CN106522282A CN201611227244.9A CN201611227244A CN106522282A CN 106522282 A CN106522282 A CN 106522282A CN 201611227244 A CN201611227244 A CN 201611227244A CN 106522282 A CN106522282 A CN 106522282A
Authority
CN
China
Prior art keywords
formwork
post
belt
casting
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611227244.9A
Other languages
Chinese (zh)
Other versions
CN106522282B (en
Inventor
蔡焕琴
王丽楠
麻建锁
李雪娜
李明宇
麻海栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Tonggong Construction Engineering Co ltd
Original Assignee
Hebei University of Architecture
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei University of Architecture filed Critical Hebei University of Architecture
Priority to CN201611227244.9A priority Critical patent/CN106522282B/en
Publication of CN106522282A publication Critical patent/CN106522282A/en
Application granted granted Critical
Publication of CN106522282B publication Critical patent/CN106522282B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Electromagnetism (AREA)
  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

一种可升降后浇带模板结构及体系及其施工方法,其中可升降后浇带模板结构包括水平设置在后浇带处的模板;还包括有模板支架和连接在模板和模板支架之间的丝杠;所述模板支架位于模板的下方,沿后浇带长轴方向平行间隔布置;所述模板支架通过丝杠与模板可调连接。本发明解决了现有后浇带部位建筑垃圾清除不便、不彻底以及后浇带施工过程中脚手架对后续施工作业的不利影响的技术问题。

A liftable post-casting belt formwork structure and system and its construction method, wherein the liftable post-casting belt formwork structure includes a formwork horizontally arranged at the post-casting belt; it also includes a formwork bracket and a frame connected between the formwork and the formwork support lead screw; the formwork support is located below the formwork and arranged in parallel and at intervals along the long axis of the post-casting tape; the formwork support is adjustable connected to the formwork through a lead screw. The invention solves the technical problems of inconvenient and incomplete removal of construction waste at the existing post-casting belt and the adverse effect of scaffolding on subsequent construction operations during the construction of the post-casting belt.

Description

一种可升降后浇带模板结构及体系及其施工方法A liftable post-casting tape formwork structure and system and its construction method

技术领域technical field

本发明涉及建筑工程施工技术领域,特别是一种可升降后浇带模板结构及体系及其施工方法。The invention relates to the technical field of building engineering construction, in particular to a liftable post-casting belt formwork structure and system and a construction method thereof.

背景技术Background technique

后浇带是为适应环境温度变化、混凝土收缩、结构不均匀沉降等因素影响,在梁、板(包括基础底板)、墙等结构中预留的具有一定宽度且经过一定时间后再浇筑的混凝土带,高层建筑、公共建筑及超长结构的现浇整体钢筋混凝土结构中通常设置后浇带,使大体积混凝土可以分块施工,加快施工进度及缩短工期。The post-pouring strip is a concrete with a certain width reserved in beams, slabs (including foundation slabs), walls and other structures and poured after a certain period of time in order to adapt to environmental temperature changes, concrete shrinkage, uneven settlement of structures and other factors. Belt, high-rise buildings, public buildings and cast-in-place integral reinforced concrete structures of super-long structures are usually equipped with post-cast belts, so that large-volume concrete can be constructed in blocks, speeding up the construction progress and shortening the construction period.

现阶段后浇带施工方法是后浇带梁板随主体结构梁板一起施工,待现浇结构梁板混凝土达到规范要求时,拆除梁板的模板及支撑体系,保留后浇带梁板部分的模板及支撑体系,待满足设计要求时,浇筑后浇带混凝土。在施工过程中以及凿毛操作中会产生较多的碎石、混凝土碎块、灰尘等杂物,这些杂物都需要及时从后续混凝土浇筑区域内清除,对于在不拆模的特殊施工作业中,清渣和清洗就会变得非常不方便,费时费力,常常造成清除不彻底的情况,导致后浇带混凝土浇筑施工的工程质量不佳。At present, the post-cast belt construction method is that the post-cast belt beam slab is constructed together with the main structural beam-slab. When the cast-in-place structural beam-slab concrete meets the specification requirements, the formwork and support system of the beam-slab are removed, and the post-cast belt beam-slab part is retained. When the formwork and support system meet the design requirements, the concrete shall be poured after pouring. During the construction process and chiseling operation, more debris, concrete fragments, dust and other sundries will be produced. These sundries need to be removed from the subsequent concrete pouring area in time. For special construction operations that do not remove the formwork , Slag removal and cleaning will become very inconvenient, time-consuming and laborious, often resulting in incomplete removal, resulting in poor engineering quality of post-pouring concrete pouring construction.

另一种方法是:先拆除后浇带处的钢管排架及模板支撑,再搭设钢管排架来回顶后浇带两侧的梁板构件。但就在这拆除和回顶过程的这段时间内,大跨度的后浇带两侧梁板处于悬臂状态,而后浇带处的梁板配筋一般都不是按悬挑结构进行设计,故极易导致梁板出现裂缝;同时回顶处理很难控制回顶力度,最终导致后浇带两侧梁板出现较多质量问题。Another method is: first remove the steel pipe bent frame and formwork support at the post-casting zone, and then set up the steel pipe bent frame to push back and forth the beam and slab members on both sides of the post-casting zone. However, during this period of demolition and roofing, the beams and slabs on both sides of the large-span post-casting belt are in a cantilever state, and the reinforcement of the beams and slabs at the post-casting belt is generally not designed according to the cantilever structure, so it is extremely It is easy to cause cracks in the beams and slabs; at the same time, it is difficult to control the topping force in the topping treatment, which eventually leads to more quality problems in the beams and slabs on both sides of the post-casting belt.

不同类型后浇带混凝土的浇筑时间是不同的,伸缩后浇带应根据在先浇部分混凝土的收缩完成情况而定,一般为施工后60d;沉降后浇带宜在建筑物基本完成沉降后进行。后浇带支撑体系保留时间非常长,影响后续施工。The pouring time of different types of post-casting concrete is different. The telescopic post-casting should be determined according to the shrinkage of the previously poured part of the concrete, generally 60 days after construction; the post-settlement post-casting should be carried out after the settlement of the building is basically completed. . The retention time of the post-pouring tape support system is very long, which affects the subsequent construction.

发明内容Contents of the invention

本发明提出了一种可升降后浇带模板结构及体系及其施工方法,要解决现有后浇带部位建筑垃圾清除不便、不彻底以及后浇带施工过程中脚手架对后续施工作业的不利影响的技术问题。The present invention proposes a formwork structure and system of a liftable post-casting belt and its construction method, to solve the inconvenient and incomplete removal of construction waste at the existing post-casting belt and the adverse effects of scaffolding on subsequent construction operations during the construction of the post-casting belt technical issues.

本发明技术方案如下。The technical scheme of the present invention is as follows.

一种可升降后浇带模板结构,包括水平设置在后浇带处的模板;还包括有模板支架和连接在模板和模板支架之间的丝杠;所述模板支架位于模板的下方,沿后浇带长轴方向平行间隔布置;所述模板支架通过丝杠与模板可调连接。A liftable post-casting strip formwork structure, including a formwork horizontally arranged at the post-casting belt; also includes a formwork support and a lead screw connected between the formwork and the formwork support; the formwork support is located below the formwork, along the rear The long axis direction of the cast strips is arranged in parallel and at intervals; the formwork support is adjustablely connected to the formwork through a lead screw.

优选的,所述模板支架的主体呈U形,其两端水平向外延伸形成水平翼杆;所述主体的横杆上间隔开有竖向螺纹孔。Preferably, the main body of the formwork support is U-shaped, and its two ends extend horizontally outward to form horizontal wing bars; vertical threaded holes are spaced apart on the cross bar of the main body.

优选的,所述模板包括模板面板、沿模板面板底面、平行间隔设置的一组纵向次背楞和沿纵向、平行间隔连接在一组次背楞底面的一组横向主背楞;所述主背楞上、对应竖向螺纹孔的位置处设有竖向通孔一;所述模板面板水平设置在主体的两根竖杆之间,模板面板上、对应竖向通孔一的位置处设有竖向通孔二。Preferably, the formwork includes a template panel, a group of longitudinal secondary back flutes arranged at parallel intervals along the bottom surface of the template panel, and a group of horizontal main back flutes connected to the bottom surface of a group of secondary back flutes along the longitudinal direction and at parallel intervals; A vertical through hole 1 is provided on the back corrugated at the position corresponding to the vertical threaded hole; the template panel is horizontally arranged between the two vertical bars of the main body, and a There are two vertical through holes.

优选的,所述主背楞的两端均设有竖向移动的U形导向板;所述导向板相互平行的对边夹在主体的竖杆两侧。Preferably, both ends of the main back flute are provided with vertically moving U-shaped guide plates; the opposite sides parallel to each other of the guide plates are clamped on both sides of the vertical bar of the main body.

优选的,所述丝杠穿插在竖向螺纹孔和竖向通孔一中,并且丝杠上端的轴承外圈固定在竖向通孔一中。Preferably, the lead screw is inserted into the vertical threaded hole and the first vertical through hole, and the bearing outer ring at the upper end of the lead screw is fixed in the first vertical through hole.

一种可升降后浇带模板结构体系,包括有待浇后浇带两侧的先浇楼板、安装在待浇后浇带下方的后浇带模板结构以及支撑在后浇带模板结构下方的模板结构支架;所述后浇带模板结构为上述的后浇带模板结构;所述模板支架的主体的开口正对待浇后浇带,两根水平翼杆分别设置在两侧的先浇楼板下方;所述模板支设在待浇后浇带正下方、主体的两根竖杆与横杆围成的槽中。A liftable post-casting belt formwork structure system, including pre-cast floor slabs on both sides of the post-casting belt, a post-casting belt formwork structure installed under the post-casting belt, and a formwork structure supported under the post-casting belt formwork structure support; the post-casting belt formwork structure is the above-mentioned post-casting belt formwork structure; the opening of the main body of the formwork support is facing the post-casting belt to be poured, and two horizontal wings are respectively arranged under the first-casting floor slabs on both sides; The formwork is supported in a groove surrounded by two vertical bars and horizontal bars of the main body just below the pouring belt to be poured.

优选的,所述模板结构支架包括有立柱、斜杆和横拉杆;所述立柱有两组,分别沿后浇带长度方向支设在待浇后浇带两侧的先浇楼板下方;所述横拉杆水平拉结在两组立柱之间;所述斜杆的一端支撑在横拉杆与立柱交点处,另一端支撑在模板支架的主体底部转角处。Preferably, the formwork structure support includes uprights, oblique rods and tie rods; there are two sets of uprights, which are supported respectively along the length direction of the back-casting belt under the first-cast floor slabs on both sides of the back-casting belt to be poured; The tie rods are tied horizontally between two sets of uprights; one end of the diagonal rod is supported at the intersection of the tie rods and the uprights, and the other end is supported at the bottom corner of the main body of the formwork support.

一种可升降后浇带模板结构体系的施工方法,包括步骤如下。A construction method for a liftable post-casting tape formwork structure system comprises the following steps.

步骤一:后浇带模板结构体系安装准备。Step 1: Preparation for installation of the post-cast tape formwork structure system.

步骤二:组装立柱及制作可升降后浇带模板结构的模板支架和模板,并将丝杠穿在竖向通孔一中,丝杠上端的轴承外圈与竖向通孔一固定。Step 2: Assemble the column and make the formwork bracket and formwork that can be raised and lowered with the formwork structure after pouring, and put the screw through the vertical through hole 1, and the bearing outer ring at the upper end of the lead screw is fixed to the vertical through hole 1.

步骤三:将模板支架安装至立柱的顶部。Step 3: Install the template support to the top of the column.

步骤四:调节立柱的高度,并固定两根水平翼杆。Step 4: Adjust the height of the column and fix the two horizontal wing bars.

步骤五:安装斜杆及横拉杆。Step 5: Install the slanting rod and tie rod.

步骤六:将模板及丝杠可调连接在模板支架上、待浇后浇带的底部。Step 6: Adjustably connect the formwork and lead screw to the formwork support and the bottom of the pouring belt after pouring.

步骤七:利用摇扳旋转丝杠以调节模板高度,模板面板顶升至待浇后浇带底部标高处停止。Step 7: Use the rocker to rotate the lead screw to adjust the height of the formwork, and the formwork panel is lifted to the bottom level of the pouring belt to be poured and stopped.

步骤八:对可升降后浇带模板结构体系进行检查。Step 8: Check the structural system of the liftable post-casting tape formwork.

步骤九:制作后浇带混凝土并浇筑后浇带。Step 9: Make post-pouring concrete and pour post-pouring.

步骤十:后浇带混凝土养护。Step 10: Post-pouring with concrete curing.

步骤十一:拆除可升降后浇带模板结构体系。Step 11: Remove the liftable post-casting tape formwork structure system.

优选的,每组立柱中相邻两根立柱之间的间距为1000mm~1500mm;所述次背楞以100mm~200mm的间距安装在模板面板的底面。Preferably, the distance between two adjacent pillars in each group of pillars is 1000mm-1500mm; the secondary back flute is installed on the bottom surface of the formwork panel at a distance of 100mm-200mm.

优选的,步骤四中的步骤具体为调节立柱高度,通过立柱柱顶与先浇楼板之间的挤压作用,将水平翼杆夹在它们中间以固定模板支架的水平翼杆;步骤五中安装斜杆及横拉杆具体为,先将斜杆的一端固定在模板支架的主体底部转角处,另一端固定于立柱柱身上;然后再安装横拉杆,横拉杆的拉两端分别与固定于立柱上的斜杆的端头相连接并固定;步骤六具体为,将丝杠下端旋入竖向螺纹孔中,并将导向板相互平行的对边夹在主体的竖杆两侧。Preferably, the step in step four is specifically to adjust the height of the column, and clamp the horizontal wing bar between them to fix the horizontal wing bar of the formwork support through the extrusion between the top of the column column and the floor slab poured first; in step five, install The slanting rod and the tie rod are specifically as follows: firstly, one end of the slanting rod is fixed at the bottom corner of the main body of the formwork support, and the other end is fixed on the column body; then the tie rod is installed, and the two ends of the tie rod are fixed on the column The ends of the slanting rods are connected and fixed; Step 6 is specifically, screw the lower end of the lead screw into the vertical threaded hole, and clamp the opposite sides parallel to each other of the guide plate on both sides of the vertical rod of the main body.

与现有技术相比本发明具有以下特点和有益效果。Compared with the prior art, the present invention has the following characteristics and beneficial effects.

1、本发明提供一种可升降后浇带模板结构及体系及其施工方法,在无需撤除后浇带部位的支撑体系的情况下,通过调节丝杠升降后浇带模板结构体系,解决后浇带部位建筑垃圾清除不便、不彻底的问题;并解决后浇带施工过程中脚手架对后续施工作业的不利影响。1. The present invention provides a liftable post-casting tape formwork structure and system and its construction method. Without removing the support system of the post-casting tape, the post-casting tape formwork structure system can be lifted and lowered by adjusting the lead screw to solve the problem of post-casting The problem of inconvenient and incomplete removal of construction waste in belt parts; and solve the adverse effects of scaffolding on subsequent construction operations during post-pouring belt construction.

2、所发明的后浇带模板结构,通过由工人使用摇扳在结构上部旋转丝杠可升降整体模板体系,在浇筑后浇带部位混凝土前,将底模调节下降,彻底的清除后浇带内在施工过程中以及凿毛操作中产生的较多的碎石、混凝土碎块、灰尘等杂物。2. In the post-cast belt formwork structure invented, the overall formwork system can be raised and lowered by workers using the rocker to rotate the screw on the upper part of the structure. Before pouring the concrete in the post-cast belt part, the bottom mold is adjusted and lowered to completely remove the post-cast belt. There are more debris, concrete fragments, dust and other sundries generated during the internal construction process and chiseling operation.

3、采用立柱支撑装置占用空间较小,且独立于其他先浇部位脚手架体系,在拆除先浇部位脚手架体系时无需拆除后浇带部位的立柱支撑装置,在整个过程中先浇部位没有处于悬臂时刻,从而避免施工荷载及自重作用下先浇部位出现裂缝等质量问题。3. The column support device takes up less space and is independent of other scaffolding systems at the first pouring site. When removing the scaffolding system at the first pouring site, it is not necessary to remove the column support device at the post-casting zone. During the entire process, the first pouring site is not in a cantilever position. Time, so as to avoid quality problems such as cracks in the first poured part under the action of construction load and self-weight.

4、采用立柱支撑装置,为后续该部位的施工作业提供充足的施工作业空间,解决传统脚手架对后续施工不便的不利影响。4. The column support device is adopted to provide sufficient construction work space for subsequent construction operations at this part, and to solve the adverse effects of traditional scaffolding on the inconvenience of subsequent construction.

5、本发明所采用的可升降模板装置,可以方便的实现对后浇带部位的堆积的建筑垃圾,在浇筑后浇带混凝土前进行彻底的清除;所采用的支撑装置制作简便同时可以,施工使用是占地小,为后续施工作业提供了充分的作业空间。5. The liftable formwork device adopted in the present invention can conveniently realize the accumulation of construction waste on the post-pouring belt, and thoroughly remove it before pouring the post-pouring concrete; It occupies a small area and provides sufficient work space for subsequent construction operations.

附图说明Description of drawings

图1 为本发明中的可升降后浇带模板结构使用状态示意图。Fig. 1 is a schematic diagram of the working state of the liftable post-cast tape formwork structure in the present invention.

图2 为本发明中的可升降后浇带模板结构示意图。Fig. 2 is a structural schematic diagram of the liftable post-casting tape formwork in the present invention.

图3 为图1中Ⅰ结构中丝杠放大示意图。Fig. 3 is an enlarged schematic diagram of the lead screw in structure I in Fig. 1 .

图4 为本发明中的可升降后浇带模板结构体系示意图。Fig. 4 is a schematic diagram of the structural system of the liftable post-cast tape formwork in the present invention.

附图标记:1―主体、2―水平翼杆、3―立柱、4―先浇楼板、5―斜杆、6―丝杠;61―轴承外圈、62―轴承内圈、 7―嵌槽双向套筒、8―主背楞、9―导向板、10―摇扳、11―竖向螺纹孔、12―竖向通孔一、13―竖向通孔二、14―次背楞、15―模板面板、16―横拉杆。Reference signs: 1—main body, 2—horizontal wing bar, 3—column, 4—first poured floor, 5—slanting rod, 6—screw; 61—bearing outer ring, 62—bearing inner ring, 7—embedded groove Two-way sleeve, 8—main back flute, 9—guide plate, 10—rocker, 11—vertical threaded hole, 12—vertical through hole 1, 13—vertical through hole 2, 14—secondary back flute, 15 —Form panel, 16—Tie rod.

具体实施方式detailed description

本发明的目的在于克服己有技术的不足,提供一种可升降后浇带模板结构及体系及其施工方法,在无需撤除后浇带部位的支撑体系的情况下,通过调节丝杠6升降后浇带模板结构,解决后浇带部位建筑垃圾清除不便、不彻底的问题;并解决后浇带施工过程中脚手架对后续施工作业的不利影响。The purpose of the present invention is to overcome the deficiencies of the existing technology, to provide a formwork structure and system of the post-casting belt that can be lifted and lowered, and its construction method. Without removing the support system of the post-casting belt, it can be raised and lowered by adjusting the lead screw 6 The formwork structure of the pouring belt solves the inconvenient and incomplete removal of construction waste at the post-casting belt; and solves the adverse effects of scaffolding on subsequent construction operations during the construction of the post-casting belt.

如图1和图2所示,这种可升降后浇带模板结构,包括水平设置在后浇带处的模板;还包括有模板支架和连接在模板和模板支架之间的丝杠6;所述模板支架位于模板的下方,沿后浇带长轴方向平行间隔布置;所述模板支架通过丝杠6与模板可调连接;所述丝杠6带动模板在竖指方向上移动。As shown in Figure 1 and Figure 2, this liftable post-casting strip formwork structure includes a formwork horizontally arranged at the post-casting belt; it also includes a formwork support and a lead screw 6 connected between the formwork and the formwork support; The formwork support is located below the formwork and is arranged at intervals in parallel along the long axis of the post-casting tape; the formwork support is adjustable connected to the formwork through a lead screw 6; the lead screw 6 drives the formwork to move in the vertical direction.

本实施例中,所述模板支架的主体1呈U形,其两端水平向外延伸形成水平翼杆2;所述主体1底部的横杆上间隔开有两个竖向螺纹孔11,所述竖向螺纹孔11供丝杠6沿其中心轴线穿过,通过切削丝杠6体上的螺纹与竖向螺纹孔11中的螺纹来传递竖向荷载;所述主体1由方钢管制作而成,安装时主体1的开口向上正对后浇带未浇筑部位,其两端水平翼杆2部位贴紧先浇楼板4。In this embodiment, the main body 1 of the template support is U-shaped, and its two ends extend horizontally outward to form a horizontal wing bar 2; two vertical threaded holes 11 are spaced apart on the cross bar at the bottom of the main body 1, so that The vertical threaded hole 11 is for the lead screw 6 to pass through along its central axis, and the vertical load is transmitted by cutting the thread on the lead screw 6 body and the thread in the vertical threaded hole 11; the main body 1 is made of square steel pipe When installed, the opening of the main body 1 faces up to the uncast part of the post-casting belt, and the horizontal wing bars 2 at both ends are close to the first-casting floor slab 4.

本实施例中,所述模板包括模板面板15、沿模板面板15底面、平行间隔设置的一组纵向次背楞14和沿纵向、平行间隔连接在一组次背楞14底面的一组横向主背楞8;所述主背楞8上、对应竖向螺纹孔11的位置处设有竖向通孔一12;所述模板面板15水平设置在主体1的两根竖杆之间,模板面板15上、对应竖向通孔一12的位置处设有竖向通孔二13。In this embodiment, the template includes a template panel 15, a set of longitudinal secondary back flutes 14 arranged at parallel intervals along the bottom surface of the template panel 15, and a group of transverse main lateral edges connected to the bottom surface of a group of secondary back flutes 14 along the longitudinal direction and at parallel intervals. Back flute 8; on the main back flute 8, a vertical through hole 12 is provided at the position corresponding to the vertical threaded hole 11; the template panel 15 is horizontally arranged between two vertical bars of the main body 1, and the template panel 15 is provided with a vertical through hole 2 13 at a position corresponding to the vertical through hole 1 12 .

本实施例中,所述模板面板15为双层胶合板制作而成;所述模板面板15上的竖向通孔二13与轴承内圈62外径相同,其圆心在丝杠6的轴线上;所述模板面板15上层胶合板沿宽度方向两端各比下层胶合板沿宽度方向短10mm。In this embodiment, the template panel 15 is made of double-layer plywood; the vertical through hole 13 on the template panel 15 has the same outer diameter as the bearing inner ring 62, and its center of circle is on the axis of the lead screw 6; Both ends of the upper plywood of the template panel 15 along the width direction are 10mm shorter than the lower plywood along the width direction.

所述次背楞14截面尺寸为80mm×50mm,相邻两根次背楞14间距为100mm~200mm之间。The cross-sectional size of the secondary back corrugated 14 is 80 mm×50 mm, and the distance between two adjacent secondary back corrugated 14 is between 100 mm and 200 mm.

本实施例中,所述主背楞8的两端均设有竖向移动的U形导向板9;所述导向板9相互平行的对边夹在主体1的竖杆两侧。In this embodiment, both ends of the main back flute 8 are provided with vertically movable U-shaped guide plates 9 ;

本实施例中,所述丝杠6穿插在竖向螺纹孔11和竖向通孔一12中,并且丝杠6上端的轴承外圈61固定在竖向通孔一12中;所述轴承外圈61内设有轴承内圈62,所述轴承内圈62与丝杠6顶端连接制作为一个整体,轴承外圈61嵌入竖向通孔一12且与主背楞8连接为一个整体。In this embodiment, the lead screw 6 is inserted into the vertical threaded hole 11 and the vertical through hole 12, and the bearing outer ring 61 at the upper end of the lead screw 6 is fixed in the vertical through hole 12; A bearing inner ring 62 is arranged in the ring 61, and the bearing inner ring 62 is connected with the top of the screw 6 as a whole, and the bearing outer ring 61 is embedded in the vertical through hole 12 and connected with the main back corrugated 8 as a whole.

所述丝杠6的顶端,与轴承内圈62接触的部位在套丝制作时不进行套丝加工;在丝杠6顶端上部焊接直径与轴承内圈62直径相同的嵌槽双向套筒7,并与轴承内圈62和丝杠6顶端局部形成一个整体。所述嵌槽双向套筒7的中心轴线与丝杠6及轴承内圈62中心轴线重合,与摇扳10配合使用可以使丝杠6顺时针或逆时针旋转,实现主背楞8的上下移动。The top of the screw 6 is not threaded at the part that is in contact with the inner ring 62 of the bearing; the top of the screw 6 is welded with a two-way sleeve 7 with the same diameter as the inner ring 62 of the bearing. And partly form a whole with the bearing inner ring 62 and the top end of the leading screw 6 . The central axis of the two-way socket 7 coincides with the central axis of the lead screw 6 and the bearing inner ring 62, and it can be used in conjunction with the rocker 10 to make the lead screw 6 rotate clockwise or counterclockwise to realize the up and down movement of the main back groove 8 .

如图4所示,一种可升降后浇带模板结构体系,包括有待浇后浇带两侧的先浇楼板4、安装在待浇后浇带下方的后浇带模板结构以及支撑在后浇带模板结构下方的模板结构支架;所述后浇带模板结构为上述的后浇带模板结构;所述模板支架的主体1的开口正对待浇后浇带,两根水平翼杆2分别设置在两侧的先浇楼板4下方;所述模板支设在待浇后浇带正下方、主体1的两根竖杆与横杆围成的槽中。As shown in Figure 4, a liftable post-casting strip formwork structure system includes the first-cast floor slabs 4 on both sides of the post-casting strip to be poured, the post-casting strip formwork structure installed under the post-casting strip and the support on the post-casting Formwork structure support below the belt formwork structure; the post-casting tape formwork structure is the above-mentioned post-casting tape formwork structure; the opening of the main body 1 of the formwork support is facing the post-casting tape to be poured, and two horizontal wing bars 2 are respectively arranged on Below the floor slabs 4 that are poured first on both sides; the formwork is supported in a groove surrounded by two vertical bars and cross bars of the main body 1 just below the post-casting belt to be poured.

本实施例中,所述模板通过主体1将荷载传递至模板结构支架。In this embodiment, the formwork transmits the load to the formwork structure support through the main body 1 .

本实施例中,所述模板结构支架包括有立柱3、斜杆5和横拉杆16;所述立柱3有两组,分别沿后浇带长度方向支设在待浇后浇带两侧的先浇楼板4下方;所述横拉杆16水平拉结在两组立柱3之间;所述斜杆5的一端支撑在横拉杆16与立柱3交点处,另一端支撑在模板支架的主体1底部转角处。所述立柱3由冷弯薄壁型钢通过螺栓连接制作而成,支撑于所述主体1水平翼杆2的下方;所述斜杆5为圆钢管,一端固定于主体1底部角点,另一端固定于立柱3上;所述横拉杆16两端分别与左右固定于立柱3上的斜杆5端头进行连接,形成横向约束,从而构成稳固的下部支架。In this embodiment, the formwork structure support includes uprights 3, oblique rods 5 and tie rods 16; the uprights 3 have two groups, which are respectively supported on the first and second sides of the back-casting belt along the length direction of the back-casting belt. Below the floor slab 4; the tie rod 16 is horizontally tied between the two sets of columns 3; one end of the diagonal rod 5 is supported at the intersection of the tie rod 16 and the column 3, and the other end is supported at the bottom corner of the main body 1 of the formwork support place. The column 3 is made of cold-formed thin-walled steel through bolt connection, and is supported under the horizontal wing bar 2 of the main body 1; the oblique bar 5 is a round steel pipe, one end is fixed at the bottom corner of the main body 1, and the other end It is fixed on the column 3; the two ends of the tie rod 16 are respectively connected with the ends of the oblique rods 5 fixed on the column 3 on the left and right to form a lateral constraint, thereby forming a stable lower bracket.

这种可升降后浇带模板结构体系的施工方法,包括步骤如下。The construction method of the liftable post-casting tape formwork structure system includes the following steps.

步骤一:后浇带模板结构体系安装准备;后浇带模板结构体系安装准备工作主要从人员、材料及机械三个方面进行准备。Step 1: Preparation for the installation of the post-cast belt formwork structure system; the preparation for the installation of the post-cast belt formwork structure system is mainly prepared from three aspects: personnel, materials and machinery.

步骤二:组装立柱3及制作可升降后浇带模板结构的模板支架和模板,并将丝杠6穿在竖向通孔一12中,丝杠6上端的轴承外圈61与竖向通孔一12固定。Step 2: Assemble the column 3 and make the formwork bracket and formwork that can be lifted and lowered to formwork with formwork structure, and put the screw 6 through the vertical through hole 12, the bearing outer ring 61 on the upper end of the lead screw 6 and the vertical through hole One 12 is fixed.

步骤三:将模板支架安装至立柱3的顶部;Step 3: Install the template support to the top of the column 3;

步骤四:调节立柱3的高度,通过立柱3柱顶与先浇楼板4的挤压作用固定夹在它们中间的水平翼杆2。Step 4: Adjust the height of the upright column 3, and fix the horizontal wing bar 2 sandwiched between them through the extruding action of the top of the upright column 3 and the first poured floor 4.

步骤五:安装斜杆5及横拉杆16;将丝杠6安装在主背楞8中,再将其组合体安装至主体1中:通过丝杠6与主体1的螺纹连接将主背楞8与丝杠6一体构件安装于主体1中。Step 5: Install the diagonal rod 5 and the tie rod 16; install the lead screw 6 in the main back corrugated 8, and then install the combination into the main body 1: connect the main back corrugated 8 through the threaded connection of the lead screw 6 and the main body 1 The integral component with the lead screw 6 is installed in the main body 1 .

步骤六:将模板及丝杠6可调连接在模板支架上、待浇后浇带的底部。Step 6: Adjustably connect the formwork and lead screw 6 to the formwork support and the bottom of the pouring belt after pouring.

步骤七:利用摇扳10旋转丝杠6以调节模板高度,模板面板15顶升至待浇后浇带底部标高处停止。Step 7: Use the rocker 10 to rotate the lead screw 6 to adjust the height of the formwork, and the formwork panel 15 is lifted to the bottom elevation of the cast belt to be poured and stopped.

步骤八:对可升降后浇带模板结构体系进行检查。Step 8: Check the structural system of the liftable post-casting tape formwork.

步骤九:制作后浇带混凝土并浇筑后浇带。Step 9: Make post-pouring concrete and pour post-pouring.

步骤十:后浇带混凝土养护。Step 10: Post-pouring with concrete curing.

步骤十一:拆除可升降后浇带模板结构体系。Step 11: Remove the liftable post-casting tape formwork structure system.

本实施例中,步骤二中,将冷弯薄壁型钢构件通过螺栓连接制作成为立柱3或者所述立柱3即为成型构件,每组立柱中相邻两根立柱3之间的间距为1000mm~1500mm,立柱3沿后浇带长度方向布置在后浇带两侧的先浇楼板4下方;将单层胶合板按照模板面板15的尺寸要求制作为双层模板;所述模板装置中次背楞14以100mm~200mm的间距安装在模板面板15的底面。In this embodiment, in step 2, the cold-formed thin-walled steel members are connected by bolts to make uprights 3 or the uprights 3 are formed components, and the distance between two adjacent uprights 3 in each set of uprights is 1000mm- 1500mm, the column 3 is arranged under the first pouring floor 4 on both sides of the post-casting belt along the length direction of the post-casting belt; the single-layer plywood is made into a double-layer formwork according to the size requirements of the formwork panel 15; the secondary back corrugated 14 in the formwork device They are installed on the bottom surface of the template panel 15 at a pitch of 100 mm to 200 mm.

本实施例中,步骤四中的步骤具体为调节立柱3高度,通过立柱3柱顶与先浇楼板4之间的挤压作用,将水平翼杆2夹在它们中间以固定模板支架的水平翼杆2;步骤五中安装斜杆5及横拉杆16具体为,先将斜杆5的一端固定在模板支架的主体1底部转角处,另一端固定于立柱3的柱身上;然后再安装横拉杆16,横拉杆16的拉两端分别与固定于立柱3上的斜杆5的端头相连接并固定;步骤六具体为,将丝杠6下端旋入竖向螺纹孔11中,并将导向板9相互平行的对边夹在主体1的竖杆两侧。In this embodiment, the step in step 4 is specifically to adjust the height of the column 3, and through the extrusion between the column top of the column 3 and the floor slab 4 to be poured first, the horizontal wing bar 2 is sandwiched between them to fix the horizontal wing of the formwork support Rod 2; in step 5, install the slanting rod 5 and the tie rod 16. Specifically, first fix one end of the slanting rod 5 at the bottom corner of the main body 1 of the formwork support, and fix the other end on the column body of the column 3; then install the tie rod 16. The two ends of the tie rod 16 are respectively connected and fixed to the ends of the oblique rod 5 fixed on the column 3; Step 6 is specifically to screw the lower end of the lead screw 6 into the vertical threaded hole 11, and guide the The parallel opposite sides of the board 9 are sandwiched between the two sides of the vertical bar of the main body 1 .

本说明书实施例所述的内容仅仅是对发明构思的实现形式的列举,本发明的保护范围不应当被视为仅限于实施例所陈述的具体形式,本发明的保护范围涵盖本领域技术人员根据本发明构思所能够想到的等同技术手段。The content described in the embodiments of this specification is only an enumeration of the implementation forms of the inventive concept. The protection scope of the present invention should not be regarded as limited to the specific forms stated in the embodiments. The protection scope of the present invention covers those skilled in the art. Equivalent technical means conceivable by the concept of the present invention.

Claims (10)

1.一种可升降后浇带模板结构,包括水平设置在后浇带处的模板;其特征在于:还包括有模板支架和连接在模板和模板支架之间的丝杠(6);1. A liftable post-casting belt formwork structure, including a formwork horizontally arranged at the post-casting belt; it is characterized in that it also includes a formwork support and a lead screw (6) connected between the formwork and the formwork support; 所述模板支架位于模板的下方,沿后浇带长轴方向平行间隔布置;The formwork support is located below the formwork and arranged in parallel and at intervals along the long axis of the post-casting tape; 所述模板支架通过丝杠(6)与模板可调连接。The template support is adjustable connected with the template through a lead screw (6). 2.根据权利要求1所述的一种可升降后浇带模板结构,其特征在于:所述模板支架的主体(1)呈U形,其两端水平向外延伸形成水平翼杆(2);2. A liftable post-cast tape formwork structure according to claim 1, characterized in that: the main body (1) of the formwork support is U-shaped, and its two ends extend horizontally outward to form horizontal wing bars (2) ; 所述主体(1)的横杆上间隔开有竖向螺纹孔(11)。Vertical threaded holes (11) are spaced apart on the cross bar of the main body (1). 3.根据权利要求2所述的一种可升降后浇带模板结构,其特征在于:所述模板包括模板面板(15)、沿模板面板(15)底面、平行间隔设置的一组纵向次背楞(14)和沿纵向、平行间隔连接在一组次背楞(14)底面的一组横向主背楞(8);3. A liftable post-casting tape formwork structure according to claim 2, characterized in that the formwork includes a formwork panel (15), a group of longitudinal secondary backs arranged at parallel intervals along the bottom surface of the formwork panel (15) flutes (14) and a group of horizontal main back flutes (8) connected to the bottom surface of a group of secondary back flutes (14) along the longitudinal and parallel intervals; 所述主背楞(8)上、对应竖向螺纹孔(11)的位置处设有竖向通孔一(12);A vertical through hole (12) is provided on the main back flute (8) corresponding to the vertical threaded hole (11); 所述模板面板(15)水平设置在主体(1)的两根竖杆之间,模板面板(15)上、对应竖向通孔一(12)的位置处设有竖向通孔二(13)。The template panel (15) is horizontally arranged between the two vertical bars of the main body (1), and the template panel (15) is provided with a vertical through hole two (13) at a position corresponding to the vertical through hole one (12). ). 4.根据权利要求3所述的一种可升降后浇带模板结构,其特征在于:所述主背楞(8)的两端均设有竖向移动的U形导向板(9);所述导向板(9)相互平行的对边夹在主体(1)的竖杆两侧。4. A liftable post-cast tape formwork structure according to claim 3, characterized in that: both ends of the main back flute (8) are provided with U-shaped guide plates (9) that move vertically; The opposite sides parallel to each other of the guide plate (9) are clamped on both sides of the vertical bar of the main body (1). 5.根据权利要求3或4所述的一种可升降后浇带模板结构,其特征在于:所述丝杠(6)穿插在竖向螺纹孔(11)和竖向通孔一(12)中,并且丝杠(6)上端的轴承外圈(61)固定在竖向通孔一(12)中。5. A liftable post-cast tape formwork structure according to claim 3 or 4, characterized in that: the screw (6) is inserted through the vertical threaded hole (11) and the vertical through hole one (12) , and the bearing outer ring (61) at the upper end of the lead screw (6) is fixed in the vertical through hole one (12). 6.一种可升降后浇带模板结构体系,包括有待浇后浇带两侧的先浇楼板(4)、安装在待浇后浇带下方的后浇带模板结构以及支撑在后浇带模板结构下方的模板结构支架;其特征在于:所述后浇带模板结构为权利要求5中所述的后浇带模板结构;所述模板支架的主体(1)的开口正对待浇后浇带,两根水平翼杆(2)分别设置在两侧的先浇楼板(4)下方;所述模板支设在待浇后浇带正下方、主体(1)的两根竖杆与横杆围成的槽中。6. A liftable post-pouring belt formwork structure system, including the pre-cast floor slabs (4) on both sides of the post-pouring belt, the post-casting belt formwork structure installed under the post-pouring belt, and the post-casting belt formwork supported The formwork structure support under the structure; it is characterized in that: the post-cast tape formwork structure is the post-cast tape formwork structure described in claim 5; the opening of the main body (1) of the formwork support is facing the post-cast tape, Two horizontal wing bars (2) are respectively arranged under the first-cast floor slabs (4) on both sides; in the slot. 7.根据权利要求6所述的一种可升降后浇带模板结构体系,其特征在于:所述模板结构支架包括有立柱(3)、斜杆(5)和横拉杆(16);所述立柱(3)有两组,分别沿后浇带长度方向支设在待浇后浇带两侧的先浇楼板(4)下方;所述横拉杆(16)水平拉结在两组立柱(3)之间;所述斜杆(5)的一端支撑在横拉杆(16)与立柱(3)交点处,另一端支撑在模板支架的主体(1)底部转角处。7. A liftable post-casting tape formwork structure system according to claim 6, characterized in that: the formwork structure support includes uprights (3), diagonal bars (5) and tie rods (16); There are two sets of upright columns (3), which are supported respectively along the length direction of the post-poured belt under the first-cast floor slabs (4) on both sides of the to-be-poured belt; ); one end of the diagonal rod (5) is supported at the intersection of the tie rod (16) and the column (3), and the other end is supported at the bottom corner of the main body (1) of the formwork support. 8.一种权利要求6或7中任意一项所述的可升降后浇带模板结构体系的施工方法,其特征在于,包括步骤如下,8. A construction method of the liftable post-casting tape formwork structure system according to any one of claim 6 or 7, characterized in that, comprising the following steps, 步骤一:后浇带模板结构体系安装准备;Step 1: Preparation for installation of the post-cast tape formwork structure system; 步骤二:组装立柱(3)及制作可升降后浇带模板结构的模板支架和模板,并将丝杠(6)穿在竖向通孔一(12)中,丝杠(6)上端的轴承外圈(61)与竖向通孔一(12)固定;Step 2: Assemble the column (3) and make the formwork bracket and formwork that can be lifted and lowered to formwork with formwork structure, and put the screw (6) through the vertical through hole one (12), and the bearing on the upper end of the lead screw (6) Outer ring (61) is fixed with vertical through hole one (12); 步骤三:将模板支架安装至立柱(3)的顶部;Step 3: Install the template support to the top of the column (3); 步骤四:调节立柱(3)的高度,并固定两根水平翼杆(2);Step 4: Adjust the height of the column (3) and fix the two horizontal wing bars (2); 步骤五:安装斜杆(5)及横拉杆(16);Step 5: Install the slanting rod (5) and tie rod (16); 步骤六:将模板及丝杠(6)可调连接在模板支架上、待浇后浇带的底部;Step 6: Adjustably connect the formwork and lead screw (6) to the formwork support and the bottom of the pouring belt after pouring; 步骤七:利用摇扳(10)旋转丝杠(6)以调节模板高度,模板面板(15)顶升至待浇后浇带底部标高处停止;Step 7: Use the rocker (10) to rotate the lead screw (6) to adjust the height of the formwork, and the formwork panel (15) is lifted to the bottom elevation of the pouring belt to be poured and stopped; 步骤八:对可升降后浇带模板结构体系进行检查;Step 8: Check the structural system of the liftable post-cast belt formwork; 步骤九:制作后浇带混凝土并浇筑后浇带;Step 9: Make post-pouring concrete and pour post-pouring; 步骤十:后浇带混凝土养护;Step 10: post-pouring with concrete curing; 步骤十一:拆除可升降后浇带模板结构体系。Step 11: Remove the liftable post-casting tape formwork structure system. 9.根据权利要求8所述的一种可升降后浇带模板结构体系的施工方法,其特征在于:每组立柱中相邻两根立柱(3)之间的间距为1000mm~1500mm;所述次背楞(14)以100mm~200mm的间距安装在模板面板(15)的底面。9. The construction method of a liftable post-casting belt formwork structure system according to claim 8, characterized in that: the distance between two adjacent columns (3) in each group of columns is 1000 mm to 1500 mm; The secondary back flute (14) is installed on the bottom surface of the template panel (15) with a spacing of 100mm to 200mm. 10.根据权利要求8所述的一种可升降后浇带模板结构体系的施工方法,其特征在于:10. The construction method of a liftable post-casting tape formwork structure system according to claim 8, characterized in that: 步骤四中的步骤具体为调节立柱(3)高度,通过立柱(3)柱顶与先浇楼板(4)之间的挤压作用,将水平翼杆(2)夹在它们中间以固定模板支架的水平翼杆(2);The step in step 4 is to adjust the height of the upright column (3), and through the extrusion between the top of the upright column (3) and the floor slab (4) to be poured first, sandwich the horizontal wing bar (2) between them to fix the formwork support horizontal wing bars (2); 步骤五中安装斜杆(5)及横拉杆(16)具体为,先将斜杆(5)的一端固定在模板支架的主体(1)底部转角处,另一端固定于立柱(3)的柱身上;然后再安装横拉杆(16),横拉杆(16)的拉两端分别与固定于立柱(3)上的斜杆(5)的端头相连接并固定;In the fifth step, install the diagonal rod (5) and the tie rod (16). Specifically, first fix one end of the diagonal rod (5) to the bottom corner of the main body (1) of the formwork support, and fix the other end to the column of the upright column (3). body; then install the tie rod (16), the two ends of the tie rod (16) are respectively connected and fixed with the ends of the oblique rod (5) fixed on the column (3); 步骤六具体为,将丝杠(6)下端旋入竖向螺纹孔(11)中,并将导向板(9)相互平行的对边夹在主体(1)的竖杆两侧。Step 6 is specifically to screw the lower end of the lead screw (6) into the vertical threaded hole (11), and clamp the opposite sides of the guide plate (9) parallel to each other on both sides of the vertical bar of the main body (1).
CN201611227244.9A 2016-12-27 2016-12-27 A kind of liftable post-cast strip template structure and system and its construction method Active CN106522282B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611227244.9A CN106522282B (en) 2016-12-27 2016-12-27 A kind of liftable post-cast strip template structure and system and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611227244.9A CN106522282B (en) 2016-12-27 2016-12-27 A kind of liftable post-cast strip template structure and system and its construction method

Publications (2)

Publication Number Publication Date
CN106522282A true CN106522282A (en) 2017-03-22
CN106522282B CN106522282B (en) 2019-01-15

Family

ID=58337715

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611227244.9A Active CN106522282B (en) 2016-12-27 2016-12-27 A kind of liftable post-cast strip template structure and system and its construction method

Country Status (1)

Country Link
CN (1) CN106522282B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109930816A (en) * 2019-04-09 2019-06-25 上海欧本钢结构有限公司 It can breathing and liftable shared template
CN110242040A (en) * 2019-07-08 2019-09-17 中信国安建工集团有限公司 Construction method based on building post-cast belt
CN110670805A (en) * 2019-09-05 2020-01-10 广东龙越建筑工程有限公司 Post structure of post-cast strip, stress calculation step and arrangement process of post-cast strip
CN111140008A (en) * 2019-12-13 2020-05-12 中冶天工集团有限公司 Post-pouring strip template supporting system with function of back jacking after disassembly
CN114922417A (en) * 2022-05-19 2022-08-19 中建三局集团有限公司 Post-cast strip formwork-supporting-free and support-free system and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130087922A (en) * 2012-01-30 2013-08-07 (주)에이원알폼 Concrete mold assembly and method of constructing beam by using the same
CN204386153U (en) * 2014-12-26 2015-06-10 江苏省矿业工程集团有限公司 The adjustable rest of clear-water concrete ater-casting formwork
CN204418660U (en) * 2015-01-07 2015-06-24 福建工程学院 Cast-in-situ concrete beam and slab structure form bracing system
CN206418523U (en) * 2016-12-27 2017-08-18 河北建筑工程学院 A kind of liftable post-cast strip template structure and system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130087922A (en) * 2012-01-30 2013-08-07 (주)에이원알폼 Concrete mold assembly and method of constructing beam by using the same
CN204386153U (en) * 2014-12-26 2015-06-10 江苏省矿业工程集团有限公司 The adjustable rest of clear-water concrete ater-casting formwork
CN204418660U (en) * 2015-01-07 2015-06-24 福建工程学院 Cast-in-situ concrete beam and slab structure form bracing system
CN206418523U (en) * 2016-12-27 2017-08-18 河北建筑工程学院 A kind of liftable post-cast strip template structure and system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109930816A (en) * 2019-04-09 2019-06-25 上海欧本钢结构有限公司 It can breathing and liftable shared template
CN110242040A (en) * 2019-07-08 2019-09-17 中信国安建工集团有限公司 Construction method based on building post-cast belt
CN110670805A (en) * 2019-09-05 2020-01-10 广东龙越建筑工程有限公司 Post structure of post-cast strip, stress calculation step and arrangement process of post-cast strip
CN111140008A (en) * 2019-12-13 2020-05-12 中冶天工集团有限公司 Post-pouring strip template supporting system with function of back jacking after disassembly
CN114922417A (en) * 2022-05-19 2022-08-19 中建三局集团有限公司 Post-cast strip formwork-supporting-free and support-free system and construction method thereof

Also Published As

Publication number Publication date
CN106522282B (en) 2019-01-15

Similar Documents

Publication Publication Date Title
CN103422667B (en) Double-plate prefabricated superposed wall supporting system
CN106522282A (en) Liftable post-cast strip template structure and system and construction method thereof
CN106592966A (en) Support-beam-plate-free post-cast strip formwork system and construction method thereof
CN106193589B (en) Concrete superelevation heavy type beam and overlapping board combining structure method for supporting
CN208668596U (en) A kind of reinforced concrete girder slab system and prefabricated post assembly node
CN108661313A (en) A kind of cast-in-place linkage section mould plate supporting device of tool-type concrete folding plate
CN207878262U (en) A kind of high pier shaft binder concrete construction strutting system
CN206418523U (en) A kind of liftable post-cast strip template structure and system
CN106285721B (en) A kind of railway culvert method of construction based on sliding mode system
CN103046740B (en) Large-span moving-door type combined formwork system
CN115075613A (en) Fabricated building supporting system and construction method thereof
CN107859061A (en) A kind of construction method of box culvert primary concreting
CN215291438U (en) Post-cast with independent support structure
CN206625553U (en) For pouring the formwork bracing system of high-low bay structure simultaneously
CN110847598B (en) A thin-walled hollow pier diaphragm bottom template and construction method
CN219080981U (en) Non-support fixing device for post-pouring strip of superimposed sheet
CN219196714U (en) An integral lifting formwork and its formwork system
CN206438766U (en) One kind is without support beam board post poured band template system
CN219824918U (en) Unloading device convenient to process
CN217299956U (en) Hollow floor supporting mechanism
CN211899624U (en) A reinforced concrete beam and slab post-cast belt temporary support system
CN115354788A (en) Template-free supporting and reinforcing structure for steel frame composite floor slab and construction method thereof
CN210067441U (en) Integrated cast-in-place concrete for elevator brick wall and door buttress
CN207392530U (en) A kind of avoid-dismantle outer wall of basement flange single side formwork device
CN207160064U (en) Template system of open cut tunnel arc roof water proof coating

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20250314

Address after: Room 101, No. 8, Shuiguo Industrial Park, Shizhong District, Zaozhuang City, Shandong Province, China 277000

Patentee after: Shandong Tonggong Construction Engineering Co.,Ltd.

Country or region after: China

Address before: No. 13 Chaoyang Street, Zhangjiakou, Hebei, Hebei

Patentee before: HEBEI University OF ARCHITECTURE

Country or region before: China