CN107354831A - 一种铺轨机走行支架 - Google Patents

一种铺轨机走行支架 Download PDF

Info

Publication number
CN107354831A
CN107354831A CN201710731269.0A CN201710731269A CN107354831A CN 107354831 A CN107354831 A CN 107354831A CN 201710731269 A CN201710731269 A CN 201710731269A CN 107354831 A CN107354831 A CN 107354831A
Authority
CN
China
Prior art keywords
track
rail
section
laying machine
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710731269.0A
Other languages
English (en)
Inventor
谢伟
梁洪杰
罗强
杨北京
张洪卫
龚楠富
周琴
宫秋洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Original Assignee
Sixth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd filed Critical Sixth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Priority to CN201710731269.0A priority Critical patent/CN107354831A/zh
Publication of CN107354831A publication Critical patent/CN107354831A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/16Transporting, laying, removing, or replacing rails; Moving rails placed on sleepers in the track

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

本发明公开了一种铺轨机走行轨斜支架,包括底座和支柱,底座底部固定有两个卡盒,并倾斜地固定连接在支柱下端,支柱上端固定安装走行轨平台,走行轨平台上安装P24走行钢轨,两个卡盒固定连接在与其形状相一致的管片手孔中。本发明通过卡盒固定连接在管片手孔内增加了铺轨机走行安全,增加了铺轨施工的安全性,采用此走行斜支架,避免了人工操作安全性差,操作安全性更高,并且安装时手孔距离标准不用考虑净距影响,不用钻孔使用螺栓固定,直接人工安装,减少了对管片钻孔损伤,本发明还具有结构简单、操作使用方便快捷的特点。

Description

一种铺轨机走行支架
技术领域
本发明涉及一种铺轨机走行轨斜支架,属于铺轨机技术领域。
背景技术
传统地铁施工铺轨机走行轨斜支架通过在隧道管片上打孔插入膨胀螺栓固定。为了避免因在管片上钻孔损坏管片质量,在管片预制时预留C槽用来安装铺轨机走行支架。上海市地铁9号线施工中,由于管片上预留C槽位置过高,无法满足铺轨机跨距,不能使用传统方法和直接在预留C槽上安装铺轨机走行轨。本发明提供的一种铺轨机走行轨斜支架,斜支架安装在管片预留手孔上,管片不打孔,既不破坏管片质量,又能满足铺轨机跨距要求,确保铺轨车走行安全。
发明内容
本发明解决的技术问题是:提供一种铺轨机走行支架,在盾构隧道铺轨机施工中,减少了在管片上打孔,提高了安装效率,增加了铺轨施工的安全性,以解决现有技术中存在的“管片上预的留C槽位置过高,无法满足地铁铺轨车跨距”的问题。
本发明采取的技术方案为:一种铺轨机走行轨斜支架,包括底座和支柱,底座底部固定有两个卡盒,并倾斜地固定连接在支柱下端,支柱上端固定安装走行轨平台,走行轨平台上安装P24走行钢轨,两个卡盒固定连接在与其形状相一致的管片手孔中。
优选的,上述两个卡盒上下焊接在底座上,上部卡盒底部设置有条形孔一,条形孔一插入L型螺栓与管片手孔内螺栓孔连接。
优选的,上述走行轨平台通过固定夹固定连接P24走行钢轨,固定夹包括对称的两夹持片,两夹持片采用螺栓固定在走行轨平台上。
本发明的有益效果:与现有技术相比,本发明通过卡盒固定连接在管片手孔内增加了铺轨机走行安全,增加了铺轨施工的安全性,采用此走行斜支架,避免了人工操作安全性差,操作安全性更高,并且安装时手孔距离标准不用考虑净距影响,不用钻孔使用螺栓固定,直接人工安装,减少了对管片钻孔损伤,本发明还具有结构简单、操作使用方便快捷的特点。
附图说明
图1为本发明的结构示意图;
图2为本发明的底座结构示意图;
图3为走行轨平台示结构意图;
图4为本发明安装后结构示意图;
图5为管片手孔结构示意图;
图6为管片手孔侧视结构示意图。
具体实施方式
下面结合附图及具体的实施例对本发明进行进一步介绍。
实施例1:如图1―图6所示,一种铺轨机走行轨斜支架,包括底座1和支柱2,底座1为与隧道表面相一致的弧形钢板结构,底座1底部固定有两个卡盒3,并倾斜地固定连接在支柱2下端,支柱2采用空心管制作,支柱2上端固定安装走行轨平台4,走行轨平台4上安装P24走行钢轨5,两个卡盒3固定连接在与其形状相一致的管片手孔11中,走行轨平台4采用槽钢制作。
优选的,上述两个卡盒3上下焊接在底座1上,上部卡盒3底部设置有条形孔一8,条形通孔便于L型螺栓移动,条形孔一8插入L型螺栓与管片手孔11内螺栓孔12连接。
优选的,上述走行轨平台4通过固定夹7固定连接P24走行钢轨5,固定夹7包括对称的两夹持片6,走行轨平台4上开设有条形孔二10,采用螺栓9穿过夹持片6和条形通孔二10将夹持片6固定连接在走行轨平台4上,通过两夹持片将走行轨固定连接在走行轨平台上,连接可靠稳定。
以上所述,仅为本发明的具体实施方式实例,本发明的保护范围并不局限于此。熟悉该技术领域的技术人员在本发明揭露的技术范围内,可轻易找到变化或替换方式,这些都应涵盖在本发明的保护范围之内。为此,本发明的保护范围应以所述权利要求的保护范围为准。

Claims (3)

1.一种铺轨机走行轨斜支架,其特征在于:包括底座(1)和支柱(2),底座(1)底部固定有两个卡盒(3),并倾斜地固定连接在支柱(2)下端,支柱(2)上端固定安装走行轨平台(4),走行轨平台(4)上安装P24走行钢轨(5),两个卡盒(3)固定连接在与其形状相一致的管片手孔(11)中。
2.根据权利要求1所述的一种铺轨机走行斜支架,其特征在于:两个卡盒(3)上下焊接在底座(1)上,上部卡盒(3)底部设置有条形孔一(8),条形孔一(8)插入L型螺栓与管片手孔(11)内螺栓孔(12)连接。
3.根据权利要求1所述的一种铺轨机走行斜支架,其特征在于:走行轨平台(4)通过固定夹(7)固定连接P24走行钢轨(5),固定夹(7)包括对称的两夹持片(6),两夹持片(6)采用螺栓(9)固定在走行轨平台(4)上。
CN201710731269.0A 2017-08-23 2017-08-23 一种铺轨机走行支架 Pending CN107354831A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710731269.0A CN107354831A (zh) 2017-08-23 2017-08-23 一种铺轨机走行支架

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710731269.0A CN107354831A (zh) 2017-08-23 2017-08-23 一种铺轨机走行支架

Publications (1)

Publication Number Publication Date
CN107354831A true CN107354831A (zh) 2017-11-17

Family

ID=60288627

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710731269.0A Pending CN107354831A (zh) 2017-08-23 2017-08-23 一种铺轨机走行支架

Country Status (1)

Country Link
CN (1) CN107354831A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109915166A (zh) * 2019-04-16 2019-06-21 中铁十一局集团第三工程有限公司 一种走行轨支腿
CN117988171A (zh) * 2024-01-29 2024-05-07 中铁五局集团有限公司 自动铺轨定位施工装置及方法

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU927886A1 (ru) * 1980-06-27 1982-05-15 Центральное Конструкторское Бюро Тяжелых Путевых Машин Министерства Тяжелого И Транспортного Машиностроения Ссср Устройство дл извлечени участка рельсовой плети
DE3108050A1 (de) * 1981-03-04 1982-09-23 Krupp Stahl Ag, 4630 Bochum Vorrichtung zum befestigen einer schiene auf einem traeger
CN103061213A (zh) * 2012-12-28 2013-04-24 中铁二十四局集团上海铁建工程有限公司 一种独立式盾构台车轨枕及其施工方法
CN103225243A (zh) * 2013-04-24 2013-07-31 中铁上海工程局有限公司 一种矩形马蹄形隧道铺轨机走行轨支架
CN203320366U (zh) * 2013-05-15 2013-12-04 中铁上海工程局有限公司 一种圆形隧道铺轨机走行轨支架
CN203402832U (zh) * 2013-08-20 2014-01-22 中铁十一局集团第三工程有限公司 无级可调式铺轨龙门吊走行轨支腿
CN105133443A (zh) * 2015-07-30 2015-12-09 中铁二十四局集团有限公司 一种通用性盾构台车轨枕的安装结构及其施工方法
CN205973473U (zh) * 2016-08-15 2017-02-22 中冶天工集团有限公司 桥式起重机钢基滑触线支架安装用定尺
CN207176407U (zh) * 2017-08-23 2018-04-03 中铁五局集团第六工程有限责任公司 一种铺轨机走行支架

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU927886A1 (ru) * 1980-06-27 1982-05-15 Центральное Конструкторское Бюро Тяжелых Путевых Машин Министерства Тяжелого И Транспортного Машиностроения Ссср Устройство дл извлечени участка рельсовой плети
DE3108050A1 (de) * 1981-03-04 1982-09-23 Krupp Stahl Ag, 4630 Bochum Vorrichtung zum befestigen einer schiene auf einem traeger
CN103061213A (zh) * 2012-12-28 2013-04-24 中铁二十四局集团上海铁建工程有限公司 一种独立式盾构台车轨枕及其施工方法
CN103225243A (zh) * 2013-04-24 2013-07-31 中铁上海工程局有限公司 一种矩形马蹄形隧道铺轨机走行轨支架
CN203320366U (zh) * 2013-05-15 2013-12-04 中铁上海工程局有限公司 一种圆形隧道铺轨机走行轨支架
CN203402832U (zh) * 2013-08-20 2014-01-22 中铁十一局集团第三工程有限公司 无级可调式铺轨龙门吊走行轨支腿
CN105133443A (zh) * 2015-07-30 2015-12-09 中铁二十四局集团有限公司 一种通用性盾构台车轨枕的安装结构及其施工方法
CN205973473U (zh) * 2016-08-15 2017-02-22 中冶天工集团有限公司 桥式起重机钢基滑触线支架安装用定尺
CN207176407U (zh) * 2017-08-23 2018-04-03 中铁五局集团第六工程有限责任公司 一种铺轨机走行支架

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109915166A (zh) * 2019-04-16 2019-06-21 中铁十一局集团第三工程有限公司 一种走行轨支腿
CN117988171A (zh) * 2024-01-29 2024-05-07 中铁五局集团有限公司 自动铺轨定位施工装置及方法

Similar Documents

Publication Publication Date Title
CN101666230B (zh) 三软煤层加长前梁综采、综采放顶煤采煤方法及设备
CN207363606U (zh) 一种钻机滑移系统
CN109026049A (zh) 一种迈步式掘支锚联合机组及其使用方法
CN107354831A (zh) 一种铺轨机走行支架
CN109026050A (zh) 一种综采式掘支锚联合机组及其使用方法
CN105369699A (zh) 轻便新型盾构机后续台车与电瓶车系统分枕轨枕构建方法
CN206448820U (zh) 一种隧道施工台车
CN207176407U (zh) 一种铺轨机走行支架
CN209276914U (zh) 一种盾构隧道施工用的电瓶车跑道轨枕
CN206015442U (zh) 一种可拆式复合型盾构施工轨枕
CN202144748U (zh) 一种矿用高端液压支架井下装车平台
CN205801132U (zh) 一种抱轨及自锁组合式阻车器
CN208777997U (zh) 一种迈步式掘支锚联合机组
CN205382563U (zh) 一种钢结构支撑架
CN208486886U (zh) 一种具有快速拆装功能的既有铁路隧道缺陷整治施工台架
CN202882954U (zh) 一种u型钢支架
CN207609438U (zh) 锚索支护托梁
CN206813826U (zh) 一种皮带机
CN213295924U (zh) 铁轨接缝连接夹具
CN202786991U (zh) 铁路股道轨面不等高线路加固装置
CN205775658U (zh) 用于盾构施工的落地牛腿轨枕
CN214362987U (zh) 一种金属百叶孔声屏障
CN204676428U (zh) 一种弧形箱梁模板支撑结构
CN212247688U (zh) 一种防止顶进施工造成线路方向偏差的工具
CN204552062U (zh) 建筑窗口处外挑卸料平台固定装置

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171117

RJ01 Rejection of invention patent application after publication