CN201581510U - Advanced water-stop post-pouring belt of foundation slab - Google Patents

Advanced water-stop post-pouring belt of foundation slab Download PDF

Info

Publication number
CN201581510U
CN201581510U CN2009202801901U CN200920280190U CN201581510U CN 201581510 U CN201581510 U CN 201581510U CN 2009202801901 U CN2009202801901 U CN 2009202801901U CN 200920280190 U CN200920280190 U CN 200920280190U CN 201581510 U CN201581510 U CN 201581510U
Authority
CN
China
Prior art keywords
slab
stop
ater
sole plate
post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009202801901U
Other languages
Chinese (zh)
Inventor
肖华锋
刘干
崔超
吕茂森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Tanki Industry & Commerce Group Co Ltd
Original Assignee
Shandong Tanki Industry & Commerce Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Tanki Industry & Commerce Group Co Ltd filed Critical Shandong Tanki Industry & Commerce Group Co Ltd
Priority to CN2009202801901U priority Critical patent/CN201581510U/en
Application granted granted Critical
Publication of CN201581510U publication Critical patent/CN201581510U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model relates to an advanced water-stop post-pouring belt of a foundation slab. An advanced water-stop slab (2) is added below a post-pouring belt (8) of a foundation slab; the middle part of the advanced water-stop slab (2) is remained with an expansion joint (3), and the inside of the joint is filled by adopting an extrusion-molding polyphenyl plate; the middle of the expansion joint (3) is transversely provided with a rubber water-stop belt (4); a scavenging layer (7) is reserved between the post-pouring belt (8) of the foundation slab and the advanced water-stop slab (2); the side face of the post-pouring belt (8) of the foundation slab adopts a quick and easy closing-up net (9) and is supported and provided with a template, and the advanced water-stop slab (2) and the foundation slab (5) are simultaneously poured with concrete; and the advanced water-stop slab (2) is provided with double layers of reinforcing steel bars (11). The utility model has the advantages of lowering the engineering cost, shortening the construction period, reducing the potential safety hazard caused by a deep foundation pit, lowering the amount of precipitation greatly, protecting water resources effectively and the like.

Description

The leading sealing of a kind of sole plate ater-casting
Technical field
The utility model relates to the leading sealing of a kind of sole plate ater-casting, belongs to technical field of building construction.
Background technology
In recent years, along with the development of construction technology, the engineering of high level, superelevation layer, the big scale of construction is more and more, and the application of ater-casting frequently occurs thereupon.The ater-casting generally can be divided into flexible ater-casting and pouring after settlement by purposes.No matter flexible ater-casting, or pouring after settlement, its retention time is all longer.When the building foundation is positioned at groundwater table when following, adopt traditional ater-casting to stay the mode of establishing, the ater-casting must be built the ater-casting concrete again after main structure construction is finished.This just requires to continue to carry out precipitation, guarantees that groundwater table remains on below the basis, after the ater-casting concrete is finished and built to agent structure, just can stop precipitation.When the building main body construction time is longer, will certainly increase the precipitation expense greatly, increase engineering cost; Foundation Design is exposed to outdoor for a long time, because day and night temperature is bigger, basic exterior wall easily produces flexible crack; After finish on the basis, do not carry out backfill immediately and have potential safety hazard for deep-foundation pit engineering; Simultaneously, not backfill of basic earthwork, the construction with follow-up other operations of influence influences the duration of a project.
The utility model content
The technical problems to be solved in the utility model is: overcome traditional ater-casting precipitation expense height, exterior wall easily produces crack, deep foundation ditch potential safety hazard and influences problems such as duration of a project.Providing a kind of can carry out leading sealing to underground water, can carry out follow-up works such as external wall waterproof, backfill after finish on the basis, can stop the leading sealing of the sole plate ater-casting of precipitation at any time according to requirement of engineering.
The technical scheme that its technical problem that solves the utility model adopts is: the leading sealing of this a kind of sole plate ater-casting, comprise sole plate, the ater-casting that in sole plate, is provided with, fast easy-to-closing net and water-swellable sealing rod are installed in the side, ater-casting, it is characterized in that:
A, below sole plate post-poured strip, increase together leading sealing base plate;
The shrinkage joint is stayed at b, leading sealing base plate middle part one, adopts extruded polystyrene board to fill in the seam;
C, at one rubber fastening band of shrinkage joint intermediate lateral setting;
Reserve the cleaning layer between d, sole plate post-poured strip and the leading sealing base plate;
E, sole plate post-poured strip side adopt the fast easy-to-closing net to install template, and leading sealing base plate and sole plate be concreting simultaneously;
F, leading sealing backplane double steel bar.
In project subject construction period, this leading sealing base plate both can waterproof, can freely stretch again, did not influence follow-up works such as basic earthwork backfill; Because sole plate post-poured strip is easy to clean not, between sole plate and leading sealing base plate, increase the cleaning layer.
Compared with prior art, the beneficial effect that the utility model had is: the foundation pit dewatering time has been shortened in the leading sealing of sole plate ater-casting, reduces operating expenses.Basic external wall waterproof, outdoor backfilling of earthwork can in time be carried out in this ater-casting after Foundation Design is finished, reduce the probability that produces structural cracks because of day and night temperature between the basement exposure period.Simultaneously, in time carry out backfilling of earthwork after, can carry out the construction of subsequent handlings such as masonry, more reasonably carry out operation and intert, the reduction of erection time.Carry out external wall waterproof, backfilling of earthwork operation after finish on the basis immediately, eliminated the potential safety hazard that deep foundation ditch brings.The timely backfill of foundation ditch has increased the construction plant of main body construction, for civilized construction has been created better condition.This ater-casting precipitation time shortens greatly, and pump-out reduces greatly, has protected water resource effectively.
Description of drawings
The leading sealing of Fig. 1 sole plate ater-casting structural representation;
The leading sealing of Fig. 2 sole plate ater-casting bar construction frame schematic diagram.
Fig. 1-2 is the most preferred embodiment of the leading sealing of the utility model sole plate ater-casting.Among the figure: 9 fast easy-to-closing nets, 10 sole plate reinforcing bars, the 11 leading sealing base plate reinforcing bars of 4 rubber fastening bands, 5 sole plates, 6 water-swellable sealing rods, 7 cleaning layers, 8 ater-casting, 1 foundation pad, 2 leading sealing base plates, 3 shrinkage joint
The specific embodiment
Below in conjunction with accompanying drawing 1-2 the leading sealing of a kind of sole plate of the utility model ater-casting is described further:
The leading sealing of this sole plate ater-casting is made up of foundation pad 1, leading sealing base plate 2, shrinkage joint 3, rubber fastening band 4, sole plate 5, water-swellable sealing rod 6, cleaning layer 7, ater-casting 8, fast easy-to-closing net 9, sole plate reinforcing bar 10 and leading sealing base plate reinforcing bar 11.
A, below sole plate post-poured strip 8, increase together leading sealing base plate 2, be used for the sealing needs of sole plate 5 before 8 concretings of ater-casting;
B, leading sealing base plate thickness are not less than 250mm, and the every limit of width is than ater-casting 8 wide 250mm;
Shrinkage joint 3 is stayed at c, leading sealing base plate 2 middle parts one, if wide 40mm is stitched for flexible ater-casting in the ater-casting, if the ater-casting is a pouring after settlement, stitches wide 30mm, adopts extruded polystyrene board to fill in the seam;
D, at the shrinkage joint the wide rubber fastening band 4 of one 300mm of 3 intermediate lateral settings, the shrinkage joint can guarantee the needs of the flexible and sedimentation and deformation of sole plate;
Reserve cleaning layer 7 between e, sole plate post-poured strip 8 and the leading sealing base plate 2, the thickness of cleaning layer 7 is not less than 50mm, reserves certain cleaning space, assurance sole plate 5 architecture qualities in the time of can guaranteeing clear up in the ater-casting;
F, sole plate post-poured strip 8 sides adopt fast easy-to-closing net 9 to install template, leading sealing base plate 2 and 5 while of sole plate concreting;
G, leading sealing base plate 2 are arranged double steel bar 11, guarantee the force request before build ater-casting 8.
Job practices and process are as follows:
When a, basic earthwork excavation, deepen the leading sealing base plate 2 and cleaning layer 7 degree of depth at sole plate post-poured strip 8 positions.
B, the leading sealing base plate of colligation reinforcing bar 11 stay shrinkage joint 3 one at leading sealing base plate 2 middle parts after reinforcing bar binding is finished.If wide 40mm is stitched for flexible ater-casting in the ater-casting; If the ater-casting is a pouring after settlement, stitch wide 30mm.Adopt extruded polystyrene board to fill in the seam, place respectively up and down at rubber fastening band 4.
C, rubber fastening band 4 is set one at the shrinkage joint in the middle of 3, rubber fastening band 4 width are 300mm.
Reserve cleaning layer 7 between d, sole plate post-poured strip 8 and the leading sealing base plate 2.
E, sole plate post-poured strip side adopt fast easy-to-closing net 9 to install template, leading sealing base plate 2 and 5 while of sole plate concreting;
F, after main body is finished, in the time of can building the ater-casting, sole plate post-poured strip is cleaned out, water-swellable sealing rod 6 is installed in the both sides, ater-casting, build the sole plate post-poured strip concrete again.
G, ater-casting 8 concrete should adopt expansive concrete to build, and its strength grade is than the high one-level of both sides strength grade of concrete.After concrete reached initial set, covered with plastic film, felt carried out maintenance to this place's expansive concrete immediately.
The above, it only is preferred embodiment of the present utility model, be not to be the restriction of the utility model being made other form, any those skilled in the art may utilize the technology contents of above-mentioned announcement to be changed or be modified as the equivalent embodiment of equivalent variations.But every technical solutions of the utility model content that do not break away to any simple modification, equivalent variations and remodeling that above embodiment did, still belongs to the protection domain of technical solutions of the utility model according to technical spirit of the present utility model.

Claims (1)

1. the leading sealing of a sole plate ater-casting comprises sole plate, the ater-casting that is provided with in sole plate, and fast easy-to-closing net and water-swellable sealing rod are installed in the side, ater-casting, it is characterized in that:
A, below sole plate post-poured strip (8), increase together leading sealing base plate (2);
One shrinkage joint (3) stayed at b, leading sealing base plate (2) middle part, adopts extruded polystyrene board to fill in the seam;
C, at the shrinkage joint one rubber fastening band of (3) intermediate lateral setting (4);
Reserve cleaning layer (7) between d, sole plate post-poured strip (8) and the leading sealing base plate (2);
E, sole plate post-poured strip (8) side adopt fast easy-to-closing net (9) to install template, leading sealing base plate (2) and sole plate (5) while concreting;
F, leading sealing base plate (2) are arranged double steel bar (11).
CN2009202801901U 2009-12-05 2009-12-05 Advanced water-stop post-pouring belt of foundation slab Expired - Fee Related CN201581510U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202801901U CN201581510U (en) 2009-12-05 2009-12-05 Advanced water-stop post-pouring belt of foundation slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202801901U CN201581510U (en) 2009-12-05 2009-12-05 Advanced water-stop post-pouring belt of foundation slab

Publications (1)

Publication Number Publication Date
CN201581510U true CN201581510U (en) 2010-09-15

Family

ID=42723507

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202801901U Expired - Fee Related CN201581510U (en) 2009-12-05 2009-12-05 Advanced water-stop post-pouring belt of foundation slab

Country Status (1)

Country Link
CN (1) CN201581510U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102373715A (en) * 2011-07-29 2012-03-14 中国二十二冶集团有限公司 Advance water stop construction method of post poured band of fundamental plane part and external wall of underground part
CN102587421A (en) * 2012-03-12 2012-07-18 中天建设集团有限公司 Advanced water-stopping isolation structure of later poured band for basement
CN103225401A (en) * 2013-04-19 2013-07-31 国家电网公司 Method for filling expansion joint of enclosing wall of transformer substation
CN105064579A (en) * 2015-09-01 2015-11-18 江苏兴厦建设工程集团有限公司 Construction method guaranteeing pouring formation of toilet water-stop ridge platform
CN105780938A (en) * 2016-03-14 2016-07-20 中建三局第二建设工程有限责任公司 Vertical construction seam construction method of core tube bottom board for super high-rise
CN106759517A (en) * 2016-12-07 2017-05-31 北京首钢建设集团有限公司 Post-cast strip advanced water-stopping method
CN107780442A (en) * 2016-08-27 2018-03-09 上海宝冶集团有限公司 The high slope advance water stop construction method combined with soil nailing
CN114045882A (en) * 2021-12-07 2022-02-15 深圳大学建筑设计研究院有限公司 Waterproof construction method for post-cast strip of underground engineering

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102373715A (en) * 2011-07-29 2012-03-14 中国二十二冶集团有限公司 Advance water stop construction method of post poured band of fundamental plane part and external wall of underground part
CN102587421A (en) * 2012-03-12 2012-07-18 中天建设集团有限公司 Advanced water-stopping isolation structure of later poured band for basement
CN103225401A (en) * 2013-04-19 2013-07-31 国家电网公司 Method for filling expansion joint of enclosing wall of transformer substation
CN105064579A (en) * 2015-09-01 2015-11-18 江苏兴厦建设工程集团有限公司 Construction method guaranteeing pouring formation of toilet water-stop ridge platform
CN105780938A (en) * 2016-03-14 2016-07-20 中建三局第二建设工程有限责任公司 Vertical construction seam construction method of core tube bottom board for super high-rise
CN105780938B (en) * 2016-03-14 2017-12-22 中建三局第二建设工程有限责任公司 A kind of Super High core tube end plate vertical construction joint construction method
CN107780442A (en) * 2016-08-27 2018-03-09 上海宝冶集团有限公司 The high slope advance water stop construction method combined with soil nailing
CN107780442B (en) * 2016-08-27 2020-04-14 上海宝冶集团有限公司 High slope surface advanced water stop construction method combined with soil nails
CN106759517A (en) * 2016-12-07 2017-05-31 北京首钢建设集团有限公司 Post-cast strip advanced water-stopping method
CN114045882A (en) * 2021-12-07 2022-02-15 深圳大学建筑设计研究院有限公司 Waterproof construction method for post-cast strip of underground engineering

Similar Documents

Publication Publication Date Title
CN201581510U (en) Advanced water-stop post-pouring belt of foundation slab
CN201217811Y (en) Advanced water-stop post-pouring zone of base exterior wall
CN202000380U (en) Basement outer wall post-pouring belt backfill protective plate
GB2455008A (en) Impregnated fabric
CN101418569B (en) Optimization complex arch wall combining prefabricated arch leaf, support and major structure
CN104878783A (en) Super-long basement concrete base plate deformation joint leakage prevention and leakage treatment method
CN107574842A (en) Basement post-pouring zone advance water stop construction method
CN201326184Y (en) Connection joint structure for top plate of subway station and bottom plate of foundation pit
CN106978823A (en) Outer wall of basement advanced water-stop post-pouring zone construction method
CN104790435A (en) Post-subsidence pouring belt advancing waterstop impermeable concrete structure and construction technology thereof
CN204703179U (en) A kind of composite geo-membrane sloping core cofferdam
CN113622464A (en) Anti-cracking waterproof construction process for basement outer wall post-cast strip
CN202416379U (en) Precipitation post-pouring belt capable of stopping dewatering in advance
CN201162233Y (en) Rear irrigation zone structure with higher ground water level
CN213709920U (en) Waterproof structure of bottom plate post-cast strip
CN102619329B (en) Expansion restraint construction method for post-pouring belt
CN213572062U (en) Subside post-cast strip assembled structure of backfilling in advance
CN210049292U (en) Advanced water stop pouring belt structure for building
CN209538214U (en) A kind of late poured band structure of outer wall of basement
CN104594389A (en) Post-cast strip external wall plugging structure with elastic water stoppers
CN202440852U (en) Advance water-stop isolation structure of basement post-poured strip
CN204326119U (en) A kind of pile-raft foundation float Structure
CN216586626U (en) Basement post-cast strip drainage system
CN102587421A (en) Advanced water-stopping isolation structure of later poured band for basement
CN201598645U (en) Advanced water stop post-pouring belt for base soleplate

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100915

Termination date: 20151205

EXPY Termination of patent right or utility model