CN110158664A - A kind of basement post-pouring zone anti-seepage construction method - Google Patents
A kind of basement post-pouring zone anti-seepage construction method Download PDFInfo
- Publication number
- CN110158664A CN110158664A CN201910393868.5A CN201910393868A CN110158664A CN 110158664 A CN110158664 A CN 110158664A CN 201910393868 A CN201910393868 A CN 201910393868A CN 110158664 A CN110158664 A CN 110158664A
- Authority
- CN
- China
- Prior art keywords
- post
- water absorption
- absorption layer
- layer
- pouring zone
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/16—Arrangement or construction of joints in foundation structures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/02—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Hydrology & Water Resources (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The invention discloses a kind of basement post-pouring zone anti-seepage construction methods, it is used in this method and arrives a kind of impermeable structure of basement post-pouring zone, the structure includes water-swellable layer, sealing rod, mixed mud bed course, reinforced concrete layer and water absorption layer etc. on post-cast strip, it can play the role of impermeable well, simultaneously setting mixed mud bed course be more advantageous to pouring and forming for subsequent mixed mud, guarantee integrally-built stabilization, securely;Waterproof steel plate is equipped on the mixed mud bed course on the groove body side wall of post-cast strip, bottom plate and isolation board set on the bottom plate are equipped on the mixed mud bed course of groove body bottom, the steel plate and the isolation board at two end of bottom plate abut against, steel plate thickness can be designed according to actual needs, guaranteed to meet after it is installed with bottom plate to fully take up and filled up slot bottom bottom area (extrudable mixed mud bed course);The structures such as bottom plate and its internal water absorption layer are installed to slot bottom again after can making in advance, guarantee efficient, the orderly progress of entire process.
Description
Technical field
The present invention relates to post-cast strip waterproof technique fields, and in particular to a kind of basement post-pouring zone anti-seepage construction method.
Background technique
Post-cast strip is to prevent the structure of cast-in-situ steel reinforced concrete in construction due to temperature, shrinking unequal factor
And leading to the generation of harmful cracks, the temporary construction seam of setting in sole plate, wall or beam corresponding position temporarily divides structure
If being poured again after a certain period of time by component inside contraction for stem portion and smashing the construction joint concrete structure is linked to be entirety.In order to
Ensure the globality of structure and the impermeability of basement structure, the In Great Basement basement bottom board of high-rise would generally
It is completed as the provisional deformation joint of indwelling in cast-in-place integral reinforced concrete structure to main structure using post-cast strip form
In certain time, settle it is basicly stable after, then with slightly expanded concrete post-cast strip is closed, structure is made to form continuous entirety.
It is controlled by process, with reasonable, advanced construction technology, controls post empiricism quality, solve post-cast strip, leakage
The common quality defects such as water are to ensure that the important link of overall structure quality, if handling when unreasonable structure or construction bad, it will right
The use function and construction quality of engineering cause adverse effect.
Summary of the invention
The invention aims to provide preferably transformation basement post-pouring zone anti-seepage construction method, for solving at present
There are problems that the hidden danger that seeps water in basement bottom plate rear pouring tape structure.
Technical proposal that the invention solves the above-mentioned problems is: a kind of basement post-pouring zone anti-seepage construction method, describedly
Using a kind of impermeable structure of basement post-pouring zone is arrived in the impermeable construction method in lower room post-cast strip, the basement post-pouring zone is anti-
Infiltration structure includes: post-cast strip, the wall of post-cast strip two sides, to pour mixed mud, to form reinforcing bar mixed on the post-cast strip
The groove body of dirt bed is equipped with mixed mud bed course on groove body inner wall, is equipped with positioned at the mixed mud bed course of the groove body side wall anti-
Water steel plate, the mixed mud bed course positioned at the groove body bottom are equipped with bottom plate, on the bottom plate vertical direction be equipped with it is multiple to
Accommodating cavity is formed to accommodate the isolation board of water absorption layer, the waterproof steel plate side wall is abutted against with the isolation board;The water absorption layer
Be additionally provided between the reinforced concrete layer in the accommodating cavity in water absorption layer water swelling provide gap every
Off-network layer.
Preferably, the wall is additionally provided with the caulking groove to laterally fixed sealing rod on the two sidewalls of post-cast strip, and two
The water-swellable layer with the sealing rod general parallel orientation, the water-swellable layer and the sealing rod are also poured between a caulking groove
Between be equipped with isolation mesh.
It preferably, further include cover board to close the accommodating cavity, the cover board is equipped with to be connected to the accommodating
The through-hole of chamber.
Preferably, the water absorption layer include close the cover board in the same accommodating cavity the first water absorption layer and close bottom
Second water absorption layer of plate.
Preferably, the water absorption layer includes the first water absorption layer and the second water absorption layer in different accommodating cavities.
Preferably, first water absorption layer is high hydroscopic resin layer;Second water absorption layer is sealing rod layer.
Preferably, the sealing rod is water expandable waterstop or steel plate waterstop strip.
Preferably, the isolation mesh is set as multilayer steel wire or fast-easy closing-up net.
Preferably, waterproofing membrane is additionally provided between the mixed mud bed course and the bottom plate.
Preferably, the post-cast strip is poured using slightly expanded concrete.
Beneficial effects of the present invention: it is used in the basement post-pouring zone anti-seepage construction method and arrives a kind of basement post-pouring zone
Impermeable structure, the structure include water-swellable layer, sealing rod, mixed mud bed course, reinforced concrete layer on post-cast strip
And water absorption layer etc., can play the role of well it is impermeable, while be arranged mixed mud bed course be more advantageous to subsequent mixed mud
Pour and form, guarantee integrally-built stabilization, securely;It is equipped on the mixed mud bed course on the groove body side wall of post-cast strip anti-
Water steel plate is equipped with bottom plate and isolation board set on the bottom plate, the steel plate and bottom plate two on the mixed mud bed course of groove body bottom
The isolation board at end abuts against, and steel plate thickness can be designed according to actual needs, guarantees to have met after it is installed with bottom plate
It occupies entirely and fills up slot bottom bottom area (extrudable mixed mud bed course);The structures such as bottom plate and its internal water absorption layer can arrange in advance
It installs again to slot bottom after the completion, guarantees efficient, the orderly progress of entire process.
Detailed description of the invention
Fig. 1 is a kind of impermeable knot of the basement post-pouring zone that basement post-pouring zone anti-seepage construction method uses of the present invention
The structure chart of structure.
Fig. 2 is the schematic diagram of the accommodating cavity of one embodiment of the invention.
Fig. 3 is the schematic diagram of the water-swellable layer of one embodiment of the invention.
In figure:
The post-cast strip 1-;2- wall;3- groove body;4- reinforced concrete layer;5- mixed mud bed course;6- waterproof steel plate;7- bottom plate;71-
Isolation board;8- accommodating cavity;9- water absorption layer;The first water absorption layer of 91-;The second water absorption layer of 92-;10- isolation mesh;11- sealing rod;
12- caulking groove;13- water-swellable layer;14- cover board;141- through-hole.
Specific embodiment
In order to illustrate the embodiments of the present invention more clearly with technical solution in the prior art, Detailed description of the invention will be compareed below
A specific embodiment of the invention.It should be evident that drawings in the following description are only some embodiments of the invention, for
For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings other
Attached drawing, and obtain other embodiments, the present invention is not restricted to the embodiment.
Referring to Fig. 1 to Fig. 3.A kind of basement post-pouring zone anti-seepage construction method of the embodiment of the present invention, it is described
It is used in the impermeable construction method of basement post-pouring zone and arrives a kind of impermeable structure of basement post-pouring zone, the basement post-pouring zone
Impermeable structure includes: post-cast strip 1, the wall 2 of 1 two sides of post-cast strip, is formed to pour mixed mud on the post-cast strip 1
The groove body 3 of reinforced concrete layer 4 is equipped with mixed mud bed course 5 on 3 inner wall of groove body, positioned at the mixed mud pad of 3 side wall of groove body
Layer 5 is equipped with waterproof steel plate 6, and the mixed mud bed course 5 positioned at 3 bottom of groove body is equipped with bottom plate 7, vertical on the bottom plate 7
Direction be equipped with multiple isolation boards 71 that water absorption layer 9 is accommodated to form accommodating cavity 8,6 side wall of waterproof steel plate and it is described every
It is abutted against from plate 71;The water absorption layer 9 is being additionally provided between the reinforced concrete layer 4 to inhale in the accommodating cavity 8
The isolation mesh 10 in gap is provided when water layer water swelling.
Supplementary explanation, the above-mentioned effect of mixed mud bed course 5 are filling 3 inner walls of groove body, and including but not limited to ash is laid bricks wall etc.
Form exists, and can also carry out brushing waterproof material after the completion of mixed mud bed course 5;It can brushing waterproof material on waterproof steel plate 6
Or it is nested with waterproofing membrane, it is fixed on the mixed mud bed course 5 on 3 two side walls of groove body by sealant etc., is further prevented
Water penetration;Structure in the accommodating cavity 8 of the bottom plate 7 and bottom plate 7 is installed on 3 bottom of groove body, and bottom again after the completion of can arranging
The isolation board 71 at 7 two end of plate is abutted against with waterproof steel plate 6, is in particular that the thickness of waterproof steel plate 6 can be according to 3 bottom of groove body
The width or length in portion are designed, so that waterproof steel plate 6 and bottom plate 7 can fully take up 3 bottom of groove body after being installed
Area can also generate certain extruding force to mixed mud bed course 5, guarantee integrally-built stability and waterproof performance.
Referring to Fig. 1 and Fig. 2.In this example, the wall 2 is also provided with use on the two sidewalls of post-cast strip 1
With the caulking groove 12 of laterally fixed sealing rod 11, the water suction with 11 general parallel orientation of sealing rod is also poured between two caulking grooves 12
Expanding layer 13 is equipped with isolation mesh 10 between the water-swellable layer 13 and the sealing rod 11, the purpose for the arrangement is that, setting
Sealing rod 11 can one end inlay and set in caulking groove 12, one end part is stretched out, to pour completion in entire reinforced concrete layer 4
Afterwards, water-swellable prevents water penetration;The water-swellable layer 13 of setting to sealing rod 11 tentatively water suction after, if there are also water it is residual
It stays, can further absorb to it prevents from leaking;The isolation mesh 10 of setting is inhaled to sealing rod 11 and water-swellable layer 13
Water expansion.
Supplementary explanation, above-mentioned water-swellable layer 13 are first to pour water-swellable layer 13 for specific by pouring molding
The reinforced concrete layer 4 of lower section after reaching suitable condition, then pours water-swellable layer 13, then carry out isolation mesh 10 and
The installation of sealing rod 11, then pouring reinforcement mixed mud 4 complete the structure arrangement of entire post-cast strip 1;The master of the water-swellable layer 13
Acting on is that can absorb water, by and the combination of sealing rod 11 completely effectively can tentatively solve infiltration problem, a kind of implementation
Mode can pour for quick lime, it is, of course, also possible to have other modes to realize identical function and effect.
Referring to Fig. 1 and Fig. 2.It can also include the cover board 14 to close the accommodating cavity 8 in this example, it is described
Cover board 14 is equipped with the through-hole 141 to be connected to the accommodating cavity 8, the purpose for the arrangement is that, the cover board 14 of setting can be closed
Accommodating cavity 8 guarantees that mixed mud excessive will not be flow in accommodating cavity 8 when pouring, it can also be ensured that in disposed outside water absorption layer 9
When other impurities entrance;The water that the through-hole 141 of setting can facilitate access for post-cast strip is flow in accommodating cavity 8, passes through water absorption layer 9
It absorbs water.
Referring to Fig. 2.In this example, a kind of embodiment of the water absorption layer 9 can be to include set on same accommodating cavity 8
Second water absorption layer 92 of the first water absorption layer 91 of interior close cover board 14 and close bottom plate 7, the purpose for the arrangement is that, it will absorb water
Layer 9 is set as two layers of composition and is located in same accommodating cavity 8, up and down arranges that effect is more to utilize different material and carry out moisture absorption
It is good.
In this example, 9 another embodiment of water absorption layer can be include the first water suction in the different accommodating cavities 8
Layer 91 and the second water absorption layer 92, the purpose for the arrangement is that: when the first water absorption layer 91 and 92 material of the second water absorption layer of arrangement can not
It is arranged apart not only to can achieve soaking effect when compatible, but also keep function more diversified.
In this example, a kind of embodiment of first water absorption layer 91 can be high hydroscopic resin layer;Second water absorption layer
A kind of 92 embodiments can be sealing rod layer, both materials can extremely effective absorption moisture, prevent from permeating.When
So, there can also be other modes to realize identical function and effect.
In this example, the sealing rod 11 can be water expandable waterstop or steel plate waterstop strip, according to use environment demand
And cost performance is selected, and guarantees effectively water suction.
In this example, the isolation mesh 10 can be set to multilayer steel wire or fast-easy closing-up net, the purpose done so
It is that isolation mesh 10 is that multilayer steel wire or fast-easy closing-up net form, isolation mesh 10 can be changed by the setting of the number of plies
Thickness, while there are gaps between multilayer steel wire, it is swollen after absorbing water convenient for sealing rod 11 or water absorption layer 9 or water-swellable layer 13
It is swollen.
In this example, it is also provided with waterproofing membrane (not shown) between the mixed mud bed course 5 and the bottom plate 7,
The purpose for the arrangement is that on mixed mud bed course 5 can coated with waterproof material or waterproofing membrane, can also be in the mixed mud of 3 bottom of groove body
The waterproofing membrane being arranged on bed course 5, doing so can make mixed mud bed course 5 further function as impermeable effect, can also prevent into
Enter the gap outflow to the water in post-cast strip 1 between waterproof steel plate 6 and isolation board 71.
In this example, the post-cast strip 1 can be poured using slightly expanded concrete, and being poured using microdilatancy mixed mud can be so as to
It is integrally-built firm after pouring molding.
Specific embodiments of the present invention are described in detail above.It should be appreciated that those skilled in the art are without wound
The property made labour, which according to the present invention can conceive, makes many modifications and variations.Therefore, all those skilled in the art
Present inventive concept passes through the available technical solution of logical analysis, reasoning, or a limited experiment in the prior art, all
It should be in protection scope determined by the claims.
Claims (10)
1. a kind of basement post-pouring zone anti-seepage construction method, which is characterized in that the impermeable construction party of basement post-pouring zone
Using a kind of impermeable structure of basement post-pouring zone is arrived in method, the impermeable structure of basement post-pouring zone includes: post-cast strip
(1), the wall (2) of post-cast strip (1) two sides, be set to the post-cast strip (1) on to pour mixed mud formed reinforced concrete layer
(4) groove body (3) is equipped with mixed mud bed course (5) on groove body (3) inner wall, is located at the mixed mud bed course of the groove body (3) side wall
(5) waterproof steel plate (6) are equipped with, the mixed mud bed course (5) for being located at the groove body (3) bottom is equipped with bottom plate (7), the bottom plate
(7) vertical direction is equipped with multiple isolation boards (71) that water absorption layer (9) are accommodated to form accommodating cavity (8), the waterproof steel on
Plate (6) side wall is abutted against with the isolation board (71);The water absorption layer (9) mixes mud with the reinforcing bar in the accommodating cavity (8)
It is additionally provided between soil layer (4) to provide the isolation mesh (10) in gap in water absorption layer water swelling.
2. a kind of basement post-pouring zone anti-seepage construction method according to claim 1, it is characterised in that: the wall
(2) caulking groove (12) to laterally fixed sealing rod (11), two caulking grooves (12) are additionally provided on the two sidewalls of post-cast strip (1)
Between also pour water-swellable layer (13) with the sealing rod (11) general parallel orientation, the water-swellable layer (13) with it is described
Isolation mesh (10) are equipped between sealing rod (11).
3. a kind of basement post-pouring zone anti-seepage construction method according to claim 1, it is characterised in that: further include to
The cover board (14) of the accommodating cavity (8) is closed, the cover board (14) is equipped with the through-hole to be connected to the accommodating cavity (8)
(141).
4. a kind of basement post-pouring zone anti-seepage construction method according to claim 3, it is characterised in that: the water absorption layer
(9) include close cover board (14) in same accommodating cavity (8) the first water absorption layer (91) and close bottom plate (7) second
Water absorption layer (92).
5. a kind of basement post-pouring zone anti-seepage construction method according to claim 1, it is characterised in that: the water absorption layer
It (9) include the first water absorption layer (91) and the second water absorption layer (92) in different accommodating cavities (8).
6. a kind of basement post-pouring zone anti-seepage construction method according to claim 4 or 5, it is characterised in that: described
One water absorption layer (91) is high hydroscopic resin layer;Second water absorption layer (92) is sealing rod layer.
7. a kind of basement post-pouring zone anti-seepage construction method according to claim 2, it is characterised in that: the sealing rod
It (11) is water expandable waterstop or steel plate waterstop strip.
8. a kind of basement post-pouring zone anti-seepage construction method according to claim 1, it is characterised in that: the separation net
Layer (10) is set as multilayer steel wire or fast-easy closing-up net.
9. a kind of basement post-pouring zone anti-seepage construction method according to claim 1, it is characterised in that: the mixed mud
Waterproofing membrane is additionally provided between bed course (5) and the bottom plate (7).
10. a kind of basement post-pouring zone anti-seepage construction method according to claim 1, it is characterised in that: poured after described
Band (1) is poured using slightly expanded concrete.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910393868.5A CN110158664B (en) | 2019-05-13 | 2019-05-13 | Basement post-cast strip anti-seepage construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910393868.5A CN110158664B (en) | 2019-05-13 | 2019-05-13 | Basement post-cast strip anti-seepage construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110158664A true CN110158664A (en) | 2019-08-23 |
CN110158664B CN110158664B (en) | 2021-06-18 |
Family
ID=67634225
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910393868.5A Active CN110158664B (en) | 2019-05-13 | 2019-05-13 | Basement post-cast strip anti-seepage construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110158664B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110952598A (en) * | 2019-10-23 | 2020-04-03 | 巨匠建设集团股份有限公司 | Construction process for reducing cracking and leakage of basement post-cast strip |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102006053186A1 (en) * | 2006-11-09 | 2008-05-15 | Hochtief Construction Ag | Tunnel sealing method, involves carrying concrete layer from reinforced concrete under formation of joint gutter within floor area of tunnel, and sealing wall joint with wall water stop, which covers joint within wall area of tunnel |
CN107326940A (en) * | 2017-09-01 | 2017-11-07 | 广州番禺职业技术学院 | A kind of basement advanced water-stop post-pouring zone structure and its construction method |
CN207672627U (en) * | 2017-12-08 | 2018-07-31 | 广宏建设集团有限公司 | A kind of basement external wall later casting zone water stopping structure |
CN109339259A (en) * | 2018-11-19 | 2019-02-15 | 周源 | A kind of civil engineering dilatation joint waterproof structure |
CN109577512A (en) * | 2018-12-06 | 2019-04-05 | 蒋筠 | A kind of new material construction wall to absorb water |
-
2019
- 2019-05-13 CN CN201910393868.5A patent/CN110158664B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102006053186A1 (en) * | 2006-11-09 | 2008-05-15 | Hochtief Construction Ag | Tunnel sealing method, involves carrying concrete layer from reinforced concrete under formation of joint gutter within floor area of tunnel, and sealing wall joint with wall water stop, which covers joint within wall area of tunnel |
CN107326940A (en) * | 2017-09-01 | 2017-11-07 | 广州番禺职业技术学院 | A kind of basement advanced water-stop post-pouring zone structure and its construction method |
CN207672627U (en) * | 2017-12-08 | 2018-07-31 | 广宏建设集团有限公司 | A kind of basement external wall later casting zone water stopping structure |
CN109339259A (en) * | 2018-11-19 | 2019-02-15 | 周源 | A kind of civil engineering dilatation joint waterproof structure |
CN109577512A (en) * | 2018-12-06 | 2019-04-05 | 蒋筠 | A kind of new material construction wall to absorb water |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110952598A (en) * | 2019-10-23 | 2020-04-03 | 巨匠建设集团股份有限公司 | Construction process for reducing cracking and leakage of basement post-cast strip |
Also Published As
Publication number | Publication date |
---|---|
CN110158664B (en) | 2021-06-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2761930C1 (en) | Impregnated fabric and its appliance | |
CN107326940B (en) | basement advanced water stop post-cast strip structure and construction method thereof | |
CN105714849B (en) | The reverse construction method of the adjacent high low layer (across) of basement | |
US4566238A (en) | Energy conserving concrete masonry unit, wall construction and method | |
CN107700556A (en) | Underground pipe gallery water-proof system and its construction method | |
CN108301466A (en) | Integral prefabricated caisson of toilet and caisson of toilet construction and its construction method | |
CN104652676A (en) | Hollow slab floor adopting steel nets and plastic plates for combined hole forming | |
CN110158664A (en) | A kind of basement post-pouring zone anti-seepage construction method | |
CN112459115A (en) | Construction method for rebuilding basement exterior wall of existing building | |
CN206800665U (en) | A kind of basement side wall late poured band structure | |
CN105780818B (en) | A kind of the composite water-proof structure and construction method of sidewall of basement aseismatic joint | |
JPH0583688B2 (en) | ||
CN214658806U (en) | Waterproof impervious concrete template of basement outer wall post-cast strip | |
CN213358674U (en) | Indoor pipe ditch structure for collapsible area | |
CN215906860U (en) | Post-pouring belt of foundation slab and beam | |
CN108118717A (en) | A kind of outer wall of basement settlement joint water-proof structure and its construction method | |
JPS5942765B2 (en) | cofferdam | |
KR100200086B1 (en) | Working method of drainage structure for a structure and drainage material | |
DE19814493C2 (en) | Process for the production of outer walls of rooms embedded in water-bearing soil | |
CN114232819A (en) | Composite anti-seepage structure containing partition wall pool-shaped water storage structure and construction method | |
RU2671103C2 (en) | Anti-filtration lining of channel of meliorative structure from composite blocks-trays | |
CN116254883A (en) | Horizontal construction joint structure of shallow underground foundation guide wall and construction method thereof | |
JPH02311621A (en) | Joint structure and method of concrete frame plate for underground wall | |
CN110777929A (en) | Underground outer wall anti-seepage device and application method thereof | |
JPH0665933A (en) | Driven-in type molding frame and water-insulation of underground external wall by using the same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |