CN104195952A CN201410411081.4A CN201410411081A CN104195952A CN 104195952 A CN104195952 A CN 104195952A CN 201410411081 A CN201410411081 A CN 201410411081A CN 104195952 A CN104195952 A CN 104195952A
Authority
CN
China
Prior art keywords
steel
girder
steel case
case beam
machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410411081.4A
Other languages
Chinese (zh)
Inventor
李世铭
胡晓东
伍军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
China State Railway Group Co Ltd
Second Engineering Co Ltd of CTCE Group
Original Assignee
Second Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of CTCE Group filed Critical Second Engineering Co Ltd of CTCE Group
Priority to CN201410411081.4A priority Critical patent/CN104195952A/en
Publication of CN104195952A publication Critical patent/CN104195952A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a steel box girder erection method which is applied to a steel and concrete hybrid girder cable-stayed bridge. Side-span concrete girders are constructed first, and middle-span steel box girders are installed in a segmented mode. The segments of the steel box girders are lifted to a girder transport cart on the constructed side-span girder face through a bridge tail girder lifting gantry, the steel box girders are transported into a cantilever bridge girder erection machine along rails on the girder face through the cart, and then the steel box girders are hoisted, transferred forward, turned, transferred backward and installed through the cantilever bridge girder erection machine. The constructed side-span concrete girders serve as the middle-span steel box girder transportation channel for transporting girders on girders, the steel box girder lifting, transporting and erecting process is not limited by ground construction, and navigation is not affected; the problems of construction environment constraints are solved, and multiple construction devices involved in steel box girder erection are innovatively designed, developed and successfully applied. According to on-site practice, all links are compact and controllable in terms of construction time, the steel box girder erection method is safe, reliable and high in applicability, the defects of a traditional construction method are compensated for, and development of the steel box girder erection construction technology is promoted.

Description

Be applied to steel reinforced concrete hybrid beam steel box girder of cable stayed bridge erection method
Technical field
The present invention relates to steel box beam erection field, be specifically related to one and be applicable to steel reinforced concrete hybrid beam steel box girder of cable stayed bridge erection method.
Background technology
Steel box girder of cable stayed bridge routine is set up generally two kinds: one is erection by protrusion, and main feature is steel case beam to be transported to bridge location by pioneer road (trestle), navigation channel (sea) etc. treat below, frame place, utilizes erection crane to promote piecemeal and set up into bridge; The method need to have existing communications and transportation under transport channel and the Long-term Effect bridge at bridge location place.Another kind is longitudinal incremental launching method, main feature is, in bridge one side (or both sides), incremental launching construction platform is set, and temporary rest pier, slideway, nose girder etc. are set, and relies on thrustor, single-point or multi-point pushing by beam body along bridge y direction progressively jacking put in place, suspension cable Cheng Qiao are installed; The method need arrange larger pushing tow job platform, needs ground transport passage, and temporary rest pier is limited across footpath, affects existing communications and transportation under bridge.
Above conventional construction method can not meet steel reinforced concrete hybrid beam steel box girder of cable stayed bridge under the ambient conditions such as ground transport inconvenience, existing communications and transportation is unaffected and set up requirement.Must look for another way, exploitation is on the steel box beam erection new method that environment relies on and impact is all less, to solve a construction environment restriction difficult problem complicated in steel box beam erection construction.
Summary of the invention
The object of the invention is the shortcoming in order to overcome above-mentioned background technology, a kind of steel reinforced concrete hybrid beam steel box girder of cable stayed bridge new method for erecting is provided, be applicable to the ambient conditions such as ground transport inconvenience, existing communications and transportation is unaffected, enrich steel box girder of cable stayed bridge erection construction method.
Technical scheme of the present invention is: one is applied to steel reinforced concrete hybrid beam steel box girder of cable stayed bridge erection method, comprises the following steps:
(1) carry out successively pile foundation, cushion cap, pier shaft, Sarasota, end bay concrete box girder and the construction of steel reinforced concrete adapter section, concrete box girder adopts cast-in-place support to construct, containing entirely girder pre-stressed;
(2) utilize construction bearing platform basis at bridge tail, installation can be promoted to steel case beam merogenesis the bale handle door frame of end bay concrete beam face, during this time by 1st~3 pairs of suspension cables are installed, and successively order by symmetrical stretch-draw;
(3) in concrete girder leans on, fill cantilever erections machine anchoring across end matching, synchronously lay fortune beam orbit at beam face, fortune beam dolly is installed;
(4) steel case beam is transported to lifting assigned address by ground beam transportation vehicle, utilizes bale handle door frame that steel case beam is promoted and along bridge to load-carrying vertical shift, steel case beam be held on beam face fortune beam dolly, and steel case beam is transported to cantilever erections machine inside by fortune beam dolly;
(5) cantilever erections machine hoists, and overhead traveling crane promotes steel case beam and load-carrying moves forward to front end, utilize rotary hanger by steel case beam half-twist aloft, the overhead traveling crane that hoists retreats, wire rope of sling is transferred, steel case beam is connected with existing steel case beam-ends mouth exact matching, in steel case beam splice girth welding process, carries out the corresponding suspension cable of this spliced girder section and install, after steel box beam Welding completes, symmetrical, synchronous tension suspension cable, complete this beam section construction;
(6) cantilever erections machine is removed rear anchor, hoist and move to cantilever erections machine tail end fixing after overhead traveling crane, cantilever erections machine is under hydraulic jack dynamic action, move forward to next sections steel box beam erection position anchoring along walking rails, complete during this time fortune beam trolley track spreading, next lifting of sections steel case beam and transport, repeat to set up operation;
(7) two sides repeat steel case beam and suspension cable installation as stated above, until full-bridge closure.
Described end bay concrete girder has been constructed in advance; In across steel case beam in the segmented making of ground processing space, steel case top surface of the beam arranges interim hanger, hanger mates design with bale handle door frame hoisting hanger and cantilever erections machine suspender, for lifting and double as anchor point after cantilever erections machine.
On the described segmented lifting upper beam of steel case beam, beam, transport beam, bridge location is set a roof beam in place, it is mainly completed by plant equipment such as bale handle door frame, fortune beam dolly and cantilever erections machines; Bale handle door frame is promoted to sections steel case beam on end bay beam face fortune beam dolly, fortune beam dolly by steel case beam in beam face is transported to across cantilever erections machine inside, cantilever erections machine completes steel box beam erection.
Described bale handle door frame, is made up of steel pipe support, longitudinal Bailey truss, horizontal Bailey truss, rail system, walking system, erecting equipment, electrical system and suspender; Described longitudinal Bailey truss is fixed on steel pipe support top, and rail system is fixed on longitudinal Bailey truss top; Described erecting equipment is fixed on horizontal Bailey truss middle part, and laterally walking system is installed at Bailey truss two ends; Described erecting equipment, under electric driving, utilizes suspender to promote steel case beam; Described walking system, under electric driving, can come and go operation in orbit; Described suspender arranges Telescopic steel wire thick stick, thereby adjustable steel case beam center of gravity is controlled lifting attitude.
Formed by main frame, the overhead traveling crane that hoists, rotary hanger, walking rails, traveling hydraulic jack, rear anchor and adjustable supports; Described main frame forms frame construction by bottom framework, vertical rod, girder, brace, connecting rod; Described adjustable supports is positioned at four jiaos of bottom frameworks, is supported on steel case beam face when the anchoring of cantilever erections machine, when the traveling of cantilever erections machine, packs up; Described walking rails and hydraulic jack are all arranged at bottom framework bottom, provide power, cantilever erections machine integral forward lead in orbit by hydraulic jack; Described rotary hanger carries electrical system and Telescopic steel wire thick stick, and suspender is connected with steel case beam hanger coupling, thereby Telescopic steel wire thick stick regulates steel case beam, center of gravity is controlled lifting attitude, and electrical system can drive steel case beam to do 360 ° and rotate freely; The described overhead traveling crane that hoists, under electrical system effect, vertically moves before and after on girder by overhead crane orbit, and the overhead traveling crane that hoists also arranges hydraulic jack, can transverse shifting; Described rear anchor mates design with steel case beam hanger, uses bearing pin to be connected with mounting rail section hanger, thus anchoring cantilever erections machine; Described walking rails is that sectional making, bolt connect, circulation peace is torn use open.
Described fortune beam dolly, is wheel-track type girder carrier, is made up of main spandrel girder, connecting rod, traveling wheels, electrical system, cable hank; Described main spandrel girder two ends utilize and are bolted to traveling wheels top, two main spandrel girders and two connecting rod composition rectangular frame structure, and main spandrel girder end face is consistent with steel case beam contact surface slope, after installation rubber pad, directly bears steel case beam weight; Described connecting rod two ends adopt bearing pin to be connected with main spandrel girder; Totally 4 of described traveling wheels, are arranged on beam face track; Running trolley is under electrical system drives, and traveling wheels come and go operation, the synchronous retractable cable of cable hank at beam face track; Beam face track is made up of rail and sleeper, is fixed on Liang Mianshang, and with the splicing of steel case beam, spreading is equipped with and adjusts joint.
The invention has the beneficial effects as follows: the present invention is not limited by traffic above-ground traffic condition, and the impact of existing environment is dropped to minimum degree, especially do not affect existing communications and transportation under bridge.The present invention breaks through routine, look for another way, the method that steel case beam adopts transport on the lifting of bridge tail, beam, bridge location to set up, technical scheme independence is strong, little to environmental disturbances, the expenses such as navigation channel transport, construction bridge of having saved drop into, and greatly reduce construction cost, when not being subject to communications and transportation restriction, not affecting it and normally move.
When the present invention relates to a kind of steel box beam erection new method, this field construction equipment is carried out innovative design, independent research and is applied to engineering reality, not only effectively solve a construction technology difficult problem, and economic and social benefit is obvious.The present invention has made up the deficiency of conventional construction method, has promoted steel box girder construction technical development, and its steel box beam erection method and construction equipment all have wide promotional value.
Brief description of the drawings
Fig. 1 is integral arrangement structural representation of the present invention;
Fig. 2 is bale handle door frame side elevation structural representation;
Fig. 3 is the positive facade structural representation of bale handle door frame;
Fig. 4 is cantilever erections pusher side facade structures schematic diagram;
Fig. 5 is the positive facade structural representation of cantilever erections machine;
Fig. 6 is fortune beam dolly side elevation structural representation;
Fig. 7 is the positive facade structural representation of fortune beam dolly;
Fig. 8 is fortune beam dolly plane structure schematic diagram;
Fig. 9 is fortune beam dolly travelling wheel pair and beam face section structure schematic diagram;
Wherein: Z1, bale handle door frame, Z2, fortune beam dolly, Z3, cantilever erections machine, Z4, steel case beam, 1, pile foundation, 2, cushion cap, 3, pier shaft, 4, Sarasota, 5, end bay concrete box girder, 6, steel reinforced concrete adapter section, 7, hanger, 8, track, 9, suspension cable, 10, beam transportation vehicle, 11, steel pipe support, 12, longitudinally Bailey truss, 13, rail system, 14, walking system, 15, laterally Bailey truss, 16, erecting equipment, 17, suspender, 18, main frame, 19, overhead traveling crane hoists, 20, rotary hanger, 21, walking rails, 22, rear anchor, 23, overhead crane orbit, 24, overhead traveling crane hydraulic jack, 25, Telescopic steel wire thick stick, 26, spike, 27, traveling hydraulic jack, 28, main spandrel girder, 29, connecting rod, 30, traveling wheels, 31, electrical system, 32, cable hank.
Detailed description of the invention
The present invention is applied to case history, and a kind of new steel box beam erection method is provided, and by reference to the accompanying drawings the specific embodiment of the invention is illustrated as follows:
A, carry out pile foundation (1), cushion cap (2), pier shaft (3), Sarasota (4), end bay concrete box girder (5) and steel reinforced concrete adapter section (6) construction successively, concrete box girder (5) adopts cast-in-place support to construct;
B, utilize construction bearing platform (2) basis at bridge tail, installation can be promoted to steel case beam (Z4) merogenesis the bale handle door frame (Z1) of end bay concrete beam face, during this time by 1st~3 pairs of suspension cables (9) are installed, and successively order by symmetrical stretch-draw;
C, in concrete girder (5) leans on across end matching dress cantilever erections machines (Z3) anchoring, synchronously lay fortune beam orbit (8) at beam face, fortune beam dolly (Z2) be installed;
Steel case beam (Z4) is transported to lifting assigned address by D, ground beam transportation vehicle (10), utilize bale handle door frame (Z1) special hanger (17) by steel case beam (Z4) lifting and along bridge to load-carrying vertical shift, steel case beam (Z4) is held on to beam face fortune beam dolly (Z2) upper, steel case beam (Z4) is transported to cantilever erections machine (Z3) inside by fortune beam dolly (Z2);
E, cantilever erections machine (Z3) hoists, and overhead traveling crane (19) promotes steel case beam (Z4) and load-carrying moves forward to front end, utilize rotary hanger (20) by steel case beam (Z4) half-twist aloft, the overhead traveling crane (19) that hoists retreats, suspender (20) wire rope is transferred, steel case beam (Z4) is connected with existing steel case beam-ends mouth exact matching, in steel case beam (Z4) joint ring seam welding process, carrying out the corresponding suspension cable of this spliced girder section (9) installs, after steel box beam Welding completes, symmetrical, synchronous tension suspension cable (9), complete this beam section construction,
F, cantilever erections machine (Z3) are removed rear anchor (22), hoist and move to cantilever erections machine (Z3) tail end fixing after overhead traveling crane (19), cantilever erections machine (Z3) is under hydraulic jack (27) dynamic action, move forward to next sections steel box beam erection position anchoring along walking rails (23), complete during this time fortune beam trolley track spreading (8), next lifting of sections steel case beam and transport, repeat to set up operation;
G, two sides repeat steel case beam (Z4) and suspension cable (9) installation as stated above, until full-bridge closure;
H, dismounting beam face gadget, carry out suspension cable (9) Suo Li and adjust, until Suo Li and full-bridge line style meet design requirement, completes full-bridge construction.
Described steel box beam erection method, is primarily characterized in that:
(1) end bay concrete girder (5) has been constructed in advance, in across steel case beam (Z4) in the segmented making of ground processing space, steel case beam (Z4) end face arranges interim hanger (7), hanger (7) mates design with bale handle door frame hoisting hanger (17) and cantilever erections machine suspender (20), for lifting and double as anchor point after cantilever erections machine;
(2) on the segmented lifting upper beam of steel case beam (Z4), beam, transport beam, bridge location is set a roof beam in place, it is mainly completed by bale handle door frame (Z1), fortune beam dolly (Z2) and the plant equipment such as cantilever erections machine (Z3).Bale handle door frame (Z1) is promoted to sections steel case beam (Z4) on end bay beam face fortune beam dolly (Z2), fortune beam dolly (Z2) by steel case beam (Z4) in beam face is transported to across cantilever erections machine (Z3) inside, cantilever erections machine (Z3) completes steel case beam (Z4) and sets up.
Described bale handle door frame (Z1), is characterized in that: be made up of steel pipe support (11), longitudinal Bailey truss (12), horizontal Bailey truss (15), rail system (13), walking system (14), erecting equipment (16), electrical system and suspender (17); Described longitudinal Bailey truss (12) is fixed on steel pipe support top, and rail system (13) is fixed on longitudinal Bailey truss (12) top; Described erecting equipment (16) is fixed on horizontal Bailey truss (15) middle part, and laterally walking system (14) is installed at Bailey truss (15) two ends; Described erecting equipment (16), under electric driving, utilizes suspender (17) to promote steel case beam (Z4); Described walking system (14), under electric driving, can come and go operation in orbit; Described suspender (17) arranges Telescopic steel wire thick stick, thereby adjustable steel case beam center of gravity is controlled lifting attitude.
Described cantilever erections machine (Z3), is characterized in that: be made up of main frame (18), the overhead traveling crane that hoists (19), rotary hanger (20), walking rails (21), traveling hydraulic jack (24), rear anchor (22) and adjustable supports (26); Described main frame (18) forms frame construction by bottom framework, vertical rod, girder, brace, connecting rod; Described adjustable supports (26) is positioned at four jiaos of bottom frameworks, is supported on steel case beam face when the anchoring of cantilever erections machine, when the traveling of cantilever erections machine, packs up; Described walking rails (21) and hydraulic jack (27) are all arranged at bottom framework bottom, provide power by hydraulic jack (27), and cantilever erections machine (Z3) is at the upper integral forward lead of track (21); Described rotary hanger (20) carries electrical system and Telescopic steel wire thick stick (25), suspender (20) is connected with steel case beam hanger (7) coupling, Telescopic steel wire thick stick (25) regulates steel case beam (Z4) thereby center of gravity is controlled lifting attitude, and electrical system can drive steel case beam (Z4) to do 360 ° and rotate freely; The described overhead traveling crane that hoists (19), under electrical system effect, vertically moves before and after on girder by overhead crane orbit (23), and the overhead traveling crane that hoists (19) also arranges hydraulic jack (24), can transverse shifting; Described rear anchor (19) mates design with steel case beam hanger (7), uses bearing pin to be connected with mounting rail section hanger, thus anchoring cantilever erections machine (Z3); Described walking rails (21) is that sectional making, bolt connect, circulation peace is torn use open.
Described fortune beam dolly (Z2), it is characterized in that: be wheel-track type girder carrier, formed by main spandrel girder (28), connecting rod (29), traveling wheels (30), electrical system (31), cable hank (32) etc.; Described main spandrel girder (28) two ends utilize and are bolted to traveling wheels (30) top, two main spandrel girders (28) and two connecting rods (29) composition rectangular frame structure, main spandrel girder (28) end face is consistent with steel case beam contact surface slope, after installation rubber pad, directly bears steel case beam weight; Described connecting rod (29) two ends adopt bearing pin to be connected with main spandrel girder (28); Totally 4 of described traveling wheels (30), are arranged on beam face track; Running trolley is under electrical system (30) drives, and traveling wheels (30) come and go operation at beam face track, the synchronous retractable cable of cable hank (32); Beam face track is made up of rail (8) and sleeper, is fixed on Liang Mianshang, and with the splicing of steel case beam, spreading is equipped with and adjusts joint.

Claims (6)

1. be applied to a steel reinforced concrete hybrid beam steel box girder of cable stayed bridge erection method, it is characterized in that comprising the following steps:
(1) carry out successively pile foundation, cushion cap, pier shaft, Sarasota, end bay concrete box girder and the construction of steel reinforced concrete adapter section, concrete box girder adopts cast-in-place support to construct, containing entirely girder pre-stressed;
(2) utilize construction bearing platform basis at bridge tail, installation can be promoted to steel case beam merogenesis the bale handle door frame of end bay concrete beam face, during this time by 1st~3 pairs of suspension cables are installed, and successively order by symmetrical stretch-draw;
(3) in construction beam body across the assembled cantilever erections machine of end carriage face anchoring, synchronously lay fortune beam orbit at beam face, fortune beam dolly be installed, fortune beam dolly, can be at the convenient round fortune beam of beam face track under electric driving;
(4) steel case beam is transported to lifting position, bale handle door frame below by ground beam transportation vehicle, utilize bale handle door frame by the lifting of steel case beam and along bridge to load-carrying vertical shift, steel case beam is held on beam face fortune beam dolly, and steel case beam is transported to cantilever erections machine inside by fortune beam dolly;
(5) cantilever erections machine hoists, and overhead traveling crane promotes steel case beam and load-carrying moves forward to front end, utilize rotary hanger by steel case beam half-twist aloft, the overhead traveling crane that hoists retreats, wire rope of sling is transferred, steel case beam is connected with existing steel case beam-ends mouth exact matching, in steel case beam splice girth welding process, carries out the corresponding suspension cable of this spliced girder section and install, after steel box beam Welding completes, symmetrical, synchronous tension suspension cable, complete this beam section construction;
(6) cantilever erections machine is removed rear anchor, hoist and move to cantilever erections machine tail end fixing after overhead traveling crane, cantilever erections machine is under hydraulic jack dynamic action, move forward to next sections steel box beam erection position anchoring along walking rails, complete during this time fortune beam trolley track spreading, next lifting of sections steel case beam and transport, repeat to set up operation;
(7) two sides repeat steel case beam and stayed Cable Construction as stated above, until full-bridge closure.
2. the steel reinforced concrete hybrid beam steel box girder of cable stayed bridge erection method that is applied to according to claim 1, is characterized in that: described end bay concrete girder has been constructed in advance; In across steel case beam in the segmented making of ground processing space, steel case top surface of the beam arranges interim hanger, hanger mates design with bale handle door frame hoisting hanger and cantilever erections machine suspender, for lifting and double as anchor point after cantilever erections machine.
3. the steel reinforced concrete hybrid beam steel box girder of cable stayed bridge erection method that is applied to according to claim 1, it is characterized in that: described bale handle door frame is promoted to sections steel case beam on end bay beam face fortune beam dolly, fortune beam dolly by steel case beam in beam face is transported to across cantilever erections machine inside, cantilever erections machine completes steel box beam erection.
4. the steel reinforced concrete hybrid beam steel box girder of cable stayed bridge erection method that is applied to according to claim 1, it is characterized in that: described bale handle door frame, is made up of steel pipe support, longitudinal Bailey truss, horizontal Bailey truss, rail system, walking system, erecting equipment, electrical system and suspender; Described longitudinal Bailey truss is fixed on steel pipe support top, and rail system is fixed on longitudinal Bailey truss top; Described erecting equipment is fixed on horizontal Bailey truss middle part, and laterally walking system is installed at Bailey truss two ends; Described erecting equipment, under electric driving, utilizes suspender to promote steel case beam; Described walking system, under electric driving, can come and go operation in orbit; Described suspender arranges Telescopic steel wire thick stick, thereby adjustable steel case beam center of gravity is controlled lifting attitude.
5. the steel reinforced concrete hybrid beam steel box girder of cable stayed bridge erection method that is applied to according to claim 1, is characterized in that: described cantilever erections machine, is made up of main frame, the overhead traveling crane that hoists, rotary hanger, walking rails, traveling hydraulic jack, rear anchor and adjustable supports; Described main frame forms frame construction by bottom framework, vertical rod, girder, brace, connecting rod; Described adjustable supports is positioned at four jiaos of bottom frameworks, is supported on steel case beam face when the anchoring of cantilever erections machine, when the traveling of cantilever erections machine, packs up; Described walking rails and hydraulic jack are all arranged at bottom framework bottom, provide power, cantilever erections machine integral forward lead in orbit by hydraulic jack; Described rotary hanger carries electrical system and Telescopic steel wire thick stick, and suspender is connected with steel case beam hanger coupling, thereby Telescopic steel wire thick stick regulates steel case beam, center of gravity is controlled lifting attitude, and electrical system can drive steel case beam to do 360 ° and rotate freely; The described overhead traveling crane that hoists, under electrical system effect, vertically moves before and after on girder by overhead crane orbit, and the overhead traveling crane that hoists also arranges hydraulic jack, can transverse shifting; Described rear anchor for mating design, uses bearing pin to be connected with mounting rail section hanger with steel case beam hanger, thus anchoring cantilever erections machine; Described walking rails is that sectional making, bolt connect, circulation peace is torn use open.
6. the steel reinforced concrete hybrid beam steel box girder of cable stayed bridge erection method that is applied to according to claim 1, is characterized in that: described fortune beam dolly is wheel-track type girder carrier, is made up of main spandrel girder, connecting rod, traveling wheels, electrical system, cable hank; Described main spandrel girder two ends utilize and are bolted to traveling wheels top, two main spandrel girders and two connecting rod composition rectangular frame structure, and main spandrel girder end face is consistent with steel case beam contact surface slope, after installation rubber pad, directly bears steel case beam weight; Described connecting rod two ends adopt bearing pin to be connected with main spandrel girder; Totally 4 of described traveling wheels, are arranged on beam face track; Running trolley is under electrical system drives, and traveling wheels come and go operation, the synchronous retractable cable of cable hank at beam face track; Beam face track is made up of rail and sleeper, is fixed on Liang Mianshang, and with the splicing of steel case beam, spreading is equipped with and adjusts joint.
CN201410411081.4A 2014-08-20 2014-08-20 Steel box girder erection method applied to steel and concrete hybrid girder cable-stayed bridge Pending CN104195952A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410411081.4A CN104195952A (en) 2014-08-20 2014-08-20 Steel box girder erection method applied to steel and concrete hybrid girder cable-stayed bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410411081.4A CN104195952A (en) 2014-08-20 2014-08-20 Steel box girder erection method applied to steel and concrete hybrid girder cable-stayed bridge

Publications (1)

Publication Number Publication Date
CN104195952A true CN104195952A (en) 2014-12-10

Family

ID=52081305

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410411081.4A Pending CN104195952A (en) 2014-08-20 2014-08-20 Steel box girder erection method applied to steel and concrete hybrid girder cable-stayed bridge

Country Status (1)

Country Link
CN (1) CN104195952A (en)

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104790300A (en) * 2015-05-19 2015-07-22 中铁大桥局集团有限公司 Flexible pier-side girder erecting platform and construction method thereof
CN105200923A (en) * 2015-09-08 2015-12-30 贵州省公路工程集团有限公司 Hoisting device for steel truss sections of steel truss cable-stayed bridge and hoisting method of hoisting device
CN105220621A (en) * 2015-09-08 2016-01-06 贵州省公路工程集团有限公司 A kind of vertical shift system of steel truss girder sections and vertical shift method
CN105297629A (en) * 2015-04-07 2016-02-03 蓝清 Rotating disc for turning whole bridge girder erection machine
CN105386411A (en) * 2015-12-14 2016-03-09 中交一公局第三工程有限公司 Multifunctional portal device of suspension bridge pillar top
CN105672136A (en) * 2016-02-03 2016-06-15 中铁一局集团有限公司 Erecting construction process for large-span steel-concrete combination beam
CN105951609A (en) * 2016-03-23 2016-09-21 中铁四局集团钢结构有限公司 Wide span variable girder high continuous steel truss bridge cantilever erection mid-span closure construction method
CN105970836A (en) * 2016-03-23 2016-09-28 中铁四局集团钢结构有限公司 Method for erecting large-span lower chord variable truss high continuous steel trussed beam cantilever
CN106192762A (en) * 2016-08-16 2016-12-07 山东省路桥集团有限公司 Steel box girder construction trestle fortune beam, beam body plane swivel, free cantilever erection construction method
CN107288044A (en) * 2017-06-21 2017-10-24 腾达建设集团股份有限公司 The assembled equipment of portable asymmetric bridge girder cantilever and its application process
CN108547223A (en) * 2018-03-12 2018-09-18 中交第二航务工程局有限公司 The hybrid beam bridge construction method of steel reinforced concrete overlapping
CN108842634A (en) * 2018-08-06 2018-11-20 王燏斌 A kind of Bridge Erector for cable-stayed bridge and suspension bridge
CN109137759A (en) * 2018-09-29 2019-01-04 中铁第四勘察设计院集团有限公司 A kind of prestressed concrete box girder precast segment cantilever assembling method and system
CN109371806A (en) * 2018-10-26 2019-02-22 中铁武汉勘察设计研究院有限公司 A long-span viaduct across railway stations
CN109371852A (en) * 2018-10-26 2019-02-22 中铁武汉勘察设计研究院有限公司 A kind of high-level bridge construction method across rail yard
CN109505225A (en) * 2018-11-27 2019-03-22 江苏沪宁钢机股份有限公司 A kind of safe and stable type suspension bridge and its construction technology
CN110042769A (en) * 2019-06-03 2019-07-23 四川公路桥梁建设集团有限公司 Auxiliary span full-cantilever assembling construction method for composite beam cable-stayed bridge
CN110541368A (en) * 2019-09-29 2019-12-06 中交路桥华南工程有限公司 method for mounting steel box girder of cable-stayed bridge
CN112323644A (en) * 2020-10-30 2021-02-05 中铁一局集团有限公司 Beam transporting vehicle, beam transporting system, steel box beam assembling system and steel box beam assembling method
CN112342933A (en) * 2020-12-15 2021-02-09 中交二公局第三工程有限公司 Installation device and method for large-section steel box girder under high-slope-crossing bridge
CN112411380A (en) * 2020-09-27 2021-02-26 中铁城建集团有限公司 Multi-machine combined-hoisting river-crossing erection construction method for prefabricated box girder
CN112681103A (en) * 2020-12-23 2021-04-20 蒋友富 Bottle gourd-shaped steel box girder convenient to construct and construction method thereof
CN112709152A (en) * 2020-03-27 2021-04-27 中铁十四局集团第三工程有限公司 Special plate erecting machine for bridge deck and construction process
CN113120771A (en) * 2021-05-20 2021-07-16 上海市政工程设计研究总院(集团)有限公司 Double-side synchronous hoisting equipment suitable for rear cantilever arm of composite-section beam bridge and construction method
CN114197329A (en) * 2021-12-15 2022-03-18 中交路桥华南工程有限公司 Main beam erecting method
CN114319108A (en) * 2021-11-30 2022-04-12 杭州地方铁路开发有限公司 Hydraulic lifting and hoisting method for steel-concrete combined section
CN115450138A (en) * 2022-09-29 2022-12-09 中国建筑第六工程局有限公司 Assembled box girder bidirectional sliding device suitable for height-limited area and construction method thereof
CN117286804A (en) * 2023-11-27 2023-12-26 中交一公局第六工程有限公司 Integrated equipment for paving and erecting beam and girder erecting method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2839363Y (en) * 2005-10-20 2006-11-22 中铁大桥勘测设计院有限公司 Stayed-cable bridge steel-concrete box shape combined bridge girder
CN102268856A (en) * 2011-05-31 2011-12-07 中铁大桥勘测设计院有限公司 Box-truss combined structured girder of large-span railway cable-stayed bridge and construction method of box-truss combined structured girder
KR101101204B1 (en) * 2011-06-03 2012-01-04 (주) 효성 Cantilevered part of steel box bridge slab using steel permanent support and construction method
CN202187293U (en) * 2011-07-08 2012-04-11 温州合力建设机械有限公司 Deck portal bridge girder erection machine

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2839363Y (en) * 2005-10-20 2006-11-22 中铁大桥勘测设计院有限公司 Stayed-cable bridge steel-concrete box shape combined bridge girder
CN102268856A (en) * 2011-05-31 2011-12-07 中铁大桥勘测设计院有限公司 Box-truss combined structured girder of large-span railway cable-stayed bridge and construction method of box-truss combined structured girder
KR101101204B1 (en) * 2011-06-03 2012-01-04 (주) 효성 Cantilevered part of steel box bridge slab using steel permanent support and construction method
CN202187293U (en) * 2011-07-08 2012-04-11 温州合力建设机械有限公司 Deck portal bridge girder erection machine

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
李鹏程等: "360度旋转式大型悬臂提梁机的设计及应用", 《安徽建筑》 *
王道义: "混合梁斜拉桥钢箱梁梁上运梁法架设关键技术", 《安徽建筑》 *
王道义: "混合梁斜拉桥钢箱梁梁上运梁法架设关键技术", 《安徽建筑》, no. 3, 30 June 2014 (2014-06-30) *
王鹰等: "甬江特大桥钢混结合段支架设计与施工技术", 《施工技术》 *

Cited By (37)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105297629A (en) * 2015-04-07 2016-02-03 蓝清 Rotating disc for turning whole bridge girder erection machine
CN104790300B (en) * 2015-05-19 2017-07-21 中铁大桥局集团有限公司 Set a roof beam in place by a kind of flexible pier platform and its construction method
CN104790300A (en) * 2015-05-19 2015-07-22 中铁大桥局集团有限公司 Flexible pier-side girder erecting platform and construction method thereof
CN105200923A (en) * 2015-09-08 2015-12-30 贵州省公路工程集团有限公司 Hoisting device for steel truss sections of steel truss cable-stayed bridge and hoisting method of hoisting device
CN105220621A (en) * 2015-09-08 2016-01-06 贵州省公路工程集团有限公司 A kind of vertical shift system of steel truss girder sections and vertical shift method
CN105200923B (en) * 2015-09-08 2018-07-13 贵州省公路工程集团有限公司 A kind of steel truss girder cable-stayed bridge steel truss girder segment handling apparatus and its handling method
CN105220621B (en) * 2015-09-08 2018-06-29 贵州省公路工程集团有限公司 A kind of vertical shift system of steel truss girder segment and vertical shift method
CN105386411A (en) * 2015-12-14 2016-03-09 中交一公局第三工程有限公司 Multifunctional portal device of suspension bridge pillar top
CN105386411B (en) * 2015-12-14 2017-06-30 中交一公局第三工程有限公司 Suspension cable top of bridge pier multifunction gate rack device
CN105672136A (en) * 2016-02-03 2016-06-15 中铁一局集团有限公司 Erecting construction process for large-span steel-concrete combination beam
CN105970836A (en) * 2016-03-23 2016-09-28 中铁四局集团钢结构有限公司 Method for erecting large-span lower chord variable truss high continuous steel trussed beam cantilever
CN105951609A (en) * 2016-03-23 2016-09-21 中铁四局集团钢结构有限公司 Wide span variable girder high continuous steel truss bridge cantilever erection mid-span closure construction method
CN106192762A (en) * 2016-08-16 2016-12-07 山东省路桥集团有限公司 Steel box girder construction trestle fortune beam, beam body plane swivel, free cantilever erection construction method
CN107288044A (en) * 2017-06-21 2017-10-24 腾达建设集团股份有限公司 The assembled equipment of portable asymmetric bridge girder cantilever and its application process
CN108547223A (en) * 2018-03-12 2018-09-18 中交第二航务工程局有限公司 The hybrid beam bridge construction method of steel reinforced concrete overlapping
CN108842634A (en) * 2018-08-06 2018-11-20 王燏斌 A kind of Bridge Erector for cable-stayed bridge and suspension bridge
CN109137759A (en) * 2018-09-29 2019-01-04 中铁第四勘察设计院集团有限公司 A kind of prestressed concrete box girder precast segment cantilever assembling method and system
CN109137759B (en) * 2018-09-29 2023-12-19 中铁第四勘察设计院集团有限公司 Precast cantilever assembling method and system for prestressed concrete box girder segment
CN109371852A (en) * 2018-10-26 2019-02-22 中铁武汉勘察设计研究院有限公司 A kind of high-level bridge construction method across rail yard
CN109371806A (en) * 2018-10-26 2019-02-22 中铁武汉勘察设计研究院有限公司 A long-span viaduct across railway stations
CN109505225B (en) * 2018-11-27 2020-08-11 江苏沪宁钢机股份有限公司 Safe and stable suspension bridge and construction process thereof
CN109505225A (en) * 2018-11-27 2019-03-22 江苏沪宁钢机股份有限公司 A kind of safe and stable type suspension bridge and its construction technology
CN110042769A (en) * 2019-06-03 2019-07-23 四川公路桥梁建设集团有限公司 Auxiliary span full-cantilever assembling construction method for composite beam cable-stayed bridge
CN110541368A (en) * 2019-09-29 2019-12-06 中交路桥华南工程有限公司 method for mounting steel box girder of cable-stayed bridge
CN112709152A (en) * 2020-03-27 2021-04-27 中铁十四局集团第三工程有限公司 Special plate erecting machine for bridge deck and construction process
CN112411380A (en) * 2020-09-27 2021-02-26 中铁城建集团有限公司 Multi-machine combined-hoisting river-crossing erection construction method for prefabricated box girder
CN112411380B (en) * 2020-09-27 2023-11-14 中铁城建集团有限公司 Construction method for connecting prefabricated boxes Liang Duoji to hoist and span river
CN112323644A (en) * 2020-10-30 2021-02-05 中铁一局集团有限公司 Beam transporting vehicle, beam transporting system, steel box beam assembling system and steel box beam assembling method
CN112323644B (en) * 2020-10-30 2022-04-08 中铁一局集团有限公司 Beam transporting vehicle, beam transporting system, steel box beam assembling system and steel box beam assembling method
CN112342933A (en) * 2020-12-15 2021-02-09 中交二公局第三工程有限公司 Installation device and method for large-section steel box girder under high-slope-crossing bridge
CN112681103A (en) * 2020-12-23 2021-04-20 蒋友富 Bottle gourd-shaped steel box girder convenient to construct and construction method thereof
CN113120771A (en) * 2021-05-20 2021-07-16 上海市政工程设计研究总院(集团)有限公司 Double-side synchronous hoisting equipment suitable for rear cantilever arm of composite-section beam bridge and construction method
CN114319108A (en) * 2021-11-30 2022-04-12 杭州地方铁路开发有限公司 Hydraulic lifting and hoisting method for steel-concrete combined section
CN114197329A (en) * 2021-12-15 2022-03-18 中交路桥华南工程有限公司 Main beam erecting method
CN114197329B (en) * 2021-12-15 2024-02-06 中交路桥华南工程有限公司 Main girder erection method
CN115450138A (en) * 2022-09-29 2022-12-09 中国建筑第六工程局有限公司 Assembled box girder bidirectional sliding device suitable for height-limited area and construction method thereof
CN117286804A (en) * 2023-11-27 2023-12-26 中交一公局第六工程有限公司 Integrated equipment for paving and erecting beam and girder erecting method

Similar Documents

Publication Publication Date Title
CN104195952A (en) Steel box girder erection method applied to steel and concrete hybrid girder cable-stayed bridge
CN102182147B (en) Steel box girder erection method
CN104805773B (en) The Segmental assembling bridge-erecting machine of little curved bridge of constructing
CN110130229A (en) A multi-frame juxtaposed double cantilever bridge erecting machine and beam erecting and via-hole method thereof
CN104762882B (en) Bridge subsection hanging apparatus and hanging method
CN105648916B (en) A kind of erection method of Bridge Erector and the Bridge Erector
CN106744351A (en) The method of hoisting the main girder of the cable-stayed bridge by using the cable crane
CN107747282B (en) On across both wired old bridge overall pulling down methods
CN111255469B (en) Modular disassembly construction method in closed narrow space of shield machine
CN108301331A (en) Steel box-girder installation erection crane and steel box girder cantilever assembling and construction method
CN101446066A (en) Erection method of stiffening girder of suspension bridge and device thereof
CN111794754B (en) Pipe piece assembled derrick and construction method thereof
CN201106155Y (en) Inclined guy cable auxiliary full cantaliver crane trussed steel beam device
CN205369055U (en) Rotatory lifting device of suspension bridge stiffening beam
CN101481903B (en) The method of erecting the main truss of the suspension bridge in mountainous area by reversing the cable-span crane
CN105484168B (en) Rotary hoisting equipment for stiffening beam of suspension bridge and erecting method of stiffening beam
CN102587284A (en) Independent derrick mast and beam plate mounting method
CN108625270A (en) Nose girder gantry crane installs bridge prefabrication box girder construction method
CN210366808U (en) Lifting and dismantling device for rail walking
CN113322819B (en) Method for erecting first-span T beam at tunnel outlet
CN112938773B (en) Method and system for installing underground engineering section and installation crane
CN103806374B (en) The overall track erection supplying system of assembly type steel bridge on highway and erection push technique
CN201546176U (en) Curtain board mounting trolley
CN104746432B (en) The feasible bridge guidance tape in plate-beam transports installs car
CN110510526A (en) A cable conveyor for traffic emergency support

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CHINA TIESIJU CIVIL ENGINEERING GROUP CO., LTD. CH

Effective date: 20150608

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20150608

Address after: Li River Road, Xiangcheng Economic Development Zone, Suzhou City, Jiangsu Province, No. 9 215131

Applicant after: THE SECOND CONSTRUCTION CO., LTD. OF CTCE Group

Applicant after: CHINA TIESIJU CIVIL ENGINEERING GROUP Co.,Ltd.

Applicant after: CHINA RAILWAY Corp.

Address before: Li River Road, Xiangcheng Economic Development Zone, Suzhou City, Jiangsu Province, No. 9 215131

Applicant before: THE SECOND CONSTRUCTION CO., LTD. OF CTCE Group

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20141210