CN107662100A - A kind of mobile phone assembly production chain - Google Patents

A kind of mobile phone assembly production chain Download PDF

Info

Publication number
CN107662100A
CN107662100A CN201711094977.4A CN201711094977A CN107662100A CN 107662100 A CN107662100 A CN 107662100A CN 201711094977 A CN201711094977 A CN 201711094977A CN 107662100 A CN107662100 A CN 107662100A
Authority
CN
China
Prior art keywords
lifting body
mobile phone
fixed
carrier
conveyer belt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711094977.4A
Other languages
Chinese (zh)
Inventor
何立强
肖晚辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Ce Way Technology Co Ltd
Original Assignee
Shenzhen Ce Way Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Ce Way Technology Co Ltd filed Critical Shenzhen Ce Way Technology Co Ltd
Priority to CN201711094977.4A priority Critical patent/CN107662100A/en
Publication of CN107662100A publication Critical patent/CN107662100A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P21/00Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control
    • B23P21/002Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control the units stationary whilst being composed
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
    • B23P19/001Article feeders for assembling machines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
    • B23P19/008Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes the parts being continuously transported through the machine during assembling or disassembling

Abstract

The present invention discloses a kind of mobile phone assembly production chain, for transmitting carrier and allowing the robot to carry out the assembling action of mobile phone directly on streamline, it is characterised in that:Including transfer tape assemble, lifting body and cache mechanism;The lifting body, which can jack up the carrier on the conveyer belt of transfer tape assemble, to be made carrier leave conveyer belt and is maintained on lifting body, and then the robot is directly carried out the assembling of mobile phone in the lifting body and acted;The cache mechanism is arranged on before lifting body and/or below, the one or more carrier for entering lifting body to waiting caches, and it can provide the operating platform of online mobile phone assembling for robot.

Description

A kind of mobile phone assembly production chain
Technical field
The present invention relates to mobile phone automatic assembling field, more particularly to a kind of mobile phone assembly production chain.
Background technology
In traditional mobile phone assembling process, more by the way of assembling offline, i.e., by workpiece/put in corresponding assembly process Have and assembled again on the special assembly equipment outside the carrier transfer to streamline of workpiece.Its shortcoming has:Need for each dress With process, special assembly station is set outside streamline, makes special assembly equipment or whole production line takes up space ratio It is larger;Because each assembly process is related to workpiece/carrier transfer more, the efficiency of assembling is reduced, and workpiece/carrier is back and forth Transfer, the position identification and positioning repeated is resulted in the need for, hinders the realization of full-automatic assembling.
The content of the invention
It is an object of the invention to overcome the deficiencies of the prior art and provide a kind of mobile phone assembly production chain, and it can be machine Device people provides the operating platform assembled online.
The present invention provides a kind of mobile phone assembly production chain, for transmitting carrier and allowing the robot to directly in streamline The upper assembling action for carrying out mobile phone, it is characterised in that:Including transfer tape assemble, lifting body and cache mechanism;The jack Structure, which can jack up the carrier on the conveyer belt of transfer tape assemble, to be made carrier leave conveyer belt and is maintained on lifting body, and then is made The robot directly can carry out the assembling action of mobile phone in the lifting body;The cache mechanism is arranged on lifting body Before and/or below, for being cached to waiting into the one or more carrier of lifting body.
In to the above-mentioned further improvement project of mobile phone assembly production chain, it is gentle that the lifting body includes jacking frame Cylinder, the jacking frame have bottom plate and set two blocks of vertical side plates parallel to each other on bottom plate, two blocks of vertical side plates it is upper Section inner side is respectively symmetrically provided with horizontal supporting plate;The vertical side plate and supporting plate are respectively positioned on the conveyer belt of transfer tape assemble Outside;The bottom plate of the jacking frame tightens together with the top land of cylinder;The cylinder can drive vertical side plate and branch Fagging is moved vertically upward, and then the carrier reached on conveyer belt is jacked up and kept on the supporting plate by supporting plate.
In to the above-mentioned further improvement project of mobile phone assembly production chain, in addition to framework, the transfer tape assemble are consolidated It is scheduled on framework;The lifting body also includes fixed mount, guide rod and linear bearing;The upper end of the fixed mount fastens with framework Together;The bottom of the bottom plate of fixed mount is provided with four linear bearings;The bottom plate of the guide rod and jacking frame, which is fixed, to be connected Connect, the other end is flexibly connected with corresponding linear bearing;The cylinder can promote jacking frame and guide rod synchronously to move up and down.
In to the above-mentioned further improvement project of mobile phone assembly production chain, the cache mechanism includes two affixed sides Plate, fixed bottom plate, ball bearing, ball screw, movable floor and mobile side board;The fixed bottom plate both sides are longitudinally provided with two Fixed side parallel to each other;Described two fixed sides be arranged at streamline two outside, wherein the upper end of fixed side with Framework tightens together;The ball bearing is fixed on the center of fixed bottom plate, the bottom of ball screw and ball bearing It is flexibly connected, the movable floor is arranged on the nut seat of ball screw and tightened together with nut seat;Two pieces parallel to each other Mobile side board be fixedly installed on the both sides of movable floor with being respectively perpendicular, symmetrically level is set the medial surface of the mobile side board There are some support blocks in the arrangement of vertically multirow;The mobile side board and support block are respectively positioned on the outside of conveyer belt;The rolling Ballscrew can be such that support block moves vertically upward line by line, and then the carrier for entering cache mechanism is cached by support block one by one.
In to the above-mentioned further improvement project of mobile phone assembly production chain, the cache mechanism also includes some right angles and turned Block, slide rail and sliding block are connect, the bottom of movable floor is fixed at the top of the right angle transfer block, the inner side of the fixed side is each vertical It is flexibly connected to the lateral surface provided with two parallel sliding tracks, right angle transfer block by sliding block with the slide rail.
In to the above-mentioned further improvement project of mobile phone assembly production chain, in addition to cylinder barrier assembly, the cylinder Barrier assembly is arranged on behind lifting body and cache mechanism, for reaching lifting body and caching the carrier of mechanism position Carry out spacing.
In to the above-mentioned further improvement project of mobile phone assembly production chain, in addition to some slide plates, the two of the framework Chute is additionally provided with lateral surface, the fixed side of the lifting body, the fixed mount of cache mechanism pass through corresponding slide plate respectively It is flexibly connected with the chute of framework.
In to the above-mentioned further improvement project of mobile phone assembly production chain, the framework is located at the fixed mount of lifting body The position of lower section is further fixedly arranged on linear guides slide unit, the direction and the side of conveyer belt transmission of the linear guides slide unit extension To identical, the lifting body can be slided along linear guides slide unit to adjust the position of lifting body.
In to the above-mentioned further improvement project of mobile phone assembly production chain, the framework has two layers or more of knot Structure, the transfer tape assemble, lifting body, cache mechanism and cylinder barrier assembly are arranged on the upper strata of framework;The framework The second layer is provided with the conveyer belt for being used for that finished product to be delivered to the first station from the passback of last station.
The improvement of mobile phone assembly production chain in summary reduces shared space, leads to for the robot of each assembly station Cross lifting body and provide stable and firm on-line operation platform, solving workpiece/carrier transfer, transfer and positioning reduce back and forth The problem of efficiency of assembling, while by binding cache mechanism and the isostructural combination of cylinder barrier assembly, make transmission with it is online Specially with being independent of each other, the time-consuming assembly process of difference is also coordinated mutually, final to improve overall efficiency of assembling.
Brief description of the drawings
Fig. 1 is one of structural representation of mobile phone assembly production chain in certain preferred embodiment;
Fig. 2 is one of structural representation of lifting body in certain preferred embodiment;
Fig. 3 is two of the structural representation of lifting body in certain preferred embodiment;
Fig. 4 is two of the structural representation of mobile phone assembly production chain in certain preferred embodiment;
Fig. 5 is the structural representation of cache mechanism in certain preferred embodiment.
Embodiment
Below in conjunction with drawings and embodiments, the invention will be further described.
A kind of mobile phone assembly production chain, for the associated workpiece in mobile phone assembling process or the transmission of product and realize The robot of relevant device carries out online all kinds of assemblings action directly on streamline.Mobile phone assembly production chain can be by several Pipelined units assembly and connection forms.As shown in figure 1, in certain preferred embodiment, pipelined units include framework 1, two conveyer belts Component 2, lifting body 3, cylinder barrier assembly 4, adjustment component 5 and ECU 6.The framework 1 is provided with four layers, first layer Provided with transfer tape assemble 2 and lifting body 3, transfer tape assemble 2 is used to transmit carrier to latter station, and lifting body 3 is used for will Carrier jacks and leaves the conveyer belt of transfer tape assemble 2, while provides firm on-line operation platform for each equipment machine people.Top Rise the rear end of mechanism 3(Along conveyer belt direction of transfer)Provided with a cylinder barrier assembly 4;Lifting body 3 and cylinder barrier assembly 4 are simultaneously Framed bent is located at the first layer centre position of framework 1.The second layer is provided with transfer tape assemble 2, and this transfer tape assemble 2 is used for streamline Middle carrier delivers to the first station from the passback of last station, the process that can save worker's transport carrier;Third layer and the 4th layer can For placing ECU 6, ECU 