CN203546762U - Triple waterproof advance water stop structure for post-cast strip - Google Patents

Triple waterproof advance water stop structure for post-cast strip Download PDF

Info

Publication number
CN203546762U
CN203546762U CN201320687032.4U CN201320687032U CN203546762U CN 203546762 U CN203546762 U CN 203546762U CN 201320687032 U CN201320687032 U CN 201320687032U CN 203546762 U CN203546762 U CN 203546762U
Authority
CN
China
Prior art keywords
ater
casting
water
post
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320687032.4U
Other languages
Chinese (zh)
Inventor
周倩羽
缪建国
卢江华
张义勇
傅亚松
付定鑫
刘承华
毛华祥
余万江
杨灼
谢亚光
刘璇
童霞
金鹭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yongsheng Construction Group Co Ltd
No 1 Construction Engineering Co Ltd of Guizhou Construction and Engineering Group
Original Assignee
Yongsheng Construction Group Co Ltd
No 1 Construction Engineering Co Ltd of Guizhou Construction and Engineering Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yongsheng Construction Group Co Ltd, No 1 Construction Engineering Co Ltd of Guizhou Construction and Engineering Group filed Critical Yongsheng Construction Group Co Ltd
Priority to CN201320687032.4U priority Critical patent/CN203546762U/en
Application granted granted Critical
Publication of CN203546762U publication Critical patent/CN203546762U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

A triple waterproof advance water stop structure for a post-cast strip is characterized in that the post-cast strip (1) is in a rectangular groove shape and fixed in a bottom plate (3), a reinforcing plate (4) is arranged at the bottom of the bottom plate (3), an externally attached waterstop (6) is horizontally arranged on the upper side of the reinforcing plate (4), and a water swelling strip (5) is vertically arranged between the externally attached waterstop (6) and the bottom of the post-cast strip (1). The externally attached waterstop and the water swelling strip are added, so that the partial structure of the post-cast strip has the self-waterproof and triple waterproof function, and the water stop function of the post-cast strip is improved greatly; no water can seep into a basement, no water needs to be pumped out of the basement, and sedimentation, temperature deformation and the like of buildings with different heights and structural styles are allowed before concrete plugging construction of the post-cast strip. Construction is convenient, and operation is easy. The triple waterproof advance water stop structure is suitable for construction of basement baseboard post-cast strips and outer wallboard post-cast strips having the requirement for differential settlement.

Description

The ater-casting advanced water-stopping structure of three road waterproof
Technical field
The utility model relates to layout or the structure technology of foundation structure seam, especially the ater-casting advanced water-stopping structure of three road waterproof.
Background technology
Advanced water-stopping is before does not pour into a mould ater-casting, when structure wouldn't realize from water-proof function, carries out in advance the local leading waterproof construction in ater-casting, realizes the dual-use function of waterproof and deformation joint.After simultaneously basement construction completes, just can the backfill earthwork, reduce deep foundation ditch potential safety hazard, integral waterproofing effect is more satisfactory.The method of ater-casting advanced water-stopping refers generally to waterproof scheme between member and the water surface or before, and the method for ater-casting advanced water-stopping is a lot.Generally local thicken and set up external labeling type or middle buried water stop.Ater-casting advanced water-stopping and construction method, mainly because building underground water level is higher, simultaneously for accelerating construction progress, the time of general ater-casting is two months, after basement roof has been constructed, carry out as early as possible the backfill of foundation ditch, therefore advanced water-stopping measure has all been taked in the ater-casting of basement bottom board and exterior wall.It should be noted that, the Design of Construction Organization examination Ying You designing unit of basement part participates in, to just determine the embodiment of a complete advanced water-stopping before excavation of foundation pit, bed course are built, otherwise construction finds that advanced water-stopping aspect has problem just to propose integrality and reasonability that Change In Design requirement meeting affects whole sealing scheme midway, advanced water-stopping mainly should take appropriate measures and prevent that surface water, curing water and rubbish incidental from falling into, and advanced water-stopping also should be applied among the overall process of whole engineering until backfill completes.If desired, should sump be set near bottom plate rear pouring tape in conjunction with the design of basement flat drainage system, be convenient to ater-casting and build front last cleaning.In addition, while not adopting advanced water-stopping, also sump should be set, can be located in the ground as stated above indoorly, or as temporory structure, be located in the ground outdoor.
When ater-casting needs advanced water-stopping, external labeling type or middle buried water stop should local be thickeied and set up to position, ater-casting concrete, the construction of ater-casting should meet the following requirements, be to construct again after Ying Qi both sides, ater-casting reach 42d the age of concrete, but the ater-casting of highrise building should be carried out after structure roof concreting 14d; The seam crossing of ater-casting ought to meet regulation and stipulation; before the concrete construction of ater-casting; position, ater-casting and external labeling type waterstop be should give protection; be strictly on guard against and fall into foreign material and damage external labeling type waterstop; ater-casting should adopt expansive concrete to build; its strength grade should be lower than both sides concrete, and the concrete curing time in ater-casting must not be less than 28d.Adopt traditional ater-casting way, post-pouring belt of outer wall gap can not backfill immediately after basement construction completes, and forms foundation ditch, by the inconvenience of bringing to follow-up construction, unfavorable to civilized construction, there is larger potential safety hazard; The procedure connection time while reducing the construction of traditional ater-casting, optimize and utilize site operation place; Before ater-casting concrete is not poured into a mould, underground water, surface water, the rainwater chamber that can not permeate the ground from ater-casting, for the indoor construction of basement has been created a good environment.If adopt traditional ater-casting way, a large amount of underground water, surface water, the rainwater chamber that can permeate the ground from ater-casting before the shutoff of ater-casting, cause a large amount of ponding of basement, to basement, cause environment pollution, cause great inconvenience to the follow-up indoor construction of basement, greatly increase pump-out, increase power consumption.
Existing relevant improvement technology is rare open.
Utility model content
Utility model object of the present utility model is to provide a kind of ater-casting advanced water-stopping structure of three road waterproof, and stronger to compliance such as sedimentation, temperature deformations, after construction application, basement need not draw water substantially.
The purpose of this utility model will realize by following technical measures: the rectangular groove shape in ater-casting, ater-casting is fixed in base plate, stiffener is arranged at base plate 3 bottoms, in stiffener upper horizontal, external labeling type waterstop is installed, outside at right angle setting water-swellable sealing rod between pasting type waterstop and bottom, ater-casting.
Especially, on the inwall of ater-casting, fast-easy closing-up net is installed.
Especially, water-swellable sealing rod is connected with base plate by structure glue adhesive linkage.
Especially, vertical fixedly single layer separator net partition on the ater-casting inwall on top, water-swellable sealing rod installation site, meanwhile, in water-swellable sealing rod both sides, by the fixing extruded sheet of reinforced steel, this extruded sheet is parallel and be close to water-swellable sealing rod.
Especially, outside, ater-casting week is along erectting straight fixing protection wall.Especially, protection wall top level is added a cover wooden cover plate.Meanwhile, concreting outside ater-casting.
Advantage of the present utility model and effect: increased external labeling type waterstop and water-swellable sealing rod and made the structure of part, ater-casting from the triple water-proof functions of waterproof, the water stopping function of ater-casting is improved greatly; Can make not seep water after basement construction, basement need not draw water substantially, allows the building of differing heights, different structure type to produce sedimentation, temperature deformation etc. before the concrete plugging construction of ater-casting.Easy construction, easily operation.Be applicable to the basement bottom plate rear pouring tape of differential settlement requirement, the construction of exterior panel ater-casting.
Accompanying drawing explanation
Fig. 1 is bottom plate rear pouring tape advanced water-stopping organigram in the utility model embodiment.
Fig. 2 is that in the utility model embodiment, water-swellable sealing rod is reinforced schematic diagram.
Fig. 3 is one of ater-casting safeguard measure schematic diagram in the utility model embodiment.
Fig. 4 is two schematic diagrames of ater-casting safeguard measure in the utility model embodiment.
Reference numeral comprises: ater-casting 1, fast-easy closing-up net 2, base plate 3, stiffener 4, water-swellable sealing rod 5, external labeling type waterstop 6, structure glue adhesive linkage 7, reinforced steel 8, extruded sheet 9, single layer separator net cut off 10, protect wall 11, wooden cover plate 12, concrete 13.
The specific embodiment
The utility model principle is, works is thickeied in advance to process in ater-casting part and is formed an integral body, ater-casting is peeled off out, by water-swellable sealing rod being set in the middle of thickening position, meet different sedimentations, dilatation, can before basement post-pouring zone perfusion, meet stagnant water effect again.
Below in conjunction with drawings and Examples, the utility model is described in further detail.
Embodiment: as shown in Figure 1, the rectangular groove shape in ater-casting 1, ater-casting 1 is fixed in base plate 3, and stiffener 4 is arranged at base plate 3 bottoms, in stiffener 4 upper horizontal, external labeling type waterstop 6, outside at right angle setting water-swellable sealing rod 5 between pasting type waterstop 6 and 1 bottom, ater-casting are installed.
In aforementioned, on 1 inwall of ater-casting, fast-easy closing-up net 2 is installed.
In aforementioned, water-swellable sealing rod 5 is connected with base plate 3 by structure glue adhesive linkage 7.
In the present embodiment; when external labeling type waterstop 6 is installed; on the 1 waterproofing course topping of ater-casting, eject the position line of external labeling type waterstop 6, brushing structure glue, then take advantage of structure glue not dry before immediately in ater-casting the position at 1 middle part by the line put well in advance, paste external labeling type sealing rod 6.
In aforementioned, base plate 3 comprises deck, topping, waterproofing course, leveling layer and concrete cushion.
In aforementioned, water-swellable sealing rod is reinforced as shown in Figure 2, on ater-casting 1 inwall on water-swellable sealing rod 5 tops, installation site, vertical fixedly single layer separator net cuts off 10, simultaneously, in water-swellable sealing rod 5 both sides, by the fixing extruded sheet 9 of reinforced steel 8, this extruded sheet 9 is parallel and be close to water-swellable sealing rod 5.
In aforementioned, as shown in Figure 3,1 outside week of ater-casting is along erectting straight fixing protection wall 11 for one of ater-casting safeguard measure.
In aforementioned, ater-casting safeguard measure two as shown in Figure 4, aforementioned in, protection wall 11 top levels are added a cover wooden cover plate 12.Meanwhile, the 1 outside concreting 13 in ater-casting.
In the present embodiment, increased external labeling type waterstop 1 and water-swellable sealing rod 5 and made the structure of part, ater-casting from the triple water-proof functions of waterproof, the water stopping function of ater-casting is improved greatly; After completing, basement construction can, by post-pouring belt of outer wall place together backfill, the procedure connection time while reducing the construction of traditional ater-casting, optimize and utilize site operation place during backfill; Before ater-casting concrete is not poured into a mould, underground water, surface water, the rainwater chamber that can not permeate the ground from ater-casting, for the indoor construction of basement has been created a good environment.Outer wall of basement side plate and base arrangement have a style of one's own, in advance by waterproofing work.Can whole backfill after basement construction completes, while constructing to overground part, increase construction plant, the operation and the duration that overground part are given to work are favourable, for the project of job site narrow field provides more operating space.
The feature of the utility model construction method comprises: easy construction, easily operation.Before the concrete plugging construction of ater-casting, allow the building of differing heights, different structure type to produce sedimentation, temperature deformation etc.Increase by three road waterproof measures and can make not seep water after basement construction, basement need not draw water substantially, and after adopting traditional ater-casting basement construction to complete, pump-out is very large.Be applicable to construction work and have the basement bottom plate rear pouring tape that differential settlement requires, a construction of exterior panel ater-casting because upper structure type is different, for what meet that building deformation arranges.

Claims (6)

  1. The ater-casting advanced water-stopping structure of 1.San road waterproof, it is characterized in that, the rectangular groove shape in ater-casting (1), ater-casting (1) is fixed in base plate (3), stiffener (4) is arranged at base plate (3) bottom, in stiffener (4) upper horizontal, external labeling type waterstop (6) is installed, outside at right angle setting water-swellable sealing rod (5) between pasting type waterstop (6) and ater-casting (1) bottom.
  2. 2. the ater-casting advanced water-stopping structure of three road waterproof as claimed in claim 1, is characterized in that, on the inwall of ater-casting (1), fast-easy closing-up net (2) is installed.
  3. 3. the ater-casting advanced water-stopping structure of three road waterproof as claimed in claim 1, is characterized in that, water-swellable sealing rod (5) is connected with base plate (3) by structure glue adhesive linkage (7).
  4. 4. the ater-casting advanced water-stopping structure of three road waterproof as claimed in claim 1, it is characterized in that, on ater-casting (1) inwall on water-swellable sealing rod (5) top, installation site, vertical fixedly single layer separator net cuts off (10), simultaneously, in water-swellable sealing rod (5) both sides, by the fixing extruded sheet (9) of reinforced steel (8), this extruded sheet (9) is parallel and be close to water-swellable sealing rod (5).
  5. 5. the ater-casting advanced water-stopping structure of three road waterproof as claimed in claim 1, is characterized in that, ater-casting (1) outside week is along erectting straight fixing protection wall (11).
  6. 6. the ater-casting advanced water-stopping structure of three road waterproof as claimed in claim 5, is characterized in that, protection wall (11) top level is added a cover wooden cover plate (12).
CN201320687032.4U 2013-11-04 2013-11-04 Triple waterproof advance water stop structure for post-cast strip Expired - Fee Related CN203546762U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320687032.4U CN203546762U (en) 2013-11-04 2013-11-04 Triple waterproof advance water stop structure for post-cast strip

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320687032.4U CN203546762U (en) 2013-11-04 2013-11-04 Triple waterproof advance water stop structure for post-cast strip

Publications (1)

Publication Number Publication Date
CN203546762U true CN203546762U (en) 2014-04-16

Family

ID=50464898

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320687032.4U Expired - Fee Related CN203546762U (en) 2013-11-04 2013-11-04 Triple waterproof advance water stop structure for post-cast strip

Country Status (1)

Country Link
CN (1) CN203546762U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104314050A (en) * 2014-11-10 2015-01-28 南京市水利规划设计院有限责任公司 Concrete engineering deformation joint vertical water stop cavity die and construction method thereof
CN104328802A (en) * 2014-11-10 2015-02-04 张朝利 Concrete engineering cavity die skeleton and manufacturing method thereof
CN104452826A (en) * 2014-11-10 2015-03-25 张朝利 Concrete engineering cavity die gasbag and manufacturing method thereof
CN107604952A (en) * 2017-07-26 2018-01-19 上海市政工程设计研究总院(集团)有限公司 A kind of underpass spare interface construction excavated from the later stage
CN107653913A (en) * 2017-09-22 2018-02-02 上海宝冶集团有限公司 A kind of basement construction waterproof technology
CN112681393A (en) * 2020-12-28 2021-04-20 中国建筑第八工程局有限公司 Advanced water stop structure of bottom plate post-cast strip and construction method thereof
CN114809115A (en) * 2022-05-27 2022-07-29 中建八局第三建设有限公司 Force-transferring profiled steel post-cast strip shaped assembling interception construction method
CN115126006A (en) * 2022-06-30 2022-09-30 陕西帕源路桥建设有限公司 Post-pouring belt water stopping mechanism for house building construction

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106088590B (en) * 2014-11-10 2017-12-26 盛闯 The vertical sealing swaging die of concrete works movement joint with reinforcing fiber
CN104452826A (en) * 2014-11-10 2015-03-25 张朝利 Concrete engineering cavity die gasbag and manufacturing method thereof
CN104314050A (en) * 2014-11-10 2015-01-28 南京市水利规划设计院有限责任公司 Concrete engineering deformation joint vertical water stop cavity die and construction method thereof
CN105951679B (en) * 2014-11-10 2018-03-16 珠海大捷建设有限公司 A kind of manufacture method of concrete works swaging die air bag
CN105951891A (en) * 2014-11-10 2016-09-21 苏州多固工程设计有限公司 Concrete engineering deformation seam perpendicular water stopping cavity die with protrusions and reinforced fibers
CN105951679A (en) * 2014-11-10 2016-09-21 苏州多固工程设计有限公司 Manufacturing method of concrete engineering cavity mold airbag
CN105951890A (en) * 2014-11-10 2016-09-21 苏州多固工程设计有限公司 Application method of concrete engineering cavity mold airbag
CN105484201B (en) * 2014-11-10 2017-05-31 发达控股集团有限公司 A kind of manufacture method of concrete works swaging die skeleton
CN105951891B (en) * 2014-11-10 2018-02-23 魏子阳 With raised sealing swaging die vertical with the concrete works movement joint of reinforcing fiber
CN104328802A (en) * 2014-11-10 2015-02-04 张朝利 Concrete engineering cavity die skeleton and manufacturing method thereof
CN105484201A (en) * 2014-11-10 2016-04-13 苏州多固工程设计有限公司 Manufacturing method for cavity die framework of concrete engineering
CN106088591B (en) * 2014-11-10 2018-02-06 广东梁亮建筑工程有限公司 The vertical sealing swaging die of concrete works movement joint with projection
CN107604952A (en) * 2017-07-26 2018-01-19 上海市政工程设计研究总院(集团)有限公司 A kind of underpass spare interface construction excavated from the later stage
CN107653913A (en) * 2017-09-22 2018-02-02 上海宝冶集团有限公司 A kind of basement construction waterproof technology
CN112681393A (en) * 2020-12-28 2021-04-20 中国建筑第八工程局有限公司 Advanced water stop structure of bottom plate post-cast strip and construction method thereof
CN114809115A (en) * 2022-05-27 2022-07-29 中建八局第三建设有限公司 Force-transferring profiled steel post-cast strip shaped assembling interception construction method
CN115126006B (en) * 2022-06-30 2023-11-07 陕西帕源路桥建设有限公司 Post-pouring belt water stopping mechanism for house building construction
CN115126006A (en) * 2022-06-30 2022-09-30 陕西帕源路桥建设有限公司 Post-pouring belt water stopping mechanism for house building construction

Similar Documents

Publication Publication Date Title
CN203546762U (en) Triple waterproof advance water stop structure for post-cast strip
CN202689046U (en) Closed advanced water sealing post-cast strip
CN201217811Y (en) Advanced water-stop post-pouring zone of base exterior wall
CN103410175B (en) A kind of water seepage control construction method for karst water-rich geological underground structure waterproof construction
CN104179417A (en) Installation method for energy-saving steel-plastic auxiliary frames and doors/windows
CN103774800B (en) A kind of method of building ecological Roof system and ecologic roof system architecture
CN210066671U (en) Novel rectangular gallery structure
CN201581510U (en) Advanced water-stop post-pouring belt of foundation slab
CN106978823A (en) Outer wall of basement advanced water-stop post-pouring zone construction method
CN203755495U (en) Mounting construction structure at prefabricated wall plate horizontal seam connecting portion
CN201593204U (en) Water-proof drainage structure of basement external wall water back face
CN204532364U (en) Tunneling boring rock tunnel development machine engineering method subway tunnel pressure release type liner structure
CN206487057U (en) A kind of Novel distribution box shell of concealed installation in filling within the walls
CN104234089B (en) The construction method that a kind of basement guarded drainage combines
CN209145323U (en) Balcony is transformed in the low energy consumption of existing building
CN203270627U (en) Construction joint structure of shear wall
CN202689047U (en) Waterproof structure applied to construction joint in fabricated tube section of immersed tube
CN206554318U (en) Wall is built in a kind of room
CN103572786B (en) A kind of pile crown node waterproof treating apparatus and construction method thereof
CN206346308U (en) A kind of construction for facilitating structure base slab post-cast strip to clear up
CN203977451U (en) Electric power overhaul well
CN203613522U (en) Easily-assembled-and-disassembled tunnel portal water-retaining device for power plant circulating water system
CN205000360U (en) Basement structure with waterproof structure
CN206205166U (en) It is a kind of can synchronous crossed construction outer wall of basement waterproofing protection structure
CN206769023U (en) A kind of outer wall of basement waterproof construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140416