CN107697812A - A kind of cantilever crane set up for bridge subsection transport - Google Patents

A kind of cantilever crane set up for bridge subsection transport Download PDF

Info

Publication number
CN107697812A
CN107697812A CN201710915264.3A CN201710915264A CN107697812A CN 107697812 A CN107697812 A CN 107697812A CN 201710915264 A CN201710915264 A CN 201710915264A CN 107697812 A CN107697812 A CN 107697812A
Authority
CN
China
Prior art keywords
supporting leg
bridge
main couple
cantilever crane
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710915264.3A
Other languages
Chinese (zh)
Inventor
赵伟
马白虎
樊永波
李忠贤
周磊
刘胜高
虞海
刘慧�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUIZHOU BRIDGE CONSTRUCTION GROUP CO Ltd
Original Assignee
GUIZHOU BRIDGE CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUIZHOU BRIDGE CONSTRUCTION GROUP CO Ltd filed Critical GUIZHOU BRIDGE CONSTRUCTION GROUP CO Ltd
Priority to CN201710915264.3A priority Critical patent/CN107697812A/en
Publication of CN107697812A publication Critical patent/CN107697812A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C17/00Overhead travelling cranes comprising one or more substantially horizontal girders the ends of which are directly supported by wheels or rollers running on tracks carried by spaced supports
    • B66C17/06Overhead travelling cranes comprising one or more substantially horizontal girders the ends of which are directly supported by wheels or rollers running on tracks carried by spaced supports specially adapted for particular purposes, e.g. in foundries, forges; combined with auxiliary apparatus serving particular purposes
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of cantilever crane set up for bridge subsection transport, it includes two main couples be arrangeding in parallel(1), main couple(1)Between be provided with middle cross beam(2), main couple(1)Top is provided with lifting dolly(3), main couple(1)The middle supporting leg being connected with bridge floor is provided with below middle part(4), main couple(1)The rear support leg being connected with bridge floor is provided with below rearward end(5), the cantilever crane also includes and main couple(1)The rear slip supporting leg being slidably connected(6).The present invention bridge prefabrication section splice during have it is simple in construction, be easy to set up, section transport it is more convenient the advantages of, reduce construction quantities and construction difficulty, improve construction safety coefficient, the construction period is shorter, splicing precision it is higher.

Description

A kind of cantilever crane set up for bridge subsection transport
Technical field
The present invention relates to a kind of equipment for bridge construction, particularly a kind of cantilever crane set up for bridge subsection transport.
Background technology
During bridge erection is constructed, the means spliced typically by prefabricated subsection are set up;Build first Bridge tower, completion erection is then fixedly connected with by prefabricated bridge subsection lifting and with bridge tower.Apply at present carrying out erection to bridge In man-hour, because prefabricated subsection build is larger, bridge tower is higher, and during splicing is set up, quantities is larger, and difficulty of construction is higher, Construction risk is higher, and the duration is longer.In bridge prefabrication section, splicing is more during setting up at present is applied using erection crane Work, but because erection crane need to set pre-splicing field in work progress under tower, it is not only larger by the influence of topography, and high-altitude is risen Crane operation lifting altitude is higher, pre-splicing field under tower is had a great influence during work high above the ground, working security is relatively low, while uses bridge floor Each tie point is both needed to set construction platform when loop wheel machine carries out lifting operation, sets operation relatively complicated, causes the construction period longer. Therefore, at present in bridge prefabrication section splicing exist during setting up loop wheel machine set difficulty is higher, section transport is relatively complicated, The shortcomings that construction work amount is larger, difficulty of construction is higher, construction risk is higher and the duration is longer.
The content of the invention
It is an object of the present invention to provide a kind of cantilever crane set up for bridge subsection transport.The present invention is in bridge Prefabricated subsection splice during have it is simple in construction, be easy to set up, section transport it is more convenient the advantages of, reduce construction Quantities and the difficulty of construction, improve construction safety coefficient, and the construction period is shorter, and splicing precision is higher.
Technical scheme:A kind of bridge subsection that is used for transports the cantilever crane set up, including two be arranged in parallel Main couple, middle cross beam is provided between main couple, is provided with lifting dolly above main couple, lifting dolly can on main couple longitudinal direction Mobile, lower section is provided with the middle supporting leg being connected with girder in the middle part of main couple, is provided with below main couple rearward end after being connected with girder Supporting leg, the cantilever crane also include the rear slip supporting leg being slidably connected with main couple.
In a kind of foregoing cantilever crane set up for bridge subsection transport, the lifting dolly includes upending frame, rises Hanging dolly can walk on upending frame, realize the direction across bridge movement of lifting dolly;The lifting dolly also includes rotary hanger, revolves Rotary lifting is connected by steel wire rope cabling with lifting dolly, and rotary hanger can carry out full circle swinging, and framework is provided with below rotary hanger Suspender.
In a kind of foregoing cantilever crane set up for bridge subsection transport, wherein the middle cross beam is packaged type crossbeam, Supporting leg is installed below middle cross beam both ends.
In a kind of foregoing cantilever crane set up for bridge subsection transport, the middle supporting leg and rear support leg are liftable Supporting leg.
Compared with prior art, by supporting leg in setting and rear support leg, two are set to put down above middle supporting leg and rear support leg Capable main couple, and lifting dolly is set above main couple, it is more convenient to build, and need to only be set in construction in steel girder joint Steel girder and the prefabricated bridge installation of bridge subsection can be carried out by putting construction platform, reduce quantities and the construction of construction Difficulty, and pre-splicing field can be arranged on bridge floor, it is easy to bridge prefabrication section to transport and splice, while reduce work high above the ground Point, workmen is reduced, improve working security, reduce the construction period.
The using effect of the artificial checking cantilever crane of application, by practice of construction by cantilever crane with present frequently with bridge Face loop wheel machine contrasts, and concrete outcome is as shown in table 1:
In summary, the present invention bridge prefabrication section splice during have it is simple in construction, be easy to set up, section transport compared with For it is convenient the advantages of, reduce construction quantities and construction difficulty, improve construction safety coefficient, the construction period is shorter, It is higher to splice precision.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the side structure schematic diagram of the present invention;
Fig. 3 is hoisting process schematic diagram of the present invention.
Mark in accompanying drawing for:1- main couples, 2- middle cross beams, 3- lifting dollies, supporting leg in 4-, 5- rear support legs are sliding after 6- Dynamic supporting leg, 7- upending frames, 8- lifting jacks, 9- rotary hangers, 10- frame lifting appliances, 11- supporting legs.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples, but be not intended as to the present invention limit according to According to.
Embodiment.A kind of cantilever crane set up for bridge subsection transport, as shown in Figure 1 to Figure 3, including two parallel The main couple 1 of setting, middle cross beam 2 is provided between main couple 1, the top of main couple 1 is provided with lifting dolly 3, and lifting dolly 3 can be in master Vertically moved on truss 1, the middle part of main couple 1 lower section is provided with the middle supporting leg 4 being connected with bridge floor, is provided with below the rearward end of main couple 1 The rear support leg 5 being connected with bridge floor, the cantilever crane also include the rear slip supporting leg 6 being slidably connected with main couple 1.
The lifting dolly 3 includes upending frame 7, and lifting dolly 3 can walk on upending frame 7, realizes that lifting dolly 3 is horizontal Bridge is to movement;The lifting dolly 3 also includes rotary hanger 9, and rotary hanger 9 is connected by steel wire rope cabling with lifting dolly 3, Rotary hanger 9 can carry out full circle swinging, and the lower section of rotary hanger 9 is provided with frame lifting appliance 10;Wherein the middle cross beam 2 is packaged type crossbeam, The both ends supported underneath leg 11 of middle cross beam 2;The middle supporting leg 4 and rear support leg 5 are liftable supporting leg.
Operation principle:Cantilever crane walking process, the gooseneck of reach middle cross beam 2 to the anchor tie plate position for having completed beam section On, the rear supporting leg 6 that slides is moved near middle supporting leg 4, the point midway that dolly is moved between middle cross beam 2 and middle supporting leg 4, is put down Frame lifting appliance 10 to bridge floor, middle supporting leg 4 and rear support leg 5 shrinks, and reduces the height of main couple 1, makes the supporting leg of middle cross beam 2 and rear sliding Supporting leg is supported on bridge floor, releases the anchor measure of rear support leg 5, and middle supporting leg 4 and rear support leg 5 continue to shrink, and leave bridge floor, middle cross beam 2 and the rear supporting leg 6 that slides drive main couple 1 to move forward, lifting dolly 3 is synchronously moved rearwards, when after slide supporting leg 6 after and prop up During leg 5, stop movement.Supporting leg 4 and rear support leg 5 in jacking, supporting leg is slid after making and departs from bridge floor, it is rear to slide the adjustment of supporting leg forward end One segment distance, then middle supporting leg 4 and rear support leg 5 shrink away from bridge floor, the rear supporting leg that slides is supported on bridge floor again, middle cross beam 2 Main couple 1 is driven to move forward again with rear slip supporting leg 6, lifting dolly 3 is synchronously moved rearwards, and central supporting leg 4 is located at anchor drawing When at plate above gooseneck, stop main couple 1 and move forward.Supporting leg 4 and rear support leg 5 in jacking, main couple 1 is raised to operation height, The supporting leg of middle cross beam 2 and rear sliding supporting leg is set to depart from bridge floor, middle cross beam 2 is moved near rear support leg 5, and anchoring rear support leg 5 is in steel master On beam crossbeam, the installation frame suspender 10 of dolly 3 is lifted by crane, prepares lifting operation.
During the splicing of bridge prefabrication section is set up, cantilever crane is built in girder front end, anchors rear support leg 5, lifting dolly 3, Middle cross beam 2, rear sliding supporting leg are moved to the rearward end of main couple 1, and then installing frame is set a roof beam in place suspender on lifting dolly 3, is prepared Lifting operation;During construction, by travelling bogie, bridge prefabrication section is transported to cantilever crane rear, in bridge out of pre-splicing field first Installation frame suspender 10 on prefabricated subsection, and be connected with rotary hanger 9 on lifting dolly 3, bridge prefabrication section is carried out assembly After, you can carry out next bridge prefabrication section assembling.
Lift by crane dolly 3 and lift by crane bridge prefabrication section, walked to girder front end, and adjust bridge prefabrication section in good time to bridge Midline position, middle cross beam 2 follows lifting dolly 3 to move ahead, and is fixed in the middle position of supporting leg 4, and lifting dolly 3 proceeds to installation The anchor tie plate crossbeam position+10cm places parking of section.
Rotary hanger 9 is operated, rotates 90 degree of steel girder section to installation site by rule, it is pre- that lifting dolly 3 transfers bridge Section processed is alignd with having installed section, and lifting dolly 3 adjusts bridge prefabrication section docking location, installs connecting plate and high intensity spiral shell Bolts, suspension cable and prefabricated bridge, floorings are installed and are installed in place in order by cantilever crane, suspension cable successively just and Two, the wet seam of floorings of constructing, after concrete strength reaches 100%, stretch-draw prestressing force and suspension cable, cantilever crane are run to On the beam section middle cross beam 2, repeat the above steps and carry out next bridge prefabrication section installation.

