CN107447893A - A kind of lightgage steel joist concrete anticracking filling wall and its construction method - Google Patents

A kind of lightgage steel joist concrete anticracking filling wall and its construction method Download PDF

Info

Publication number
CN107447893A
CN107447893A CN201710536974.5A CN201710536974A CN107447893A CN 107447893 A CN107447893 A CN 107447893A CN 201710536974 A CN201710536974 A CN 201710536974A CN 107447893 A CN107447893 A CN 107447893A
Authority
CN
China
Prior art keywords
steel
wall
keel frame
lightgage
joist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710536974.5A
Other languages
Chinese (zh)
Inventor
王新泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Jiangrun Technology Co Ltd
Original Assignee
Hangzhou Jiangrun Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Jiangrun Technology Co Ltd filed Critical Hangzhou Jiangrun Technology Co Ltd
Priority to CN201710536974.5A priority Critical patent/CN107447893A/en
Publication of CN107447893A publication Critical patent/CN107447893A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/74Removable non-load-bearing partitions; Partitions with a free upper edge
    • E04B2/76Removable non-load-bearing partitions; Partitions with a free upper edge with framework or posts of metal
    • E04B2/78Removable non-load-bearing partitions; Partitions with a free upper edge with framework or posts of metal characterised by special cross-section of the frame members as far as important for securing wall panels to a framework with or without the help of cover-strips
    • E04B2/7854Removable non-load-bearing partitions; Partitions with a free upper edge with framework or posts of metal characterised by special cross-section of the frame members as far as important for securing wall panels to a framework with or without the help of cover-strips of open profile
    • E04B2/789Removable non-load-bearing partitions; Partitions with a free upper edge with framework or posts of metal characterised by special cross-section of the frame members as far as important for securing wall panels to a framework with or without the help of cover-strips of open profile of substantially U- or C- section
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/74Removable non-load-bearing partitions; Partitions with a free upper edge
    • E04B2/82Removable non-load-bearing partitions; Partitions with a free upper edge characterised by the manner in which edges are connected to the building; Means therefor; Special details of easily-removable partitions as far as related to the connection with other parts of the building
    • E04B2/821Connections between two opposed surfaces (i.e. floor and ceiling) by means of a device offering a restraining force acting in the plane of the partition
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/86Walls made by casting, pouring, or tamping in situ made in permanent forms
    • E04B2/8658Walls made by casting, pouring, or tamping in situ made in permanent forms using wire netting, a lattice or the like as form leaves

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention relates to a kind of lightgage steel joist concrete anticracking to fill wall, including:Expanded metal lath, wall surface mortar basic unit, wall surface mortar insulation binder course, finish coat, lightgage steel joist, transverse steel and self-tapping screw nail;Lightgage steel joist is to be pressed into C-type steel by hot dip galvanizing sheet iron, connects to be formed with several band steels between C-type steel, and lightgage steel joist, which is welded in, to be arranged on the L-type angle steel and steel column of wall top and wall bottom;Band steel sets up transverse steel, settled water & electric pipe line, installs vertical reinforcement, and expanded metal lath is to be fixed on round pad to form light steel keel frame by self-tapping screw nail, casting concrete in light steel keel frame, peripheral hardware wall surface mortar basic unit, wall surface mortar insulation binder course and architectural surface.The beneficial effects of the invention are as follows:Using light steel keel frame and concrete combined construction, the strength and stability of filling wall is added, is suitably promoted in earthquake territory, solve the problems, such as most of filling wall low intensity.

Description

A kind of lightgage steel joist concrete anticracking filling wall and its construction method
Technical field
The present invention relates to a kind of cracking resistance to fill wall, more particularly to a kind of lightgage steel joist concrete anticracking filling wall and its making Method.
Background technology
The construction of traditional wall, it is exactly two kinds nothing but, reinforced concrete wall and masonry walls, the former needs branch masterplate to pour Concrete, maintenance will also dismantle to template after completing, waste time and energy, influence construction speed, and construction environment is caused Influence, and the latter's masonry walls are constructed, and are to be built a wall by manual human, due to human factor, construction speed is also slow, and the items of wall Quality index is difficult to be met, in addition, the anti-cracking waterproof ability of masonry walls is more general, it is high to be more unfavorable for quality requirement Engineering.As a result with the development of economy and society, everybody requirement more and more higher for wall, seek a kind of new wall and The requirement of its construction method is also just a series of new into a main trend, the plasterboard partition wall that has been born etc. for current construction industry Type wall, but these walls it is all more or less have its own shortcoming, such as intensity is not high, and soundproof effect is bad, it is impossible to protects The shortcomings of warm.
Therefore, need badly at present and seek a kind of new there are anti-cracking waterproof, energy-conserving and environment-protective, shorten the duration, be cost-effective Fill wall and its construction method.
The content of the invention
The purpose of the present invention is exactly to overcome drawbacks described above, there is provided a kind of construction party of lightgage steel joist concrete anticracking filling wall Method.
It is a further object to provide a kind of lightgage steel joist concrete anticracking to fill wall.The purpose of the present invention is logical Cross following technical scheme realization:
A kind of new light steel keel frame concrete anticracking filling wall, mainly by expanded metal lath, wall surface mortar basic unit, metope Mortar insulation binder course, finish coat, lightgage steel joist, transverse steel and self-tapping screw nail composition, lightgage steel joist is thin by galvanizing Steel plate is pressed into C-type steel, connects to be formed with several band steels between C-type steel, and lightgage steel joist, which is welded in, is arranged in wall top and wall bottom L-type angle steel and steel column on;Band steel sets up transverse steel, and settled water & electric pipe line installs vertical reinforcement, and expanded metal lath is by certainly Tapping nail, which is fixed on round pad, forms light steel keel frame, casting concrete in light steel keel frame, peripheral hardware metope sand Starch basic unit, wall surface mortar insulation binder course and architectural surface.
L-type angle steel does the positioning of metope both sides, is welded in wall bottom, wall top or upper strata beam bottom, is used as lightgage steel joist fixation.
It is horizontal support that the steel column of lightgage steel joist, which adds horizontal band steel,.
A kind of construction method of lightgage steel joist concrete anticracking filling wall, comprises the following steps:
1) L-type angle steel is welded in wall bottom, wall top or upper strata beam bottom;
2) hot dip galvanizing sheet iron is pressed into C-type steel, several band steels is and then connected between C-type steel, it is light so as to obtain Steel joist;
3) lightgage steel joist is weldingly fixed on L-type angle steel and steel column, transverse steel is then set up on band steel;
4) the pre-buried of hydroelectric line is carried out;
5) followed closely by self-tapping screw, expanded metal lath is fixed on round pad, installed;
6) casting concrete into the light steel keel frame of formation;
7) treat to carry out wall decoration construction after the completion of concrete curing, finally obtain new light steel keel frame concrete Cracking resistance fills wall.
As preferred:In the step 4), hydroelectric line is pre-buried must be after lightgage steel joist welds reinforcement, before one-side net laying Constructed, and expanded metal lath can be sealed after hydroelectric project's teacher acceptance(check).
As preferred:In the step 5), when installing expanded metal lath, net and net must stagger overlap joint, and align round pad;It is fixed When followed closely with self-tapping screw, self-tapping screw nail is fixed on round pad, during punching it is oblique staggeredly.
As preferred:In the step 7), wall surface mortar basic unit, wall surface mortar insulation binder course and architectural surface are applied Work, carries out wall plastering successively, external wall plastering, coating application, paste heat-preserving material, scrape cracking resistance water proof putty and tapestry brick this Several steps.
The present invention has following features and beneficial effect:
The present invention uses light steel keel frame and concrete combined construction, adds the strength and stability of filling wall, fits Preferably promoted in earthquake territory, solve the problems, such as most of filling wall low intensity.
The present invention uses expanded metal lath, saves the flow of formwork form removal, shortens the duration, and can increase the cracking resistance of wall Fire resistance characteristic.
The wall decoration engineering of the present invention, which employs, have been applied water resistant anti-cracking powder of lacquer putty for use on and has pasted insulation material, so enters one Step ensure that the anti-cracking waterproof of wall, also ensures energy-saving heat preserving in addition, is advantageous to the development and popularization of green building.
Brief description of the drawings
Fig. 1 is lightgage steel joist concrete anticracking filling wall design sketch;
Fig. 2 is lightgage steel joist top view;
Fig. 3 is lightgage steel joist concrete anticracking filling wall horizontal sectional drawing;
Fig. 4 is lightgage steel joist welding L-type angle steel and column schematic diagram;
Fig. 5 is light steel keel frame figure;
Fig. 6 is expanded metal lath overlap joint schematic diagram
In figure:1- expanded metal laths;2- wall surface mortars basic unit;3- wall surface mortars are incubated binder course;4- architectural surfaces;The light steel dragons of 5- Bone;6- transverse steels;7- self-tapping screws are followed closely;8- hot dip galvanizing sheet irons;9-C shaped steel;10- transverse direction band steels;11-L type angle steel;12- Steel column;13- hydroelectric lines;14- vertical reinforcements;The round pads of 15-;16- light steel keel frames;17- concrete.
Embodiment
Unwrapping wire is measured according to Design Requirement Drawing first, after the completion of wall bottom and the assigned position of wall top welding angle steel 11, specific size is L30 × 3, and final effect is as shown in the 11 of Fig. 4 lower section.
Next hot dip galvanizing sheet iron 8 is pressed into C-type steel 9, as shown in Fig. 2 the specific size of C-type steel 9 is that section is wide 10mm, depth of section 18mm, thickness 1.5mm are spent, is 1.5mm in the width welded section thickness of C-type steel 9, length is 180mm band steel 10, spacing are no more than 150mm, finally give Fig. 2 structures, i.e. lightgage steel joist 5.
Obtained lightgage steel joist 5 is welded in the steel for being arranged on the L-type angle steel 11 at wall bottom and wall bottom and placing already On column 12, the spacing of steel column 12 is generally kept in 180-250mm, and Design Requirement Drawing institute is then set up on horizontal band steel 10 The transverse steel 6 needed, generally vertical reinforcing bar 14 are also to set up what is completed in this step, finally obtain structure as shown in Figure 4.
After the welding of lightgage steel joist 5 is strengthened, take up the pre-buried of hydroelectric line 13, must first be marked before casting concrete 17 Position of opening is wanted, in order to chisel borehole cleaning after having poured concrete 17.
Then the installation of expanded metal lath 1 is carried out, the specific size of expanded metal lath 1 is length x width:2400mm × 600mm is thick Degree:0.35mm~0.6mm, size of mesh:5mm~8mm × 16mm, when installing expanded metal lath 1, net must not exceed with net overlapping splice 3cm, lap position should be in the centres of lightgage steel joist steel column 12, and net and net must stagger overlap joint, and align round pad 15;When fixed Follow closely 7 using self-tapping screw, self-tapping screw nail 7 is fixed on round pad 15, during punching it is oblique staggeredly, and spray on nail emits red Color or conspicuous color mark are to check.The size of circular gasket 15 is 5mm*1mm, and it is diameter 2.5mm that self-tapping screw, which follows closely 7 sizes, Length is 25mm, is arranged by spacing 300mm, finally gives light steel keel frame 16 as shown in Figure 5.
The casting concrete 17 into light steel keel frame 16, mode pouring construction is poured using U-shaped.
After the completion for the treatment of that concrete 17 conserves, wall face decorating layer construction is carried out, carries out wall surface mortar basic unit 2, metope sand successively The construction of slurry insulation binder course 3 and architectural surface 4, is comprised the concrete steps that:The construction of wall surface mortar basic unit 2, one layer of bottom ash is smeared first, The groove of expanded metal lath 1 is filled up, rough levelling, then float coat is then scraped with mortar.Screed-coat preferably uses 8mm-12mm thickness 1:3 cement bonded sands Slurry, bottoming brooming, surface layer preferably use 8mm~10mm solid cement mortar covers;Wall surface mortar is incubated the construction of binder course 3, first carries out The construction of plaster base, the brushing of water-repellent paint is carried out after mortar is fully dried, is to scrape anti-cracking waterproof putty successively again afterwards With paste heat-preserving material;The construction of architectural surface 4, pasted using polymer bonding mortar or ceramic tile sticker, joint thickness 3mm-5mm;Face brick thickness is no more than 10mm.So far lightgage steel joist concrete anticracking filling wall as shown in Figure 1 is obtained, it is flat Face profile is as shown in Figure 3.

Claims (7)

  1. A kind of 1. new light steel keel frame concrete anticracking filling wall, it is characterised in that:Mainly by expanded metal lath (1), metope Mortar basic unit (2), wall surface mortar insulation binder course (3), finish coat (4), lightgage steel joist (5), transverse steel (6) and self-tapping screw (7) composition is followed closely, lightgage steel joist (5) is to be pressed into C-type steel (9) by hot dip galvanizing sheet iron (8), flat with several between C-type steel (9) Steel (10) connection is formed, and lightgage steel joist (5) is welded on the L-type angle steel (11) and steel column (12) for being arranged in wall top and wall bottom; Band steel (10) sets up transverse steel (6), and settled water & electric pipe line (13), installation vertical reinforcement (14), expanded metal lath (1) is to pass through self tapping Screw (7), which is fixed on round pad (15), forms light steel keel frame (16), and coagulation is poured in light steel keel frame (16) Native (17), peripheral hardware wall surface mortar basic unit (2), wall surface mortar insulation binder course (3) and architectural surface (4).
  2. 2. new light steel keel frame concrete anticracking filling wall according to claim 1, it is characterised in that:L-type angle Steel (11) does the positioning of metope both sides, is welded in wall bottom, wall top or upper strata beam bottom, and it is fixed to be used as lightgage steel joist (5).
  3. 3. new light steel keel frame concrete anticracking filling wall according to claim 1, it is characterised in that:Light steel dragon It is horizontal support that the steel column (12) of bone (5), which adds horizontal band steel (10),.
  4. 4. a kind of construction method of the new light steel keel frame concrete anticracking filling wall based on described in claim 1, its It is characterised by, comprises the following steps:
    1) L-type angle steel (11) is welded in wall bottom, wall top or upper strata beam bottom;
    2) hot dip galvanizing sheet iron (8) is pressed into C-type steel (9), several band steels (10) is and then connected between C-type steel (9), from And obtain lightgage steel joist (5);
    3) lightgage steel joist (5) is weldingly fixed on L-type angle steel (11) and steel column (12), then set up on band steel (10) horizontal To reinforcing bar (6);
    4) the pre-buried of hydroelectric line (13) is carried out;
    5) (7) are followed closely by self-tapping screw, expanded metal lath (1) is fixed on round pad (15), installed;
    6) to light steel keel frame (16) interior casting concrete (17) of formation;
    7) treat to carry out wall decoration construction after the completion of concrete (17) maintenance, finally obtain new light steel keel frame concrete Cracking resistance fills wall.
  5. 5. new light steel keel frame concrete anticracking filling wall according to claim 4, it is characterised in that:The step It is rapid 4) in, hydroelectric line (13) is pre-buried to be constructed after lightgage steel joist (5) is welded and strengthened before one-side net laying, and through water Expanded metal lath (1) can be sealed after electrical engineering teacher's acceptance(check).
  6. 6. new light steel keel frame concrete anticracking filling wall according to claim 4, it is characterised in that:The step It is rapid 5) in, when installing expanded metal lath, net and net must stagger overlap joint, and align round pad (15);(7) are followed closely with self-tapping screw when fixed, Self-tapping screw nail (7) is fixed on round pad (15), during punching it is oblique staggeredly.
  7. 7. new light steel keel frame concrete anticracking filling wall according to claim 4, it is characterised in that:The step It is rapid 7) in, wall surface mortar basic unit (2), wall surface mortar insulation binder course (3) and architectural surface (4) construction, carry out metope successively Plaster, external wall plastering, coating application, paste heat-preserving material, scrape cracking resistance water proof putty and tapestry brick these steps.
CN201710536974.5A 2017-07-04 2017-07-04 A kind of lightgage steel joist concrete anticracking filling wall and its construction method Withdrawn CN107447893A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710536974.5A CN107447893A (en) 2017-07-04 2017-07-04 A kind of lightgage steel joist concrete anticracking filling wall and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710536974.5A CN107447893A (en) 2017-07-04 2017-07-04 A kind of lightgage steel joist concrete anticracking filling wall and its construction method

Publications (1)

Publication Number Publication Date
CN107447893A true CN107447893A (en) 2017-12-08

Family

ID=60488266

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710536974.5A Withdrawn CN107447893A (en) 2017-07-04 2017-07-04 A kind of lightgage steel joist concrete anticracking filling wall and its construction method

Country Status (1)

Country Link
CN (1) CN107447893A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577524A (en) * 2019-01-02 2019-04-05 常州市米尼特机械有限公司 A kind of cast-in-place foamed concrete wall
CN109779102A (en) * 2019-03-04 2019-05-21 中国五冶集团有限公司 Lattice keel expanded metal lath mould composite wall and its construction method
CN109930712A (en) * 2019-03-28 2019-06-25 温州市华宁建筑机械有限公司 The cast-in-place double mesh sheet of one kind exempt from the plaster dedicated framework of partition wall construction and its construction method
CN112282147A (en) * 2020-09-02 2021-01-29 众合天成(大连)科技发展有限公司 Method for manufacturing disassembly-free template by scraping and smearing reinforced cement on steel plate mesh
CN113216443A (en) * 2021-04-14 2021-08-06 凯第建筑集团有限公司 Steel mesh formwork wall body and construction process thereof
CN113530025A (en) * 2020-04-22 2021-10-22 南京环达装饰工程有限公司 Light steel keel partition wall adaptive to building structure construction errors and construction method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577524A (en) * 2019-01-02 2019-04-05 常州市米尼特机械有限公司 A kind of cast-in-place foamed concrete wall
CN109577524B (en) * 2019-01-02 2024-02-13 常州市米尼特机械有限公司 Cast-in-situ foam concrete wall
CN109779102A (en) * 2019-03-04 2019-05-21 中国五冶集团有限公司 Lattice keel expanded metal lath mould composite wall and its construction method
CN109930712A (en) * 2019-03-28 2019-06-25 温州市华宁建筑机械有限公司 The cast-in-place double mesh sheet of one kind exempt from the plaster dedicated framework of partition wall construction and its construction method
CN113530025A (en) * 2020-04-22 2021-10-22 南京环达装饰工程有限公司 Light steel keel partition wall adaptive to building structure construction errors and construction method thereof
CN112282147A (en) * 2020-09-02 2021-01-29 众合天成(大连)科技发展有限公司 Method for manufacturing disassembly-free template by scraping and smearing reinforced cement on steel plate mesh
CN113216443A (en) * 2021-04-14 2021-08-06 凯第建筑集团有限公司 Steel mesh formwork wall body and construction process thereof

Similar Documents

Publication Publication Date Title
CN107447893A (en) A kind of lightgage steel joist concrete anticracking filling wall and its construction method
CN104018598B (en) A kind of external wall structure and construction installation method
CN104314204B (en) Non-form stripping lightweight internal partition board and overall grouting construction method thereof
CN104790595B (en) Pitched roof adjustable tile system construction method
CN104358341B (en) Building brickwork and masonry construction method of building brickwork
CN104746772B (en) Ash concrete hollow partition board anti-cracking construction method
CN106436893A (en) Fully-prefabricated structure and construction method thereof
CN106801517B (en) External reinforcing and reinforcing method for school shed with prefabricated porous plate brick mixed structure
CN102808513B (en) Crack controlling construction method for lightweight wall
CN106284706A (en) The construction method of external wall outer insulation rock cotton board
CN207194239U (en) Lightgage steel joist concrete anticracking fills wall
CN203514570U (en) Square bar keel partition wall
CN106013509A (en) Dry-method construction method for high-performance autolaved aerated concrete block wall
CN101586370A (en) Construction method of ceramsite light wallboard
CN106083150A (en) Self-heat conserving autoclaved lightweight sand aerated concrete block and wall construction technique thereof
CN101761155A (en) Construction method for ceramsite concrete light-weight wall boards
CN112459291A (en) Prefabricated heat insulation structure integrated wall structure and construction process thereof
CN110805212A (en) Construction method for roof flashing
CN111042392A (en) Construction method of SDHH type disassembly-free formwork foam concrete partition wall
CN108286341B (en) Anti-cracking steel mesh template structure at joint of different substrate materials and construction method using same
CN114482135A (en) Advanced water stop structure of basement exterior wall post-cast strip and construction method
CN108130992A (en) Rubble plate, styrofoam and porous brick compound thermal-insulating decorative external wall construction engineering method
CN101538904B (en) Gypsum powder poured integral wall and manufacturing method thereof
CN102182323A (en) Process for dry laying of autoclaved aerated concrete blocks in low-latitude plateaus
CN102011466B (en) Narrow conduit shaft wall light pre-dressing method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20171208

WW01 Invention patent application withdrawn after publication