CN109736357A - A kind of basement bottom plate rear pouring tape construction joint optimization processing structure - Google Patents

A kind of basement bottom plate rear pouring tape construction joint optimization processing structure Download PDF

Info

Publication number
CN109736357A
CN109736357A CN201910137855.1A CN201910137855A CN109736357A CN 109736357 A CN109736357 A CN 109736357A CN 201910137855 A CN201910137855 A CN 201910137855A CN 109736357 A CN109736357 A CN 109736357A
Authority
CN
China
Prior art keywords
construction
construction joint
steel plate
sealing water
boats
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910137855.1A
Other languages
Chinese (zh)
Inventor
张家驹
梁森
李松晏
张明
张廷爱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Bureau First Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau First Construction Engineering Co Ltd filed Critical China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority to CN201910137855.1A priority Critical patent/CN109736357A/en
Publication of CN109736357A publication Critical patent/CN109736357A/en
Pending legal-status Critical Current

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The present invention provides a kind of basement bottom plate rear pouring tape construction joint optimization processing structure, steel plate for sealing water is transversely fixed at construction joint, one end of steel plate for sealing water is embedded in advance in first pouring concrete position, the other end extends in rear pouring concrete position, the wooden a tree, used in making timber for boats is also respectively provided with above and below steel plate for sealing water, the wooden a tree, used in making timber for boats is located at construction joint and is arranged along the length direction of construction joint, and the side of the wooden a tree, used in making timber for boats is embedded in advance in first pouring concrete position.It is many and diverse to solve post empiricism, either it will affect construction speed in construction time or post-cast strip process phase, post-cast strip could should generally be closed after 60 days, various rubbish and sundries are inevitably dropped into during this period, since reinforcing bar is intensive, cleaning work is extremely difficult, and construction quality certainly will completely not influenced by clearing up.This construction method can reduce construction joint quantity, avoid post empiricism many and diverse and increase percolation-proof effect.Belong to foundation of civil work technical field of construction.

Description

A kind of basement bottom plate rear pouring tape construction joint optimization processing structure
Technical field
The present invention relates to a kind of basement bottom plate rear pouring tape construction joints to reduce infiltration hidden danger optimization processing structure, belongs to civil engineering Foundation construction technical field.
Background technique
Currently, part engineering basement bottom board belongs to Super Large concrete structure, some construction areas about 40,000 are flat Square rice has enough flowing water sections, and the temperature and humidity that underground engineering is born in construction changes greatly, in such construction environment In, the temperature stress occurred in the construction stage is much larger than the tensile capacity of concrete material, fully relies on concrete itself by anti- Method be difficult it is anti-live, should take " anti-to put simultaneous apply ", " first put and resist afterwards ", the method for last " based on resisting ".This explanation Underground engineering environmental condition is most suitable for " jumping storehouse method " construction.Using the construction of storehouse method is jumped, i.e., overall structure is pressed construction joint segmentation, every One section is poured one section (one section of tripping is poured one section), through being no less than the 7d time fill out again pour it is integral.It can avoid with the construction of this scheme The fierce temperature difference and drying shrinkage action of a part of During Initial Stage Construction, a large amount of temperature dilation matrices for cutting down construction period, effectively control are split Seam, moreover it is possible to accelerate construction progress.The sealing tongue and groove for increasing by 80 × 80mm of twice is maximized in conjunction with steel plate for sealing water, high ribbed formwork and is reduced Seep water hidden danger, but it is many and diverse to pour belt construction, either will affect construction speed, post-cast strip one in construction time or post-cast strip process phase As could should close after 60 days, inevitably drop into various rubbish and sundries during this period, since reinforcing bar is intensive, cleaning It works extremely difficult, and construction quality certainly will completely not influenced by clearing up.
Summary of the invention
It is an object of the invention to: a kind of basement bottom plate rear pouring tape construction joint optimization processing structure is provided, after solving It is many and diverse to pour belt construction, either will affect construction speed in construction time or post-cast strip process phase, post-cast strip generally should be at 60 days After could close, inevitably drop into various rubbish and sundries during this period, since reinforcing bar is intensive, cleaning work is quite tired Difficulty, and construction quality certainly will completely not influenced by clearing up.This construction method can reduce construction joint quantity, avoid post empiricism numerous Miscellaneous and increase percolation-proof effect.
To solve the above problems, such a basement bottom plate rear pouring tape construction joint optimization processing structure of proposed adoption, construction Steel plate for sealing water is transversely fixed at seam, one end of steel plate for sealing water is embedded in advance in first pouring concrete position, and the other end pours after extending to The wooden a tree, used in making timber for boats is also respectively provided in concrete position, above and below steel plate for sealing water, the wooden a tree, used in making timber for boats is located at construction joint and along construction joint Length direction setting, the side of the wooden a tree, used in making timber for boats is embedded in advance in first pouring concrete position.
In aforementioned construction joint optimization processing structure, the steel plate for sealing water by 8 bar spacing 30cm of Φ with upper and lower level steel Muscle is welded and fixed;
In aforementioned construction joint optimization processing structure, the spreading of steel plate for sealing water uses overlap welding mode, lap of splice 5cm.
Compared with prior art, the configuration of the present invention is simple, it is easy for construction, solve the problems, such as that post empiricism is many and diverse, together When, the method is combined with jump storehouse method, and over length mass concrete is divided into several fritters of 40m*40m or so, is poured every one piece One piece, in each piece, once-pouring of concrete is completed, and adjacent two block concrete pours time interval and is no less than 7d, adjacent Storehouse flank side surface makes New-old concrete combine closely using steel plate water stopper and painted concrete interfacial agents, cancels traditional post-cast strip, After i.e. original two construction joints in post-cast strip position become one, therefore can effectively reduce construction joint quantity, and then reduction is total It pours the tape handling time, lifting construction efficiency, reduces difficulty and the time of cleaning task afterwards, guarantee construction quality.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, the present invention will be made below further detailed Explanation.
Embodiment:
Referring to attached drawing 1, the present embodiment provides a kind of basement bottom plate rear pouring tape construction joint optimization processing structure, at construction joint It is transversely fixed with steel plate for sealing water 1, one end of steel plate for sealing water 1 is embedded in advance in first pouring concrete position 2, and the other end pours mixed after extending to In solidifying soil position 3, steel plate for sealing water 1 is fixed by 8 bar spacing 30cm of Φ with upper and lower level reinforcement welding, and steel plate for sealing water 1 connects Long to use overlap welding mode, lap of splice 5cm is also respectively provided with the wooden a tree, used in making timber for boats of 80 × 80mm above and below steel plate for sealing water 1 4, the wooden a tree, used in making timber for boats 4 is located at construction joint and is arranged along the length direction of construction joint, and the side of the wooden a tree, used in making timber for boats 4 is embedded in first pouring concrete position 2 in advance It is interior, the wooden a tree, used in making timber for boats 4 is removed after the completion of pouring and forms 80 × 80mm of twice sealing tongue and groove, reduces infiltration hidden danger, and in Fig. 1, appended drawing reference 5 is 18 thick templates.
Construction joint carries out dabbing processing after demoulding, and interface is made to form rough surface, mentions for casting concrete next time For ideal joint surface, makes conjunction old and new concret at firm entirety, greatly increase seam quality, improve and connect Leakage resistance energy at seam.
The above embodiments are only used to illustrate and not limit the technical solutions of the present invention, although referring to above-described embodiment to this hair It is bright to be described in detail, it will be apparent to an ordinarily skilled person in the art that: still the present invention can be modified or be waited With replacement, without departing from the spirit or scope of the invention, or any substitutions, should all cover in power of the invention In sharp claimed range.