6 is used to control the mobile phones such as transfer tape assemble 2, lifting body 3, cylinder barrier assembly 4 The action of associated mechanisms on assembly production chain, include the start and stop etc. of conveyer belt transfer rate, conveyer belt.Framework 1 The both ends of first layer and the second layer are respectively provided with two adjustment components 5, and adjustment component 5 is used for adjusting conveyer belt in transfer tape assemble 2 It is elastic.The course of work of lifting body 3 and cylinder barrier assembly 4 is as described below in streamline:When carrier uploads in streamline When sending, now cylinder barrier assembly 4 is located at below conveyer belt, when detecting that carrier is sent to the position with lifting body 3, Cylinder piston in cylinder barrier assembly 4 rises, and the block of cylinder barrier assembly 4 blocks carrier, lifting body 3 drive carrier to Upper motion, the robot beside streamline carry out all kinds of assembly manipulations to the product in carrier, pushed up after the completion of corresponding assembly manipulation Rise mechanism 3 to decline, cylinder barrier assembly 4 is returned to below conveyer belt, and under conveyer belt effect, the product processed transmits with carrier To next station.
As shown in Figure 2 and Figure 4, the lifting body 3 includes fixed mount 31, cylinder 32, the jacking frame 33 of U-shaped, guide rod 34 With linear bearing 35.The upper end of fixed mount 31 is connected through a screw thread mode and is anchored on framework 1, and jacking frame 33 is placed in fixed mount 31 Top.The lower section centre position of fixed mount 31 is fixedly connected with a cylinder 32, and the piston of cylinder 32 is passed through among fixed mount 31 Through hole, and be fixedly connected with the bottom plate centre position of jacking frame 33.The bottom of the bottom plate of fixed mount 31 is provided with four linear axis Hold 35, it is preferable that four 35 square distributions of linear bearing.Four guide rods are correspondingly movably installed with four linear bearings 35 34.The bottom plate of Kong Houyu jacking frames 33 is fixed together corresponding to the upper end of guide rod 34 through the bottom plate of fixed mount 31.It is described The bottom plate both sides of jacking frame 33 have be arranged in parallel two vertical side plates 331, each on the two vertical side plate 331 to fix a horizontal supporting plate 332.Vertical side plate 331 and supporting plate 332 are located at two outsides of streamline conveyer belt;Before jacking, supporting plate 332 is located at conveyer belt Below the horizontal plane of place.During the work of lifting body 3, when carrier is transmitting on streamline, the supporting plate 332 of lifting body 3 Below horizontal plane where conveyer belt(Or same level);When the carrier that carry workpiece or product reaches lifting body 3 surface and after stopping that stopping is fed forward by cylinder barrier assembly 4, the piston of the cylinder 32 of lifting body 3 promotes top Frame 33 is risen when moving upwards, due to the guide effect of four guide rods 34, uniform vertical ascent that jacking frame 33 can be stablized;And Carrier is upwardly separated from conveyer belt in the case where supporting plate 332 and side plate 331 act on, and is securely placed in supporting plate 332, convenient Corresponding equipment machine people is operated accordingly to the workpiece on carrier or product, such as places part, welding, fastening. For jacking frame 33 in addition to carrier is jacked, prior effect is to provide a kind of firm online behaviour for the operation of equipment machine people Make platform, realize the on-line automatic assembling of mobile phone concerned process steps.In addition, when equipment machine people is to the workpiece or product on carrier Carry out after the completion of operating accordingly, the piston of cylinder 32 moves downward, and carrier also moves downward with supporting plate 332, plate 332 to be supported After returning to the lower section of conveyer belt, carrier reapposes backflow waterline and is sent to next station with conveyer belt.
As shown in Figure 4 and Figure 5, cache mechanism 7 is additionally provided with pipelined units.Cache mechanism 7 can be located at lifting body 3 Front, also respectively it can set one before and after lifting body 3.Cache mechanism 7 is correspondingly provided with a cylinder barrier assembly 4 below, when When product and its carrier transmit so far station with conveyer belt, the cylinder piston in cylinder barrier assembly 4 rises, cylinder barrier assembly 4 blocks correspondingly block carrier, and now cache mechanism 7 acts caches to carrier, treat the product on next station lifting body 3 After machining, cache mechanism 7 discharges carrier thereon into streamline.In addition, if it also is provided with delaying behind lifting body 3 Mechanism 7 is deposited, then the processed product of latter pipelined units can more be stored, and latter stream pipeline units, then it can save Save the space that cache mechanism 7 is set.Specifically, the cache mechanism 7 includes two fixed sides 71, fixed bottom plate 72, ball Bearing 73, ball screw 74, movable floor 75 and mobile side board 76.The both sides of fixed bottom plate 72 are longitudinally mutually equal provided with two Capable fixed side 71;Described two fixed sides 71 are set in parallel in two outsides of streamline, and wherein fixed side 71 is upper End is connected through a screw thread mode and is fixed on framework 1.The ball bearing 73 is fixed on the center of fixed bottom plate 72, ball wire The bottom of bar 74 is flexibly connected with ball bearing 73.A stepper motor, stepper motor are fixed with the lower section of fixed bottom plate 72 Driving function is provided to cache mechanism 7, drives the rotation of ball screw 74.The movable floor 75 is set in parallel in fixed bottom plate 72 top, movable floor 75 are arranged on the nut seat 741 of ball screw 74 and tightened together with nut seat 741.Work as ball When screw mandrel 74 rotates, nut seat 741 and movable floor 75 can be driven while do up/down linear motion.The mobile side board The 76 vertical both sides for being fixedly installed on movable floor 75, the medial surface of mobile side board 76 are provided with some support blocks 761.It is wherein movable Side plate 76 and support block 761 are located at the outside of streamline conveyer belt with the work without prejudice to conveyer belt.Support block 761 carries to carrier For supporting role.Certain preferred case, support block 761 can be structure as a whole with mobile side board 76, or make pin block and be fixed on work On dynamic side plate 76, support block 761 can vertically multirow be arranged as shown in the figure, to realize the caching of multiple carriers.When cache mechanism 7 During operation, stepper motor rotation drives ball screw 74 to rotate, and the translating rotation of ball screw 74 is the upper and lower of nut seat 741 It is mobile.Now movable floor 75, mobile side board 76 and support block 761 also move up and down with nut seat 741.When cache mechanism 7 will When realizing caching or discharging the function of multiple carriers, the inner side vertical array multirow support block 761 of mobile side board 76, below with arrangement Support block 761 in the top is the first row, and support block 761 below illustrates that cache mechanism 7 is real for the second behavior example Now store or discharge the operation principle of multiple carriers.Before caching, under horizontal plane where corresponding support block 761 is located at conveyer belt It is in just or with conveyer belt and is same as a horizontal plane, is sent because the width of carrier is more than between two conveyer belts on component 2 In addition to being supported by conveyer belt, both sides more extend out to the top of support block 761 for width, i.e. carrier;When by carrier store to During cache mechanism 7, cylinder barrier assembly 4 blocks the carrier on streamline conveyer belt, and then the rotation driving of ball screw 74 Mobile side board 76 is moved upwards, and the fixed distance of motion is passed carrier with departing from upwards in the presence of the support block 761 of the first row Band is sent, now carrier is placed in the top of conveyer belt with the support block 761 of the first row, and now the support block 761 of the second row is located at The lower section of horizontal plane where conveyer belt is in conveyer belt and is same as a horizontal plane;Then follow-up carrier flow continues to transmit And enter cache mechanism 7, cylinder barrier assembly 4 blocks the carrier on streamline conveyer belt, and then mobile side board 76 continue to The fixed distance of upper motion, carrier move fixed distance to depart from conveyer belt upwards in the presence of the second row support block 761, Now second carrier is placed in the top of conveyer belt with the second row support block 761, the like, complete the same of other multiple carriers When cache.When the carrier on cache mechanism 7 is discharged into streamline, the reverse rotation driving active side of ball screw 74 Plate 76 moves downward, and second carrier moves downward fixed distance, the support block 761 of the second row with the second row support block 761 Again the lower section of horizontal plane or it is in conveyer belt when being same as a horizontal plane where the conveyer belt, second carrier is again Put back to the conveyer belt of streamline and flow to next station with conveyer belt, when mobile side board 76 continues to move downward fixed journey system, One carrier moves downward fixed distance with the first row support block 761, and now the first row support block 761 is placed under conveyer belt Side, first carrier are placed back the conveyer belt of streamline and flow to next station with conveyer belt.The cache mechanism 7 also wraps Slide rail 78 and four right angle transfer blocks 77 and sliding block are included, the inner side of fixed side 71 is respectively provided with two parallel sliding tracks 78, right angle switching One end of block 77 is fixedly connected on the bottom of movable floor 75, and right angle transfer block 77 is movably arranged on fixed side 71 by sliding block Slide rail 78 on.When nut seat 741 supports movable floor 75 to move up and down, right angle transfer block 77 drives movable floor simultaneously 75 move up and down along slide rail 78 by fixed movement locus, improve the vertical up-or-down movement process of mobile side board 76 of cache mechanism 7 In stability.So, by cache mechanism 7 and specific structure and control program, flowing water can be assembled to whole piece mobile phone The progress temporal matching mutually of the different on-line operation processes of line.Such as compare more on-line operation processes for time-consuming, The line number of support block 761 on cache mechanism 7 can be increased to cache more carriers, on the contrary, for time-consuming fewer online Operational sequence, it is possible to reduce the line number of support block 761 improves the transmission efficiency of streamline on cache mechanism 7, makes each online behaviour Make process to be mutually adapted on the streamline that whole piece assembles, improve overall operating efficiency.
As shown in Figure 2 and Figure 3, it is that the lifting body 3 in pipelined units can integrate in certain another preferred embodiment It is lower to move and linear guides also can be set along belt direction of transfer transverse shifting function, the lower section of the fixed mount 31 of lifting body 3 Slide unit 36, support column 37, sliding block pinboard 38, support plate 39.Cancel the upper end of fixed mount 31 and framework described in former lifting body 3 1 screw being fixedly connected, a support column 37 is fixed the bottom four corners of fixed mount 31 are each, the lower section of support column 37, which is hung, connects sliding block switching Plate 38, sliding block pinboard 38 are connected through a screw thread mode and are fixed on the sliding block of linear guides slide unit 36, linear guides slide unit 36 It is identical with the belt direction of transfer of streamline along slide unit moving direction, the lower section of linear guides slide unit 36 is fixed a support plate 39 and led to Support plate 39 is crossed to be fixed on framework 1.When sliding block pinboard 38 is moving with sliding block on linear guides slide unit 36, it is fixed thereon The fixed mount 31 of side can drive jacking frame 33 to be moved with the sliding block of linear guides slide unit 36.When carrier is made in the support of jacking frame 33 After lower disengaging conveyer belt, carrier can also be moved with jacking frame 33 along linear guides slide unit 36, and then carrier is further conveyed To the operating mechanism of correlation, such as welding mechanism etc., corresponding assembly manipulation is carried out, position is so integrated by lifting body 3 Function is adjusted, can further adapt in online assembling process, position can not be separately provided to associative operation mechanism because space is small The problem of adjustment structure, increase the versatility of streamline.
As shown in figure 4, chute 11 is additionally provided with two lateral surfaces of framework 1, fixed side 71, the caching machine of lifting body 3 The fixed mount 31 of structure 7 is flexibly connected by corresponding slide plate 12 with the chute 11 of framework 1 respectively.So, can be according to actual need Lifting body 3, cache mechanism 7 are adjusted along sending the position with the direction of transfer of component 2 and mutual distance.
Some of the invention or some preferred embodiments are the foregoing is only, not thereby limits the patent model of the present invention Enclose, every equivalent structure or equivalent transformation made using description of the invention and accompanying drawing content, or be directly or indirectly used in Other related technical fields, all should similarly be included within the scope of the present invention.In addition, above word description is not most Part can also reference chart direct expression and conventional understanding and prior art combine and go to implement.

Claims (9)

  1. A kind of 1. mobile phone assembly production chain, for transmitting carrier and allowing the robot to carry out mobile phone directly on streamline Assembling acts, it is characterised in that:Including transfer tape assemble, lifting body and cache mechanism;The lifting body can be by conveyer belt Carrier on the conveyer belt of component, which jacks up, to be made carrier leave conveyer belt and is maintained on lifting body, and then enables the robot Enough assembling actions that mobile phone is directly carried out in the lifting body;The cache mechanism be arranged on before lifting body and/or Below, for waiting the one or more carrier into lifting body to cache.
  2. 2. mobile phone assembly production chain according to claim 1, it is characterised in that it is gentle that the lifting body includes jacking frame Cylinder, the jacking frame have bottom plate and set two blocks of vertical side plates parallel to each other on bottom plate, two blocks of vertical side plates it is upper Section inner side is respectively symmetrically provided with horizontal supporting plate;The vertical side plate and supporting plate are respectively positioned on the conveyer belt of transfer tape assemble Outside;The bottom plate of the jacking frame tightens together with the top land of cylinder;The cylinder can drive vertical side plate and branch Fagging is moved vertically upward, and then the carrier reached on conveyer belt is jacked up and kept on the supporting plate by supporting plate.
  3. 3. mobile phone assembly production chain according to claim 2, it is characterised in that also including framework, the transfer tape assemble It is fixed on framework;The lifting body also includes fixed mount, guide rod and linear bearing;The upper end of the fixed mount and framework are tight Gu together;The bottom of the bottom plate of fixed mount is provided with four linear bearings;The bottom plate of the guide rod and jacking frame is fixed Connection, the other end are flexibly connected with corresponding linear bearing;The cylinder can promote jacking frame and guide rod synchronously to move up and down.
  4. 4. mobile phone assembly production chain according to any one of claims 1 to 3, it is characterised in that the cache mechanism includes two Individual fixed side, fixed bottom plate, ball bearing, ball screw, movable floor and mobile side board;The fixed bottom plate both sides longitudinal direction Provided with two fixed sides parallel to each other;Described two fixed sides are arranged at two outsides of streamline, wherein fixed side Upper end tightened together with framework;The ball bearing is fixed on the center of fixed bottom plate, the bottom of ball screw with Ball bearing is flexibly connected, and the movable floor is arranged on the nut seat of ball screw and tightened together with nut seat;Two pieces Mobile side board parallel to each other is fixedly installed on the both sides of movable floor with being respectively perpendicular, and the medial surface of the mobile side board is symmetrical Ground is horizontal to be provided with some support blocks in the arrangement of vertically multirow;The mobile side board and support block are respectively positioned on the outer of conveyer belt Side;The ball screw can be such that support block moves vertically upward line by line, and then will enter the carrier of cache mechanism one by one by propping up Bracer caches.
  5. 5. mobile phone assembly production chain according to claim 4, it is characterised in that the cache mechanism also includes some right angles Transfer block, slide rail and sliding block, the right angle transfer block top are fixed on the bottom of movable floor, and the inner side of the fixed side is each Longitudinal direction is provided with two parallel sliding tracks, and the lateral surface of right angle transfer block is flexibly connected by sliding block with the slide rail.
  6. 6. mobile phone assembly production chain according to claim 5, it is characterised in that also including cylinder barrier assembly, the gas Cylinder barrier assembly is arranged on behind lifting body and cache mechanism, for reaching lifting body and caching the load of mechanism position Tool carries out spacing.
  7. 7. mobile phone assembly production chain according to claim 6, it is characterised in that also including some slide plates, the framework Chute is additionally provided with two lateral surfaces, the fixed side of the lifting body, the fixed mount of cache mechanism pass through corresponding cunning respectively Plate is flexibly connected with the chute of framework.
  8. 8. mobile phone assembly production chain according to claim 7, it is characterised in that the framework is located at the fixation of lifting body Position below frame is further fixedly arranged on linear guides slide unit, direction and the conveyer belt transmission of the linear guides slide unit extension Direction is identical, and the lifting body can be slided along linear guides slide unit to adjust the position of lifting body.
  9. 9. mobile phone assembly production chain according to claim 8, it is characterised in that the framework has two layers or more of knot Structure, the transfer tape assemble, lifting body, cache mechanism and cylinder barrier assembly are arranged on the upper strata of framework;The framework The second layer is provided with the conveyer belt for being used for that finished product to be delivered to the first station from the passback of last station.
CN201711094977.4A 2017-11-09 2017-11-09 A kind of mobile phone assembly production chain Pending CN107662100A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711094977.4A CN107662100A (en) 2017-11-09 2017-11-09 A kind of mobile phone assembly production chain

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711094977.4A CN107662100A (en) 2017-11-09 2017-11-09 A kind of mobile phone assembly production chain

Publications (1)

Publication Number Publication Date
CN107662100A true CN107662100A (en) 2018-02-06

Family

ID=61144914

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711094977.4A Pending CN107662100A (en) 2017-11-09 2017-11-09 A kind of mobile phone assembly production chain

Country Status (1)

Country Link
CN (1) CN107662100A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110948195A (en) * 2018-09-27 2020-04-03 山东大学 Double-deck transportation platform of heat exchanger
CN113814622A (en) * 2021-11-09 2021-12-21 深圳市东盈讯达电子有限公司 Take many feed channels's precision assembly welding mechanism

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH648381A5 (en) * 1980-06-12 1985-03-15 Glasmatec Ag Method and device for the automatic coating of frames on both sides with a compound
JPH08215942A (en) * 1994-12-13 1996-08-27 Ricoh Co Ltd Parts feeder
CN103698916A (en) * 2013-12-23 2014-04-02 苏州博众精工科技有限公司 Pipeline type LCD (Liquid Crystal Display) mounting equipment
CN103817351A (en) * 2013-06-28 2014-05-28 宁波精益微型轴有限公司 Automatic modularized turning assembly line
CN105128492A (en) * 2015-08-25 2015-12-09 武汉三工光电设备制造有限公司 Multilayered laminating machine for solar battery assemblies
KR20160042838A (en) * 2016-03-31 2016-04-20 권현근 the transfer robot and the transfer system therewith
CN207447849U (en) * 2017-11-09 2018-06-05 深圳市策维科技有限公司 A kind of mobile phone assembly production chain

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH648381A5 (en) * 1980-06-12 1985-03-15 Glasmatec Ag Method and device for the automatic coating of frames on both sides with a compound
JPH08215942A (en) * 1994-12-13 1996-08-27 Ricoh Co Ltd Parts feeder
CN103817351A (en) * 2013-06-28 2014-05-28 宁波精益微型轴有限公司 Automatic modularized turning assembly line
CN103698916A (en) * 2013-12-23 2014-04-02 苏州博众精工科技有限公司 Pipeline type LCD (Liquid Crystal Display) mounting equipment
CN105128492A (en) * 2015-08-25 2015-12-09 武汉三工光电设备制造有限公司 Multilayered laminating machine for solar battery assemblies
KR20160042838A (en) * 2016-03-31 2016-04-20 권현근 the transfer robot and the transfer system therewith
CN207447849U (en) * 2017-11-09 2018-06-05 深圳市策维科技有限公司 A kind of mobile phone assembly production chain

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110948195A (en) * 2018-09-27 2020-04-03 山东大学 Double-deck transportation platform of heat exchanger
CN113814622A (en) * 2021-11-09 2021-12-21 深圳市东盈讯达电子有限公司 Take many feed channels's precision assembly welding mechanism
CN113814622B (en) * 2021-11-09 2022-06-10 深圳市东盈讯达电子有限公司 Take many feed channels's precision assembly welding mechanism

Similar Documents

Publication Publication Date Title
CN103101725B (en) Reinforcing steel bar movement conveying mechanism of welding machine of mesh
CN108176988B (en) Automatic production line for metal sheets
WO2019227561A1 (en) Mesh welding robot
CN108405791A (en) A kind of bent plate chain cover plate assembly machine
CN103010699A (en) Tooling board delivering and taking circulating system
CN107378604A (en) A kind of section steel cutting automatic charging device
CN107662100A (en) A kind of mobile phone assembly production chain
CN207242134U (en) Toothbrush captures pitch-changing mechanism
CN107215632B (en) Tray trolley multistation transportation system
CN209140528U (en) A kind of crankshaft grinding process line
CN207447849U (en) A kind of mobile phone assembly production chain
CN109702828A (en) A kind of doorframe Frame assembling machine and doorframe group frame method
CN208631378U (en) A kind of shaped piece feeding device
CN105236114B (en) Rock wool turnover machine
CN206203294U (en) A kind of quick positioning formula automatic conveyor
CN206232139U (en) A kind of bunching device
CN109201775A (en) The online vision inspection apparatus of punching parts defect and method
CN105480777A (en) Cloth roll conveying device for multi-layer cloth laying machine
CN203667686U (en) Material storing device
US5878641A (en) Cutting apparatus
CN103144926A (en) Reinforcement rotating conveying mechanism of mesh welding machine
CN206088066U (en) Conveyor of long and thin type of part
CN209699358U (en) A kind of doorframe Frame assembling machine
CN210335008U (en) Intelligent flexible assembly line
CN209794304U (en) Cloth wrapping device of cloth wrapping machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination