Prior art keywords
construction
conical shell
steel truss
oblique column
truss
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710557043.3A
Other languages
Chinese (zh)
Other versions
CN107269085A (en
Inventor
孟文清
沈金生
崔邯龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei University of Engineering
Original Assignee
Hebei University of Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei University of Engineering filed Critical Hebei University of Engineering
Priority to CN201710557043.3A priority Critical patent/CN107269085B/en
Publication of CN107269085A publication Critical patent/CN107269085A/en
Application granted granted Critical
Publication of CN107269085B publication Critical patent/CN107269085B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H7/00Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
    • E04H7/22Containers for fluent solids, e.g. silos, bunkers; Supports therefor
    • E04H7/24Constructions, with or without perforated walls, depending on the use of specified materials
    • E04H7/26Constructions, with or without perforated walls, depending on the use of specified materials mainly of concrete, e.g. reinforced concrete or other stone-like materials

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Rod-Shaped Construction Members (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention belongs to the construction fields of silo top conical shell structure, it is related to a kind of construction method of diameter Silo silo roof conical shell structure, the structure combined using skeleton with cone conformation structure and steel bar truss floor support plate, using umbrella keel structure as support, the problem of building operation platform is needed before overcoming aforementioned construction in the prior art, therefore the problem of also there is no the later periods to operation platform progress large area dismounting, to greatly shorten construction period, reduce cost brought by operation platform, the steel bar truss floor support plate is process using the reinforcement frame in concrete floor, the access approaches of material are extensive, it is low in cost, it is worth a wide range of to promote and apply.

Description

A kind of construction method of large-diameter concrete silo top conical shell structure
Technical field
The invention belongs to structural engineering technical fields, and in particular to a kind of large-diameter concrete silo top conical shell knot The construction method of structure.
Background technique
With the rapid industrial development in our country and to the raising of environmental protection requirement, large-diameter concrete silo is obtained largely Using.The bulkhead construction of silo has generallyd use sliding mode technology at present, and the technology short construction period, construction effect is good, by Will be widely welcomed for market, but the construction of the silo roof conical shell of silo always exists many technical problems, the master of silo roof conical shell construction Want method there are several types of:
1, full hall frame formwork system: silo roof is built using expiring by the way of hall builds scaffold from bottom to top in silo Operation platform, expend a large amount of manpower and material resources, cause construction cost high.
2, steel truss structure and the combined system of center derrick: increase the architectural construction of center derrick in construction, in Heart derrick is support column, and builds the platform that steel truss structure is constructed as silo roof on center derrick top, is built in conical shell construction It is removed at rear, construction cost is also higher.
3, steel truss support system: the system is using in such a way that ground is prefabricated, the conical shell space of steel truss support structure Grid structure is whole shaped like canopy, and centre is upper collar tie beam structure, and stock, steel truss support structure week are hung with below upper collar tie beam Circle with stock lower end has reinforcing bar zipper to be attached, and reinforcing bar zipper upper berth is set up defences protective net, and whole with the steel truss support structure Pouring for silo roof conical shell is carried out for operation platform, after the completion of construction, needs to remove the steel truss support structure, and silo construction Specially reserved construction member outlet is had no afterwards, therefore after can only being disassembled in silo, by large size from the aperture of silo roof Loop wheel machine takes out, and construction cost is high, and construction period is longer, and applies man-hour requirement and add to hit damage when protection avoids taking out construction member The bad silo roof newly poured.
As it can be seen that the mode of existing silo roof conical shell construction is there are numerous drawbacks, these drawbacks exactly limit silo construction into The principal element of degree and cost.Therefore, seek a kind of save the cost, easy construction silo top conical shell structure construction method It is extremely urgent.
Summary of the invention
The present invention provides a kind of large-diameter concrete silo top to solve above-mentioned problems of the prior art The construction method of conical shell structure.The building of operation platform, scaffold and template is effectively prevented using the method for the present invention, is dismantled Constructing operation, required building element is less and mostly prefabricated components, helps to shorten the construction period, saves construction cost.It utilizes simultaneously Ring on circumferential reinforcement fabrication circumferential reinforcement truss floor support plate and the oblique column of steel truss, conical shell space grid structure steel truss in conical shell Beam can partially substitute Reinforcement in conical shell, after having poured concrete, form the stiffness in armored concrete conical shell structure Steel framed concrete beam increases the degree of safety of structure in the case where the steel content of conical shell structure is basically unchanged.
The specific technical solution that the present invention uses is:
A kind of construction method of large-diameter concrete silo top conical shell structure, the construction method be in silo construction It is carried out on the basis of the column built-in fitting of lower ring pre-plugged, the construction method of silo roof conical shell structure includes the following steps:
A, prefabricated:
Ring beam, steel bar truss floor support plate on the oblique column of production steel truss, steel truss, it is spare;
B, the oblique column of steel truss is installed:
In silo construction, one group of column built-in fitting is buried in lower ring, the concrete strength of lower ring is waited to reach work After journey construction requirement, the oblique column of steel truss is installed on column built-in fitting;
C, umbrella keel structure is assembled:
Ring beam on hoisting prefabricated steel truss, the upper end of ring beam on steel truss and the oblique column of steel truss is fixed to be formed Umbrella keel structure;
D, conical shell space grid structure is assembled:
Steel bar truss floor support plate is lifted and is laid with, steel bar truss floor support plate and the oblique column of steel truss are fixedly connected to form conical shell Then skeleton is laid with longitudinal reinforcement and circumferential reinforcement on conical shell skeleton to form conical shell space grid structure;
E, the casting concrete on conical shell space grid structure forms silo top conical shell structure.
In the step b, during silo construction, interim built-in fitting, the oblique column installation of steel truss are buried on the inside of bulkhead When, temporary support columns are installed on interim built-in fitting, temporary support columns both ends respectively with interim built-in fitting and the oblique column of steel truss It is connected, the oblique column of steel truss, temporary support columns, bulkhead form triangular support configurations.
In the step b, the oblique column of steel truss is at least 3, in the step c, after umbrella keel structure is formed, according to The quantity for the oblique column of steel truss that engineering construction requires, lifts the oblique column of remaining steel truss.
In the step d, the circumferential of multilayer is formed after all steel bar truss floor support plates and the oblique column installation of steel truss and is supported Structure, lower ring are supported undermost circumferential support construction, and the circumferential support construction of lower layer supports the circumferential direction on upper layer Structure is supported.
The beneficial effects of the present invention are:
Permanent mould of the construction method of the present invention using the profiled sheet of steel bar truss floor support plate lower part as conical shell concrete Plate forms space net rack knot by ring beam, steel bar truss floor support plate, longitudinal reinforcement, circumferential reinforcement on the oblique column of steel truss, steel truss Structure undertakes the construction loads of conical shell as silo cone shell form bracing system.It is needed before overcoming aforementioned construction in the prior art The problem of erection construction platform, thus also there is no the later period to operation platform carry out large area dismounting the problem of, thus greatly Construction period is shortened, cost brought by operation platform is reduced, is worth a wide range of and promotes and applies.
Detailed description of the invention
Fig. 1 is umbrella keel structure schematic diagram of the invention;
Fig. 2 is the top view of specific embodiment 2;
Fig. 3 is the schematic diagram of specific embodiment 3;
In attached drawing, 1, the oblique column of steel truss, 2, ring beam on steel truss, 3, steel bar truss floor support plate, 4, circumferential support construction, 5, lower ring, 6, column built-in fitting, 7, interim built-in fitting, 8, bulkhead, 9, temporary support columns.
Specific embodiment
With reference to the accompanying drawing and specific embodiment the invention will be further described:
Specific embodiment 1, the present invention are a kind of construction method of large-diameter concrete silo top conical shell structure, the construction Method is carried out on the basis of the column built-in fitting 6 of 5 pre-plugged of lower ring in silo construction, and silo roof conical shell structure is applied Work method includes the following steps:
A, prefabricated:
Ring beam 2, steel bar truss floor support plate 3 on the oblique column 1 of production steel truss, steel truss, it is spare;
B, the oblique column 1 of steel truss is installed:
In silo construction, one group of column built-in fitting 6 is buried in lower ring 5, and the concrete strength of lower ring 5 is waited to reach After engineering construction requires, the oblique column 1 of steel truss is installed on column built-in fitting 6;
C, umbrella keel structure is assembled:
Ring beam 2 on hoisting prefabricated steel truss, by the upper end of ring beam 2 on steel truss and the oblique column 1 of steel truss it is fixed to Form umbrella keel structure;
D, conical shell space grid structure is assembled:
Steel bar truss floor support plate 3 is lifted and is laid with, steel bar truss floor support plate 3 is fixedly connected to form with the oblique column 1 of steel truss Then conical shell skeleton is laid with longitudinal reinforcement and circumferential reinforcement on conical shell skeleton to form conical shell space grid structure;
E, the casting concrete on conical shell space grid structure forms silo top conical shell structure.
Complete umbrella keel knot as shown in Figure 1 first in the present invention by the way of prefabrication, in build process The assembling of structure, subsequent construction not only can be using the umbrella keel structure as operation platform, but also umbrella keel structure is also reinforcing bar The support system of concrete silo silo roof conical shell, therefore it is not related to the dismounting problem after construction, therefore existing skill is not present It builds operation platform in art, the problem of construction later period is removed again, has in construction cost and on construction period, difficulty of construction Reduction, is conducive to promote and apply.
Specific embodiment 2 during silo construction, is buried interim pre- on the inside of bulkhead 8 as shown in Fig. 2, the step b Embedded part 7, interim built-in fitting 7 are that reserved steel bar end or Bolt plate are pacified on interim built-in fitting 7 when the oblique column 1 of steel truss is installed Temporary support columns 9 are filled, temporary support columns both ends are connected with interim built-in fitting 7 and the oblique column 1 of steel truss respectively, the oblique column of steel truss 1, temporary support columns 9, bulkhead 8 form triangular support configurations.
In the step b, in the step b, the oblique column 1 of steel truss is at least 3, in the step c, umbrella keel knot After being configured to, according to the quantity for the oblique column 1 of steel truss that engineering construction requires, the oblique column 1 of remaining steel truss is lifted;
The present embodiment is the further improvement to umbrella keel structure, when practice of construction, completes it in umbrella keel structure Before, operation platform is had no, therefore difficulty of construction is larger, in order to overcome the problem, first using silo side wall top as platform, under The oblique column 1 of at least three steel truss is equally spacedly lifted on ring beam 5, and it is oblique to above-mentioned steel truss to lift temporary support columns 9 simultaneously Column 1 is supported, so that the oblique column 1 of steel truss, temporary support columns 9, bulkhead 8 form triangular support configurations, after this step, is hung Ring beam 3 on prefabricated steel truss is filled, the oblique column 1 of steel truss and ring beam 3 on steel truss is fixed, the umbrella formed at this time Keel structure is the more sparse structure of skeleton, is operation platform in this umbrella keel structure, lifts remaining steel truss and tiltedly stand (the oblique column 1 of steel truss that dotted line indicates in Fig. 2, the oblique column 1 of the steel truss is not required to be equipped with temporary support columns 9 column 1, by existing Umbrella keel complete self-supporting), complete umbrella keel structure is formed, removes temporary support columns 9 at this time and by it from silo top The drawbacks of hanging in the gap of the umbrella keel structure in portion, save subsequent dismounting, the column built-in fitting 6, interim built-in fitting 7 For reserved steel bar end, bolt base, in order to later period attended operation.
Since umbrella keel structure has formed and stablized self-supporting, lift the remaining oblique column 1 of steel truss it Preceding that temporary support columns 9 are removed and hung, umbrella keel structure gap is larger at this time, constructs convenient for crane, reduces and applies Work difficulty avoids damage appearance of colliding with caused by the hoisting process being likely to occur.
Specific embodiment 3, as shown in figure 3, in the step d, the fan-shaped structure of steel bar truss floor support plate 3 is its downside The truss structure for welding bottom plate in the step d, is formed after all steel bar truss floor support plates 3 and the oblique installation of column 1 of steel truss The circumferential support construction 4 of multilayer, lower ring 5 are supported undermost circumferential support construction 4, the circumferential support construction of lower layer The circumferential support construction 4 on 4 pairs of upper layers is supported.So that circumferential support construction 4 does not need outside by the oblique formation of column 1 of steel truss The self-supporting system for adding support facility, gap after multilayer circumferential direction support construction 4 laminates, mutually between circumferential direction support construction 4 Mutually overlap joint occlusion, forms sealing, according to the optional welding of construction requirement or closure gap filler.And with the increasing of the construction number of plies Add, be gradually expanded to the construction space of operator, helps to reduce high altitude operation risk, accelerate construction progress.
Specific embodiment 4, in the step d, after conical shell space truss structure is completed, along conical shell space truss structure Frame body upper surface be laid with longitudinal reinforcement along longitudinal direction and circumferential reinforcement circumferentially, bind or form grid after being welded and fixed Shape structure, longitudinal reinforcement, circumferential reinforcement form conical shell space net rack with steel bar truss floor support plate 3, the fixation of umbrella keel structure again Structure, the structure can self-contained support, have preferable bearing capacity.The fenestral fabric that longitudinal reinforcement and circumferential reinforcement are formed After concreting, as the upper surface profile of conical shell, while proof strength, the beautiful journey of whole silo roof conical shell is improved It spends, ring beam 2 on the oblique column 1 of the steel truss, conical shell steel truss, part substitutes conical shell middle skeleton beam and upper ring in traditional construction Reinforcement in beam, the steel bar truss floor support plate 3 is using the steel bar stress processing in traditional concrete conical shell It forms, part substitutes the circumferential steel bar stress in concrete conical shell, after fixing with the oblique column 1 of steel truss, forms conical shell sky Between truss structure system, therefore steel content is almost unchanged compared with the mode that existing scaffold support template is poured.
Stiffness steel reinforced concrete after casting concrete, in space grid structure System forming armored concrete conical shell structure Component in the case where the steel content of conical shell structure is basically unchanged, and increases the degree of safety of structure.The present invention is oblique by steel truss Ring beam 2, steel bar truss floor support plate 3, longitudinal reinforcement, circumferential reinforcement form conical shell space net rack knot on column 1, conical shell steel truss Structure undertakes the construction loads of conical shell as silo cone shell form bracing system, gets rid of construction member or the construction of other peripheral hardwares Platform reduces integral construction cost, shortens the construction period.

Claims (3)

1. a kind of construction method of large-diameter concrete silo top conical shell structure, which is characterized in that the construction method is in cylinder Storehouse carries out on the basis of column built-in fitting (6) of lower ring (5) pre-plugged when constructing, the construction method of silo roof conical shell structure Include the following steps:
A, prefabricated:
Ring beam (2), steel bar truss floor support plate (3) in the production oblique column of steel truss (1), steel truss, it is spare;
B, the oblique column of steel truss (1) is installed:
In silo construction, one group of column built-in fitting (6) is buried in lower ring (5), and the concrete strength of lower ring (5) is waited to reach After requiring to engineering construction, the oblique column of steel truss (1) is installed on column built-in fitting (6);
C, umbrella keel structure is assembled:
Ring beam (2) on hoisting prefabricated steel truss, by the upper end of ring beam on steel truss (2) and the oblique column of steel truss (1) it is fixed from And form umbrella keel structure;
D, conical shell space grid structure is assembled:
It lifts and is laid with steel bar truss floor support plate (3), steel bar truss floor support plate (3) is fixedly connected with shape with the oblique column of steel truss (1) At conical shell skeleton, it is laid with longitudinal reinforcement and circumferential reinforcement on conical shell skeleton then to form conical shell space grid structure;
E, the casting concrete on conical shell space grid structure forms silo top conical shell structure;
In the step b, during silo construction, buried interim built-in fitting (7) on the inside of bulkhead (8), the oblique column of steel truss (1) When installation, on interim built-in fitting (7) install temporary support columns (9), temporary support columns both ends respectively with interim built-in fitting (7) and The oblique column of steel truss (1) is connected, and the oblique column of steel truss (1), temporary support columns (9), bulkhead (8) form triangular support configurations.
2. a kind of construction method of large-diameter concrete silo top conical shell structure according to claim 1, feature exist In: in the step b, the oblique column of steel truss (1) is at least 3, in the step c, after umbrella keel structure is formed, according to work The quantity of the oblique column of the steel truss of journey construction requirement (1) lifts the oblique column of remaining steel truss (1).
3. a kind of construction method of large-diameter concrete silo top conical shell structure according to claim 1, feature exist In: in the step d, the circumferential of multilayer is formed after all steel bar truss floor support plates (3) and the oblique column of steel truss (1) installation and is supported Structure (4), lower ring (5) are supported undermost circumferential support construction (4), and the circumferential support construction (4) of lower layer is to upper The circumferential support construction (4) of layer is supported.
CN201710557043.3A 2017-07-10 2017-07-10 A kind of construction method of large-diameter concrete silo top conical shell structure Expired - Fee Related CN107269085B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710557043.3A CN107269085B (en) 2017-07-10 2017-07-10 A kind of construction method of large-diameter concrete silo top conical shell structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710557043.3A CN107269085B (en) 2017-07-10 2017-07-10 A kind of construction method of large-diameter concrete silo top conical shell structure

Publications (2)

Publication Number Publication Date
CN107269085A CN107269085A (en) 2017-10-20
CN107269085B true CN107269085B (en) 2019-08-06

Family

ID=60072335

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710557043.3A Expired - Fee Related CN107269085B (en) 2017-07-10 2017-07-10 A kind of construction method of large-diameter concrete silo top conical shell structure

Country Status (1)

Country Link
CN (1) CN107269085B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678181B (en) * 2018-05-28 2020-08-21 中国二十二冶集团有限公司 High-altitude construction method for steel truss and concrete combined structure on top of bin
CN109184189B (en) * 2018-08-30 2022-08-16 郑州建工集团有限责任公司 Construction method for conical shell silo top structure of large-diameter silo
CN113863753B (en) * 2021-09-16 2023-03-31 中国一冶集团有限公司 Crushing reduction silo and construction method thereof
CN114215251A (en) * 2022-01-28 2022-03-22 中国建筑西南设计研究院有限公司 Steel grid sprayed concrete combined dome structure and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296858A (en) * 2011-06-29 2011-12-28 中建二局第三建筑工程有限公司 Roof steel structure for cement production line clinker warehouse and construction method thereof
CN202401807U (en) * 2011-12-31 2012-08-29 中平能化建工集团有限公司土建处 Oblique-cone top cover supporting device of large-diameter high silo
CN103015782A (en) * 2012-12-14 2013-04-03 中煤建筑安装工程集团有限公司 Construction platform and construction method for integrating silo roof and silo wall slip form
KR101346569B1 (en) * 2013-07-11 2014-01-02 주식회사 복주 Storage tank and method of manufacturing storage tank
CN104100122A (en) * 2014-08-01 2014-10-15 中国化学工程第三建设有限公司 Construction method of cone-shaped top structure of large silo

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296858A (en) * 2011-06-29 2011-12-28 中建二局第三建筑工程有限公司 Roof steel structure for cement production line clinker warehouse and construction method thereof
CN202401807U (en) * 2011-12-31 2012-08-29 中平能化建工集团有限公司土建处 Oblique-cone top cover supporting device of large-diameter high silo
CN103015782A (en) * 2012-12-14 2013-04-03 中煤建筑安装工程集团有限公司 Construction platform and construction method for integrating silo roof and silo wall slip form
KR101346569B1 (en) * 2013-07-11 2014-01-02 주식회사 복주 Storage tank and method of manufacturing storage tank
CN104100122A (en) * 2014-08-01 2014-10-15 中国化学工程第三建设有限公司 Construction method of cone-shaped top structure of large silo

Also Published As

Publication number Publication date
CN107269085A (en) 2017-10-20

Similar Documents

Publication Publication Date Title
CN107269085B (en) A kind of construction method of large-diameter concrete silo top conical shell structure
CN106088327B (en) The production method of assembling frame column based on 3D printing
CN104131703A (en) Method for constructing core tube wall through self-climbing formwork and adopted self-climbing formwork
CN104746422A (en) Bridge prefabricated hollow pier column post-poured connecting structure and construction method
CN102535845A (en) Construction method of bearing frame of corridor structure
CN109944161B (en) Steel box concrete bent pier on steel pipe arch bridge arch and construction method
CN103935911B (en) Tower crane attached wall supporting construction and construction method thereof
CN108661221A (en) A kind of precast floor slab and its connection structure and its construction method
CN104100122A (en) Construction method of cone-shaped top structure of large silo
CN107401113A (en) Stiff skeleton straining beam structure and construction method built in a kind of high pier
CN108360380A (en) A kind of bridge pier column construction operation platform and its construction method
CN108277881A (en) A kind of assembled beam-column connecting node
CN105568854A (en) Construction method of overwater curved fish-bellied cast-in-place reinforced concrete box girder
CN114457668B (en) Large-span space special-shaped arch rib delphinium type basket steel box arch bridge and rapid construction method
CN204097864U (en) A kind of bridge prefabrication hollow pier stud delay-pour joint structure
CN107882328A (en) The construction method of large span steel truss overhung construction
CN102691267A (en) High pier construction method for external whole operation platform
CN104775363B (en) The spelling method of upper king-post strut reinforcing bar sections
CN107313551A (en) A kind of concrete prefabricated wallboard of steel bar girder and structural system and its construction method
CN104453228A (en) Construction method of large-span super-large-section steel plate wall beam
CN207332305U (en) Climbing frame in a kind of king-post construction
CN114134991B (en) High-rise building construction method with conversion structure
CN109812001A (en) A kind of construction method of Super High bilayer I-steel overhanging support system
CN109610707A (en) A kind of design and rapid constructing method of prefabricated girder steel and floor fit flush
CN108360685A (en) Monoblock type jack-up construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190806