Claims (3)

1. a kind of basement bottom plate rear pouring tape construction joint optimization processing structure, it is characterised in that: be transversely fixed at construction joint Steel plate for sealing water (1), one end of steel plate for sealing water (1) are embedded in advance in first pouring concrete position (2), and the other end extends to rear pouring concrete portion It in position (3), is also respectively provided with above and below steel plate for sealing water (1) the wooden a tree, used in making timber for boats (4), the wooden a tree, used in making timber for boats (4) is located at construction joint and edge is applied The length direction setting of work seam, the side of the wooden a tree, used in making timber for boats (4) is embedded in advance in first pouring concrete position (2).
2. a kind of basement bottom plate rear pouring tape construction joint optimization processing structure according to claim 1, it is characterised in that: described Steel plate for sealing water (1) is fixed by 8 bar spacing 30cm of Φ with upper and lower level reinforcement welding.
3. a kind of basement bottom plate rear pouring tape construction joint optimization processing structure according to claim 1, it is characterised in that: sealing The spreading of steel plate (1) uses overlap welding mode, lap of splice 5cm.
CN201910137855.1A 2019-02-25 2019-02-25 A kind of basement bottom plate rear pouring tape construction joint optimization processing structure Pending CN109736357A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910137855.1A CN109736357A (en) 2019-02-25 2019-02-25 A kind of basement bottom plate rear pouring tape construction joint optimization processing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910137855.1A CN109736357A (en) 2019-02-25 2019-02-25 A kind of basement bottom plate rear pouring tape construction joint optimization processing structure

Publications (1)

Publication Number Publication Date
CN109736357A true CN109736357A (en) 2019-05-10

Family

ID=66368194

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910137855.1A Pending CN109736357A (en) 2019-02-25 2019-02-25 A kind of basement bottom plate rear pouring tape construction joint optimization processing structure

Country Status (1)

Country Link
CN (1) CN109736357A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114718122A (en) * 2022-03-16 2022-07-08 中国五冶集团有限公司 Method for anti-seepage treatment of new and old structure underground corridor foundation connection construction joint

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010106534A (en) * 2008-10-30 2010-05-13 Seibu Polymer Corp Method of repairing and replacing flexible joint of closed conduit, and repair and replacement structure therefor
CN102587421A (en) * 2012-03-12 2012-07-18 中天建设集团有限公司 Advanced water-stopping isolation structure of later poured band for basement
CN203361206U (en) * 2013-07-05 2013-12-25 浙江宝厦建设有限公司 Basement advanced water-stop post-cast strip construction structure
WO2015169707A2 (en) * 2014-05-06 2015-11-12 Trelleborg Ridderkerk B.V. Method for producing a construction element, in particular a tunnel element, having a watertight seal
CN205421919U (en) * 2015-11-30 2016-08-03 中国建筑第八工程局有限公司 Sealing device and stagnant water structure of post -cast strip or construction joint
CN106284427A (en) * 2016-08-31 2017-01-04 中国冶集团有限公司 A kind of basement post-pouring zone temporary leaking water gear soil construction method
CN107326940A (en) * 2017-09-01 2017-11-07 广州番禺职业技术学院 A kind of basement advanced water-stop post-pouring zone structure and its construction method
CN109183825A (en) * 2018-09-12 2019-01-11 中国二十冶集团有限公司 The construction method of raft board post poured band side form
CN209723051U (en) * 2019-02-25 2019-12-03 中建四局第一建筑工程有限公司 A kind of basement bottom plate rear pouring tape construction joint optimization processing structure

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010106534A (en) * 2008-10-30 2010-05-13 Seibu Polymer Corp Method of repairing and replacing flexible joint of closed conduit, and repair and replacement structure therefor
CN102587421A (en) * 2012-03-12 2012-07-18 中天建设集团有限公司 Advanced water-stopping isolation structure of later poured band for basement
CN203361206U (en) * 2013-07-05 2013-12-25 浙江宝厦建设有限公司 Basement advanced water-stop post-cast strip construction structure
WO2015169707A2 (en) * 2014-05-06 2015-11-12 Trelleborg Ridderkerk B.V. Method for producing a construction element, in particular a tunnel element, having a watertight seal
CN205421919U (en) * 2015-11-30 2016-08-03 中国建筑第八工程局有限公司 Sealing device and stagnant water structure of post -cast strip or construction joint
CN106284427A (en) * 2016-08-31 2017-01-04 中国冶集团有限公司 A kind of basement post-pouring zone temporary leaking water gear soil construction method
CN107326940A (en) * 2017-09-01 2017-11-07 广州番禺职业技术学院 A kind of basement advanced water-stop post-pouring zone structure and its construction method
CN109183825A (en) * 2018-09-12 2019-01-11 中国二十冶集团有限公司 The construction method of raft board post poured band side form
CN209723051U (en) * 2019-02-25 2019-12-03 中建四局第一建筑工程有限公司 A kind of basement bottom plate rear pouring tape construction joint optimization processing structure

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
孙运棉;: "钢筋混凝土后浇带施工探究", 门窗, no. 08 *
杨军伟;: "薄底板基础后浇带止水钢板处侧模施工方法探讨", 四川水泥, no. 02 *
汤建新;: "浅谈后浇带的设计与施工", 科学之友, no. 23 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114718122A (en) * 2022-03-16 2022-07-08 中国五冶集团有限公司 Method for anti-seepage treatment of new and old structure underground corridor foundation connection construction joint

Similar Documents

Publication Publication Date Title
CN106677049B (en) Assembled steel-concrete combined structure bridge and construction method
CN108951425A (en) Cast-in-situ prestressed concrete continuous box girder primary concreting molding construction method
CN103615053B (en) Monolithic reinforced concrete structure post empiricism engineering method
CN108166397B (en) Railway Frame Bridge construction method
CN107190866B (en) A kind of construction method of assembled architecture overhanging outrigger anchor hoop
CN204000956U (en) A kind of basement bottom plate rear pouring tape structure
CN109457993A (en) A kind of concrete column restoring and fastening method
CN107013040A (en) The construction method of floor is poured after a kind of sleeve built-in type
CN103981798A (en) Novel articulated prefabricated hollow slab girder bridge hinge joint connector and construction method thereof
CN104631513A (en) Construction method for closing basement exterior wall post-cast strip
CN108708300A (en) A kind of loss of weight carries the Reinforcing Double-curve Arch Bridge method for maintaining of load extension durability
CN104674660A (en) Novel hollow plate hinge joint structure and construction method thereof
CN108951399A (en) A kind of Single-box multi-chamber box beam bridge and its construction method
CN108252220A (en) A kind of construction method of super-large span stiff skeleton
CN114892552A (en) Box girder type bridge reconstruction construction method
CN209723051U (en) A kind of basement bottom plate rear pouring tape construction joint optimization processing structure
CN110344844A (en) A kind of track engineering section of track well construction method
CN109736357A (en) A kind of basement bottom plate rear pouring tape construction joint optimization processing structure
CN106917358B (en) A kind of cable-stayed bridge main-beam combination constructing method thereof and its counter weight construction system
CN109594581A (en) Cross a river segment pipe structure and its installation method
CN109469242A (en) A kind of profiled sheet-regeneration concrete composite floor and its construction method
CN106285001B (en) A kind of facet integration segment quickly intersects flowing water construction method
CN103741651B (en) A kind of concrete teeth groove stiling basin and construction method thereof
CN106337530B (en) A kind of construction of frame beam seams stifled construction method
CN209114299U (en) A kind of Single-box multi-chamber box beam bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination