CN104310165A (en) Guide rail type adhesion construction lifter and construction method thereof
CN102251483B (en) Construction method for hoisting concrete-filled steel tube lattice bridge pier through self-lifting attached crane
CN103806639A (en) Steel tube truss support system for silo top and construction method of steel tube truss support system
CN102912996B (en) Steel tube concrete column high-altitude construction safety protection system
CN101503908B (en) Construction method for spacing suspension cable structural template support platform
CN103790423A (en) Construction method of large concrete granary
CN107269085B (en) A kind of construction method of large-diameter concrete silo top conical shell structure
CN103485574B (en) A kind of granulation tower tower top structure of reinforced concrete method
CN207268073U (en) Novel flexible formwork bearing frame
CN207332305U (en) Climbing frame in a kind of king-post construction
CN115233960A (en) Integral construction platform structure and method for increasing core tube wall in air
CN102767282B (en) Assembly-type high-formwork construction method for cantilever of oversized special-shaped conversion layer
CN202954552U (en) Steel tube concrete column high-altitude construction safety protection system
CN204781927U (en) Elevartor shaft formwork and elevartor shaft concrete placement operation platform
CN107700819A (en) Climbing frame and the king-post construction method using climbing frame in king-post construction in king-post construction
CN102691267A (en) High pier construction method for external whole operation platform
CN202990427U (en) Climbing discharging platform
CN111705677A (en) A smooth frame that rises for high pier stud turns over mould construction
CN205653708U (en) Work platform that inclined plane climbed follows

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant