CN201217811Y - Advanced water-stop post-pouring zone of base exterior wall - Google Patents

Advanced water-stop post-pouring zone of base exterior wall Download PDF

Info

Publication number
CN201217811Y
CN201217811Y CNU2008200231735U CN200820023173U CN201217811Y CN 201217811 Y CN201217811 Y CN 201217811Y CN U2008200231735 U CNU2008200231735 U CN U2008200231735U CN 200820023173 U CN200820023173 U CN 200820023173U CN 201217811 Y CN201217811 Y CN 201217811Y
Authority
CN
China
Prior art keywords
wall
exterior wall
ater
casting
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200231735U
Other languages
Chinese (zh)
Inventor
肖华锋
崔超
刘玉艳
田春蕾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Tanki Industry & Commerce Group Co Ltd
Original Assignee
Shandong Tanki Industry & Commerce Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Tanki Industry & Commerce Group Co Ltd filed Critical Shandong Tanki Industry & Commerce Group Co Ltd
Priority to CNU2008200231735U priority Critical patent/CN201217811Y/en
Application granted granted Critical
Publication of CN201217811Y publication Critical patent/CN201217811Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model relates to a base outer wall advance waterproof post-pouring band which belongs to a post-pouring band in the construction engineering field and comprises a base outer wall, a post-pouring band arranged on the base outer wall, a fast-easy setback grid and a water-expanding waterproofing strip which are arranged at the side of the post-pouring band. The base outer wall advance waterproof post-pouring band is characterized in that a concrete guide wall (2) is arranged at the outer side of the post-pouring band (6) of the base outer wall (3), an isolation joint (7) filled with a plastic benzoic board is additionally arranged between the guide wall (2) and the post-pouring band (6), an expansion joint (1) is arranged at the middle of the guide wall (2), the middle part of the expansion joint (1) is transversely provided with a rubber waterproofing strip (10), and bar construction frames are arranged in the outer wall (3) and the guide wall (2). Compared with the prior art, the utility model has the advantages that the foundation pit dewatering time is shortened, the construction period is reduced, the potential safety hazard brought by deep foundation pits is eliminated, groundwater resources are effectively protected, and the like.

Description

The leading sealing of a kind of basic exterior wall ater-casting
Technical field
The utility model relates to the leading sealing of a kind of basic exterior wall ater-casting, belongs to a kind of ater-casting of building engineering field.
Background technology
In recent years, along with the development of construction technology, the engineering of high level, superelevation layer, the big scale of construction is more and more, and the application of ater-casting frequently occurs thereupon.The ater-casting generally can be divided into flexible ater-casting and pouring after settlement by purposes.No matter flexible ater-casting, or pouring after settlement, its retention time is all longer.When the building foundation is positioned at groundwater table when following, adopt traditional ater-casting to stay the mode of establishing, the ater-casting must be built the ater-casting concrete again after main structure construction is finished.This just requires to continue to carry out precipitation, guarantees that groundwater table remains on below the basis, after the ater-casting concrete is finished and built to agent structure, just can stop precipitation.When the building main body construction time is longer, will certainly increase the precipitation expense greatly, increase engineering cost; Foundation Design is exposed to outdoor for a long time, because day and night temperature is bigger, basic exterior wall easily produces flexible crack; After finish on the basis, do not carry out backfill immediately and have potential safety hazard for deep-foundation pit engineering; Simultaneously, not backfill of basic earthwork, the construction with follow-up other operations of influence influences the duration of a project.
The utility model content
The technical problems to be solved in the utility model is: overcome traditional ater-casting precipitation expense height, exterior wall easily produces crack, deep foundation ditch potential safety hazard and influences deficiencies such as duration of a project, provide a kind of and can carry out leading sealing underground water, after finishing, the basis can carry out follow-up works such as external wall waterproof, backfill, can stop the leading sealing of a kind of basic exterior wall ater-casting of precipitation at any time according to requirement of engineering.
The technical scheme that its technical problem that solves the utility model adopts is: the leading sealing of this a kind of basic exterior wall ater-casting, comprise the ater-casting that basic exterior wall, basic exterior wall are provided with, fast easy-to-closing net and water-swellable sealing rod are installed in the side, ater-casting, it is characterized in that: outside left is provided with concrete guide wall in the ater-casting of basic exterior wall, fill the isolation seam of extruded polystyrene board between the ater-casting, setting up leading wall, expansion joint, expansion joint middle part horizontally set rubber fastening band are set leading in the middle of the wall, exterior wall is provided with the bar construction frame within the walls with leading.
Isolate colligation exterior wall reinforcing bar cushion block between seam and the exterior wall outside reinforcing bar, lead within the walls that the side reinforcing bar is provided with the mortar cushion block between stitching with isolation.
The bar construction frame comprises leads within the walls the side reinforcing bar and leads wall outside reinforcing bar, and exterior wall outside reinforcing bar.
Increase concrete guide wall at basic post-pouring belt of outer wall position, lead the wall middle part and stay and establish the shrinkage joint, the middle part, shrinkage joint is provided with rubber fastening band, in project subject construction period, this leads wall both can waterproof, can freely stretch again, did not influence follow-up works such as basic external wall waterproof, backfilling of earthwork.Owing to lead within the walls that side is difficult for installing template, between exterior wall, increase and isolate seam leading wall, isolate seam and adopt extruded polystyrene board to fill, isolate the effect of side template within the walls of leading of having played of stitching.For guaranteeing to lead side thickness of protection tier within the walls, colligation mortar cushion block on inboard reinforcing bar.For guaranteeing the topping of exterior wall outside reinforcing bar, adopt bar dowel as topping, play the effect that extruded polystyrene board is isolated the seam support member simultaneously.
The beneficial effect that the leading sealing of a kind of basic exterior wall of the present utility model ater-casting is had is: increase concrete guide wall at basic post-pouring belt of outer wall position, leading wall middle part stays and establishes the shrinkage joint, the middle part, shrinkage joint is provided with rubber fastening band, in project subject construction period, this leads wall both can waterproof, can freely stretch again, shorten the foundation pit dewatering time, reduce operating expenses; Reduction produces the probability of structural cracks because of day and night temperature between the basement exposure period; Simultaneously, in time carry out backfilling of earthwork after, can carry out the construction of subsequent handlings such as masonry, more reasonably carry out operation and intert, the reduction of erection time; Carry out external wall waterproof, backfilling of earthwork operation after finish on the basis immediately, eliminated the potential safety hazard that deep foundation ditch brings; The timely backfill of foundation ditch has increased the construction plant of main body construction, for civilized construction has been created better condition; Its precipitation time shortens greatly, and pump-out reduces greatly, has protected groundwater resources effectively.
Description of drawings
Fig. 1 is the utility model basis external wall elevation schematic diagram;
Fig. 2 is the A-A sectional structure schematic diagram of Fig. 1;
Fig. 3 is the utility model bar construction frame schematic diagram.
Fig. 1-the 3rd, most preferred embodiment of the present utility model.
Wherein: 1 shrinkage joint 2 is led the basic exterior wall 4 water-swellable sealing rods of wall 35 exterior wall reinforcing bar cushion blocks 6 ater-castings 7 and is isolated seam 8 fast easy-to-closing nets 9 and lead wall mortar reinforcing bar cushion block 10 rubber fastening bands 11 and lead within the walls side reinforcing bar 12 and lead the reinforcing bar 13 exterior walls outside, wall outside reinforcing bar.
The specific embodiment
1-3 is described further the utility model below in conjunction with accompanying drawing:
With reference to Fig. 1-3:
The leading sealing of this a kind of basic exterior wall ater-casting, by shrinkage joint 1, lead wall 2, basic exterior wall 3, water-swellable sealing rod 4, exterior wall reinforcing bar cushion block 5, ater-casting 6, isolate seam 7, fast easy-to-closing net 8, lead wall mortar reinforcing bar cushion block 9, rubber fastening band 10, lead within the walls side reinforcing bar 11, lead wall outside reinforcing bar 12, exterior wall outside reinforcing bar 13 is formed.Fast easy-to-closing net 8 and water-swellable sealing rod 4 are installed in 6 sides, ater-casting, 6 outside lefts are provided with concrete guide wall 2 in the ater-casting of basic exterior wall 3, fill the isolation seam 7 of extruded polystyrene board between ater-casting 6, setting up leading wall 2, isolate colligation exterior wall reinforcing bar cushion block 5 between seam 7 and the exterior wall outside reinforcing bar 13, lead within the walls that side reinforcing bar 11 is provided with mortar cushion block 9 between stitching 7 with isolation, in the middle of leading wall 2 expansion joint 1, expansion joint 1 middle part horizontally set rubber fastening bands 10 are set, exterior wall 3 is provided with the bar construction frame with leading in the wall 2.The bar construction frame comprises leads within the walls side reinforcing bar 11 and leads wall outside reinforcing bar 12, and exterior wall outside reinforcing bar 13.
Job practices and process are as follows:
A, according to engineering drawing, colligation bar dowel cushion block 5 on the reinforcing bar 13 of the exterior wall at 6 positions, the basic exterior wall 3 ater-castings outside, reinforcing bar cushion block 5 play simultaneously to isolating the effect of the support member of extruded polystyrene board in the seam;
B, between exterior wall 3, increase and isolate seam 7 leading wall 2, isolate seam 7 and adopt extruded polystyrene boards to fill.Isolate seam 7 and played the effect of side template within the walls of leading;
C, at extruded polystyrene board and lead between the wall the thick mortar cushion block 9 of colligation 15mm as leading wall reinforcement cover cushion block;
D, according to engineering drawing, side reinforcing bar 11 is within the walls led in colligation;
E, lead wall middle part and stay the wide shrinkage joint 1 of 30mm-40mm one, adopt extruded polystyrene board to fill in the seam; If wide 40mm is stitched for flexible ater-casting in the ater-casting; If the ater-casting is a pouring after settlement, stitch wide 30mm;
F, the wide rubber fastening band 10 of 300mm is set one in the middle of the shrinkage joint;
G, according to engineering drawing, wall outside reinforcing bar 12 is led in colligation;
H, post-pouring belt of outer wall position adopt fast easy-to-closing net 8 to install template, and wall and exterior wall while concreting are led in the ater-casting;
I, foundation structure are finished, after the outer wall of basement subsurface work acceptance, carry out the construction of subsequent handlings such as external wall waterproof, backfilling of earthwork immediately, and stopping precipitation time should determining greater than phreatic buoyancy according to upper load;
J, after main body is finished, in the time of can building the ater-casting, cleaning ater-casting place concrete is installed water-swellable sealing rod 4 in the middle of the concrete of both sides, ater-casting;
K, ater-casting 6 concrete should adopt expansive concrete to build, and its strength grade is than the high one-level of both sides strength grade of concrete, and after concrete reached initial set, covered with plastic film, felt carried out maintenance to this place's expansive concrete immediately.

Claims (3)

1, the leading sealing of a kind of basic exterior wall ater-casting, comprise the ater-casting that basic exterior wall, basic exterior wall are provided with, fast easy-to-closing net and water-swellable sealing rod are installed in the side, ater-casting, it is characterized in that: outside left is provided with concrete guide wall (2) in the ater-casting (6) of basic exterior wall (3), fill the isolation seam (7) of extruded polystyrene board between ater-casting (6), setting up leading wall (2), expansion joint (1), expansion joint (1) middle part horizontally set rubber fastening band (10) are set leading in the middle of the wall (2), exterior wall (3) is provided with the bar construction frame with leading in the wall (2).
2, the leading sealing of a kind of basic exterior wall according to claim 1 ater-casting is characterized in that: isolate colligation exterior wall reinforcing bar cushion block (5) between seam (7) and the exterior wall outside reinforcing bar (13), lead within the walls side reinforcing bar (11) and stitch between (7) with isolation mortar cushion block (9) is set.
3, the leading sealing of a kind of basic exterior wall according to claim 1 ater-casting is characterized in that: the bar construction frame comprises leads within the walls side reinforcing bar (11) and leads wall outside reinforcing bar (12), and exterior wall outside reinforcing bar (13).
CNU2008200231735U 2008-05-29 2008-05-29 Advanced water-stop post-pouring zone of base exterior wall Expired - Fee Related CN201217811Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200231735U CN201217811Y (en) 2008-05-29 2008-05-29 Advanced water-stop post-pouring zone of base exterior wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200231735U CN201217811Y (en) 2008-05-29 2008-05-29 Advanced water-stop post-pouring zone of base exterior wall

Publications (1)

Publication Number Publication Date
CN201217811Y true CN201217811Y (en) 2009-04-08

Family

ID=40540644

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200231735U Expired - Fee Related CN201217811Y (en) 2008-05-29 2008-05-29 Advanced water-stop post-pouring zone of base exterior wall

Country Status (1)

Country Link
CN (1) CN201217811Y (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587421A (en) * 2012-03-12 2012-07-18 中天建设集团有限公司 Advanced water-stopping isolation structure of later poured band for basement
CN102720216A (en) * 2012-07-11 2012-10-10 南通市达欣工程股份有限公司 Foundation post-pouring belt template constructing method
CN102758456A (en) * 2012-07-12 2012-10-31 成军 Construction method of basement waterproofing projects
CN102995665A (en) * 2012-12-17 2013-03-27 广州市设计院 Self-healing type construction steam structure of underground construction lateral wall and construction method thereof
CN104032741A (en) * 2014-06-30 2014-09-10 河北省水利工程局 Rapid construction method for large-size temperature control in water conservancy project
CN104099942A (en) * 2013-04-09 2014-10-15 上海市政工程设计研究总院(集团)有限公司 Construction method of underground reinforced concrete box culvert structure temporary closure wall
CN105862928A (en) * 2016-05-31 2016-08-17 中国冶集团有限公司 Post-cast strip outer wall in-advance water stopping treatment structure and construction process thereof
CN106759517A (en) * 2016-12-07 2017-05-31 北京首钢建设集团有限公司 Post-cast strip advanced water-stopping method
CN108442411A (en) * 2018-04-12 2018-08-24 玉田县长春建筑工程有限公司 A kind of construction method of poured band of outer wall of basement and its building structure
CN109763518A (en) * 2019-01-30 2019-05-17 成都建工第四建筑工程有限公司 A kind of construction method of basement post-pouring zone
CN109826240A (en) * 2018-12-25 2019-05-31 浙江华临建设集团有限公司 A kind of anti-basement bottom plate rear pouring tape leak device and its construction method

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587421A (en) * 2012-03-12 2012-07-18 中天建设集团有限公司 Advanced water-stopping isolation structure of later poured band for basement
CN102720216A (en) * 2012-07-11 2012-10-10 南通市达欣工程股份有限公司 Foundation post-pouring belt template constructing method
CN102758456B (en) * 2012-07-12 2013-07-10 南通纺织职业技术学院 Construction method of basement waterproofing projects
CN102758456A (en) * 2012-07-12 2012-10-31 成军 Construction method of basement waterproofing projects
CN102995665B (en) * 2012-12-17 2016-03-09 广州市设计院 The self-healing construction joint structure of a kind of underground building sidewall and construction method thereof
CN102995665A (en) * 2012-12-17 2013-03-27 广州市设计院 Self-healing type construction steam structure of underground construction lateral wall and construction method thereof
CN104099942A (en) * 2013-04-09 2014-10-15 上海市政工程设计研究总院(集团)有限公司 Construction method of underground reinforced concrete box culvert structure temporary closure wall
CN104099942B (en) * 2013-04-09 2017-06-27 上海市政工程设计研究总院(集团)有限公司 A kind of underground reinforced concrete box culvert structure temporary plugging wall construction method
CN104032741A (en) * 2014-06-30 2014-09-10 河北省水利工程局 Rapid construction method for large-size temperature control in water conservancy project
CN104032741B (en) * 2014-06-30 2016-03-02 河北省水利工程局 The rapid constructing method of a kind of hydraulic engineering large volume temperature control
CN105862928A (en) * 2016-05-31 2016-08-17 中国冶集团有限公司 Post-cast strip outer wall in-advance water stopping treatment structure and construction process thereof
CN106759517A (en) * 2016-12-07 2017-05-31 北京首钢建设集团有限公司 Post-cast strip advanced water-stopping method
CN108442411A (en) * 2018-04-12 2018-08-24 玉田县长春建筑工程有限公司 A kind of construction method of poured band of outer wall of basement and its building structure
CN109826240A (en) * 2018-12-25 2019-05-31 浙江华临建设集团有限公司 A kind of anti-basement bottom plate rear pouring tape leak device and its construction method
CN109826240B (en) * 2018-12-25 2021-02-02 浙江华临建设集团有限公司 Device for preventing post-cast strip of underground chamber bottom plate from leaking and construction method thereof
CN109763518A (en) * 2019-01-30 2019-05-17 成都建工第四建筑工程有限公司 A kind of construction method of basement post-pouring zone

Similar Documents

Publication Publication Date Title
CN201217811Y (en) Advanced water-stop post-pouring zone of base exterior wall
CN201581510U (en) Advanced water-stop post-pouring belt of foundation slab
CN201687102U (en) Assembled integral type shear wall structure system
CN104631512B (en) Hang modulus method after-pouring band beam-slab construction method
CN101818527A (en) Assembled integral shear wall structure system and construction method thereof
CN203546762U (en) Triple waterproof advance water stop structure for post-cast strip
CN208280185U (en) A kind of post-cast strip advanced water-stopping construction
CN101418569B (en) Optimization complex arch wall combining prefabricated arch leaf, support and major structure
CN201296994Y (en) Multifunctional precast arch piece
CN109024870A (en) The connection structure and its construction method of assembled underground structure vertical member
CN106978823A (en) Outer wall of basement advanced water-stop post-pouring zone construction method
CN105003020A (en) Ceramsite concrete metal net rack light wallboard and splicing structure thereof
CN112376624A (en) Secondary pouring and retaining advanced water stop structure for basement floor post-cast strip and construction method
CN104790435A (en) Post-subsidence pouring belt advancing waterstop impermeable concrete structure and construction technology thereof
CN102619329B (en) Expansion restraint construction method for post-pouring belt
CN205591555U (en) Processing apparatus of basement outer wall
CN206035045U (en) Prefabricated assembled underground granary of endocyst plastics
CN104594389A (en) Post-cast strip external wall plugging structure with elastic water stoppers
CN105064411B (en) Method for building post-pouring expansion reinforcing band of wallboard of underground structure
CN204475379U (en) Shorten the basement post-pouring zone in Dewatering cycle
CN201598645U (en) Advanced water stop post-pouring belt for base soleplate
CN106193120A (en) Basement is encorbelmented, and base plate is inverse makees structure and construction method
CN205206055U (en) Basement outer wall post -cast strip thickening anti -seepage waterstop structure
CN209082729U (en) A kind of anti-bank impermeable structure construction of kitchen and toilet
CN106567415A (en) Drain sleeve for preventing basement floating upward and use method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090408

Termination date: 20150529

EXPY Termination of patent right or utility model