CN107326940A CN201710781124.1A CN201710781124A CN107326940A CN 107326940 A CN107326940 A CN 107326940A CN 201710781124 A CN201710781124 A CN 201710781124A CN 107326940 A CN107326940 A CN 107326940A
Authority
CN
China
Prior art keywords
post
basement
cast strip
water
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710781124.1A
Other languages
Chinese (zh)
Other versions
CN107326940B (en
Inventor
卢士华
梁环跃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Panyu Polytechnic
Original Assignee
Guangzhou Panyu Polytechnic
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Panyu Polytechnic filed Critical Guangzhou Panyu Polytechnic
Priority to CN201710781124.1A priority Critical patent/CN107326940B/en
Publication of CN107326940A publication Critical patent/CN107326940A/en
Application granted granted Critical
Publication of CN107326940B publication Critical patent/CN107326940B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)

Abstract

The invention discloses a kind of basement advanced water-stop post-pouring zone structure and its construction method; including left and right basement agent structure and post-cast strip region; also include being provided with cast-in-place concrete trapezoidal groove structure below post-cast strip, the basement agent structure is with being followed successively by waterproof roll layer, polyurethane waterproof coating layer, fish tail and waterproof layer and concrete cushion below cast-in-place concrete trapezoidal groove structure;The basement advanced water-stop post-pouring zone structure of the present invention has impervious good water-proof effect, contraction distortion ability is strong, it is not likely to produce the bad phenomenons such as product slurry, ponding, debris ponding can be prevented effectively from and enter post-cast strip region, avoid secondary cleaning, simple in construction, easy construction, can effective accelerating construction progress, be worthy to be popularized.

Description

A kind of basement advanced water-stop post-pouring zone structure and its construction method
Technical field
The present invention relates to building engineering field, more particularly to a kind of basement advanced water-stop post-pouring zone structure and its construction party Method.
Background technology
Since reform and opening-up, especially since last decade, Chinese society economy is developed rapidly, and construction scale is increasingly grand, Structural shape is more complicated various, particularly overlength, ultra-deep basement structure and high-rise main tower and low layer or multilayer annex phase The structure type of connection is a lot, and this requires to set late poured band structure.It presently, there are and advanced water-stopping construction is poured after some, but this It is not straight that a little advanced water-stoppings constructions have the easy seepage in post-cast strip, crack, product slurry, ponding, a surface, flatness it is poor and after Pour the problems such as clearing up difficult with interior debris.
The content of the invention
It is an object of the invention to overcome the defect of prior art there is provided a kind of basement advanced water-stop post-pouring zone structure, What the technical scheme of the basement advanced water-stop post-pouring zone structure was realized in:
A kind of basement advanced water-stop post-pouring zone structure, including left and right basement agent structure and middle post-cast strip, it is described The native face of meeting of basement advanced water-stop post-pouring zone structure is additionally provided with cast-in-place concrete trapezoidal groove structure, the basement main body Waterproof roll layer, waterproof coating layer and fish tail and waterproof layer are sequentially provided with the outside of structure, middle post-cast strip and trapezoidal groove structure.
The nearly native side steel bar stress of the cast-in-place concrete trapezoidal groove structure gos deep into the basement agent structure of left and right, described Expansion joint is provided with the middle of trapezoidal groove structure, the near-end at the expansion joint and middle post-cast strip is provided with U-shaped reinforcing bar, expansion joint two Side is provided with external labeling type waterstop, and nearly soil side distal end is provided with inside back-adhering waterstop, the expansion joint to be filled with pitch, spunyarn Seam.
The middle post-cast strip both sides middle part is provided with c-type steel plate for sealing water, and the c-type steel plate for sealing water is perpendicular to main body Structure and post-cast strip are set, and water expandable waterstop are provided with the outside of c-type steel plate for sealing water, middle post-cast strip both sides are additionally provided with close mesh steel Silk screen.
Further, when agent structure is side wall, the agent structure both sides are reserved with for fixing plugging structure High-strength bolt.
The concrete of the middle post-cast strip is shrinkage compensated concrete, and concrete grade is higher than basement agent structure etc. Level one-level;The basement agent structure and the concrete of trapezoidal groove structure be it is integrated pour, after the concrete of post-cast strip Pour.
Plugging structure is provided with the inside of the basement agent structure and middle post-cast strip.
Further, the basement agent structure includes basement bottom board and basement side wall, when for basement bottom board When, the plugging structure is using glued cover closure, when being that enclosed construction is using formwork structure closing for side wall.
The step of construction method of above-mentioned basement bottom board advanced water-stop post-pouring zone structure, is as follows:
(1) the waterproof roll layer, waterproof coating layer and fish tail and waterproof layer of basement bottom board outer layer are performed first;
(2) fabrication and installation trapezoidal groove structure and basement agent structure include the reinforcing bar of post-cast strip and colligation is fixed, and use Supporting steel bar is supported, and leveling, levelling;
(3) external labeling type waterstop is laid along expansion joint center line both sides and end, is formed and closed together at expansion joint Sealing collar, at expansion joint using extruded polystyrene board fill, set up during construction U-shaped reinforcing bar be used for fix extruded polystyrene board and rubber Glue waterstop, extruded polystyrene board and rubber fastening band are effectively positioned;
(4) c-type steel plate for sealing water is welded in post-cast strip both sides, steel plate for sealing water direction is installed water-swellable and stopped towards native face is met Water bar, then post-cast strip both sides welded reinforcement skeleton, outsourcing dense mesh, skeleton reinforcing steel bar are fixed with bottom plate, exterior wall reinforcing bar colligation Together;
(5) bottom plate integrated template fabrication and installation, and reserve horizontal water stop slot;
(6) concrete of trapezoidal groove structure is poured, extruded polystyrene board is drawn except clean, and with spunyarn, pitch jointing;
(7) plugging structure is performed;Brick band is performed at bottom plate two ends first, is covered again with glued cover plate on brick band;
(8) wait to settle basicly stable after-pouring post-cast strip complementary contraction concrete.
The step of construction method of above-mentioned basement side wall advanced water-stop post-pouring zone structure, is as follows:
(1) fabrication and installation trapezoidal groove structure and basement side wall include the reinforcing bar of post-cast strip and colligation is fixed, and use split heads Muscle is supported, and leveling, levelling;
(2) external labeling type waterstop is laid along expansion joint center line both sides and end, is formed and closed together at expansion joint Sealing collar, at expansion joint using extruded polystyrene board fill, set up during construction U-shaped reinforcing bar be used for fix extruded polystyrene board and rubber Glue waterstop, extruded polystyrene board and rubber fastening band are effectively positioned;
(3) c-type steel plate for sealing water is welded in post-cast strip both sides, steel plate for sealing water direction is installed water-swellable and stopped towards native face is met Water bar, then post-cast strip both sides welded reinforcement skeleton, outsourcing dense mesh, skeleton reinforcing steel bar are fixed with bottom plate, exterior wall reinforcing bar colligation Together;
(4) side wall integrated template fabrication and installation, exterior wall advanced water-stopping band is integrated with outer wall formwork of basement, concrete Brace and support are provided with construction, side wall dense mesh, post-cast strip both sides side wall reserves high-strength bolt, for fixed closure Template;
(5) concrete of trapezoidal groove structure is poured, extruded polystyrene board is drawn except clean, and with spunyarn, pitch jointing;Apply Do the waterproof layer of basement side wall;
(6) plugging structure is performed;Directly closing is realized with the high-strength bolt fixed form for being reserved in both sides agent structure;
(7) wait to settle basicly stable after-pouring post-cast strip complementary contraction concrete.
The basement advanced water-stop post-pouring zone structure of the present invention has following beneficial aspects:
(1) rubber fastening band is set in advanced water-stopping band expansion joint side and bottom, closing sealing collar is formed, in base top Two horizontal water stopping troughs are set up in face, form constructional waterproofing, and common with the waterproof layer of polyurethane coating film waterproof, waterproof roll composition Multilayer flashing is constituted in antenatal waterstop position, water proof anti-seepage effect is improved, while post-cast strip region is provided with steel plate for sealing water And water expandable waterstop improves the waterproof effect of post-cast strip region.
(2) advanced water-stopping band expansion joint pours before concrete and to set extruded polystyrene board and rubber fastening band sets seam using staying, after pouring To extruded polystyrene board raked joint, and with water proofing asphalt and the spunyarn cementation of fissures, it be ensure that while reaching good waterproofing effect at post-cast strip Contraction distortion ability.
(3) post-cast strip both sides are provided with dense mesh, occur product slurry when preventing from vibrating during rear pouring concrete with concrete Phenomenon, it is ensured that post-cast strip impression quality.
(4) post-cast strip top surface is provided with plugging structure, and during preventing that post-cast strip from placing, debris, sewage enter, it is to avoid secondary Cleaning.
Brief description of the drawings
Fig. 1 is the schematic diagram of basement advanced water-stopping bottom plate rear pouring tape structure of the present invention;
Fig. 2 is the schematic diagram of basement advanced water-stopping side wall late poured band structure of the present invention.
Reference:Post-cast strip in the middle of 1-, 2- basements agent structure (including bottom plate and side wall), 3- cast-in-place concretes ladder Connected in star structure, 301- transverse steels, 4- waterproof rolls layer, 40- polyurethane waterproof coatings layer, 5- fish tail and waterproof layers, 6- coagulations Soil padding, 7- expansion joints, 71-U steel bars, 72- pitches, the spunyarn cementation of fissures, 73- both sides external labeling type waterstop, 74- ends external labeling type Waterstop, the horizontal water stop slots of 8-, 8a- high-strength bolts, 9-C type steel plate for sealing water, 10- water expandable waterstops, 11- closure knots Structure, 111- brick bands, 112- gluing cover plates, 12- dense meshes.
Embodiment
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Embodiment 1
As shown in figure 1, a kind of basement bottom board advanced water-stop post-pouring zone structure, including left and right basement bottom board 2 and centre Cast-in-place concrete trapezoidal groove structure 3, basement bottom board 2 and cast-in-place concrete are provided with below post-cast strip 1, in addition to post-cast strip The lower section of trapezoidal groove structure 3 is followed successively by waterproof roll layer 4, waterproof coating layer 40, fish tail and waterproof layer 5 and concrete cushion 6.
When it is implemented, the transverse steel 301 of cast-in-place concrete trapezoidal groove structure 3 gos deep into left and right sides basement bottom board Expansion joint 7 is provided with the middle of 2 tops, trapezoidal groove structure 3, expansion joint 7 is provided with U-shaped reinforcing bar 71 with the middle handing-over of post-cast strip 1 end, interior Portion is installed with extruded polystyrene board, after raked joint after concreting, then with pitch, the cementation of fissures of spunyarn 72, the both sides of expansion joint 7 are provided with two Side external labeling type waterstop 73, bottom is provided with end external labeling type waterstop 74, and outside is connected with waterproof roll layer 4, trapezoidal groove The both sides of structure 3 are additionally provided with two horizontal water stop slots 8.
When it is implemented, being provided with steel plate for sealing water 9 in the middle of the both sides of middle post-cast strip 1, the lower section of steel plate for sealing water 9 is provided with chance water Expansion sealing strip 10, is vertically provided with dense mesh 12 sideways, and the middle inner side of post-cast strip 1 is additionally provided with plugging structure 11, wrapped Two ends brick band 111 and intermediate rubber closing lid plate 112 are included, the concrete of middle post-cast strip 1 is shrinkage compensated concrete, and coagulation is poured after being Soil.
When it is implemented, the junction of plugging structure 11 and basement bottom board 2 uses cement mortar to carry out the smooth place that plasters Reason.
Poured when it is implemented, trapezoidal groove structure 3 is integrated with the concrete of basement bottom board 2.
When it is implemented, the two ends of trapezoidal groove structure 3 are longer than the straight line portion of middle post-cast strip 1 and the level of broken line part Length is not less than 250mm.
When it is implemented, the strength grade that compensating concrete is poured behind middle post-cast strip 1 is more than the coagulation of basement bottom board 2 Native grade one-level.
The step of construction method of above-mentioned basement bottom board advanced water-stop post-pouring zone structure, is as follows:
(1) concrete cushion 6 of basement bottom board outer layer is performed first, then performs waterproof roll layer 4, waterproof coating layer 40 With fish tail and waterproof layer 5;
(2) fabrication and installation trapezoidal groove structure 3 and basement agent structure 2 include reinforcing bar and the colligation of middle post-cast strip 1 It is fixed, supported with supporting steel bar, and leveling, levelling;
(3) both sides external labeling type waterstop 73 and end external labeling type waterstop 74 are laid along the center line both sides of expansion joint 7, The sealing collar of closing together is formed at expansion joint 7, is filled at expansion joint 7 using extruded polystyrene board, U-shaped reinforcing bar is set up during construction 71 are used for fixing extruded polystyrene board and rubber fastening band, and extruded polystyrene board and rubber fastening band are effectively positioned;
(4) in the middle both sides of post-cast strip 1 welding c-type steel plate for sealing water 9, the direction of steel plate for sealing water 9 is installed towards native face is met and meets water Expansion sealing strip 10, then post-cast strip both sides welded reinforcement skeleton, outsourcing dense mesh 12, skeleton reinforcing steel bar and bottom plate, exterior wall steel Muscle colligation is fixed together;
(5) bottom plate integrated template fabrication and installation, and reserve horizontal water stop slot 8;
(6) concrete of trapezoidal groove structure 3 is poured, extruded polystyrene board is drawn and removes clean, and is hooked with spunyarn, pitch 72 Seam;
(7) plugging structure 11 is performed;Brick band 111 is performed at bottom plate two ends first, is covered again with glued cover plate 112 on brick band Lid;
(8) wait to settle basicly stable after-pouring post-cast strip complementary contraction concrete.
Embodiment 2
As shown in Fig. 2 a kind of basement side wall advanced water-stop post-pouring zone structure, including left and right basement side wall 2 and centre Cast-in-place concrete trapezoidal groove structure 3, basement side wall 2 and cast-in-place concrete are provided with below post-cast strip 1, in addition to post-cast strip The outside of trapezoidal groove structure 3 is followed successively by waterproof roll layer 4, waterproof coating layer 5, fish tail and waterproof layer 6.
When it is implemented, the transverse steel 301 of cast-in-place concrete trapezoidal groove structure 3 gos deep into left and right sides basement side wall Expansion joint 7 is provided with the middle of 2 inner sides, trapezoidal groove structure 3, expansion joint 7 is provided with U-shaped reinforcing bar 71 with the middle handing-over of post-cast strip 1 end, interior Portion is installed with extruded polystyrene board, after raked joint after concreting, then with pitch, the cementation of fissures of spunyarn 72, the both sides of expansion joint 7 are provided with both sides External labeling type waterstop 73, outboard end is provided with end external labeling type waterstop 74, and outside is connected with waterproof roll layer 4.
When it is implemented, being provided with steel plate for sealing water 9 in the middle of the both sides of middle post-cast strip 1, the outside of steel plate for sealing water 9 is provided with chance water Expansion sealing strip 10, post-cast strip region 1 is vertically provided with dense mesh 12, the basement side wall 2 of the middle both sides of post-cast strip 1 High-strength bolt 8 is reserved with, for fixing plugging structure 11, plugging structure 11 is stopend so that middle post-cast strip 1 is formed Closing space;The concrete of middle post-cast strip 1 pours shrinkage compensated concrete after being.
When it is implemented, dense mesh 12 is additionally provided with brace and support.
Poured when it is implemented, trapezoidal groove structure 3 is integrated with the concrete of basement side wall 2.
When it is implemented, the two ends of trapezoidal groove structure 3 are longer than the straight line portion of middle post-cast strip 1 and the level of broken line part Length is not less than 250mm.
When it is implemented, the strength grade that compensating concrete is poured behind middle post-cast strip 1 is more than the coagulation of basement side wall 2 Native grade one-level.
The step of construction method of above-mentioned basement side wall advanced water-stop post-pouring zone structure, is as follows:
(1) fabrication and installation trapezoidal groove structure 3 and basement side wall 2 include the reinforcing bar of middle post-cast strip 1 and colligation is fixed, Supported with supporting steel bar, and leveling, levelling;
(2) both sides external labeling type waterstop 73 and end external labeling type waterstop 74 are laid along the center line both sides of expansion joint 7, The sealing collar of closing together is formed at expansion joint 7, is filled at expansion joint 7 using extruded polystyrene board, U-shaped reinforcing bar is set up during construction 71 are used for fixing extruded polystyrene board and rubber fastening band, and extruded polystyrene board and rubber fastening band are effectively positioned;
(3) in the middle both sides of post-cast strip 1 welding c-type steel plate for sealing water 9, the direction of steel plate for sealing water 9 is installed towards native face is met and meets water Expansion sealing strip 10, then the both sides welded reinforcement skeleton of post-cast strip 1, outsourcing dense mesh 12, skeleton reinforcing steel bar and bottom plate, exterior wall steel Muscle colligation is fixed together;
(4) the integrated template fabrication and installation of basement side wall 2, exterior wall advanced water-stopping band and the template of outer wall of basement 2, coagulation Brace and support are provided with native integrated construction, side wall dense mesh 12, the both sides side wall 2 of post-cast strip 1 reserves high-strength bolt 8a, for fixing stopend 11;
(5) concrete of trapezoidal groove structure 3 is poured, extruded polystyrene board is drawn and removes clean, and is hooked with spunyarn, pitch 72 Seam;Perform the waterproof layer of basement side wall;
(6) plugging structure 11 is performed;Directly envelope is realized with the high-strength bolt 8a fixed forms for being reserved in both sides agent structure Close;
(7) wait to settle basicly stable after-pouring post-cast strip complementary contraction concrete.
The technology contents and technical characteristic of the present invention have revealed that as above those skilled in the art are still potentially based on this The teaching of invention and make the replacement and modification without departing substantially from essence of the invention, therefore, the scope of the present invention is not limited to embodiment Disclosed content, also including various replacements and modification without departing substantially from essence of the invention.

Claims (3)

1. a kind of basement advanced water-stop post-pouring zone structure, including left and right basement agent structure and middle post-cast strip, its feature It is:The native face of meeting of the basement advanced water-stop post-pouring zone structure is additionally provided with cast-in-place concrete trapezoidal groove structure, described Basement agent structure, middle post-cast strip be sequentially provided with the outside of trapezoidal groove structure waterproof roll layer, waterproof coating layer and Fish tail and waterproof layer;
The nearly native side steel bar stress of the cast-in-place concrete trapezoidal groove structure gos deep into the basement agent structure of left and right, described trapezoidal Expansion joint is provided with the middle of groove structure, the near-end at the expansion joint and middle post-cast strip is provided with U-shaped reinforcing bar, and expansion joint both sides are set External labeling type waterstop is equipped with, nearly soil side distal end is provided with inside back-adhering waterstop, the expansion joint with pitch, the spunyarn cementation of fissures;
The middle post-cast strip both sides middle part is provided with c-type steel plate for sealing water, and the c-type steel plate for sealing water is perpendicular to agent structure Set with post-cast strip, water expandable waterstop is provided with the outside of c-type steel plate for sealing water, middle post-cast strip both sides are additionally provided with close mesh steel wire Net;
The concrete of the middle post-cast strip is shrinkage compensated concrete, and concrete grade is higher than basement agent structure grade one Level;The basement agent structure and the concrete of trapezoidal groove structure be it is integrated pour, poured after the concrete of post-cast strip;
Plugging structure is provided with the inside of the basement agent structure and middle post-cast strip.
2. basement advanced water-stop post-pouring zone structure according to claim 1, it is characterised in that:The basement body junction Structure includes basement bottom board and basement side wall, when for basement bottom board, and the plugging structure uses glued cover closure, when During for side wall, plugging structure is closed using formwork structure.
3. the construction method of the basement advanced water-stop post-pouring zone structure described in any of the above claim, it is characterised in that:Institute The construction method step for stating basement advanced water-stop post-pouring zone structure is as follows:
(1) the waterproof roll layer, waterproof coating layer and fish tail and waterproof layer of basement bottom board outer layer are performed first;
(2) fabrication and installation trapezoidal groove structure and basement agent structure include the reinforcing bar of post-cast strip and colligation is fixed, and use split heads Muscle is supported, and leveling, levelling;
(3) external labeling type waterstop and outboard end back-adhering waterstop are laid along expansion joint center line both sides, at expansion joint The sealing collar of closing together is formed, is filled at expansion joint using extruded polystyrene board, U-shaped reinforcing bar is set up during construction and is used for fixed squeeze Styrofoam and rubber fastening band are moulded, extruded polystyrene board and rubber fastening band are effectively positioned;
(4) c-type steel plate for sealing water is welded in post-cast strip both sides, water expandable waterstop is installed in steel plate for sealing water direction towards native face is met, Post-cast strip both sides welded reinforcement skeleton again, outsourcing dense mesh, skeleton reinforcing steel bar is fixed on one with bottom plate, exterior wall reinforcing bar colligation Rise;
(5) bottom plate, side wall integrated template fabrication and installation, exterior wall advanced water-stopping band are applied with outer wall formwork of basement, with integrated Brace and support are provided with work, side wall dense mesh, high-strength bolt is reserved at side wall two ends, for fixing stopend;Bottom Plate reserves horizontal water stop slot;
(6) concrete of trapezoidal groove structure is poured, extruded polystyrene board is drawn except clean, and with spunyarn, pitch jointing;Perform ground The waterproof layer of lower room side wall;
(7) plugging structure is performed;Side wall directly realizes closing, bottom with the high-strength bolt fixed form for being reserved in both sides agent structure Plate performs brick band at two ends, is covered on brick band with glued cover plate;
(8) wait to settle basicly stable after-pouring post-cast strip complementary contraction concrete.
CN201710781124.1A 2017-09-01 2017-09-01 basement advanced water stop post-cast strip structure and construction method thereof Active CN107326940B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710781124.1A CN107326940B (en) 2017-09-01 2017-09-01 basement advanced water stop post-cast strip structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710781124.1A CN107326940B (en) 2017-09-01 2017-09-01 basement advanced water stop post-cast strip structure and construction method thereof

Publications (2)

Publication Number Publication Date
CN107326940A true CN107326940A (en) 2017-11-07
CN107326940B CN107326940B (en) 2020-01-31

Family

ID=60204319

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710781124.1A Active CN107326940B (en) 2017-09-01 2017-09-01 basement advanced water stop post-cast strip structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN107326940B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403631A (en) * 2018-12-08 2019-03-01 上海宝冶集团有限公司 A kind of ground-connecting-wall connect waterproof construction method with original place flowering structure
CN109537635A (en) * 2018-11-30 2019-03-29 中衡卓创国际工程设计有限公司 Top plate of underground parking garage waterproofing of movement joints node and method of construction
CN109736357A (en) * 2019-02-25 2019-05-10 中建四局第一建筑工程有限公司 A kind of basement bottom plate rear pouring tape construction joint optimization processing structure
CN110144974A (en) * 2019-06-20 2019-08-20 中国五冶集团有限公司 A kind of construction method and its structure of fixed flush type waterstop
CN110158664A (en) * 2019-05-13 2019-08-23 浙江大东吴集团建设有限公司 A kind of basement post-pouring zone anti-seepage construction method
CN110344426A (en) * 2019-07-12 2019-10-18 无锡市亨利富建设发展有限公司 Sole plate variable cross-section pouring after settlement reinforced mesh support system construction method
CN110552431A (en) * 2019-09-06 2019-12-10 中国一冶集团有限公司 Induced joint structure for basement crack control and construction method
CN112112292A (en) * 2020-07-28 2020-12-22 中建八局第四建设有限公司 Construction method for preventing concrete from permeating into two sides of post-cast strip of bottom plate of garage
CN113266042A (en) * 2021-06-24 2021-08-17 中益诚达建设集团有限公司 Basement advanced water-stop post-cast strip and construction method thereof
CN113882436A (en) * 2021-10-14 2022-01-04 重庆建工第四建设有限责任公司 Advanced water-stopping pouring construction method
CN115030203A (en) * 2022-07-18 2022-09-09 南京宇正建设工程有限公司 Construction structure and construction method of high-pressure jet grouting impervious wall

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1008925C1 (en) * 1998-03-13 1999-09-14 Alex Blokker Duik En Bergingsb Building floor by pouring concrete into foundation pit enclosed by dam walls
CN101498136A (en) * 2008-02-03 2009-08-05 钱忠勤 After-pouring strips structure with high underground water level
CN201865127U (en) * 2010-10-18 2011-06-15 中冶成工上海五冶建设有限公司 Reinforced waterproof late poured band of basement bottom plate
CN203361206U (en) * 2013-07-05 2013-12-25 浙江宝厦建设有限公司 Basement advanced water-stop post-cast strip construction structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1008925C1 (en) * 1998-03-13 1999-09-14 Alex Blokker Duik En Bergingsb Building floor by pouring concrete into foundation pit enclosed by dam walls
CN101498136A (en) * 2008-02-03 2009-08-05 钱忠勤 After-pouring strips structure with high underground water level
CN201865127U (en) * 2010-10-18 2011-06-15 中冶成工上海五冶建设有限公司 Reinforced waterproof late poured band of basement bottom plate
CN203361206U (en) * 2013-07-05 2013-12-25 浙江宝厦建设有限公司 Basement advanced water-stop post-cast strip construction structure

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537635B (en) * 2018-11-30 2021-02-19 中衡卓创国际工程设计有限公司 Waterproof node for deformation joint of top plate of underground garage and construction method
CN109537635A (en) * 2018-11-30 2019-03-29 中衡卓创国际工程设计有限公司 Top plate of underground parking garage waterproofing of movement joints node and method of construction
CN109403631A (en) * 2018-12-08 2019-03-01 上海宝冶集团有限公司 A kind of ground-connecting-wall connect waterproof construction method with original place flowering structure
CN109736357A (en) * 2019-02-25 2019-05-10 中建四局第一建筑工程有限公司 A kind of basement bottom plate rear pouring tape construction joint optimization processing structure
CN110158664A (en) * 2019-05-13 2019-08-23 浙江大东吴集团建设有限公司 A kind of basement post-pouring zone anti-seepage construction method
CN110144974A (en) * 2019-06-20 2019-08-20 中国五冶集团有限公司 A kind of construction method and its structure of fixed flush type waterstop
CN110144974B (en) * 2019-06-20 2023-12-26 中国五冶集团有限公司 Construction method and structure of fixed embedded type water stop
CN110344426A (en) * 2019-07-12 2019-10-18 无锡市亨利富建设发展有限公司 Sole plate variable cross-section pouring after settlement reinforced mesh support system construction method
CN110552431A (en) * 2019-09-06 2019-12-10 中国一冶集团有限公司 Induced joint structure for basement crack control and construction method
CN110552431B (en) * 2019-09-06 2021-05-18 中国一冶集团有限公司 Induced joint structure for basement crack control and construction method
CN112112292A (en) * 2020-07-28 2020-12-22 中建八局第四建设有限公司 Construction method for preventing concrete from permeating into two sides of post-cast strip of bottom plate of garage
CN113266042A (en) * 2021-06-24 2021-08-17 中益诚达建设集团有限公司 Basement advanced water-stop post-cast strip and construction method thereof
CN113882436A (en) * 2021-10-14 2022-01-04 重庆建工第四建设有限责任公司 Advanced water-stopping pouring construction method
CN115030203A (en) * 2022-07-18 2022-09-09 南京宇正建设工程有限公司 Construction structure and construction method of high-pressure jet grouting impervious wall
CN115030203B (en) * 2022-07-18 2024-01-05 南京宇正建设工程有限公司 Construction structure of high-pressure rotary spraying impervious wall and construction method thereof

Also Published As

Publication number Publication date
CN107326940B (en) 2020-01-31

Similar Documents

Publication Publication Date Title
CN107326940A (en) A kind of basement advanced water-stop post-pouring zone structure and its construction method
CN207392261U (en) A kind of basement bottom board advanced water-stop post-pouring zone structure
CN106677440A (en) Roofing parapet water-floating structure and construction method thereof
CN207987983U (en) A kind of waterproof construction being used for underground engineering main body construction seam and post-cast strip
CN108678258A (en) Large span hemispherical armored concrete dome structure and its construction method
CN106930331A (en) The waterproof construction system and its construction method at underground pipe gallery expansion joint
CN107059917B (en) Split component prefabricated comprehensive pipe gallery and construction method thereof
CN103321257A (en) Anti-cracking seepage-proof construction method for ultra-long mass concrete structure basement
CN106894446B (en) Super-long Basement jointless structure construction method
CN106284427A (en) A kind of basement post-pouring zone temporary leaking water gear soil construction method
CN110872869A (en) Waterproof construction method for joints of external wall panels
CN105714849B (en) The reverse construction method of the adjacent high low layer (across) of basement
CN107023160A (en) A kind of assembly concrete shear wall structure dedicated aluminium alloy template
CN213952303U (en) Basement outer wall post-cast strip assembled protection wall construction structures
CN107190782A (en) A kind of poured band of outer wall of basement structure and its construction method
CN107447893A (en) A kind of lightgage steel joist concrete anticracking filling wall and its construction method
CN107503450A (en) A kind of cast-in-place hollow armored concrete filling wall and its construction technology
CN206721936U (en) The waterproof construction system at underground pipe gallery expansion joint
CN209162909U (en) A kind of interface waterproof construction of new-old concrete
CN108240045A (en) A kind of compound late poured band structure of outer wall precast slab and its construction method
CN206987075U (en) A kind of basement bottom board of alternative post-cast strip strengthens band structure
CN207194239U (en) Lightgage steel joist concrete anticracking fills wall
CN205954707U (en) Leading enclosed construction in basement outer wall post -cast strip
CN205669283U (en) The cast-in-place Integral Steel frame wall filled with masonry system of the spacing connection of steel disc
CN109680722B (en) Construction method for directly reserving external building access port on basement outer wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant