CN102587421A - Advanced water-stopping isolation structure of later poured band for basement - Google Patents

Advanced water-stopping isolation structure of later poured band for basement Download PDF

Info

Publication number
CN102587421A
CN102587421A CN2012100634582A CN201210063458A CN102587421A CN 102587421 A CN102587421 A CN 102587421A CN 2012100634582 A CN2012100634582 A CN 2012100634582A CN 201210063458 A CN201210063458 A CN 201210063458A CN 102587421 A CN102587421 A CN 102587421A
Authority
CN
China
Prior art keywords
water
armored concrete
wing
isolation structure
ater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100634582A
Other languages
Chinese (zh)
Inventor
夏清准
陈正立
李扬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN2012100634582A priority Critical patent/CN102587421A/en
Publication of CN102587421A publication Critical patent/CN102587421A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention provides an advanced water-stopping isolation structure of a later poured band for a basement, which comprises early poured armored concrete slabs positioned at both sides of the later poured band, extending flanges are both arranged below the later poured band on the early poured armored concrete slabs at the two sides, and a rubber water-stopping band is arranged between the two extending flanges, wherein both ends of the rubber water-stopping band are respectively inserted in the two extending flanges. Before the concreting of the later poured band, the water-stopping isolation can be effectively realized inside and outside building structures, so that water-dropping expense is reduced. Meanwhile, the earthwork backfilling construction can be carried out as soon as possible, the eliminate safety management hidden dangers of a foundation pit is eliminated, the operation fields of construction sites is increased, and advantages for the safe production and civil construction management of the construction sites are created.

Description

The leading sealing isolation structure of a kind of basement post-pouring zone
Technical field
The present invention relates to the realm of building construction, be specifically related to the leading sealing isolation structure of a kind of basement post-pouring zone.
Background technology
Along with the continuous development of Building technology, building underground space utilization development is rapid, and the building basement is increasing, more and more darker; Basement post-pouring zone is essential as the structure safety control measure, and the ater-casting often need just can build after main structure construction is accomplished, when the basement base arrangement is positioned at groundwater table when following; Pour in indoorly for fear of underground water, need continue to carry out precipitation, remain on below the basement bottom board structure to guarantee groundwater table; After main structure construction is accomplished and is built the ater-casting concrete, can stop precipitation, cause high level or super highrise building precipitation time long; The precipitation expense is high; The existence of ater-casting simultaneously influences the pit earthwork backfill, causes the waste in field operation place, is unfavorable for job site safety in production and civilized construction management simultaneously.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of basement post-pouring zone leading sealing isolation structure, can before the concreting of ater-casting, realize effective sealing isolation that building structure is inside and outside, reduces the precipitation expense.
For solving above-mentioned existing technical problem; The present invention adopts following scheme: the leading sealing isolation structure of a kind of basement post-pouring zone; Comprise be positioned at the both sides, ater-casting water armored concrete slab earlier; The below that is positioned at the ater-casting on the armored concrete slab of watering earlier of said both sides is equipped with the extension edge of a wing, is provided with two ends between said two extension edges of a wing and inserts two rubber fastening bands that extend in the edge of a wing respectively.
As preferably, be filled with the filler of soft material between said two extension edges of a wing.Can prevent the space between the extension edge of a wing, concrete or other constructional materials filling both sides, ater-casting, hinder structure normal deformation and displacement, cause the leading sealing isolation structure in ater-casting to destroy.
As preferably, the watering earlier of said both sides is provided with two ends and inserts the downward opening U type steel plate for sealing water that waters earlier in armored concrete slab and the ater-casting respectively between armored concrete slab and the ater-casting.Can prevent ater-casting new-old concrete seam crossing infiltration.
As preferably, saidly water armored concrete slab earlier and extend edge of a wing downside and be overlapped with waterproofing course.The peripheral waterproof of ability implementation structure shortens precipitation time greatly.
As preferably, said waterproofing course and water armored concrete slab earlier and extend between the edge of a wing and be provided with topping.Can protect waterproofing course, underground water gets into the ater-casting to avoid waterproofing course to break afterwards.
As preferably, said waterproofing course downside is provided with bed course.As the construction basis of waterproofing course, simultaneously, this structure is effectively isolated building structure and outer rock-soil layer,
Beneficial effect:
The leading sealing isolation structure of a kind of basement post-pouring zone that the present invention adopts technique scheme to provide can be realized effective sealing isolation that building structure is inside and outside before the concreting of ater-casting, reduce the precipitation expense.Simultaneously, can carry out backfilling of earthwork construction as early as possible, eliminate foundation ditch safety management hidden danger, increase operation place, job site, manage with civilized construction for the job site safety in production and created advantage.
Description of drawings
Fig. 1 is a structural representation of the present invention.
The specific embodiment
As shown in Figure 1; The leading sealing isolation structure of a kind of basement post-pouring zone; Comprise be positioned at 9 both sides, ater-casting water armored concrete slab 1 earlier; The below that is positioned at ater-casting 9 on the armored concrete slab 1 of watering earlier of said both sides is equipped with the extension edge of a wing 2, is provided with two ends between said two extension edges of a wing 2 and inserts two rubber fastening bands 3 that extend in the edges of a wing 2 respectively.Said two are extended the filler 8 that is filled with soft material between the edge of a wing 2.The watering earlier of said both sides is provided with two ends and inserts the downward opening U type steel plate for sealing water 7 that waters earlier in armored concrete slab 1 and the ater-casting 9 respectively between armored concrete slab 1 and the ater-casting 9.The said armored concrete slab 1 that waters earlier is overlapped with waterproofing course 5 with the extension edge of a wing 2 downsides.Said waterproofing course 5 and water armored concrete slab 1 earlier and extend between the edge of a wing 2 and be provided with topping 6.Said waterproofing course 5 downsides are provided with bed course 4.
Filler 8 adopts polyphenyl plate or soft material in this structure, and bed course 4 all adopts concrete with topping 6, and waterproofing course 5 adopts waterproof roll.In the construction, accomplish bed course 4, waterproofing course 5, fish tail and waterproof layer 6 earlier; Accomplish the structure that 9 both sides, ater-casting are watered armored concrete slab 1 earlier and extended the edge of a wing 2 again; The installation of completion rubber fastening band 3 and steel plate for sealing water 7 and fixing in the structure construction procedure; Be specially 9 both sides, ater-casting water armored concrete slab 1 earlier and extend the edge of a wing 2 in the ater-casting during structure on two sides construction one-time-concreting accomplish; Rubber fastening band 3 is installed at the extension edge of a wing 2 reinforcing bar bindings and template erection stage; Be cast in when building and extend in 2 structures of the edge of a wing, steel plate for sealing water 7 installs and fixes in basement post-pouring zone 9 biside plate reinforcing bar bindings, builds during concreting and into waters earlier in the armored concrete slab 1; Filler 8 is filled in the gap of before the concreting of watering the armored concrete slab 1 and the extension edge of a wing 2 thereof earlier of both sides, ater-casting, extending between the edge of a wing in the both sides, ater-casting.
This structure can effectively stop underground water to get into the ater-casting, can realize that the ater-casting shifts to an earlier date sealing, prevents that underground water from pouring in the ater-casting; Can shorten watering time greatly, antiseep, simultaneously; This structure is effectively isolated building structure and outer rock-soil layer, can carry out the backfilling of earthwork construction as early as possible, eliminates foundation ditch safety management hidden danger; Increase operation place, job site, manage with civilized construction for the job site safety in production and created advantage.

Claims (6)

1. leading sealing isolation structure of basement post-pouring zone; Comprise be positioned at both sides, ater-casting (9) water armored concrete slab (1) earlier; It is characterized in that: the below that is positioned at ater-casting (9) on the armored concrete slab (1) of watering earlier of said both sides is equipped with the extension edge of a wing (2), is provided with two ends between said two extension edges of a wing (2) and inserts two rubber fastening bands (3) that extend in the edges of a wing (2) respectively.
2. the leading sealing isolation structure of a kind of basement post-pouring zone according to claim 1 is characterized in that: said two are extended the filler (8) that is filled with soft material between the edge of a wing (2).
3. the leading sealing isolation structure of a kind of basement post-pouring zone according to claim 1 is characterized in that: the watering earlier of said both sides is provided with two ends and inserts the downward opening U type steel plate for sealing water (7) that waters earlier in armored concrete slab (1) and the ater-casting (9) respectively between armored concrete slab (1) and ater-casting (9).
4. the leading sealing isolation structure of a kind of basement post-pouring zone according to claim 1 is characterized in that: said water armored concrete slab (1) earlier and extend the edge of a wing (2) downside be overlapped with waterproofing course (5).
5. the leading sealing isolation structure of a kind of basement post-pouring zone according to claim 4 is characterized in that: said waterproofing course (5) and water armored concrete slab (1) earlier and extend between the edge of a wing (2) and be provided with topping (6).
6. the leading sealing isolation structure of a kind of basement post-pouring zone according to claim 4 is characterized in that: said waterproofing course (5) downside is provided with bed course (4).
CN2012100634582A 2012-03-12 2012-03-12 Advanced water-stopping isolation structure of later poured band for basement Pending CN102587421A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100634582A CN102587421A (en) 2012-03-12 2012-03-12 Advanced water-stopping isolation structure of later poured band for basement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100634582A CN102587421A (en) 2012-03-12 2012-03-12 Advanced water-stopping isolation structure of later poured band for basement

Publications (1)

Publication Number Publication Date
CN102587421A true CN102587421A (en) 2012-07-18

Family

ID=46476612

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100634582A Pending CN102587421A (en) 2012-03-12 2012-03-12 Advanced water-stopping isolation structure of later poured band for basement

Country Status (1)

Country Link
CN (1) CN102587421A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109736357A (en) * 2019-02-25 2019-05-10 中建四局第一建筑工程有限公司 A kind of basement bottom plate rear pouring tape construction joint optimization processing structure
CN110952598A (en) * 2019-10-23 2020-04-03 巨匠建设集团股份有限公司 Construction process for reducing cracking and leakage of basement post-cast strip
CN111648411A (en) * 2020-05-06 2020-09-11 上海建工二建集团有限公司 Downward-turning type post-cast strip support replacing structure, construction method and post-cast strip construction method
CN114351852A (en) * 2021-12-23 2022-04-15 广东金辉华集团有限公司 Basement outer wall post-cast strip assembly type maintenance water stop structure and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201217811Y (en) * 2008-05-29 2009-04-08 山东天齐置业集团股份有限公司 Advanced water-stop post-pouring zone of base exterior wall
CN201581510U (en) * 2009-12-05 2010-09-15 山东天齐置业集团股份有限公司 Advanced water-stop post-pouring belt of foundation slab
CN201598645U (en) * 2009-12-11 2010-10-06 江苏双楼建设集团有限公司 Advanced water stop post-pouring belt for base soleplate
KR100986300B1 (en) * 2010-01-25 2010-10-07 준이앤씨(주) Water-proofing plate unit for concrete and construction method of concrete structure using that
CN201865127U (en) * 2010-10-18 2011-06-15 中冶成工上海五冶建设有限公司 Reinforced waterproof late poured band of basement bottom plate
CN202440852U (en) * 2012-03-12 2012-09-19 中天建设集团有限公司 Advance water-stop isolation structure of basement post-poured strip

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201217811Y (en) * 2008-05-29 2009-04-08 山东天齐置业集团股份有限公司 Advanced water-stop post-pouring zone of base exterior wall
CN201581510U (en) * 2009-12-05 2010-09-15 山东天齐置业集团股份有限公司 Advanced water-stop post-pouring belt of foundation slab
CN201598645U (en) * 2009-12-11 2010-10-06 江苏双楼建设集团有限公司 Advanced water stop post-pouring belt for base soleplate
KR100986300B1 (en) * 2010-01-25 2010-10-07 준이앤씨(주) Water-proofing plate unit for concrete and construction method of concrete structure using that
CN201865127U (en) * 2010-10-18 2011-06-15 中冶成工上海五冶建设有限公司 Reinforced waterproof late poured band of basement bottom plate
CN202440852U (en) * 2012-03-12 2012-09-19 中天建设集团有限公司 Advance water-stop isolation structure of basement post-poured strip

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109736357A (en) * 2019-02-25 2019-05-10 中建四局第一建筑工程有限公司 A kind of basement bottom plate rear pouring tape construction joint optimization processing structure
CN110952598A (en) * 2019-10-23 2020-04-03 巨匠建设集团股份有限公司 Construction process for reducing cracking and leakage of basement post-cast strip
CN111648411A (en) * 2020-05-06 2020-09-11 上海建工二建集团有限公司 Downward-turning type post-cast strip support replacing structure, construction method and post-cast strip construction method
CN114351852A (en) * 2021-12-23 2022-04-15 广东金辉华集团有限公司 Basement outer wall post-cast strip assembly type maintenance water stop structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN101270582B (en) Method for setting bracing column in underground cavity
CN202000380U (en) Basement outer wall post-pouring belt backfill protective plate
CN203729424U (en) Modified horseback-riding inspection well for top pipe construction
CN103821219A (en) Top pipe construction modification inspection well construction method
CN107190782A (en) A kind of poured band of outer wall of basement structure and its construction method
CN201581510U (en) Advanced water-stop post-pouring belt of foundation slab
CN109578014B (en) Anti-surging bottom sealing structure and construction method
CN103821523A (en) Excavating method for extending existing single-hole two-driveway tunnel into four-driveway tunnel
CN206408655U (en) The top plate sidewall structure of covered back-digging construction
CN209339169U (en) A kind of precipitation well in foundation pit plugging device
CN109235493A (en) Basement beam slab is backbreak and short formwork construction method in a kind of contrary sequence method
CN102587421A (en) Advanced water-stopping isolation structure of later poured band for basement
CN110439036A (en) A kind of poured band of outer wall of basement advance water stop construction method
CN110004991A (en) Underground structure anti-floating system and construction method based on raised type tangs plate
CN104358275B (en) Darker elevator shaft or collecting well construction method
CN101498136A (en) After-pouring strips structure with high underground water level
CN202440852U (en) Advance water-stop isolation structure of basement post-poured strip
CN109736884B (en) Treatment structure for water gushing in underground river close to tunnel and construction method of treatment structure
CN201162233Y (en) Rear irrigation zone structure with higher ground water level
CN104846935B (en) Head-tank treating seepage remodeling method
CN113503166B (en) Reinforced disposal structure of karst cave at middle and lower parts of tunnel and construction method thereof
CN110159307A (en) A kind of tunnel multilayer grouting process
CN105756100A (en) Basement post-pouring belt system and making method thereof
CN203768925U (en) Seal device for dewatering well in foundation pit
CN206220277U (en) The simple type deformation joint structure of site operation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120718