CN107386329A CN201710826380.8A CN201710826380A CN107386329A CN 107386329 A CN107386329 A CN 107386329A CN 201710826380 A CN201710826380 A CN 201710826380A CN 107386329 A CN107386329 A CN 107386329A
Authority
CN
China
Prior art keywords
outer barrel
supporting device
plate supporting
mould plate
pit shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710826380.8A
Other languages
Chinese (zh)
Inventor
李爱家
薛彦军
赵炜
李元坤
赵成龙
王亚玲
李新强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 5 Co Ltd
Original Assignee
Sinohydro Bureau 5 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 5 Co Ltd filed Critical Sinohydro Bureau 5 Co Ltd
Priority to CN201710826380.8A priority Critical patent/CN107386329A/en
Publication of CN107386329A publication Critical patent/CN107386329A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a kind of pit shaft mould plate supporting device and its peace to tear method open, wherein, pit shaft mould plate supporting device is:Including plug, some telescoping support units to connect successively being enclosed on plug;The structure of telescoping support unit is:Interior hollow stem including entangling plug, four outer barrels are disposed with from the bottom up along interior hollow stem, are connected between four outer barrels by elastic mechanism;Knighthead is connected with first outer barrel, one end of knighthead is movably attached in the middle part of support rail, and support rail one end is fixed on the second outer barrel, and the other end is fixed in template;3rd outer barrel and the 4th outer barrel are also same setting;In addition, it is both provided with clip on the first outer barrel and the second outer barrel.The present invention can realize narrow and small, deep well internal model installation, remove operation, not only save human and material resources, and construction technology is relatively simple, installation, convenient disassembly, shortens the engineering time.

Description

A kind of pit shaft mould plate supporting device and its peace tear method open
Technical field
The present invention relates to concrete pit construction field, particularly a kind of pit shaft mould plate supporting device and its peace tear method open.
Background technology
In metro depot, the construction of parking lot concrete pit, due to being limited by inspection shaft working space, it is difficult to apply In general form bracing system, it more can not meet and internal model dismounting operation carried out inside operating personnel's tripping in inspection shaft.
Two major classes are broadly divided into for cylindrical shape cast-in-place concrete structure, large cylinder-shaped structure mainly has hollow thin-wall Pier, silo, chimney, deep-well pump house etc..The ratio of application is wide the columnar structured creeping formworks of more than 8m, two-sided sliding formwork, one side Sliding formwork, the Turnover Form Construction Technology, common typified form supporting construction columnar structured below 8m.Middle-size and small-size thin wall cylinder-shaped structure Main rain, sewage inspection well, bridge pad reserving hole etc..For this class formation using relatively common rainy, sewage inspection Well combined steel, plank sheathing support system, bridge pad reserving hole are mainly molded work with pre-buried plastic conduit, coring etc. Skill.
It can be seen that though cylindrical shape concrete structure construction technology at home and abroad has many application technology and plant equipment, however, basement Well is most common due to operating environment, the limitation of operating space as metro depot, the drainage system underground structure in parking lot Construction method, template system and do not apply to.
Analyzed by most common construction method, circulation material:The similar engineering hitherto seen is mainly with group Steel, the construction method progress operation of plank sheathing progress internal model support are closed, internal model installation is installed according to " by lower from upper, staged and layered " Principle, operating personnel carries out formwork reinforcement in layer inside deep-well, and internal model support system also necessarily turns into be arrived on worker The unique passage and operating platform on ground.
Not only difficulty is big for such construction operation, and personnel's Zhi Li, dismounting template security context in small space is poor, disappears Time-consuming is grown.Operating personnel is also same to be examined in face of the hot environment that the concrete heat of hydration is brought of going into the well again, part operation personnel synthesis Consider above-mentioned factor, form removal of often no longer going into the well, and internal model is retained in deep-well, feel to also comply with reason.If well depth is not only Waste of materials, and raindrop erosion template can bring the defects of blocking drainage channel, greatly increase construction in later period and maintenance cost. Such method is only applicable to the construction of inferior grade temporary work, can not meet the matter of high-grade highway, high-speed railway, rail yard Amount requires.
Analyzed by the input situation of live human resources:Conventional internal model support is carried out in small space, it is not only difficult To ensure personal security, similarly it is difficult to ensure that the concrete quality of structure pours stabilization.Under normal circumstances, it is guarantee rolling stock section, stops Large number of cylindrical shape concrete architecture quality and construction speed in parking lot, the multiple operations of substantial amounts of people's work point need to be put into while carried out Excessive risk is vertical, form removal process, and manual work productivity ratio is extremely low, considerably increases construction cost.
The content of the invention
Technical problem solved by the invention is to provide a kind of pit shaft mould plate supporting device and its peace tears method, present invention dress open It is low to put simple structure, processing and fabricating cost, can be completely achieved terrestrial operation;And the inventive method greatly simplifies pit shaft template peace Dress, the artificial input of dismounting operation procedure and scene, improve construction production efficiency and quality control, securely and reliably.
In order to solve the above technical problems, the technical solution adopted by the present invention is:
A kind of pit shaft mould plate supporting device, including the plug being vertically set in inspection shaft, are enclosed on the plug successively Some telescoping support units to connect;The structure of the telescoping support unit is:Interior hollow stem including entangling plug, edge The interior hollow stem and be disposed with the 4th outer barrel, the 3rd outer barrel, the second outer barrel and the first outer barrel from the bottom up;Described 4th Connected between outer barrel, the 3rd outer barrel, the second outer barrel and the first outer barrel by elastic mechanism;It is oblique that support is connected with first outer barrel Bar, one end of the knighthead are movably attached in the middle part of support rail, and described support rail one end is fixed on the second outer barrel, The other end is fixed in template;Knighthead and support rail are also equipped with 3rd outer barrel and the 4th outer barrel, its structure is:The Knighthead is connected with three outer barrels, one end of the knighthead is movably attached in the middle part of support rail, the support rail One end is fixed on the 4th outer barrel, and the other end is fixed in template;The first clip is provided with the first outer barrel, for by One outer barrel is fixed on interior hollow stem;The second clip is provided with the 3rd outer barrel, for the 3rd outer barrel to be fixed on into interior sky On core bar.
Further, the template uses and kills sharp gang form.
Further, the elastic mechanism is spring.
Further, the knighthead connects support rail by linkwork.
Further, pre-buried intubation is provided with inspection shaft bottom plate, the plug is inserted into pre-buried intubation.
Further, it is fixed with stroke pressure ring in the second outer barrel bottom.
Further, second outer barrel and the 3rd outer barrel and the elastic mechanism between them are integrally replaced with outside one Cylinder.
A kind of peace of pit shaft mould plate supporting device tears method, including installation method open, and the installation method specifically includes following Step:First, inspection shaft deep basal pit is excavated, pours inspection shaft bottom board concrete, and the pre-buried intubation on inspection shaft bottom plate;2nd, colligation inspection shaft Side wall reinforcing bar, it is interim fixed that periphery is carried out to inspection shaft side wall reinforcing bar using Steel bar rack;3rd, plug is transported in inspection shaft, and inserted Enter into pre-buried intubation;4th, telescoping support unit is hung in inspection shaft by plug, afterwards, using depression bar by telescopic branch Support unit is urged to the fixed position for precalculating and having debugged;5th, the 4th step process is repeated until each telescoping support unit is pacified Dress, fix in position;The 6th, internal model concrete cover cushion block is installed, outboard template is reinforced, concrete is poured to the inspection shaft borehole wall.
Further, in addition to method for dismounting, the method for dismounting specifically include following steps:First, depression bar is goed deep into basement The first clip of telescoping support unit and the second clip is set to exit the fixed position of interior hollow stem in well;2nd, from upper past Under remove telescoping support unit successively, untill all telescoping support units all remove;3rd, miscellaneous part, bag are removed Plug is included, until dismounting finishes.
Further, when dismantling pit shaft mould plate supporting device, its knocked down condition is that the intensity of inspection shaft side wall concrete reaches 2.5Mpa。
Compared with prior art, the beneficial effects of the invention are as follows:
Apparatus of the present invention can realize that same period engineering quantity numerous narrow and small, deep well internal model are installed, dismantle operation;Not only Human and material resources are saved, and construction technology is relatively simple, installation, convenient disassembly, so as to shorten the time of construction;Device rigidity Greatly, stability is good and can recycle for several times, is hardly damaged, and causes the smooth degree in concrete formation face to be effectively ensured;This Outside, operating personnel can according to design drawing requirement mine shaft depth, size needs, increase bearing height temporarily, utilize bullet Spring, hinged structures are adjusted in support length, amplitude, so as to improve production efficiency, reduce what material consumption was brought Construction cost;Realize simultaneously and installation in hole, the requirement of dismounting template are carried out on ground, and safe operation process is reliable.
Brief description of the drawings
Fig. 1 is inspection shaft facade view in the present invention.
Fig. 2 is inspection shaft section plan in the present invention.
Fig. 3 is one of pit shaft mould plate supporting device scheme of installation of the present invention.
Fig. 4 is the two of pit shaft mould plate supporting device scheme of installation of the present invention.
Fig. 5 is that inspection shaft borehole wall concrete schematic diagram is poured in the present invention.
Fig. 6 is pit shaft mould plate supporting device dismounting schematic diagram of the present invention.
Fig. 7 is telescoping support cellular construction schematic diagram in the present invention.
Fig. 8 is the template effect diagram that the present invention uses.
Fig. 9 is second of structural representation of telescoping support unit in the present invention.
Figure 10 is the third structural representation of telescoping support unit in the present invention.
In figure:1- inspection shaft side walls;2- inspection shaft bottom plates;3- borehole wall steel reinforcement cages;The pre-buried intubations of 4-;5- plugs;The telescopic branch of 6- Support unit;7- steel wire ropes;8- depression bars;9- chain blocks;10- supports;The clips of 11- first;Hollow stem in 12-;Outside 13- first Cylinder;The outer barrels of 14- second;The outer barrels of 15- the 3rd;16- knightheads;17- elastic mechanisms;The outer barrels of 18- the 4th;19- linkworks; 20- support rails;21- templates;The clips of 22- second;23- stroke pressure rings.
Embodiment
The present invention will be further described in detail with reference to the accompanying drawings and detailed description.
Embodiment 1
A kind of pit shaft mould plate supporting device, its structure are in the present invention, including the plug 5 being vertically set in inspection shaft, set Some telescoping support units 6 to connect successively on the plug 5;The structure of the telescoping support unit 6 is:Including The interior hollow stem 12 of plug 5 is entangled, the 4th outer barrel 18, the 3rd outer barrel are disposed with from the bottom up along the interior hollow stem 12 15th, the second outer barrel 14 and the first outer barrel 13;4th outer barrel 18, the 3rd outer barrel 15, the second outer barrel 14 and first outer barrel 13 it Between connected by elastic mechanism 17;Knighthead 16 is connected with first outer barrel 13, one end activity of the knighthead 16 is even The middle part of support rail 20 is connected to, described one end of support rail 20 is fixed on the second outer barrel 14, and the other end is fixed in template 21; Knighthead 16 and support rail 20 are also equipped with 3rd outer barrel 15 and the 4th outer barrel 18, its structure is:On 3rd outer barrel 15 Knighthead 16 is connected with, one end of the knighthead 16 is movably attached to the middle part of support rail 20, the support rail 20 One end is fixed on the 4th outer barrel 18, and the other end is fixed in template 21;The first clip 11 is provided with the first outer barrel 13, For the first outer barrel 13 to be fixed on into interior hollow stem 12;The second clip 22 is provided with the 3rd outer barrel 15, for by Three outer barrels 15 are fixed on interior hollow stem 12.
Technique effect is used for further lifting apparatus of the present invention, the template 21 uses and kills sharp gang form.It is described Elastic mechanism 17 is spring.The knighthead 16 connects support rail 20 by linkwork 19.It is provided with inspection shaft bottom plate 2 Pre-buried intubation 4, the plug 5 are inserted into pre-buried intubation 4.
In the present invention, telescoping support unit 6 is combined using combined steel, steel rod elements and linkwork 19, with reference to Device is segmented installation of going into the well by truck crane, loosens linkwork 19 using chain block 9, truck crane, which coordinates, is lifted out well.Operation Personnel need to only stand and apparatus of the present invention can be controlled on ground.
In the present invention, plug 5 telescoping support unit 6 is played a part of series connection, stably, support, overcome concrete lateral pressure. Knighthead 16 and support rail 20 form retractable support component by linkwork 19, (i.e. each outer by spring, guide cylinder Cylinder), clip by the overall force controlled of the template 21 of pit shaft in optimum state.Killing sharp gang form has used template corner cloudy External corner kills sharp principle, effectively overcomes the puzzlement torn open at right angle and brought during internal model.
Embodiment 2
According to the described device of embodiment 1, when removing telescoping support unit 6, whole pit shaft mould plate supporting device, depression bar 8 can preferably press the first clip 11 corresponding to the first outer barrel 13, however, the second clip 22 of the 3rd outer barrel 15 presses just Relatively difficulty is, it is necessary to optimize.
On the basis of embodiment 1, the second clip 22 is subjected to cancellation processing, and by the second outer barrel 14 and the 3rd outer barrel 15 are merged into an outer barrel, cancel middle spring mechanism 17.When mounted, the first outer barrel 13 is controlled by depression bar 8, made outside first The protruding end of first clip 11 is pressed into the first outer barrel 13 by cylinder 13 in folding process, convex by elastic mechanism 17 at first Go out end ejection to block the first clip 11, realize that the entirety of support unit is fixed;When removing, first is controlled by depression bar 8 Clip 11, the protruding end of the first clip 11 is pressed into the first outer barrel 13, passes through elastic mechanism 17 at first, the first clip 11 protruding ends are ejected, and are stuck in the top of the second outer barrel 14, are realized that telescoping support unit 6 is overall and are hung out outside well.
Embodiment 3
On the basis of the described device of embodiment 1, acted on to overcome depression bar 8 to be difficult at the 3rd outer barrel 15, second Welding stroke pressure ring 23 in the bottom subrange of outer barrel 14.During installation, the first outer barrel 13 is controlled by depression bar 8, makes the first outer barrel 13 are pressed into the protruding end of the first clip 11 in first outer barrel 13 in folding process, pass through elastic mechanism 17, protruding end ejection First outer barrel 13 is blocked, realizes that telescoping support unit 6 is overall fixed.When removing, the first outer barrel is controlled by depression bar 8 13, make the first outer barrel 13 that the protruding end of the first clip 11 is pressed into the first outer barrel 13 in folding process, pass through bullet at first Property mechanism 17, while stroke pressure ring 23 is acted on the second clip 22, the second clip 22 is slipped into the 3rd outer barrel 15, with Just next stage retractable support rod member is loosened, and is realized that telescoping support unit 6 is overall and is hung out outside well.
Method is torn open to the peace of pit shaft mould plate supporting device in the present invention below by specific installation and removal example to carry out Describe in detail, wherein, the installation method comprises the following steps:
The first step:Inspection shaft deep basal pit is excavated, pours the concrete of inspection shaft bottom plate 2, and the pre-buried intubation 4 on inspection shaft bottom plate 2;The Two steps:The reinforcing bar of colligation inspection shaft side wall 1, it is interim fixed that periphery is carried out to the reinforcing bar of inspection shaft side wall 1 using Steel bar rack;3rd step:With Truck crane hangs in plug 5 in inspection shaft, inserts in pre-buried intubation 4;4th step:The telescoping support unit 6 of every meter of segmentation is led to Cross plug 5 to hang in inspection shaft, operating personnel stands on the job platform of outside, is urged to telescoping support unit 6 using depression bar 8 Precalculate the fixed position debugged;5th step:The 4th step process is repeated until each telescoping support unit 6 is installed, be fixed In place;6th step:Internal model concrete cover cushion block is installed in outside operating platform in operating personnel station;7th step:According to common process Outboard template is reinforced;8th step:Pour the concrete of inspection shaft side wall 1.
Inspection shaft concrete placings finish, and reach 2.5Mpa form removal conditions, you can device dismounting is carried out, it is specific as follows:
The first step:Operating personnel is stood in inspection shaft wellhead ground position, and depression bar 8 is goed deep into pit shaft to make telescoping support unit 6 the first clip 11 and the second clip 22 exit the fixed position of interior hollow stem 12;Second step:Will be prior using truck crane The ready support frame of simple wellhead chain block 9, which is hung, moves to pithead position, and operating personnel uses chain block 9 by telescopic branch The first clip 11 and the second clip 22 for supportting unit 6 are lifted, and realize the contracting bone function of telescoping support unit 6;3rd Step:Support 10, chain block 9 and telescoping support unit 6 are hung into deep-well by truck crane;4th step:It is straight to repeat the 3rd step To all parts, all safety is transferred from inspection shaft.
The present invention is applied to the numerous deep well of same period engineering quantity, the pit shaft model sheetinstallat of small space, dismounting operation, It realizes operating personnel and need not gone into the well, the function that quickly well inner template support system is installed, dismantled;Device construction letter It is single, it is easy for construction, efficiently solve that the working space that original routine is vertical, form removal is brought is narrow and small, is in the discomfort of high temperature form removal The problems such as processing that operating environment, later stage come by indwelling Form board tape.Apparatus of the present invention can reach same similar engineering concrete placings matter The requirement of amount, and can are reused, during use securely and reliably, and improve operating efficiency, accelerate construction speed, reduce Construction cost.

Claims (10)

1. a kind of pit shaft mould plate supporting device, it is characterised in that including the plug (5) being vertically set in inspection shaft, be enclosed on described Some telescoping support units (6) to connect successively on plug (5);
The structure of the telescoping support unit (6) is:Interior hollow stem (12) including entangling plug (5), along the interior sky Core bar (12) is disposed with the 4th outer barrel (18), the 3rd outer barrel (15), the second outer barrel (14) and the first outer barrel from the bottom up (13);Pass through elastic mechanism between 4th outer barrel (18), the 3rd outer barrel (15), the second outer barrel (14) and the first outer barrel (13) (17) connect;
Knighthead (16) is connected with first outer barrel (13), one end of the knighthead (16) is movably attached to support rail (20) middle part, described support rail (20) one end are fixed on the second outer barrel (14), and the other end is fixed in template (21);
Knighthead (16) and support rail (20) are also equipped with 3rd outer barrel (15) and the 4th outer barrel (18), its structure is: Knighthead (16) is connected with 3rd outer barrel (15), one end of the knighthead (16) is movably attached to support rail (20) Middle part, described support rail (20) one end are fixed on the 4th outer barrel (18), and the other end is fixed in template (21);
The first clip (11) is provided with the first outer barrel (13), for the first outer barrel (13) to be fixed on into interior hollow stem (12) On;The second clip (22) is provided with the 3rd outer barrel (15), for the 3rd outer barrel (15) to be fixed on into interior hollow stem (12) On.
2. a kind of pit shaft mould plate supporting device as claimed in claim 1, it is characterised in that the template (21) uses and kills sharp group Shuttering.
3. a kind of pit shaft mould plate supporting device as claimed in claim 1, it is characterised in that the elastic mechanism (17) is bullet Spring.
4. a kind of pit shaft mould plate supporting device as claimed in claim 1, it is characterised in that the knighthead (16) passes through hinge Connection mechanism (19) connection support rail (20).
5. a kind of pit shaft mould plate supporting device as claimed in claim 1, it is characterised in that be provided with inspection shaft bottom plate (2) pre- Intubation (4) is buried, the plug (5) is inserted into pre-buried intubation (4).
6. a kind of pit shaft mould plate supporting device as claimed in claim 1, it is characterised in that in the second outer barrel (14) bottom It is fixed with stroke pressure ring (23).
7. a kind of pit shaft mould plate supporting device as claimed in claim 1, it is characterised in that second outer barrel (14) and the 3rd Outer barrel (15) and the elastic mechanism (17) between them integrally replace with an outer barrel.
8. a kind of peace of pit shaft mould plate supporting device tears method, including installation method open, it is characterised in that the installation method is specific Comprise the following steps:
First, inspection shaft deep basal pit is excavated, pours inspection shaft bottom plate (2) concrete, and the pre-buried intubation (4) on inspection shaft bottom plate (2);
2nd, colligation inspection shaft side wall (1) reinforcing bar, it is interim fixed that periphery is carried out to inspection shaft side wall (1) reinforcing bar using Steel bar rack;
3rd, plug (5) is transported in inspection shaft, and be inserted into pre-buried intubation (4);
4th, telescoping support unit (6) is hung in inspection shaft by plug (5), afterwards, using depression bar (8) by telescoping support Unit (6) is urged to the fixed position for precalculating and having debugged;
5th, the 4th step process is repeated until the installation of each telescoping support unit (6), fix in position;
The 6th, internal model concrete cover cushion block is installed, outboard template is reinforced, concrete is poured to the inspection shaft borehole wall (1).
9. a kind of peace of pit shaft mould plate supporting device as claimed in claim 8 tears method, in addition to method for dismounting open, its feature exists In the method for dismounting specifically includes following steps:
Depression bar (8) the first, is goed deep into inspection shaft to the first clip (11) and the second clip (22) for making telescoping support unit (6) Exit the fixed position of interior hollow stem (12);
2nd, telescoping support unit (6) is removed successively from top to bottom, untill all telescoping support units (6) all remove;
3rd, miscellaneous part, including plug (5) are removed, until dismounting finishes.
10. a kind of peace of pit shaft mould plate supporting device as claimed in claim 9 tears method open, it is characterised in that in dismounting pit shaft During mould plate supporting device, its knocked down condition is that the intensity of inspection shaft side wall (1) concrete reaches 2.5Mpa.
CN201710826380.8A 2017-09-14 2017-09-14 A kind of pit shaft mould plate supporting device and its peace tear method open Pending CN107386329A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710826380.8A CN107386329A (en) 2017-09-14 2017-09-14 A kind of pit shaft mould plate supporting device and its peace tear method open

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710826380.8A CN107386329A (en) 2017-09-14 2017-09-14 A kind of pit shaft mould plate supporting device and its peace tear method open

Publications (1)

Publication Number Publication Date
CN107386329A true CN107386329A (en) 2017-11-24

Family

ID=60352125

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710826380.8A Pending CN107386329A (en) 2017-09-14 2017-09-14 A kind of pit shaft mould plate supporting device and its peace tear method open

Country Status (1)

Country Link
CN (1) CN107386329A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108360570A (en) * 2018-03-30 2018-08-03 中大建设股份有限公司 Bituminous paving inspection shaft gug construction method
CN111910684A (en) * 2020-08-18 2020-11-10 安徽铭安建设工程有限公司 Rapid construction system and method for lightweight template of reinforced concrete cast-in-place circular drainage inspection well
CN113374507A (en) * 2021-06-29 2021-09-10 中国十九冶集团有限公司 Template device and template supporting method for underground deep hole retaining wall

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108360570A (en) * 2018-03-30 2018-08-03 中大建设股份有限公司 Bituminous paving inspection shaft gug construction method
CN108360570B (en) * 2018-03-30 2020-11-20 中大建设股份有限公司 Lifting construction method for asphalt pavement inspection well
CN111910684A (en) * 2020-08-18 2020-11-10 安徽铭安建设工程有限公司 Rapid construction system and method for lightweight template of reinforced concrete cast-in-place circular drainage inspection well
CN113374507A (en) * 2021-06-29 2021-09-10 中国十九冶集团有限公司 Template device and template supporting method for underground deep hole retaining wall

Similar Documents

Publication Publication Date Title
CN105201106B (en) Deformation joint double shear wall form formwork construction method
CN107386329A (en) A kind of pit shaft mould plate supporting device and its peace tear method open
CN103161126A (en) Road bridge variable section hollow high pier slip-form construction method
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN106498844A (en) A kind of high speed railway box beam bridge floor pre-fabricated electric cables groove
CN106120584A (en) A kind of box culvert slip form construction device and method
CN103419279A (en) T-beam formwork integral dismantling and longitudinal sliding construction method
CN111074950B (en) Pre-closed advanced water stop post-cast strip for basement outer wall and construction method
CN102720342A (en) Hydraulic system for jacking work platform on super high-rise building
CN106522282A (en) Liftable post-cast strip template structure and system and construction method thereof
CN207211201U (en) A kind of pit shaft mould plate supporting device
CN109605547B (en) Rapid forming device and method for prefabricated pipe gallery
CN103074871A (en) Arc-shaped slope concrete sliding and lifting template
CN113502756A (en) Thin-wall pier hydraulic creeping formwork system and construction method thereof
KR20070106386A (en) Non-cementation concrete forming structure of capsule type or cave type underground structure
CN109469100A (en) A kind of piping lane template integral support device
CN211547804U (en) Cantilever type retaining wall rapid construction device
CN110453689A (en) Circular foundation pit lining wall formwork construction system and construction method
CN106193586A (en) Elevator Telescopic folding Integral lifting core
CN105178196A (en) Multiple-joint linkage type integrated formwork surrounding wet connection section and method
CN215749829U (en) Split type prefabricated box culvert template system
CN115418983A (en) Construction method for prefabricated box culvert in highway-railway combined large-section shield tunnel
CN115110765A (en) Construction method and device for shear wall at deformation joint
CN210621713U (en) Circular foundation pit inside lining wall template construction system
CN204001713U (en) V-type cylinder oblique line section concrete is built mould

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination