CN104746432B - The feasible bridge guidance tape in plate-beam transports installs car - Google Patents
The feasible bridge guidance tape in plate-beam transports installs car Download PDFInfo
- Publication number
- CN104746432B CN104746432B CN201310754036.4A CN201310754036A CN104746432B CN 104746432 B CN104746432 B CN 104746432B CN 201310754036 A CN201310754036 A CN 201310754036A CN 104746432 B CN104746432 B CN 104746432B
- Authority
- CN
- China
- Prior art keywords
- installation
- bridge
- slab
- assembly
- truss
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明公开了一种可行于板‑梁的桥道板运输安装车,可行于板‑梁的桥道板运输安装车,包括安装组件和与安装组件配合设置并可沿已铺设桥道板和桁架上弦纵向行走的行走组件;行走组件不仅可在钢桁架梁上行走,前轮轴和后轮轴的轴向伸出段设置的横向限位组件可确保行走轮沿桁架梁纵向行驶而不发生横向偏离,横向限位组件可沿竖向翻转至横向平举,使得安装运输车可从钢桁架梁行走到桥道板上,不会形成阻碍,从而使得运输安装车可承载待铺设桥道板在桥梁桁架和铺设好的桥道板上均可自由行走到达桥道板的指定安装位,不需在桥体外侧另设桥道板架设设备,大大降低了架设成本。
The invention discloses a bridge slab transportation and installation vehicle applicable to slab-beams. The vehicle for transporting and installing bridge slabs applicable to slab-beams includes an installation component and is arranged in cooperation with the installation component and can be installed along the laid bridge slab and The walking assembly that travels longitudinally on the upper chord of the truss; the walking assembly can not only walk on the steel truss beam, but also the lateral limit assembly set on the axial extension of the front and rear axles can ensure that the walking wheel travels longitudinally along the truss beam without lateral deviation , the lateral limit assembly can be flipped vertically to horizontally lifted, so that the installation transport vehicle can walk from the steel truss beam to the bridge slab without forming obstacles, so that the transport and installation vehicle can carry the bridge slab to be laid on the bridge Both the truss and the laid bridge slab can walk freely to the designated installation position of the bridge slab, and there is no need to install additional bridge slab erection equipment outside the bridge body, which greatly reduces the erection cost.
Description
技术领域technical field
本发明涉及桥梁工程领域,特别涉及一种可行于板-梁的桥道板运输安装车。The invention relates to the field of bridge engineering, in particular to a bridge road slab transportation and installation vehicle applicable to slab-beams.
背景技术Background technique
在公路桥梁工程中,由于使用方便的特点,预制板作为桥道板得到了广泛的应用。现有技术中,桥梁预制板安装方法有自行式吊机架设法进行安装就位,即直接用吊车将预制板吊装到安装位置,此方法需要大型的起吊运输设备和施工场地,吊装时吊车起重臂工作半径和工作高度范围内,不得有输电线路和其它障碍,在受空间和平面尺寸限制的条件下不宜使用,另外,因考虑到桥梁下通常有水,可采用卷扬机配合导链架设法,在桥体两端架设临时支架,在桥体外侧纵向铺设双向轨道,桥一端卷扬机固定在桥头,另一端卷扬机分别固定在各墩台上并可移动,通过卷扬机纵向移梁,并采取手拉葫芦与钢管横向移梁,依次安装预制板,该方法操作复杂,需要耗费大量的时间和人力,并需要耗费大量的资金,且吊装过程中岗位的安全稳定性不足。并且,桥梁预制板安装时为保证桥梁整体受力平衡需要自桥梁中间向两端依次对称铺设,针对该要求,上述两方法均存在操作复杂,不便移动的问题,而且上述两方法均需要在桥体外侧架设设备,大大提高了架设成本。In highway and bridge engineering, prefabricated slabs are widely used as bridge slabs due to their ease of use. In the prior art, the installation method of bridge prefabricated panels has a self-propelled crane frame to try to install them in place, that is, directly hoist the prefabricated panels to the installation position with a crane. This method requires large-scale lifting and transportation equipment and a construction site. Within the range of the working radius and working height of the heavy arm, there must be no transmission lines and other obstacles, and it is not suitable for use under the conditions of space and plane size restrictions. In addition, because there is usually water under the bridge, a hoist can be used to cooperate with the chain guide frame. , set up temporary supports at both ends of the bridge body, and lay two-way tracks longitudinally on the outside of the bridge body. The hoist at one end of the bridge is fixed at the bridge head, and the hoist at the other end is respectively fixed and movable on each pier. The beam is moved longitudinally by the hoist and manually The hoist and steel pipe move the beam horizontally and install the prefabricated slabs sequentially. This method is complicated to operate, requires a lot of time and manpower, and requires a lot of money, and the safety and stability of the post during the hoisting process is insufficient. Moreover, in order to ensure the overall force balance of the bridge during installation, the bridge prefabricated panels need to be laid symmetrically from the middle of the bridge to both ends. In view of this requirement, the above two methods have the problems of complicated operation and inconvenient movement, and both of the above two methods need to be installed on the bridge. Erection of equipment on the outside of the body greatly increases the erection cost.
因此,针对在已建成钢桁架上铺设桥道板,需要一种在桁架梁和已铺设桥道板上均可通行的运输安装设备,具有便于移动,方便使用,结构简单的特点,可承载桥道板在桥梁桁架和铺设好的桥道板上行走,并且可方便快捷安全的对桥道板进行安装,大大减少人力、时间和资金的耗费。Therefore, for the laying of bridge slabs on the completed steel trusses, a transportation and installation equipment that can pass through both the truss girders and the laid bridge slabs is needed. It is easy to move, easy to use, and simple in structure. The road slab walks on the bridge truss and the laid bridge road slab, and can be installed conveniently, quickly and safely on the bridge road slab, greatly reducing the cost of manpower, time and money.
发明内容Contents of the invention
有鉴于此,本发明提供一种可行于板-梁的桥道板运输安装车,具有便于移动,方便使用,结构简单的特点,可承载桥道板在桥梁桁架和铺设好的桥道板上行走,并且可方便快捷安全的对桥道板进行安装,大大减少人力、时间和资金的耗费。In view of this, the present invention provides a bridge slab transportation and installation vehicle applicable to slab-beams, which is easy to move, easy to use, and simple in structure, and can carry the bridge slab on the bridge truss and the laid bridge slab Walking, and can install the bridge slab conveniently, quickly and safely, greatly reducing the cost of manpower, time and money.
本发明的可行于板-梁的桥道板运输安装车,包括安装组件和与安装组件配合设置并可沿已铺设桥道板和桁架上弦纵向行走的行走组件;The bridge slab transportation and installation vehicle applicable to slab-beams of the present invention includes an installation component and a walking component that is arranged in cooperation with the installation component and can travel longitudinally along the laid bridge slab and the upper chord of the truss;
所述安装组件包括安装架、吊梁和吊车组件,所述安装架包括横梁和立柱,所述安装架的立柱对应桥梁桁架设置至少一个,所述吊梁与所述安装架的立柱一一对应设置,每个所述吊梁与对应所述安装架的立柱呈十字形固定设置并以安装架的立柱为界两侧形成悬臂段,每侧悬臂段上均设有所述吊车组件形成沿桁架纵向前后两个方向对桥道板的运输行进和安装;The installation assembly includes an installation frame, a suspension beam and a crane assembly, the installation frame includes a beam and a column, at least one column of the installation frame corresponds to a bridge truss, and the suspension beam corresponds to the column of the installation frame one by one Setting, each of the suspension beams and the column corresponding to the installation frame are fixed in a cross shape and cantilever sections are formed on both sides with the column of the installation frame as the boundary, and the cantilever section on each side is provided with the crane assembly to form The transportation and installation of the bridge slab in the longitudinal and frontal directions;
所述行走组件包括前轮轴、后轮轴和纵梁,所述前轮轴和所述后轮轴的轴向两端均设置有行走轮,所述前轮轴和所述后轮轴的轴向两端均伸出对应行走轮形成轴向伸出段,纵梁与安装架的立柱一一对应设置,纵梁两端对应与前轮轴和后轮轴固定连接,纵梁以可在桥道板安装时相对于安装架沿纵向移动的方式对应与所述安装架的立柱底端配合设置;The walking assembly includes a front wheel shaft, a rear wheel shaft and a longitudinal beam, and both axial ends of the front wheel shaft and the rear wheel shaft are provided with walking wheels, and the axial ends of the front wheel shaft and the rear wheel shaft extend The corresponding walking wheels form an axial extension section, and the longitudinal beams are arranged in one-to-one correspondence with the columns of the mounting frame. The two ends of the longitudinal beams are fixedly connected with the front wheel shaft and the rear wheel shaft. The way the frame moves longitudinally corresponds to the bottom end of the column of the mounting frame;
所述行走组件还包括用于防止行走轮发生横向偏离的横向限位组件,所述横向限位组件以可在竖向平面内翻转至水平向平举的方式设置于所述轴向伸出段端部。The walking assembly also includes a lateral limit assembly for preventing the lateral deviation of the travel wheels, and the lateral limit assembly is arranged at the end of the axial extension section in a manner that can be turned over in the vertical plane to be lifted horizontally department.
进一步,所述安装架的立柱底端设置有连接套,所述连接套下方安装有可将安装架顶起的顶升装置,所述纵梁内套于连接套内并可在安装架顶起时沿纵向向桥道板安装相反一侧缩进形成让位。Further, the bottom end of the column of the installation frame is provided with a connecting sleeve, and a jacking device that can lift the mounting frame is installed under the connecting sleeve, and the longitudinal beam is sleeved in the connecting sleeve and can be lifted on the mounting frame. Indent to the opposite side of the bridge board installation along the longitudinal direction to form a way.
进一步,所述横向限位组件包括与前轮轴和后轮轴的轴向伸出段端部铰接的竖杆和沿竖向安装于竖杆并沿桁架上弦外侧壁行走的导向轮,所述轴向伸出段与所述竖杆铰接处设有可将竖杆平举的液压装置。Further, the lateral limit assembly includes a vertical rod hinged to the ends of the axially extending sections of the front wheel shaft and the rear wheel shaft, and a guide wheel vertically installed on the vertical rod and walking along the outer wall of the upper chord of the truss. A hydraulic device that can lift the vertical rod horizontally is provided at the hinge joint between the extension section and the vertical rod.
进一步,所述安装组件还包括斜拉杆,所述斜拉杆对应连接安装架的立柱顶端和吊梁的两侧悬臂段的端部,所述斜拉杆对应与所述安装架的立柱和所述吊梁形成三角悬臂结构。Further, the installation assembly also includes a diagonal stay rod, which is correspondingly connected to the top of the column of the installation frame and the ends of the cantilever sections on both sides of the suspension beam, and the diagonal stay rod is corresponding to the column of the installation frame and the end of the suspension beam. The beams form a triangular cantilever structure.
进一步,所述吊车组件包括沿吊梁纵向行走的移动小车、承力缆索和与承力缆索连接并对桥道板形成悬吊安装的升降装置。Further, the crane assembly includes a mobile trolley traveling longitudinally along the suspension beam, a load-bearing cable, and a lifting device connected with the load-bearing cable to form a suspension installation for the bridge deck.
进一步,还包括辅助平衡组件,所述辅助平衡组件包括辅助拉索和用于与桁架连接的扣件,所述辅助拉索一端通过扣件与桥道板安装侧相对安装架另一侧的桁架上弦节点连接,另一端与安装架的顶部横梁连接。Further, it also includes an auxiliary balance assembly, the auxiliary balance assembly includes an auxiliary cable and a fastener for connecting with the truss, one end of the auxiliary cable is connected to the truss on the other side of the mounting frame opposite to the installation side of the bridge slab through the fastener The upper chord node is connected, and the other end is connected with the top beam of the mounting frame.
进一步,所述安装架为龙门架结构,安装架的立柱为横向并列设置的两个及以上。Further, the installation frame is a gantry structure, and two or more columns of the installation frame are arranged side by side in a horizontal direction.
进一步,还包括一设置于桥梁桁架上并用于使行走轮在桁架和桥道板之间过渡行走双向转化的变坡引道部件。Further, it also includes a slope-changing approach component which is arranged on the bridge truss and is used for making the traveling wheels transition between the truss and the bridge slab and transform into two directions.
进一步,所述纵梁上沿横向设置有用于承载待安装桥道板的横垫梁。Further, the longitudinal girders are provided with horizontal pad beams for carrying the aisle slab to be installed along the transverse direction.
本发明的有益效果:本发明的可行于板-梁的桥道板运输安装车,行走轮不仅可在钢桁架梁上行走,前轮轴和后轮轴的轴向伸出段设置的横向限位组件可确保行走轮沿桁架梁纵向行驶而不发生横向偏离,横向限位组件可沿竖向翻转至横向平举,使得安装运输车可从钢桁架梁行走到桥道板上,不会形成阻碍,从而使得运输安装车可承载待铺设桥道板在桥梁桁架和铺设好的桥道板两种截然不同道上均可行走到达待安装桥道板的指定安装位,不需在桥体外侧另设桥道板运输架设设备,大大降低了运输架设成本;且吊梁与安装架以安装架的立柱为界两侧均形成悬臂段,悬臂结构具有承重力好,结构性能稳定的优点,不仅具有较好的工作稳定性,可方便对桥道板的悬吊安装,而且两侧悬臂结构使得运输安装车可沿桥梁纵向前后两个方向运输行进和安装预制桥道板,无需运输安装车在桁架上转向,还可为桥道板安装提供合理的纵向位移量,使结构简单合理的满足桥道板安装位的要求;Beneficial effects of the present invention: the present invention is applicable to the transport and installation vehicle of the slab-beam bridge road, the traveling wheels can not only walk on the steel truss beam, but also the lateral limit assembly is set on the axial extension of the front wheel shaft and the rear wheel shaft It can ensure that the traveling wheels travel along the longitudinal direction of the truss girder without lateral deviation, and the lateral limit assembly can be flipped vertically to horizontal horizontally, so that the installation transport vehicle can walk from the steel truss girder to the bridge deck without any obstruction. As a result, the transport and installation vehicle can carry the bridge slab to be laid on two completely different roads, the bridge truss and the laid bridge slab, and can walk to the designated installation position of the bridge slab to be installed, without the need for another bridge on the outside of the bridge body The transportation and erection equipment of the road slab greatly reduces the cost of transportation and erection; and the hanging beam and the installation frame are bounded by the column of the installation frame on both sides to form a cantilever section. The cantilever structure has the advantages of good bearing capacity and stable structural performance. The stability of the work can facilitate the suspension installation of the bridge slab, and the cantilever structure on both sides enables the transport and installation vehicle to transport and install the prefabricated bridge slab along the longitudinal direction of the bridge, front and rear, without the need for the transport and installation vehicle to turn on the truss , it can also provide a reasonable longitudinal displacement for the installation of the bridge slab, so that the structure is simple and reasonable to meet the requirements of the installation position of the bridge slab;
另外,桥道板先期放在纵梁形成的搭载面上运送到安装位置,安装架在自身重力的作用下通过连接套紧紧压靠在纵梁上实现稳定行走,在桥道板安装时,吊车组件将桥道板吊起,此时顶升装置可将安装架整体顶起使纵梁处于卸载状态,于是纵梁可沿纵向在连接套内移动,从而实现对桥道板安装的让位,可明显减小桥道板运输安装需要的安装架悬臂段长度,大大提高桥道板的安装安全性,使整体结构更加紧凑;总之,本发明专利可方便快捷安全的对桥道板进行运输安装,大大减少人力、时间和资金的耗费。In addition, the bridge slab is placed on the mounting surface formed by the longitudinal beams and transported to the installation position in advance, and the installation frame is tightly pressed against the longitudinal beams through the connecting sleeve under the action of its own gravity to achieve stable walking. When the bridge slab is installed, The crane assembly lifts the bridge slab. At this time, the jacking device can lift the installation frame as a whole to make the longitudinal beam in the unloaded state, so the longitudinal beam can move in the connecting sleeve along the longitudinal direction, so as to realize the installation of the bridge slab. Significantly reduce the length of the cantilever section of the mounting frame required for the transportation and installation of the bridge slab, greatly improve the installation safety of the bridge slab, and make the overall structure more compact; Greatly reduce the consumption of manpower, time and money.
附图说明Description of drawings
下面结合附图和实施例对本发明作进一步描述。The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
图1为本发明的运输安装车行走于钢桁架梁上时状态结构示意图;Fig. 1 is a schematic diagram of the state structure when the transport and installation vehicle of the present invention walks on the steel truss beam;
图2为图1右视剖面示意图;Fig. 2 is a schematic diagram of a right side sectional view of Fig. 1;
图3为运输安装车行走于已铺设的桥道板时的状态结构示意图;Fig. 3 is a schematic diagram of the state structure when the transport and installation vehicle walks on the laid bridge slab;
图4为图3右视剖面示意图;Fig. 4 is a schematic diagram of a right side sectional view of Fig. 3;
图5为本发明的运输安装车在桥道板安装时状态结构示意图;Fig. 5 is a schematic diagram of the state structure of the transport and installation vehicle of the present invention when the bridge deck is installed;
图6为图5右视剖面示意图。FIG. 6 is a schematic cross-sectional view of the right side of FIG. 5 .
具体实施方式detailed description
图1为本发明的运输安装车行走于钢桁架梁上时状态结构示意图,图2为图1右视剖面示意图,图3为运输安装车行走于已铺设的桥道板时的状态结构示意图,图4为图3右视剖面示意图,图5为本发明的运输安装车在桥道板安装时状态结构示意图,图6为图5右视剖面示意图:本实施例的可行于板-梁的桥道板运输安装车,包括安装组件和与安装组件配合设置并可沿已铺设桥道板1和桁架2上弦纵向行走的行走组件;Fig. 1 is a schematic diagram of the state structure when the transportation and installation vehicle of the present invention walks on the steel truss girder, Fig. 2 is a schematic diagram of the right side view of Fig. 1, and Fig. 3 is a schematic diagram of the state structure when the transportation and installation vehicle walks on the laid bridge slab, Fig. 4 is a schematic diagram of the right section of Fig. 3, Fig. 5 is a schematic diagram of the state structure of the transport and installation vehicle of the present invention when the bridge slab is installed, and Fig. 6 is a schematic diagram of the right section of Fig. 5: the bridge that is applicable to the slab-beam of the present embodiment Road slab transportation and installation vehicle, including installation components and a walking component that is cooperating with the installation components and can travel longitudinally along the upper chord of the laid bridge slab 1 and truss 2;
所述安装组件包括安装架3、吊梁(图中为吊梁一4和吊梁二4a)和吊车组件,所述安装架包括横梁3c和立柱(图中为立柱一3a和立柱二3b),所述安装架3的立柱对应桥梁桁架2设置至少一个,所述吊梁与所述安装架的立柱一一对应设置,即根据实际情况,桥梁有几组钢桁架,立柱就可设置与钢桁架数目相一致的个数,立柱同样对应设置与钢桁架相一致的数目,每个所述吊梁(图中为吊梁一4和吊梁二4a)对应与所述安装架的立柱(图中为立柱一3a和立柱二3b)呈十字形固定设置并以安装架的立柱为界两侧形成悬臂段,每侧悬臂段上均设有所述吊车组件形成沿桁架纵向前后两个方向对桥道板的运输行进和安装;The installation assembly includes a mounting frame 3, a suspension beam (a suspension beam 4 and a suspension beam 2 4a in the figure) and a crane assembly, and the installation frame includes a crossbeam 3c and a column (a column 3a and a column 2 3b in the figure) , the column of the mounting frame 3 is provided with at least one bridge truss 2 correspondingly, and the hanging beam is set in one-to-one correspondence with the column of the mounting frame, that is, according to the actual situation, the bridge has several groups of steel trusses, and the column can be arranged to match the steel truss. The number consistent with the number of trusses, the corresponding number of columns corresponding to the steel trusses, each of the suspension beams (the suspension beam one 4 and the suspension beam two 4a in the figure) corresponds to the column of the mounting frame (figure The middle column 1 3a and column 2 3b) are fixed in the shape of a cross and cantilever sections are formed on both sides with the column of the installation frame as the boundary. The crane components are arranged on each side of the cantilever section to form opposite directions along the longitudinal direction of the truss. Transportation and installation of bridge slabs;