Claims (4)

  1. A kind of 1. cantilever crane set up for bridge subsection transport, it is characterised in that:Including two main couples be arrangeding in parallel (1), main couple(1)Between be provided with middle cross beam(2), main couple(1)Top is provided with lifting dolly(3), main couple(1)Below middle part Provided with the middle supporting leg being connected with girder(4), main couple(1)The rear support leg being connected with girder is provided with below rearward end(5), it is described outstanding Arm loop wheel machine also includes and main couple(1)The rear slip supporting leg being slidably connected(6).
  2. A kind of 2. cantilever crane set up for bridge subsection transport according to claim 1, it is characterised in that:Described Hang dolly(3)Including upending frame(7);The lifting dolly(3)Also include rotary hanger(9), rotary hanger(9)Pass through steel wire rope Cabling and lifting dolly(3)Connection, rotary hanger(9)Lower section is provided with frame lifting appliance(10).
  3. A kind of 3. cantilever crane set up for bridge subsection transport according to claim 1, it is characterised in that:In described Crossbeam(2)For packaged type crossbeam, middle cross beam(2)Supporting leg is installed below both ends(11).
  4. A kind of 4. cantilever crane set up for bridge subsection transport according to claim 1, it is characterised in that:In described Supporting leg(4)And rear support leg(5)For liftable supporting leg.
CN201710915264.3A 2017-09-30 2017-09-30 A kind of cantilever crane set up for bridge subsection transport Pending CN107697812A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710915264.3A CN107697812A (en) 2017-09-30 2017-09-30 A kind of cantilever crane set up for bridge subsection transport

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710915264.3A CN107697812A (en) 2017-09-30 2017-09-30 A kind of cantilever crane set up for bridge subsection transport

Publications (1)

Publication Number Publication Date
CN107697812A true CN107697812A (en) 2018-02-16

Family

ID=61183259

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710915264.3A Pending CN107697812A (en) 2017-09-30 2017-09-30 A kind of cantilever crane set up for bridge subsection transport

Country Status (1)

Country Link
CN (1) CN107697812A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109629448A (en) * 2019-01-28 2019-04-16 中铁大桥局集团有限公司 The synchronous device and method for setting up girder and floorings
CN109733995A (en) * 2019-01-28 2019-05-10 青岛长永机械工程有限公司 A kind of prefabricated pipe gallery of Urban Underground is laid with hoisting machine and construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2385636A1 (en) * 1977-03-28 1978-10-27 Mecatel Structure for installing bridge girders - has secondary supports slidable on guides to allow attachment to piers which follow curve
JPH0579018A (en) * 1991-09-18 1993-03-30 P S Co Ltd Bridge girder laying device
CN101581073A (en) * 2008-07-10 2009-11-18 中铁大桥局股份有限公司 Downlink movable mould frame and walking method thereof
CN102303819A (en) * 2011-08-12 2012-01-04 中国水电建设集团铁路建设有限公司 Railway bridge sound barrier upright hoisting trolley
CN103590340A (en) * 2013-10-31 2014-02-19 河北工业大学 Lower guide beam walking type bridge erection machine contraction and folding cantilever beam system
CN103669211A (en) * 2013-08-22 2014-03-26 中铁四局集团有限公司 Hydraulic type multifunctional suspension-assembling girder lifting machine and steel box girder assembling method
CN104261280A (en) * 2014-09-17 2015-01-07 徐工集团工程机械股份有限公司 Engineering machinery and changeable track base plate device thereof
CN207293976U (en) * 2017-09-30 2018-05-01 贵州桥梁建设集团有限责任公司 A kind of cantilever crane set up for bridge subsection transport

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2385636A1 (en) * 1977-03-28 1978-10-27 Mecatel Structure for installing bridge girders - has secondary supports slidable on guides to allow attachment to piers which follow curve
JPH0579018A (en) * 1991-09-18 1993-03-30 P S Co Ltd Bridge girder laying device
CN101581073A (en) * 2008-07-10 2009-11-18 中铁大桥局股份有限公司 Downlink movable mould frame and walking method thereof
CN102303819A (en) * 2011-08-12 2012-01-04 中国水电建设集团铁路建设有限公司 Railway bridge sound barrier upright hoisting trolley
CN103669211A (en) * 2013-08-22 2014-03-26 中铁四局集团有限公司 Hydraulic type multifunctional suspension-assembling girder lifting machine and steel box girder assembling method
CN103590340A (en) * 2013-10-31 2014-02-19 河北工业大学 Lower guide beam walking type bridge erection machine contraction and folding cantilever beam system
CN104261280A (en) * 2014-09-17 2015-01-07 徐工集团工程机械股份有限公司 Engineering machinery and changeable track base plate device thereof
CN207293976U (en) * 2017-09-30 2018-05-01 贵州桥梁建设集团有限责任公司 A kind of cantilever crane set up for bridge subsection transport

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109629448A (en) * 2019-01-28 2019-04-16 中铁大桥局集团有限公司 The synchronous device and method for setting up girder and floorings
CN109733995A (en) * 2019-01-28 2019-05-10 青岛长永机械工程有限公司 A kind of prefabricated pipe gallery of Urban Underground is laid with hoisting machine and construction method
CN109629448B (en) * 2019-01-28 2023-10-20 中铁大桥局集团有限公司 Device and method for synchronously erecting girder and bridge deck

Similar Documents

Publication Publication Date Title
CN208815424U (en) A kind of bridge descending hanging basket
CN104195952A (en) Steel box girder erection method applied to steel and concrete hybrid girder cable-stayed bridge
CN107013038B (en) A kind of steel structure slipping of building roof lighting Zhongting changes column construction method
CN105000482B (en) Tower crane with walking mechanism
CN208087078U (en) A kind of boom hoisting of large span steel reinforced concrete combination beam Bridge Erector
CN212079327U (en) Hydraulic pressure regulation formula side wall template platform truck
CN104612061A (en) Suspended and open type novel hanging basket device and construction method thereof
CN108179816A (en) A kind of deviation sliding and lifting device and method
CN111139743A (en) Method for improving speed of highway beam frame and installation method of gantry crane
CN106044552A (en) Multi-leg rubber-tired track-laying crane and construction method thereof
CN111038940A (en) Rail mounted is used for hoist and mount traction system of transportation
CN107503296A (en) Bailey bridge installation method
CN207293976U (en) A kind of cantilever crane set up for bridge subsection transport
CN110723677B (en) Auxiliary lifting trolley for precast beam
CN107268455B (en) Concrete girder gooseneck composite structure beam cradle construction method
CN107697812A (en) A kind of cantilever crane set up for bridge subsection transport
CN103437301A (en) Method for mounting construction hanging basket of suspended pouring section of single plane cable-stayed bridge
CN114808747A (en) Multifunctional bridge girder erection machine and bridge girder erection construction method
JP3150572B2 (en) Bridge erection equipment
CN207987749U (en) Ride cable-styled erection crane
CN104746432B (en) The feasible bridge guidance tape in plate-beam transports installs car
CN208533370U (en) A kind of Bridge Erector of large span steel reinforced concrete combination beam erection construction
CN106837376B (en) Bind module turnover device for subway tunnel section of jurisdiction
CN108086168A (en) Ride cable-styled erection crane
CN203684019U (en) Height and span adjustable track laying machine for subway construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180216

RJ01 Rejection of invention patent application after publication