CN107486714A - A kind of system of front casing assembling sheet glass assembly element conveying assembling - Google Patents

A kind of system of front casing assembling sheet glass assembly element conveying assembling Download PDF

Info

Publication number
CN107486714A
CN107486714A CN201710693098.7A CN201710693098A CN107486714A CN 107486714 A CN107486714 A CN 107486714A CN 201710693098 A CN201710693098 A CN 201710693098A CN 107486714 A CN107486714 A CN 107486714A
Authority
CN
China
Prior art keywords
front casing
sheet glass
assembling
rotating disk
component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710693098.7A
Other languages
Chinese (zh)
Inventor
闵沛
陈林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU JACK INSTRUMENT CO Ltd
Original Assignee
JIANGSU JACK INSTRUMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU JACK INSTRUMENT CO Ltd filed Critical JIANGSU JACK INSTRUMENT CO Ltd
Priority to CN201710693098.7A priority Critical patent/CN107486714A/en
Publication of CN107486714A publication Critical patent/CN107486714A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
    • B23P19/001Article feeders for assembling machines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P21/00Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control
    • B23P21/004Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control the units passing two or more work-stations whilst being composed
    • B23P21/006Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control the units passing two or more work-stations whilst being composed the conveying means comprising a rotating table

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Specific Conveyance Elements (AREA)

Abstract

The invention discloses a kind of system of front casing assembling sheet glass assembly element conveying assembling, including front casing body, in addition to front casing supply unit, including front casing vibration component and front casing conveying mechanism;Front casing screening unit, it is connected with the front casing conveying mechanism, also include chassis, the chassis upper surface is provided with the first front casing rotating disk, and the second front casing rotating disk is additionally provided with the first front casing rotating disk, and detection components are provided with above the second front casing rotating disk, the current state of the front casing body is detected, realizes the screening to it.Beneficial effects of the present invention:When by provided with front casing supply unit, satisfactory front casing can be transferred out in irregular front casing, accelerates its conveying, improves production efficiency;Second, by provided with front casing screening unit, the screening to front casing supply unit state in package system can be completed, hence into the assembling subsystem of next element.

Description

A kind of system of front casing assembling sheet glass assembly element conveying assembling
Technical field
The present invention relates to the technical field of automatic package system, more particularly to a kind of anti-explosion digital thermometer to assemble and be automatically Front casing, sheet glass and the electronic component of system assemble subsystem automatically.
Background technology
Recently as the development of science and technology, anti-explosion digital thermometer is one of temperature measuring device type, according to The difference of thermometric substance used and the difference of temperature-measuring range, there is kerosene thermometer, alcohol thermometer, mercurial thermometer, gas temperature Spend meter, resistance thermometer, thermoelectric thermometer, radiation thermometer and flash ranging thermometer, bimetallic thermometer etc., digital temperature Meter can accurately judge and measurement temperature, and with numerical monitor, and non-pointer or mercury are shown, therefore claims digital thermometer or numeral Round-the-clock collection and communication under thermometer, its field for being adapted to that external power can not be provided or adverse circumstances, meet corrosivity, impact Property, the premise temperature such as vibrations show, meet laboratory and industry spot high precision collecting demand, substitute conventional cursor thermometer, Normal thermometer can be done.And anti-explosion digital thermometer product explosion-resistant enclosure is formed using the aluminum alloy casing die casting of high intensity, Inside uses import high accuracy, Low Drift Temperature, ultra-low power consumption integrated circuit and super large LCDs, makes temperature display more directly perceived, Apparent five-digit numbers code, which is shown, makes measurement display precision higher, and the anti-explosion digital thermometer on open market includes front casing, glass Glass piece, internal electronic element and rear casing, and it is low in the presence of the efficiency of production in process of production, it is necessary to spend a large amount of artificial And the time come complete whole completed assembled the problem of.
The content of the invention
The purpose of this part is to summarize some aspects of embodiments of the invention and briefly introduce some preferably to implement Example.It may do a little simplified or be omitted to avoid making our department in this part and the description of the present application summary and denomination of invention Point, the purpose of specification digest and denomination of invention obscure, and this simplification or omit and cannot be used for limiting the scope of the present invention.
In view of front casing, sheet glass and the electronic component of the above-mentioned existing automatic package system of anti-explosion digital thermometer are certainly The problem of dynamic assembling subsystem is present, it is proposed that the present invention.
Therefore, it is an object of the present invention to provide a kind of front casing of the automatic package system of anti-explosion digital thermometer to assemble son automatically System, the front casing, sheet glass, electronics of anti-explosion digital thermometer can be realized in the automatic package system of anti-explosion digital thermometer Component automatic screening and assembling, production efficiency is substantially increased, while reduce the cost of manpower, save production cost.
Beneficial effects of the present invention:A kind of front casing of automatic package system of anti-explosion digital thermometer provided by the invention is certainly Dynamic assembling subsystem, is the automatic assembled part of front casing in the automatic package system of anti-explosion digital thermometer, when by provided with Front casing supply unit, satisfactory front casing can be transferred out in irregular front casing, and accelerate the defeated of its Send, save the time, improve production efficiency;Second, by provided with front casing screening unit, to from front casing supply unit Front casing carry out judgement screening, the screening to front casing supply unit state in package system can be completed, complied with State under automatic package system requirement, hence into the operation in the assembling subsystem of next element, completing automation;Three Be by provided with sheet glass detection unit, the positive and negative of sheet glass can be detected;Fourth, by provided with sheet glass screen it is single Member, the sheet glass after detection can be adjusted, the sheet glass being adjusted under the state of meeting the requirements, be put down afterwards into work Platform, hence into the assembling that next step is carried out in next assembling subsystem, improve production efficiency;Fifth, by conveying assembly First scraping wings pushs out material, by being produced between the first rack on the first scraping wings and first gear and second gear Linkage, allow material to fall, realize the effect that station completes two processes.Blanking component in assembling device makes material It is more stable in blanking, the qualification rate of product is improved, and assembled by the completion of automation, operating efficiency is improved, is saved Time cost is saved.
Brief description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, required use in being described below to embodiment Accompanying drawing be briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present invention, for this For the those of ordinary skill of field, without having to pay creative labor, it can also be obtained according to these accompanying drawings other Accompanying drawing.Wherein:
The system that Fig. 1 show front casing assembling sheet glass assembly element conveying assembling described in the first embodiment of the invention The overall structure diagram of middle front casing assembling.
The system that Fig. 2 show front casing assembling sheet glass assembly element conveying assembling described in the first embodiment of the invention The overall structure diagram of middle front casing body.
The system that Fig. 3 show front casing assembling sheet glass assembly element conveying assembling described in second of embodiment of the invention Middle front casing conveying mechanism structural representation.
Fig. 4 show Fig. 3 partial enlargement structural representation.
The system that Fig. 5 show front casing assembling sheet glass assembly element conveying assembling described in the third embodiment of the invention The overall structure diagram of middle front casing screening unit.
Fig. 6 show the structural representation for removing the second front casing rotating disk in Fig. 5.
The system that Fig. 7 show the 4th kind of assembling sheet glass assembly element conveying assembling of front casing described in embodiment of the present invention In the second rotating disk overall structure diagram.
Fig. 8 show Fig. 7 bottom views structural representation.
The system that Fig. 9 show the 4th kind of assembling sheet glass assembly element conveying assembling of front casing described in embodiment of the present invention The structural representation of middle tray bottom.
Figure 10 show the overall structure diagram that sheet glass assembles in another embodiment of the present invention.
Figure 11 show the overall structure diagram of sheet glass in another embodiment of the present invention.
Figure 12 show the structural representation of sheet glass conveying mechanism in an embodiment of the present invention.
Figure 13 show the structural representation of sheet glass push component in an embodiment of the present invention.
Figure 14 show the structural representation of detection components in an embodiment of the present invention.
Figure 15 show Figure 14 sectional view.
Figure 16 show the overall structure diagram of sheet glass screening unit in an embodiment of the present invention.
Figure 17 show the partial enlargement structural representation of sheet glass screening unit in an embodiment of the present invention.
Figure 18 is the overall structure diagram in a kind of embodiment of conveying assembly of the present invention.
Figure 19 is overall structure left view schematic diagram and partial enlargement signal in a kind of embodiment of conveying assembly of the present invention Figure.
Figure 20 be a kind of embodiment of conveying assembly of the present invention in first scraping wings overall structure diagram and Close-up schematic view.
Figure 21 is the overall structure diagram of the first transmission parts and office described in a kind of embodiment of conveying assembly of the present invention Portion's enlarged diagram.
Figure 22 is the overall structure schematic front view of the first transmission parts described in a kind of embodiment of conveying assembly of the present invention.
Figure 23 be a kind of embodiment of conveying assembly of the present invention in first scraping wings overall structure diagram and Close-up schematic view.
Figure 24 be a kind of embodiment of conveying assembly of the present invention in first pushing piece overall structure diagram and Close-up schematic view.
Figure 25 is the overall structure diagram of the blanking component in a kind of present invention assembling embodiment of device.
Figure 26 is the overall structure diagram in a kind of present invention assembling embodiment of device.
Figure 27 is the overall applicability structural representation that the present invention is applied to automatic package system.
Embodiment
In order to facilitate the understanding of the purposes, features and advantages of the present invention, with reference to Figure of description pair The embodiment of the present invention is described in detail.
Many details are elaborated in the following description to facilitate a thorough understanding of the present invention, still the present invention can be with It is different from other manner described here using other to implement, those skilled in the art can be without prejudice to intension of the present invention In the case of do similar popularization, therefore the present invention is not limited by following public specific embodiment.
The front casing assembling sheet glass assembly element conveying assembling as described in Fig. 1~2 show the first embodiment of the invention System in front casing assemble overall structure diagram, in order to realize front casing assembling subsystem in front casing is conveyed And satisfactory state is filtered out, in the present embodiment, front casing body Y is the explosion-resistant enclosure of anti-explosion digital thermometer, its It is opening for a bottom surface, the circular cylinder of another bottom surface closing, accommodates inner chamber so as to be formed, intracavitary installation is explosion-proof in the receiving The electronic component of digital thermometer, rear casing is covered after by plus implosion guard piece, by its extrusion forming, and the ring of cylinder Opening is provided with shape side, stretches out along edge of opening and is fixed with penetrating column casing, column casing is by being bonded opening and accommodating Inner chamber connects, the passage for being arranged to anti-explosion digital thermometer inner member and being connected with the element of off-balancesheet of the column casing.In order to realize Front casing body Y automatic assembling, specifically, including front casing supply unit 100 and front casing screening unit 200, the front casing Front casing is delivered in front casing screening unit 200 by supply unit 100, is filtered out and is conformed to by front casing screening unit 200 The front casing body Y asked, in the workbench that drops, workbench herein is the turntable with some stations, into next group Fill the installation operation that next step is carried out in subsystem;Further, front casing vibration component 101 and front casing conveying mechanism 102, as one kind in the present embodiment preferably, it is vibrating barrel to front casing vibration component 101 herein, according to front casing body Y On be provided with the special construction of column casing, the front casing body Y of satisfactory column casing direction is selected by vibratory sieve, so as to complete pair Front casing body Y preliminary screening;And front casing conveying mechanism 102 is arranged at the top of front casing vibration component 101, to preliminary sieve Acceleration conveying is carried out after choosing, improves the efficiency assembled automatically in the process.Front casing screening unit 200 is to from front casing The front casing body Y of supply unit 100 is completed to undesirable after being judged by the rotation of itself and the rotation of inside Be adjusted, be adjusted to fall to workbench after meeting the requirements, its also include chassis 201, the first front casing rotating disk 202nd, the second front casing rotating disk 203 and detection components 204, specifically, chassis 201 is fixed carrier, thereon Central point S is provided with, and the first front casing rotating disk 202 is arranged on the upper surface on chassis 201, and can be with chassis 201 Heart point S is that the point of rotation is freely rotatable, and the first front casing rotating disk 202 is located in central point S both sides and is additionally provided with the Two front casing rotating disks 203, the second front casing rotating disk 203 are arranged on the inside of the first front casing rotating disk 202, Neng Gou First front casing rotating disk 202 carries out rotation while doing central rotation, i.e., the second front casing rotating disk 203 is not only with first Front casing rotating disk 202 also carries out rotation, this two rotate through outside central point S rotations by the point of rotation of center itself Journey can either occur simultaneously, can also independently rotate, and realize and adjusted in the horizontal direction to front casing body Y;And before second The top of shell rotating disk 203 is provided with detection components 204, and detection components 204 described herein are sensing device, are used as this reality The a kind of preferred of example is applied, it is photoelectric sensor, and photoelectric sensor is to use sensor of the photoelectric cell as detecting element, it Measured change is converted into first the change of optical signal, then further converts optical signals into telecommunications by photoelectric cell Number, photoelectric sensor is typically made up of light source, optical path and photoelectric cell three parts, therefore detection components 204 can detect Go out the direction of column casing on front casing body Y, current shell body Y is delivered to the second front casing rotating disk by front casing conveying mechanism 102 In 203, front casing body Y current state is detected by detection components 204, corresponding rotation tune is carried out after realizing the judgement to it It is whole.
As shown in figs. 34 the conveying assembling of sheet glass assembly element is assembled for front casing described in second of embodiment of the invention System in front casing conveying mechanism structural representation, in order to realize in course of conveying more stable and improve efficiency, at this It is in embodiment with the first embodiment difference:Front casing conveying mechanism 102 also include front casing delivery track 102a, Conveyer belt 102b and elastic bumps part 102c, specifically, wherein:Front casing conveying mechanism 102 also includes setting and front casing The front casing delivery track 102a that vibration component 101 is connected, its track width are slightly larger than front casing body Y diameter, front casing Body Y is entered in front casing delivery track 102a after preliminary screening, front casing delivery track 102a track end with it is preceding outer Shell screening unit 200 connects, and front casing delivery track 102a track upper end is provided with conveyer belt 102b, and conveyer belt also known as transports Band, it is for playing carrying in belt conveyor and transporting the rubber and fiber, metal composite goods of material, or plastics The compound product with fabric, such as:Rubber conveyer belt, nylon conveyer belt, one kind as the present embodiment are preferably rubber conveying Band, its both ends set roller member, driving conveying belt 102b operating after roller member is driven by drive component, and conveyer belt 102b Elastic bumps part 102c is also disposed with belt surface, some elastic bumps part 102c vertical transports directions are arranged to row's shape Into one group, some groups of elastic bumps part 102c arrange along conveying direction, are looped around conveyer belt 102b belt surface, the elastic bumps Part 102c is made in the present embodiment preferred rubber material, the certain elasticity having, the elasticity positioned at conveyer belt 102b lower surfaces Projection piece 102c can be inconsistent with the front casing body Y in front casing delivery track 102a tracks, with conveyer belt 102b to Preceding operating, conveyed before driving front casing body Y-direction, and conveyer belt 102b running speed can be adjusted to suitable size, therefore The efficiency assembled automatically is not only improved during this, also has conflict power to front casing body Y, makes its conveying more stable.
The front casing assembling sheet glass assembly element conveying assembling as described in Fig. 5~6 show the third embodiment of the invention System in front casing screening unit overall structure diagram, in order to realize the judgement to front casing body Y states, in this implementation It is in example with second of embodiment difference:First front casing rotating disk 202 also includes penetrating groove 202b, extension 202c and targeting port 202d;Specifically, in the present embodiment wherein:First front casing rotating disk 202 also includes penetrating groove 202b, extension 202c and targeting port 202d, and the first front casing rotating disk 202 is centrosymmetric on central point S both ends Penetrating groove 202b is dug out, in the present embodiment, penetrating groove 202b is penetrating for annular, can accommodate the second front casing rotating disk 203, and the diameter of the diameter of the second front casing rotating disk 203 and penetrating groove 202b coincide so that the second front casing rotating disk 203 Rotation can occur in penetrating groove 202b, and the bottom edge of the penetrating groove 202b extends internally and is provided with extension 202c, the second front casing rotating disk 203 of rotation occurs in penetrating groove 202b for being supported on, is propped up its marginal portion Support, and the first front casing rotating disk 202 and central point S is additionally provided with targeting port 202d, targeting port 202d apart from farthest one end Bottom surface be higher than penetrating groove 202b bottom surface, and targeting port 202d A/F be slightly larger than front casing body Y diameter, It is outer before second can be entered by targeting port 202d when such current shell body Y is delivered to end by front casing delivery track 102a In shell rotating disk 203.
In reference picture 7~9, the 4th kind of assembling sheet glass assembly element conveying assembling of front casing described in embodiment of the present invention The overall structure diagram of front casing screening unit in system, in order to realize that it is preceding outer that the second front casing rotating disk 203 can drive Housing Y rotates, and is in the present embodiment with the third embodiment difference:Second front casing rotating disk 203 is also wrapped The penetrating mouth 203a of annular, the penetrating mouth 203b of strip, the penetrating mouth 203c of special type are included, specifically, in the present embodiment, wherein:Second Front casing rotating disk 203 also includes the penetrating mouth 203a of annular, the penetrating mouth 203b of strip, the penetrating mouth 203c of special type, before second The center position of shell rotating disk 203 digs out downwards the annular penetrating mouth 203a corresponding with front casing body Y cylinder body shapes, and The strip penetrating mouth 203b adaptable with the column casing on front casing body Y is symmetrically dug out at the penetrating mouth 203a of annular both ends again, Therebetween the penetrating mouth 203c of special type for the front casing body Y that can be accommodated under different conditions is formed, two states herein are post Cylinder is located at the penetrating mouth of special type towards two kinds after preceding or column casing direction in the upper surface of the second front casing rotating disk 203 The 203c downward truncated section in one end, form chute 203d, chute 203d is corresponding with targeting port 202d, its floor height and Targeting port 202d floor height is identical, and the width of its groove is slightly larger than front casing body Y diameter, and current shell body Y is preceding When shell delivery track 102a is delivered to track end, it is directed into after targeting port 202d being introduced into by targeting port 202d In chute 203d, can then fall into the penetrating mouth 203c of special type and be limited, and the second front casing rotating disk 203 be arranged at it is penetrating recessed In groove 202b, its marginal portion is extended portion 202c and supported, and the second front casing rotating disk 203 and the first front casing rotating disk 202 may be contained within the upper surface on chassis 201, thus front casing body Y fall in the penetrating mouth 203c of special type after by the upper of chassis 201 Surface support, just do not fall out, and also set up one in the present embodiment on chassis 201 and drop a mouthful 201b, the shape of mouthful 201b that drops Shape and size are consistent with the penetrating mouth 203c of special type shape size, front casing body Y fall in the penetrating mouth 203c of special type after the bottom of by The upper surface support of disk 201, after the second front casing rotating disk 203 and the first front casing rotating disk 202 rotate, drop mouth 201b overlaps with the penetrating mouth 203c of special type, so as to which front casing body Y loses the upper surface support on chassis 201, therefore can be due to gravity Effect is fallen on the operating position of workbench downwards, then rotates into next subsystem assembled automatically by workbench In system.Further, in the present embodiment, in order to driving the second front casing rotating disk 203 and the first front casing rotating disk 202 rotation, the front casing screening unit 200 also include the first front casing drive device 201a and the second front casing drive device 202a, specifically, the lower end of the central point S on chassis 201 is provided with the first front casing drive device 201a, the first front casing drives Dynamic device 201a drives the rotation of the first front casing rotating disk 202, and the first front casing drive device 201a is power set herein, Can be motor or cylinder, preferably, the first front casing drive device 201a is motor to one kind as the present embodiment, and first The pivot of front casing rotating disk 202 is connected with the rotating shaft of motor, so as to drive the rotation of the first front casing rotating disk 202 Turn, and the second front casing drive device 202a is additionally provided with the first front casing rotating disk 202, the second front casing driving dress Put 202a and be preferably again motor, center symmetric setting is in central point S both sides thereon, and with the second front casing rotating disk 203 Contact, the rotation of the second front casing rotating disk 203 is driven, here, outside the second front casing drive device 202a machine shaft Surface is provided with gear, and gear is also provided with the side of the second front casing rotating disk 203, and the two passes through the ratcheting gearing knot of gear Structure, realize the rotation of the second front casing rotating disk 203 of driving.
Operation principle:The front casing body Y in it is vibrated to front casing delivery track by front casing vibration component 101 first On 102a, it is accelerated to be delivered to track end by the elastic bumps part 102c on conveyer belt 102b, by the targeting port contacted 202d enters in chute 203d, is delivered into the second front casing rotating disk 203 by elastic bumps part 102c, is now examined again afterwards Survey the column casing that component 204 is detected in the penetrating mouth 203b of strip whether there is, so as to judge the direction of column casing, judge whether it accords with this Close and require, if meeting the requirements, the first front casing rotating disk 202 rotates, and the second front casing rotating disk 203 does not rotate, so as to Fallen in front casing body Y to mouthful 201b that drops;If undesirable, the first front casing rotating disk 202 rotates, while before second Also after rotation occurs for shell rotating disk 203, fallen in front casing body Y to mouthful 201b that drops, complete the process entirely screened.
The front casing assembling sheet glass assembly element conveying dress as described in Figure 10~17 show the 4th kind of embodiment of the invention The automatic package system structural representation of sheet glass in the system matched somebody with somebody, in the present embodiment, specifically, sheet glass X is by glass The slide of manufactured cake shape, one layer of opaque film is posted on the upper surface both sides of slide, and in slide Between position do not paste the film, form a square display module, the display module can show anti-explosion digital thermometer measure Temperature, therefore it can be detected by the opaque coating posted, distinguish its positive and negative;And the subsystem also includes glass Piece supply unit 300, sheet glass detection unit 400 and sheet glass screening unit 500, sheet glass supply unit 300 is by glass Piece X is delivered to after sheet glass detection unit 400 is detected and pushed in sheet glass screening unit 500, by being sieved in sheet glass The upset on vertical direction is carried out in menu member 500, is sheet glass X under the state of meeting the requirements so as to adjust it, is passing through water Rotation on flat is transported on workbench, into next assembling subsystem, specifically, sheet glass supply unit 300 Also include sheet glass vibration component 301 and sheet glass conveying mechanism 302, sheet glass vibration component 301 is to shake in the present embodiment Dynamic cylinder, the sheet glass X in it is delivered to by way of vibration on sheet glass conveying mechanism 302;In the present embodiment, its In:Sheet glass conveying mechanism 302 also includes sheet glass delivery track 302a, limiting plate 302b and push opening 302c, enters one Step, sheet glass delivery track 302a initiating terminals are connected with sheet glass vibration component 301, and its end is provided with limiting plate 302b, The spacing positions at limiting plate 302b of sheet glass X conveyed to sheet glass delivery track 302a, and sheet glass delivery track The push opening 302c vertical with limiting plate 302b is provided with the orbit sidewall of 302a ends both sides, push opening 302c's Size is identical with the diameter of sheet glass X circular pieces, and sheet glass X can push component 402 by sheet glass and is open by push Detected in 302c push-in sheet glass detection unit 400;Push opening 302c is relative with sheet glass detection unit 400 to be connect, glass Glass piece detection unit 400 also includes sheet glass detection components 401 and sheet glass push component 402, and sheet glass push component 402 will The sheet glass rested on conveying mechanism 302 pushes in sheet glass detection components 401 detection for carrying out positive and negative, detection components 401 are docked with sheet glass screening unit 500, and group is pushed by sheet glass again after the completion of detection components 401 detect sheet glass X Part 402, which pushes it into, carries out upset adjustment in sheet glass screening unit 500;Sheet glass push component 402 also includes the first glass Piece pushes component 402a and the second sheet glass push component 402b, and the first sheet glass push component 402a will be delivered to limiting plate Sheet glass X push at 302b, which is put into detection components 401, to be detected, and the second sheet glass pushes component 402b by detection components The sheet glass X after detection is completed in 401 to release;And first sheet glass push component 402a also include being arranged at push opening 302c The first sheet glass pushing plate 402a-1 at place, the first sheet glass pushing plate 402a-1 enter from push opening 302c one end, Sheet glass X at limiting plate 302b is released by pushing the other end for the 302c that is open, and pushes the another of opening 302c End docking sheet glass detection unit 400, and the first sheet glass driving dress being connected with the first sheet glass pushing plate 402a-1 Put 402a-2;The second sheet glass that second sheet glass push component 402b also includes being arranged at the top of detection components 401 pushes away Send plate 402b-1 and the second sheet glass drive device 402b-2 being connected with the second sheet glass pushing plate 402b-1, and first Sheet glass drive device 402a-2 and the second sheet glass drive device 402b-2 is power set, preferably gas in the present embodiment Cylinder;Detection components 401 also include arc bend 403, light source component 404 and light sensing component 405, sheet glass detection components 401 For cube structure, it is arranged at push opening 302c side, and sheet glass detection components 401 are close to push opening 302c side It is provided with detection entrance 401a, the detection entrance 401a on face to dock with push opening 302c, sheet glass X can be open by push 302c enters in detection entrance 401a, and digs out a passage 401b, passage along detection entrance 401a is parallel into cube structure 401b channel width is corresponding with sheet glass X diameter, has the function that to be oriented to conveying to sheet glass X, passage 401b is extended to Detection outlet 401c is set on adjacent side, and the upper surface of sheet glass detection components 401 is provided with and connected with passage 401b Chute 401d, chute 401d one end is docked with the second sheet glass pushing plate 402b-1, and the second sheet glass pushing plate 402b- 1 can be slided after second sheet glass drive device 402b-2 drivings in chute 401d, and passage 401b and chute 401d connects Logical, the second sheet glass pushing plate 402b-1 and sheet glass X is contradicted, so as to promote slips of the sheet glass X in passage 401b;Passage Arc bend 403 is additionally provided with 402, the radian of this arc bend 403 is equal with sheet glass X circular arc, therefore sheet glass X quilts After first sheet glass pushing plate 402a-1 is pushed in passage 401b, rest on arc bend 403, itself because radian is equal, with Its edge is bonded, and the top of arc bend 403 has along its radian direction and some light source components 404 that be arranged in parallel, the light source component 404 equally have the radian same with arc bend 403, and the coverage rate of formation is a quarter of the sheet glass X area of a circle, because Sheet glass X any a quarter, which goes out, can all include opaque film, therefore when sheet glass X is located at some light source components 404 During lower section, some light source components 404 can be irradiated on sheet glass X a quarter area, and adjacent close to the light source component 404 Two sides on set light sensing component 405, if when sheet glass X for post opaque coating it is face-up when, just have light source component 404 The light of irradiation can not be penetrated, and light source would not be sensed by being arranged at both sides light sensing component 405, if if when sheet glass X is patch When having opaque coating face-down, the light that light source component 404 is irradiated will be penetrated all, and there will be no light sensing component 405 can't detect Light source, so as to detect sheet glass X state by such a mode, detection has judged rear second sheet glass pushing plate 402b-1 by glass Glass piece X is pushed in sheet glass screening unit 500;Sheet glass screening unit 500 also includes rotating horizontally component 501, turned over vertically Turn component 502 and push component 503, rotate horizontally component 501 and rotated around center of turntable, and overturn component 502 vertically to turn The both ends for rotating horizontally component 501 are symmetricly set in centered on disk center;Sheet glass pushes component by the glass after the completion of detection Piece X is pushed in vertical upset component 502, is obtained by the upset screening for overturning component 502 vertically under the state of meeting the requirements Sheet glass X;Rotating horizontally the rotation of component 501 will overturn above the band of component 502 to workbench vertically, and pushing component 503 will Sheet glass X, which is pushed, to be fallen on workbench, vertical to overturn component if detecting to meet the requirements during detecting herein 502 do not overturn, and rotate horizontally the rotation in the occurred level direction of component 501, if detecting undesirable, vertical upset component 502 first overturn, and after sheet glass X is overturn, the rotation in the occurred level direction of component 501 are rotated horizontally, by the glass after adjustment Glass piece X, which is brought to workbench top, to drop;In the present embodiment,
Wherein:Rotating horizontally component 501 also includes horizontal rotating disc 501a and extension 501b, and horizontal rotating disc 501a's turns Disk center is provided with the 3rd sheet glass drive device 501a-1 and drives its rotation, and extension 501b is arranged at horizontal rotating disc 501a On relative side, and it is centrosymmetric setting on center of turntable, the 3rd sheet glass drive device 501a-1 drivings are horizontal to be turned When disk 501a is rotated, synchronous rotation occurs for extension 501b, and vertical upset component 502 also includes roll-over table 502a, its with Extension 501b connections, are provided with the 4th sheet glass drive device 501b-1 on extension 501b, in this embodiment, the 3rd glass Piece drive device 501a-1 and the 4th preferred motors of sheet glass drive device 501b-1, roll-over table 502a and the 4th sheet glass drive Dynamic device 501b-1 machine shaft connection, the 4th sheet glass drive device 501b-1 driving roll-over table 502a in the vertical directions Upset, as the sheet glass X for detecting to fall short of specifications, is carried out the upset of vertical direction;And roll-over table 502a and detection Second entrance 502a-1 is provided with side relative outlet 401c, is pushed after sheet glass X completes to detect by the second sheet glass Plate 402b-1 is pushed into second entrance 502a-1 by detection outlet 401c, and roll-over table 502a centre is provided with sheet glass and fallen Fall a mouthful 502a-2, second entrance 502a-1 and sheet glass mouthful 502a-2 that drops are connected, sheet glass drop mouthful 502a-2 upper surfaces with Second entrance 502a-1 connectivity parts are additionally provided with push pedal opening 502a-4, push pedal opening 502a-4 and the second sheet glass pushing plate 402b-1 is corresponding, and sheet glass X push-in sheet glass is dropped and is clamped in mouthful 502a-2, therefore pushes to second entrance 502a-1's Sheet glass X can fall into sheet glass and drop in mouthful 502a-2, in the present embodiment sheet glass drop mouthful 502a-2 edge of opening on also Elastic clamping pieces 502a-3 is set, and elastic clamping pieces 502a-3 preferred rubber materials are made, and sheet glass X is clamped in glass by it Piece drops in mouthful 502a-2, does not allow it to fall down, so as to driving horizontal rotating disc 501a rotation, by sheet glass X rotate horizontally to The top of workbench, pushed by pushing component 503 and dropped, and pushing component 503 also includes the lower lock block of column structure 503a, lower lock block 503a are connected with the 5th sheet glass drive device 503b, and it drives lower lock block 503a to move downwardly to glass Piece is dropped in mouthful 502a-2, and at this moment lower lock block 503a pushes sheet glass X, and because it is under pressure, clamping glass piece X edges are set Elastic clamping pieces 502a-3 will deform upon, so as to sheet glass X be pushed on the station of the workbench that drops.
Reference picture 18~22 is one embodiment that conveying assembly 600 of the present invention provides, its main body bag in the embodiment The first pushing piece 610 and the first transmission parts 620 are included, first pushing piece 610 includes the first scraping wings 611, the first scraping wings Include the first rack 611a on 611, and the first rack 611a is positive helical teeth, i.e. the incline direction of rack is towards the right side.
Reference picture 19~21, the first transmission parts 620 include object storage component 621 and driving member 622, and driving member 622 includes first Gear 622a and second gear 622b, and first gear 622a and second gear 622b are mutually perpendicular to, i.e., the rotation of two gears Direction is vertical, for example, one is horizontally oriented rotation, another is rotated along vertical direction.First gear 622a passes through company Extension bar connects with object storage component 621, and is parallel to each other with object storage component 621, and second gear 622b is arranged on object storage component 621, with putting The driving wheel of object 621 is connected, and first gear 622a and second gear 622b intermeshings, realizes linkage.Wherein, the first tooth Wheel 622a and the first rack 611a is meshed, it is preferred that the first scraping wings 611 is arranged to U-typed, as first gear 622a and the When one rack 611a interacts, because being empty, first gear 622a and the first rack among the first scraping wings 611 During 611a engagements, 611 flexible performance of the first scraping wings, the service life of the first scraping wings 611 is enhanced.First pushes away Flitch 611 to the direction of object storage component 621 move when, the first rack 611a driving first gear 622a, first gear 622a driving the Two gear 622b are moved, and second gear 622b driving driving wheels, realize the transmission of the first transmission parts 620.
In the present embodiment, driving member 622 also includes driven member 622e and conveyer belt 622c, and conveyer belt 622c is provided with Baffle plate 622d.Driven pulley 622e includes the first driven pulley 622e-1 and the second driven pulley 622e-2, and the first driven pulley 622e-1 It is gear with the second driven pulley 622e-2, and is intermeshed.After driving wheel is driven by second gear 622b, the first driven pulley 622e-1 is also moved therewith, because the first driven pulley 622e-1 and the second driven pulley 622e-2 intermeshings, second is driven Wheel 622e-2 is also moved therewith.Conveyer belt 622c includes the first conveyer belt 622c-1 and the second conveyer belt 622c-2, when first from When driving wheel 622e-1 and the second driven pulley 622e-2 drives the first conveyer belt 622c-1 and the second conveyer belt 622c-2 motions respectively, Because being linked caused by gear engagement, the direction phase of the first conveyer belt 622c-1 and the second conveyer belt 622c-2 motions Instead.Baffle plate 622d includes first baffle 622d-1 and second baffle 622d-2, per adjacent first baffle 622d-1 and second gear In one plane, first baffle 622d-1 is arranged on the first conveyer belt 622c-1 to plate 622d-2, and second baffle 622d-2 is set In the second conveyer belt 622c-2, because the first conveyer belt 622c-1 and the second conveyer belt 622c-2 directions of motion are on the contrary, former The first first baffle 622d-1 on the first conveyer belt 622c-1, and the second gear on the second conveyer belt 622c-2 adjacent thereto After exercise, both are still adjacent and in one plane by plate 622d-2.In adjacent first baffle 622d-1 and second baffle Material is placed between 622d-2, if the first conveyer belt 622c-1 first first baffle 622d-1 and the second conveyer belt 622c-2 First second baffle 622d-2 between formed for first receiving space M, second first of the first conveyer belt 622c-1 Formed between baffle plate 622d-1 and the second conveyer belt 622c-2 second second baffle 622d-2 for the second receiving space N, In the present embodiment, first receiving space M is empty not place material.
In the present embodiment, the first rack 611a is positive helical teeth to reference picture 20, and the first rack 611a is in the first scraping wings The distance of 611 actings is equal to the distance between upper two adjacent first baffle 622d-1 of the first conveyer belt 622c-1, or waits In the distance between upper two adjacent second baffle 622d-2 of the second conveyer belt 622c-2." acting " mentioned here refers to, First rack 611a and first gear 622a are meshed, if the first rack 611a and first gear 622a are not intermeshed, the One rack 611a just not works done.So when the first scraping wings 611 pushes toward the direction of object storage component 621, the first rack 611a and One gear 622a is meshed, and starts to do work, now, the first rack 611a driving first gear 622a, first gear 622a drivings Second gear 622b is moved, and second gear 622b driving driving wheels, after driving wheel is driven by second gear 622b, first is driven Wheel 622e-1 also move therewith because the first driven pulley 622e-1 and the second driven pulley 622e-2 intermeshing, second from Driving wheel 622e-2 is also moved therewith, realizes the transmission of the first transmission parts 620, and now the material in the second receiving space N down pushes away Send the position instead of first receiving space M.When material falls on first receiving space M under the second receiving space N position, the One rack 611a completes to do work in the first scraping wings 611, allows it to complete taken mode of doing work, can set the first scraping wings 611 carry the first rack 611a rack length, can also carry the first rack 611a mono- on the first scraping wings 611 by setting The length at end, other embodiment do not illustrate one by one, but within the scope of the present invention.Continue to press on the first pusher Plate 611, now the first rack 611a and first gear 622a on the first scraping wings 611 do not do work, i.e., both no longer engagement and Linkage is not produced, therefore promotes the first scraping wings 611, and the material being now positioned in first receiving space M is pushed out.Then One scraping wings 611 moves to the opposite direction where object storage component 621, the first scraping wings 611 is pulled out, because in the present embodiment In the first rack 611a be positive helical teeth, so during counter motion, the first rack 611a does not engage with first gear 622a, therefore Linkage is not produced.When pushing again, successively so.In the present embodiment, by promoting the first scraping wings 611 to make the second receiving empty Between after material in N down pushes the position instead of first receiving space M, continuation pushes forward, material is accommodated from second empty Between push out in N after, then the first scraping wings 611 moved toward away from the direction of object storage component 621, now because the first rack 611a is Positive helical teeth, it still will not now be engaged between the first rack 611a and first gear 622a and not produce linkage.
Reference picture 23, second embodiment of conveying assembly 600 of the present invention, the embodiment are different from one embodiment It is:First rack 611a is backslash tooth, i.e. teeth directional is towards a left side.Specific embodiment is:When the first scraping wings 611 is to object storage component 621 When place direction is moved, because the first rack 611a is backslash tooth, therefore the first rack 611a does not drive first gear 622a to move, First scraping wings 611 pushes forward straight, until after material is pushed out, then the first scraping wings 611 is allowed to away from object storage component 621 directions move because the first rack 611a be backslash tooth, now the first rack 611a on the first scraping wings 611 with First gear 622a is engaged, so as to produce linkage.First rack 611a drives first gear 622a, first gear 622a to drive Dynamic second gear 622b motions, second gear 622b driving driving wheels, after driving wheel is driven by second gear 622b, first from Driving wheel 622e-1 is also moved therewith, because the first driven pulley 622e-1 and the second driven pulley 622e-2 intermeshings, second Driven pulley 622e-2 is also moved therewith, and now the material in the second receiving space N down pushes the position instead of first receiving space M Put.So in the present embodiment, when the first scraping wings 611 pushes forward, release material.When first scraping wings 611 is toward post-tensioning, on One sheaf space realizes moving down for material toward declining.
Reference picture 24, the 3rd embodiment of conveying assembly 600 of the present invention, the embodiment are different from first or second Embodiment, in the embodiment, the first pushing piece 610 includes the first actuator 613, and one end of the first actuator 613 is provided with 3rd gear 613a, the first scraping wings 611 also include the second rack 611b, the second rack 611b and the 3rd gear 613a and matched Close.3rd gear 613a rotations are driven by the first actuator 613, the 3rd gear 613a engages with the second rack 611b so that First scraping wings 611 is pushed forward, and then the first rack 611a is also moved therewith.If the first rack 611a is positive helical teeth (rack Teeth directional towards the right side), the first rack 611a driving first gear 622a, first gear 622a driving second gear 622b motions, the Two gear 622b drive driving wheel, and after driving wheel is driven by second gear 622b, the first driven pulley 622e-1 is also moved therewith, Because the first driven pulley 622e-1 and the second driven pulley 622e-2 intermeshings, the second driven pulley 622e-2 are also transported therewith Dynamic, the material in the second receiving space N down pushes the position instead of first receiving space M.And continue to push the first scraping wings 611, it is necessary to which explanation, now the first rack 611a is no longer intermeshed with first gear 622a, therefore pushes the first scraping wings When 611, material is simply pushed, does not realize the function that material declines.After material is pushed out from the second receiving space N, then will First scraping wings 611 moves toward away from the direction of object storage component 621, now between the first rack 611a and first gear 622a still not It can engage and not produce linkage, the first scraping wings 611 returns to original state position.If the first rack 611a is backslash tooth (rack Teeth directional towards a left side), when the first scraping wings 611 pushes forward, the first rack 611a and first gear 622a are not engaged, therefore at this In motion, the action for releasing material is only done.When first scraping wings 611 is toward post-tensioning, the first rack 611a driving first gear 622a, First gear 622a driving second gear 622b motions, second gear 622b driving driving wheels, when driving wheel is by second gear After 622b drivings, the first driven pulley 622e-1 is also moved therewith, because the first driven pulley 622e-1 and the second driven pulley 622e-2 Intermeshing, so the second driven pulley 622e-2 is also moved therewith, the material in the second receiving space N is down pushed instead of first Receiving space M position, realize moving down for material.
Reference picture 25 and Figure 26, present invention also offers one kind to assemble device, and the main body of the device includes conveying assembly 600 With blanking component 700, conveying assembly 600 includes the first pushing piece 610 and the first transmission parts 620, and the first pushing piece 610 includes the One scraping wings 611, include the first rack 611a on the first scraping wings 611.First transmission parts 620 include object storage component 621 and transmission Part 622, driving member 622 include first gear 622a and second gear 622b.First gear 622a passes through connecting rod and object storage component 621 connect, and are parallel to each other with object storage component 621, and second gear 622b is arranged on object storage component 621, the active with object storage component 621 Wheel is connected, and first gear 622a and second gear 622b intermeshings, realizes linkage.First scraping wings 611 is to object storage component 621 When place direction is moved, the first rack 611a driving first gear 622a, first gear 622a driving second gear 622b motions, Second gear 622b drives driving wheel, realizes the transmission of the first transmission parts 620.Driving member 622 also includes driven member 622e and biography Band 622c is sent, and conveyer belt 622c is provided with baffle plate 622d.It is driven that driven pulley 622e includes the first driven pulley 622e-1 and second 622e-2 is taken turns, and the first driven pulley 622e-1 and the second driven pulley 622e-2 are gear, and be intermeshed.When driving wheel is by After two gear 622b drivings, the first driven pulley 622e-1 is also moved therewith, because the first driven pulley 622e-1 and the second driven pulley 622e-2 is intermeshed, so the second driven pulley 622e-2 is also moved therewith.Conveyer belt 622c includes the first conveyer belt 622c-1 With the second conveyer belt 622c-2, when the first driven pulley 622e-1 and the second driven pulley 622e-2 drive the first conveyer belt respectively When 622c-1 and the second conveyer belt 622c-2 is moved, because being linked caused by gear engagement, the first conveyer belt 622c-1 Moved with the second conveyer belt 622c-2 in opposite direction.Baffle plate 622d includes first baffle 622d-1 and second baffle 622d-2, In one plane, first baffle 622d-1 is arranged on the first conveyer belt by first baffle 622d-1 and second baffle 622d-2 622c-1, second baffle 622d-2 are arranged on the second conveyer belt 622c-2, because the first conveyer belt 622c-1 and the second conveyer belt The 622c-2 directions of motion are on the contrary, so originally first baffle 622d-1 on the first conveyer belt 622c-1, and adjacent thereto After exercise, both are still adjacent and in one plane by second baffle 622d-2 on second conveyer belt 622c-2.Adjacent First baffle 622d-1 and second baffle 622d-2 between place material, if the first conveyer belt 622c-1 first first gear Formed between plate 622d-1 and the second conveyer belt 622c-2 first second baffle 622d-2 for first receiving space M, One conveyer belt 622c-1 second first baffle 622d-1 and the second conveyer belt 622c-2 second second baffle 622d-2 Between formed for the second receiving space N.If the first rack 611a is positive helical teeth (teeth directional of rack towards the right side), the first rack 611a First gear 622a is driven, first gear 622a driving second gear 622b motions, second gear 622b driving driving wheels, works as master After driving wheel is driven by second gear 622b, the first driven pulley 622e-1 is also moved therewith, because the first driven pulley 622e-1 and the Two driven pulley 622e-2 are intermeshed, so the second driven pulley 622e-2 is also moved therewith, the material in the second receiving space N is past Lower push replaces first receiving space M position.And continue to push the first scraping wings 611, it is necessary to explanation, now the first tooth Bar 611a is no longer intermeshed with first gear 622a, therefore during the first scraping wings 611 of push, material is simply pushed, does not realize thing Expect the function of declining.After material is pushed out from the second receiving space N, then by the first scraping wings 611 toward away from object storage component 621 Direction is moved, and still will not now be engaged between the first rack 611a and first gear 622a and not produced linkage, the first pusher Plate 611 returns to original state position.If the first rack 611a is backslash tooth (teeth directional of rack towards a left side), the first scraping wings 611 is past During preceding push, the first rack 611a and first gear 622a are not engaged, therefore in this motion, only do the action for releasing material. When first scraping wings 611 is toward post-tensioning, the first rack 611a driving first gear 622a, first gear 622a driving second gears 622b is moved, second gear 622b driving driving wheels, after driving wheel is driven by second gear 622b, the first driven pulley 622e-1 Also move therewith, because the first driven pulley 622e-1 and the second driven pulley 622e-2 intermeshings, the second driven pulley 622e- 2 also move therewith, and the material in the second receiving space N down pushes the position instead of first receiving space M, realizes under material Move.
Reference picture 25, blanking component 700 include the first hole 704, and material is pushed to blanking component by the first scraping wings 611 At 700 the first hole 704, material drops at the first hole 704.But if when material is pushed at the first hole 704, directly allow If material falls, the unstable of whereabouts, or material can be caused to be stuck at the first hole 704.
Preferably, blanking component 700 also includes moving member 701, moving member 701 includes the first movable plate 701a and second and moved Dynamic plate 701b, and blanking component 700 is provided with the 4th groove 702 and the 5th groove 703, the 4th groove 702 and the 5th groove 703 are arranged at On blanking component 700, and the 4th groove 702 ensures the first movable plate 701a opening and closing back and forth above the first hole 704, the 5th groove 703 Ensure the second movable plate 701b opening and closing back and forth above the first hole 704.
Preferably, the first movable plate 701a end is provided with the 4th gear 701a-1, the second movable plate 701b end is set There are the 5th gear 701b-1, and the 4th gear 701a-1 and the 5th gear 701b-1 intermeshings.4th gear 701a-1's is upper Side second drives 701a-1 ', drives the 4th gear 701a-1 rotations by the second driving 701a-1 ', and drive the 5th gear 701b-1。
Preferably, assembling device also includes the first revolving part 800, and the first revolving part 800 is provided with multiple stations, Mei Gegong Conveying assembly 600 is placed on position, so as to save the time of workers carry, only illustrates 5 stations in fig. 26, but not only limit In 5, it differs one for example, but within the scope of the present invention with quantity.
Figure 27 is the overall applicability structural representation that technical solution of the present invention is applied to the automatic package system of each part of instrument Figure.In one embodiment, before described instrument (being described in detail by taking explosion-proof thermometer as an example) first passes through assembling instrument The station of canning, front casing supply unit 100 that reference picture includes, front casing screening unit 200, by instrument front casing It is assembled on explosion-proof temperature meter, sheet glass supply unit 300 that reference picture includes, sheet glass detection unit 400, sheet glass sieve Menu member 500, after the assembling for completing apparatus glass piece, at rotary working platform to assembling device station, the conveying in reference picture Component 600, the revolving part 800 of blanking component 700 and first, after loading electronic component, rotary working platform, rotates extremely again On other stations, bonnet is assembled, is finally rotated to the station of finished product mounted box sub-device, ready-made finished product instrument is loaded into box In son.
It should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention and it is unrestricted, although with reference to preferable The present invention is described in detail embodiment, it will be understood by those within the art that, can be to the technology of the present invention Scheme is modified or equivalent substitution, and without departing from the spirit and scope of technical solution of the present invention, it all should cover in this hair Among bright right.

Claims (10)

  1. A kind of 1. system of front casing assembling sheet glass assembly element conveying assembling, it is characterised in that:Including,
    Front casing supply unit (100), including front casing vibration component (101) and front casing conveying mechanism (102), it is outer before described Shell vibration component (101) by irregular front casing body (Y) by vibrating transportation into the front casing conveying mechanism (102), The acceleration completed by the front casing conveying mechanism (102) to the front casing body (Y) conveys;
    Front casing screening unit (200), it is connected with the front casing conveying mechanism (102), in addition to chassis (201), the bottom Disk (201) upper surface is provided with the first front casing rotating disk (202), and the first front casing rotating disk (202) is with the chassis (201) central point (S) does central rotation, and the first front casing rotating disk (202) is located at the both sides of the central point (S) The second front casing rotating disk (203) is inside additionally provided with, the second front casing rotating disk (203) rotates in first front casing Disk (202) carries out rotation while doing central rotation, and is provided with detection group above the second front casing rotating disk (203) Part (204), the front casing body (Y) are delivered to the second front casing rotating disk by the front casing conveying mechanism (102) (203) in, the current state of the front casing body (Y) is detected by the detection components (204), realizes the screening to it;
    Sheet glass supply unit (300), including sheet glass vibration component (301) and sheet glass conveying mechanism (302), the glass Sheet glass (X) in it is vibrated on the sheet glass conveying mechanism (302) by piece vibration component (301);
    Sheet glass detection unit (400), it is connected with the sheet glass conveying mechanism (302), including sheet glass detection components (401) With sheet glass push component (402), the sheet glass (X) from the sheet glass conveying mechanism (302) is pushed to described Positive and negative detection is carried out in sheet glass detection components (401);
    Sheet glass screening unit (500), it is connected with the sheet glass detection unit (400), in addition to rotates horizontally component (501) component (502), is overturn vertically and pushes component (503), the horizontal rotation component (501) rotates around center of turntable, And the vertical upset component (502) is symmetricly set in the horizontal rotation component (501) centered on the center of turntable Both ends;The sheet glass (X) after the completion of detection is pushed to the vertical upset component by the sheet glass push component (402) (502) in, the sheet glass (X) under the state of meeting the requirements is obtained by the upset screening of the vertical upset component (502); The rotation for rotating horizontally component (501) is overturn above component (502) band to workbench vertically by described, described to push group The sheet glass (X) is pushed and fallen on the workbench by part (503);
    Conveying assembly (600), the conveying assembly (600) include the first pushing piece (610), and first pushing piece (610) is also Including the first scraping wings (611), first scraping wings (611) includes the first rack (611a), and first rack (611a) is helical teeth;
    First transmission parts (620), first transmission parts (620) include object storage component (621) and driving member (622), the transmission Part (622) includes first gear (622a) and second gear (622b), and two gears are mutually perpendicular to and are intermeshed, and described One gear (622a) is meshed with first rack (611a), the second gear (622b) and the object storage component (621) Driving wheel is connected;
    Wherein, during the first scraping wings (611) motion, first rack (611a) drives first gear (622a) fortune Dynamic, the first gear (622a) drives second gear (622b) motion, and the second gear (622b) drives driving wheel, Realize the transmission of the first transmission parts (620).
  2. 2. the system of front casing assembling sheet glass assembly element conveying assembling as claimed in claim 1, it is characterised in that:Before described Shell body (Y) is the circular cylinder of a bottom surface opening, is formed and accommodates inner chamber, and opening, edge are provided with the annular side of cylinder The edge of opening, which stretches out, is fixed with penetrating column casing, and the column casing is connected by being bonded the opening with the receiving inner chamber It is logical.
  3. 3. the system of front casing assembling sheet glass assembly element conveying assembling as claimed in claim 1 or 2, it is characterised in that:Institute State the front casing delivery track that front casing conveying mechanism (102) also includes being connected with the front casing vibration component (101) (102a), the track width of the front casing delivery track (102a) are slightly larger than the diameter of the front casing body (Y), and it is described before The conveyer belt (102b) parallel with the front casing delivery track (102a) is additionally provided with above shell delivery track (102a), The elastic bumps part (102c) of arrangement, the elastic bumps part (102c) and institute are provided with the surface of the conveyer belt (102b) The front casing body (Y) stated in front casing delivery track (102a) is inconsistent, is accelerated to push to the front casing screening In unit (200).
  4. 4. the system of front casing assembling sheet glass assembly element conveying assembling as claimed in claim 2, it is characterised in that:The bottom The lower end of the central point (S) on disk (201) is provided with the first front casing drive device (201a), and first front casing drives The rotation of dynamic device (201a) driving the first front casing rotating disk (202), and the first front casing rotating disk (202) On be additionally provided with the second front casing drive device (202a), the second front casing drive device (202a) center symmetric setting in The both sides of the central point (S), and contacted with the second front casing rotating disk (203), drive the second front casing rotation The rotation of disk (203).
  5. 5. the system of front casing assembling sheet glass assembly element conveying assembling as claimed in claim 2, it is characterised in that:Described One front casing rotating disk (202) has dug out penetrating groove (202b) on the central point (S) both ends are centrosymmetric, described logical The bottom edge of saturating groove (202b), which extends internally, is provided with extension (202c), and the second front casing rotating disk (203) sets Be placed in the penetrating groove (202b), supported by the extension (202c), and the first front casing rotating disk (202) with The central point (S) is additionally provided with targeting port (202d) apart from farthest one end, and the bottom surface of the targeting port (202d) is higher than institute Penetrating groove (202b) bottom surface is stated, and the A/F of the targeting port (202d) is straight slightly larger than the front casing body (Y) Footpath size.
  6. 6. the system of front casing assembling sheet glass assembly element conveying assembling as claimed in claim 5, it is characterised in that:Described The center position of two front casing rotating disks (203) digs out corresponding with front casing body (Y) cylinder body shape annular penetrating Mouth (203a), and the penetrating mouth of strip being adapted with the column casing is symmetrically dug out at the both ends of the penetrating mouth of annular (203a) (203b), the penetrating mouth of special type (203c) for accommodating the front casing body (Y) under different conditions, and described the are formed therebetween Two front casing rotating disks (203) are located at the downward truncated section in one end of the penetrating mouth of the special type (203c), form chute (203d), The floor height of the chute (203d) is identical with the floor height of the targeting port (202d), and the width of its groove is slightly larger than described The diameter of front casing body (Y).
  7. 7. the system of front casing assembling sheet glass assembly element conveying assembling as claimed in claim 6, it is characterised in that:The inspection The both sides that component (204) is symmetricly set in the central point (S) are surveyed, and positioned at the penetrating mouth of the strip of higher end The top of (203b), the column casing is detected the presence or absence of in the penetrating mouth of the strip (203b), so as to by before described first The rotation of the central rotation of shell rotating disk (202) and the second front casing rotating disk (203) is completed to the front casing The screening of body (Y).
  8. 8. the system of front casing assembling sheet glass assembly element conveying assembling as claimed in claims 6 or 7, it is characterised in that:Institute State and be additionally provided with the mouth that drops (201b) on the bottom away from the front casing supply unit (100) on chassis (201), it is described to drop Mouthful (201b) is identical with the size shape of the penetrating mouth of the special type (203c), when the penetrating mouth of the special type (203c) rotation extremely with institute State the mouth that drops (201b) up and down correspond to overlap when, the front casing body (Y) is dropped downwards.
  9. 9. the system of front casing assembling sheet glass assembly element conveying assembling as claimed in claim 8, it is characterised in that:It is described to prolong The diameter for the annular mouth that extending portion (202c) is formed is more than or equal to the most long length of mouth (201b) that drops.
  10. 10. the system of front casing assembling sheet glass assembly element conveying assembling as claimed in claim 8, it is characterised in that:It is described Front casing body (Y) is fallen on workbench after completing screening by the mouth that drops (201b), so as to which the workbench rotates To next station.
CN201710693098.7A 2017-08-14 2017-08-14 A kind of system of front casing assembling sheet glass assembly element conveying assembling Withdrawn CN107486714A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710693098.7A CN107486714A (en) 2017-08-14 2017-08-14 A kind of system of front casing assembling sheet glass assembly element conveying assembling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710693098.7A CN107486714A (en) 2017-08-14 2017-08-14 A kind of system of front casing assembling sheet glass assembly element conveying assembling

Publications (1)

Publication Number Publication Date
CN107486714A true CN107486714A (en) 2017-12-19

Family

ID=60645457

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710693098.7A Withdrawn CN107486714A (en) 2017-08-14 2017-08-14 A kind of system of front casing assembling sheet glass assembly element conveying assembling

Country Status (1)

Country Link
CN (1) CN107486714A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109227125A (en) * 2018-11-22 2019-01-18 奕雪春 A kind of air filter housing automatic assembly equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109227125A (en) * 2018-11-22 2019-01-18 奕雪春 A kind of air filter housing automatic assembly equipment

Similar Documents

Publication Publication Date Title
CN107380967A (en) A kind of apparatus glass piece assembled pack conveying push grasping system
CN107611053A (en) Chip sorting and packaging platform
CN107685980A (en) A kind of automatic assembling qualified card device of sheet glass
CN108127401B (en) Camera module kludge
CN107458822A (en) A kind of instrument rotary assembled box body conveys supplying system
CN107378480A (en) A kind of automatic assembling instrument system
CN107697603A (en) A kind of front casing assembling subsystem of automatic package system
CN107600483A (en) A kind of box body vanning subsystem of automatic package system
CN107685979A (en) A kind of sheet glass circulating conveyor assembled automatically
CN107486714A (en) A kind of system of front casing assembling sheet glass assembly element conveying assembling
CN107487613A (en) A kind of front casing assembling sheet glass package system assembled automatically
CN107457549A (en) A kind of automatic assembling front casing finished product clip loading system
CN107697604A (en) Lid arrangement after a kind of automatic assembling sheet glass
CN207020096U (en) A kind of sheet glass assembling subsystem of automatic package system
CN107322295A (en) A kind of instrument rotary assembled system
CN107511657A (en) A kind of sheet glass assembly element conveying assembly system assembled automatically
CN107378436A (en) A kind of instrument rotary assembled box body conveying push grasping system
CN109878787A (en) A kind of semi-automatic dress smoke machine
CN207090404U (en) A kind of apparatus glass piece assembled pack conveying push grasping system
CN107363537A (en) A kind of instrument package system
CN107511654A (en) A kind of front casing assembly element conveying assembly system assembled automatically
CN109785502B (en) Control method of double-row vibration type scattered paper money sorting and collecting device
CN211296693U (en) Packaging device
CN107685885A (en) A kind of box body vanning handling device of automatic package system
CN107685895A (en) A kind of element conveying assembling finished product mounted box vanning package system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20171219