所述行走组件包括前轮轴5、后轮轴6和纵梁(图中为纵梁一7和纵梁二7a),所述前轮轴5和所述后轮轴6的轴向两端均设置有行走轮(图中为行走轮一8、行走轮二8a和行走轮三8b),所述前轮轴和所述后轮轴的轴向两端均伸出对应行走轮形成轴向伸出段9,纵梁(图中为纵梁一7和纵梁二7a)与安装架的立柱一一对应设置,纵梁(图中为纵梁一7和纵梁二7a)两端对应与前轮轴5和后轮轴6固定连接,两纵梁以可在桥道板安装时相对于安装架沿纵向移动的方式对应与所述安装架的立柱底端配合设置;行走轮对应前轮轴和后轮轴轴向两端各设置一个;The walking assembly includes a front wheel shaft 5, a rear wheel shaft 6 and a longitudinal beam (longitudinal beam one 7 and longitudinal beam two 7a among the figures), and the axial ends of the front wheel shaft 5 and the rear wheel shaft 6 are provided with walking Wheels (travel wheel one 8, road wheel two 8a and road wheel three 8b among the figure), the axial ends of the front wheel shaft and the rear wheel shaft all stretch out the corresponding road wheels to form an axial extension section 9, The beams (longitudinal beam 1 7 and longitudinal beam 2 7a in the figure) are set in one-to-one correspondence with the columns of the mounting bracket, and the two ends of the longitudinal beam (longitudinal beam 1 7 and longitudinal beam 2 7a in the figure) correspond to the front axle 5 and the rear axle The wheel shaft 6 is fixedly connected, and the two longitudinal beams are arranged in such a way that they can move longitudinally relative to the mounting frame when the bridge deck is installed, and are set in cooperation with the bottom of the column of the mounting frame; the walking wheels correspond to the axial ends of the front wheel shaft and the rear wheel shaft set one each;
所述行走组件还包括用于防止行走轮发生横向偏离的横向限位组件,所述横向限位组件以可在竖向平面内翻转至横向水平向平举的方式设置于所述轴向伸出段端部;The walking assembly also includes a lateral limiting assembly for preventing the lateral deviation of the traveling wheels, and the lateral limiting assembly is arranged on the axial extension section in a manner that can be turned over in the vertical plane to be lifted horizontally and horizontally Ends;
如图1和图2所示,安装组件的吊梁内套固定于对应的安装架立柱形成十字形结构,并且以安装架立柱为界,吊梁的纵向两侧均与对应的安装架的立柱形成悬臂结构。As shown in Figure 1 and Figure 2, the inner sleeve of the hanging beam of the installation component is fixed to the corresponding mounting frame column to form a cross-shaped structure, and with the mounting frame column as the boundary, the longitudinal sides of the hanging beam are connected to the corresponding mounting frame column form a cantilever structure.
本实施例中,所述安装架的立柱底端设置有连接套(图中为连接套一10和连接套二10a),所述连接套下方安装有可将安装架顶起的顶升装置11,所述纵梁内套于连接套内并可在安装架顶起时沿纵向向桥道板安装相反一侧缩进形成让位;如图3所示,桥道板先期放在两纵梁形成的搭载面上运送到安装位置,安装架在自身重力的作用下通过连接套紧紧压靠在纵梁上实现稳定行走,如图1和图2所示,在桥道板安装时,吊车组件将桥道板吊起,此时顶升装置可将安装架整体顶起,纵梁沿纵向在连接套内移动,从而实现对桥道板安装的限位,可缩小桥道板沿吊梁的纵向位移量,减小因桥道板纵向位移过大造成整体装置的受力不稳,大大提高桥道板的安装安全性,并且使整体结构在纵向方向更加紧凑,提高稳定性;另外,本实施例中顶升装置为液压或机械式千斤顶,或者为液压气缸,只要能实现将安装架顶起的作用均可。In this embodiment, the bottom end of the column of the installation frame is provided with a connecting sleeve (connection sleeve one 10 and connection sleeve two 10a in the figure), and a jacking device 11 that can jack up the installation frame is installed below the connection sleeve. , the longitudinal girder is set inside the connecting sleeve and can be retracted longitudinally to the opposite side of the bridge slab when the mounting frame is jacked up to form a space; as shown in Figure 3, the bridge slab is placed on the two longitudinal beams in advance The formed loading surface is transported to the installation position. Under the action of its own gravity, the installation frame is tightly pressed against the longitudinal beam through the connecting sleeve to realize stable walking. As shown in Figure 1 and Figure 2, when the bridge deck is installed, the crane The component lifts the bridge slab. At this time, the jacking device can lift the installation frame as a whole, and the longitudinal beam moves in the connecting sleeve along the longitudinal direction, so as to realize the installation limit of the bridge slab and reduce the size of the bridge slab along the hanging beam. The longitudinal displacement of the bridge can reduce the stress instability of the overall device caused by the excessive longitudinal displacement of the bridge deck, greatly improve the installation safety of the bridge deck, and make the overall structure more compact in the longitudinal direction and improve stability; in addition, In this embodiment, the jacking device is a hydraulic or mechanical jack, or a hydraulic cylinder, as long as it can realize the function of jacking up the installation frame.
如图2所示,本实施例中,所述横向限位组件包括与前轮轴5和后轮轴6的轴向伸出段9端部铰接的竖杆12和沿竖向安装于竖杆并沿桁架上弦外侧壁行走的导向轮13,所述轴向伸出段与所述竖杆铰接处设有可将竖杆平举的液压装置14;结构简单,易于实现,如图1和图2所示,其中,对应行走轮各设置一个横向限位组件,当行走轮在钢桁架梁顶面行驶时,前轮轴和后轮轴的轴向伸出段端部铰接连接有竖杆,竖杆下端设水平的导向轮,以确保行走轮沿钢桁架梁纵向行驶而不发生横向偏离,当在已安装完成的桥道板上行驶时,行走轮在桥面板上行驶,前轮轴和后轮轴的轴向伸出段端部铰接的竖杆及竖杆上设置的导向轮通过液压装置平举脱离桥道板不起作用,从而确保从钢桁架梁到桥道板1上的行驶,其中,液压装置可为液压油缸,如图3和图4所示,当要在铺设好的桥道板上行走时,液压油缸将竖杆沿铰接点在竖向平面上翻转平举使其横向,另外,行走轮可以通过人力驱动,也可设置自动驱动系统进行行走,自动驱动系统可采用现有的电动四轮车控制模式进行设置,属于现有技术,在此不再赘述。As shown in Figure 2, in the present embodiment, the transverse limit assembly includes a vertical bar 12 hinged to the ends of the axial extension section 9 of the front wheel shaft 5 and the rear wheel shaft 6 and vertically installed on the vertical bar and along the The guide wheel 13 that walks on the outer wall of the upper chord of the truss, and the hydraulic device 14 that can lift the vertical rod horizontally is provided at the hinge joint between the axially extending section and the vertical rod; the structure is simple and easy to implement, as shown in Figures 1 and 2 As shown, a transverse limit assembly is provided for each of the corresponding road wheels. When the road wheels travel on the top surface of the steel truss beam, the ends of the axially extending sections of the front wheel shaft and the rear wheel shaft are hingedly connected with vertical rods, and the lower ends of the vertical rods are set Horizontal guide wheels to ensure that the traveling wheels travel longitudinally along the steel truss girder without lateral deviation. When traveling on the installed bridge deck, the traveling wheels travel on the bridge deck. The axial direction of the front and rear axles The vertical bar hinged at the end of the extension section and the guide wheel set on the vertical bar are lifted horizontally away from the bridge slab through the hydraulic device and do not work, so as to ensure the driving from the steel truss beam to the bridge slab 1. Among them, the hydraulic device can It is a hydraulic cylinder, as shown in Figure 3 and Figure 4. When walking on the paved bridge, the hydraulic cylinder will turn the vertical bar along the hinge point on the vertical plane to make it horizontal. In addition, the walking wheel It can be driven by manpower, and an automatic drive system can also be set for walking. The automatic drive system can be set by using the existing electric four-wheel vehicle control mode, which belongs to the prior art and will not be repeated here.
本实施例中,所述安装组件还包括斜拉杆15,所述斜拉杆15对应连接安装架的立柱顶端和吊梁的两侧悬臂段的端部,所述斜拉杆对应与所述安装架的立柱和吊梁形成三角悬臂结构;斜拉杆对应每个吊梁的两侧悬臂段各设置一个,以增加悬臂段的稳定性和支撑悬吊强度。In this embodiment, the installation assembly also includes a diagonal stay rod 15, the diagonal stay rod 15 is correspondingly connected to the top of the column of the installation frame and the ends of the cantilever sections on both sides of the suspension beam, and the diagonal stay rod corresponds to the end of the cantilever section on both sides of the installation frame. The upright column and the suspension beam form a triangular cantilever structure; one diagonal tie rod is provided corresponding to each cantilever section on both sides of the suspension beam, so as to increase the stability of the cantilever section and support the suspension strength.
本实施例中,所述吊车组件包括沿吊梁纵向行走的移动小车18、承力缆索19和与承力缆索19连接并对桥道板形成悬吊安装的升降装置20;移动小车包括轮系、轮轴和沿吊梁纵向设置的轮杆,为现有技术结构,在此不再赘述,升降装置为液压缸或电动马达驱动承力缆索上下运动可将桥道板提升和放下,实际应用中,可设置往返驱动装置对移动小车的往返运动进行驱动,移动小车横担设置在吊梁上,通过手动或电动驱动,均能实现发明目的,在此不再赘述。In this embodiment, the crane assembly includes a mobile trolley 18 that travels longitudinally along the suspension beam, a load-bearing cable 19, and a lifting device 20 that is connected to the load-bearing cable 19 and forms a suspension installation for the bridge deck; the mobile trolley includes a wheel train , the wheel shaft and the wheel bar arranged longitudinally along the suspension beam are existing technology structures, and will not be repeated here. The lifting device is a hydraulic cylinder or an electric motor to drive the load-bearing cable to move up and down to lift and lower the bridge deck. In practical applications , the reciprocating drive device can be set to drive the reciprocating motion of the mobile trolley, the cross arm of the mobile trolley is arranged on the suspension beam, and the purpose of the invention can be achieved through manual or electric drive, so it will not be repeated here.
本实施例中,还包括辅助平衡组件,所述辅助平衡组件包括辅助拉索16和用于与桁架连接的扣件17,所述辅助拉索16一端通过扣件17与桥道板安装侧相对安装架另一侧的桁架上弦节点连接,另一端与安装架的顶部横梁3c连接;如图5和图6所示,相对安装架另一侧是指以安装架的立柱为界,与桥道板安装位置相对应的另一侧,对安装架安装桥道板侧的三角悬臂结构起吊桥道板形成可靠的抗倾覆平衡结构体系,辅助平衡组件对应安装架立柱也设置两组,运输安装车在将桥道板运载到指定安装位后,扣件只在对桥道板悬吊时才与桁架固定连接,通过辅助拉索施加斜向拉力,防止因桥道板纵向位移造成安装架倾斜,大大提高了作业安全性。In this embodiment, an auxiliary balance assembly is also included, the auxiliary balance assembly includes an auxiliary cable 16 and a fastener 17 for connecting with the truss, and one end of the auxiliary cable 16 is opposite to the installation side of the bridge deck through the fastener 17 The upper chord node of the truss on the other side of the mounting frame is connected, and the other end is connected to the top beam 3c of the mounting frame; as shown in Figure 5 and Figure 6, the other side of the mounting frame is bounded by the column of the mounting On the other side corresponding to the installation position of the slab, the triangular cantilever structure on the side where the slab is installed on the mounting frame is used to lift the slab to form a reliable anti-overturning balance structure system. The auxiliary balance components are also provided with two sets of columns corresponding to the mounting frame, and the transportation and installation vehicle After the bridge slab is carried to the designated installation position, the fasteners are only fixedly connected to the truss when the bridge slab is suspended, and the oblique tension is applied through the auxiliary cable to prevent the installation frame from tilting due to the longitudinal displacement of the bridge slab. Greatly improved job safety.
本实施例中,所述安装架为龙门架结构,安装架的立柱为横向并列设置的两个及以上,图中为立柱一3a和立柱二3b;龙门架结构结构稳固,易于安装。In this embodiment, the mounting frame is a gantry structure, and two or more uprights of the mounting frame are horizontally arranged side by side. In the figure, the first upright 3a and the second upright 3b are shown; the gantry structure is stable and easy to install.
本实施例中,还包括一设置于桥梁桁架上并用于使行走轮在桁架和桥道板之间过渡行走双向转化的变坡引道部件;在钢桁架梁上安装变坡引道部件23形成从钢桁架梁到桥道板的过渡,本实施例中,变坡引道部件为三角形钢板,保证行走轮在钢桁架和桥道板之间的自由行走。In this embodiment, it also includes a slope-changing approach part that is arranged on the bridge truss and is used to make the traveling wheels transition and walk between the truss and the bridge slab. The slope-changing approach part 23 is formed on the steel truss For the transition from the steel truss girder to the bridge slab, in this embodiment, the slope-changing approach parts are triangular steel plates to ensure the free movement of the traveling wheels between the steel truss and the bridge slab.
本实施例中,所述纵梁上沿横向设置有用于承载待安装桥道板22的横垫梁21;横垫梁为纵向并列设置的两个,沿横向横担设置在纵梁上,提高桥道板运载的稳定性。In this embodiment, the longitudinal girder is provided with a horizontal pad beam 21 for carrying the bridge slab 22 to be installed along the horizontal direction; Board loading stability.
最后说明的是,以上实施例仅用以说明本发明的技术方案而非限制,尽管参照较佳实施例对本发明进行了详细说明,本领域的普通技术人员应当理解,可以对本发明的技术方案进行修改或者等同替换,而不脱离本发明技术方案的宗旨和范围,其均应涵盖在本发明的权利要求范围当中。Finally, it is noted that the above embodiments are only used to illustrate the technical solutions of the present invention without limitation. Although the present invention has been described in detail with reference to the preferred embodiments, those of ordinary skill in the art should understand that the technical solutions of the present invention can be carried out Modifications or equivalent replacements without departing from the spirit and scope of the technical solution of the present invention shall be covered by the claims of the present invention.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310754036.4A CN104746432B (en) | 2013-12-31 | 2013-12-31 | The feasible bridge guidance tape in plate-beam transports installs car |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310754036.4A CN104746432B (en) | 2013-12-31 | 2013-12-31 | The feasible bridge guidance tape in plate-beam transports installs car |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN104746432A CN104746432A (en) | 2015-07-01 |
| CN104746432B true CN104746432B (en) | 2016-08-31 |
Family
ID=53586635
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201310754036.4A Expired - Fee Related CN104746432B (en) | 2013-12-31 | 2013-12-31 | The feasible bridge guidance tape in plate-beam transports installs car |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104746432B (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107988909B (en) * | 2017-07-28 | 2019-12-10 | 中铁二十四局集团有限公司 | Railway is just roof beam rapid transit erects and uses trailer |
| CN109137759B (en) * | 2018-09-29 | 2023-12-19 | 中铁第四勘察设计院集团有限公司 | Precast cantilever assembling method and system for prestressed concrete box girder segment |
| CN110158485A (en) * | 2019-07-03 | 2019-08-23 | 桂林电子科技大学 | A kind of easy prefabricated bridge lifting trolley and its application method |
| CN112081012B (en) * | 2020-09-04 | 2022-02-22 | 中交第四航务工程局有限公司 | Jacking and transporting method for large prestressed concrete precast box girder |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN1270258A (en) * | 2000-05-02 | 2000-10-18 | 山东省筑港总公司 | Horizontally redirectional transportation method for bridge |
| JP3340681B2 (en) * | 1998-10-02 | 2002-11-05 | 株式会社ピー・エス | Construction method of overhanging girder bridge using corrugated steel web |
| JP2004225275A (en) * | 2003-01-20 | 2004-08-12 | Taisei Corp | Corrugated steel web box girder bridge erection device and corrugated steel web box girder bridge construction method |
| CN201250385Y (en) * | 2008-09-10 | 2009-06-03 | 中铁八局集团第一工程有限公司 | Rear support long cantilevered traveling carriage system for cable-stayed bridge cantilever casting |
| CN102174795A (en) * | 2011-03-28 | 2011-09-07 | 中铁一局集团有限公司 | Reversible suspended basket wheel type travelling system and method |
-
2013
- 2013-12-31 CN CN201310754036.4A patent/CN104746432B/en not_active Expired - Fee Related
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3340681B2 (en) * | 1998-10-02 | 2002-11-05 | 株式会社ピー・エス | Construction method of overhanging girder bridge using corrugated steel web |
| CN1270258A (en) * | 2000-05-02 | 2000-10-18 | 山东省筑港总公司 | Horizontally redirectional transportation method for bridge |
| JP2004225275A (en) * | 2003-01-20 | 2004-08-12 | Taisei Corp | Corrugated steel web box girder bridge erection device and corrugated steel web box girder bridge construction method |
| CN201250385Y (en) * | 2008-09-10 | 2009-06-03 | 中铁八局集团第一工程有限公司 | Rear support long cantilevered traveling carriage system for cable-stayed bridge cantilever casting |
| CN102174795A (en) * | 2011-03-28 | 2011-09-07 | 中铁一局集团有限公司 | Reversible suspended basket wheel type travelling system and method |
Also Published As
| Publication number | Publication date |
|---|---|
| CN104746432A (en) | 2015-07-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110130229B (en) | A multi-span parallel double cantilever bridge erecting machine and its beam erection and span crossing method | |
| CN102797222B (en) | Hanging bracket hinge joint type bridge maintenance vehicle capable of avoiding bridge-side obstacles | |
| CN104805773B (en) | The Segmental assembling bridge-erecting machine of little curved bridge of constructing | |
| CN203529768U (en) | Portal crane walking for operation on building surface | |
| CN109024291A (en) | A kind of integration Bridge Erector and its working method | |
| CN101736703B (en) | 3000t special bridge girder erection machine for integrally erecting 120m-span double-layer four-line steel beam bridge for highway and railway | |
| CN102182147A (en) | Steel box girder erection method | |
| CN106917360A (en) | Lift leg formula frame plate machine and its frame plate method | |
| CN100497833C (en) | High-altitude framework type simple plate supporting machine | |
| CN101967798B (en) | Highway double-guide-beam bridge erecting machine and turning method | |
| CN1609342A (en) | Down beam type bridge-erecting machine and bridge erecting method thereof | |
| CN114808747A (en) | Multifunctional bridge girder erection machine and bridge girder erection construction method | |
| CN211973152U (en) | Large-tonnage box girder erection construction system capable of realizing height control | |
| CN114277688A (en) | Bridge erecting machine | |
| CN110205948A (en) | A kind of expanded letter Bridge Erector and its erection method | |
| CN102225580A (en) | Method of Longitudinal Movement of Box Girder Internal Formwork | |
| CN104746432A (en) | Carriageway slab transportation and installation vehicle capable of traveling on slab and beam | |
| CN102635066B (en) | Hanger articulated bridge inspection vehicle | |
| CN205205685U (en) | Span wire pier is function portal device at most | |
| CN110565531A (en) | Construction channel structure and installation method | |
| CN206972254U (en) | A kind of heavy grade inclined shaft lining trolley | |
| CN102587678B (en) | Device for slipping node of steel structure | |
| CN115465791A (en) | Bridge deck separation belt cover plate mounting trolley and mounting method | |
| CN203334186U (en) | A wheel type device for cable-stayed bridge floor press anchoring | |
| CN216377240U (en) | Truss car for railway bridge deck system in steel truss girder |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160831 |
|