CN209723051U CN201920235011.6U CN201920235011U CN209723051U CN 209723051 U CN209723051 U CN 209723051U CN 201920235011 U CN201920235011 U CN 201920235011U CN 209723051 U CN209723051 U CN 209723051U
Authority
CN
China
Prior art keywords
construction
construction joint
steel plate
sealing water
boats
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920235011.6U
Other languages
Chinese (zh)
Inventor
张家驹
梁森
李松晏
张明
张廷爱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Bureau First Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau First Construction Engineering Co Ltd filed Critical China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority to CN201920235011.6U priority Critical patent/CN209723051U/en
Application granted granted Critical
Publication of CN209723051U publication Critical patent/CN209723051U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides a kind of basement bottom plate rear pouring tape construction joint optimization processing structure, steel plate for sealing water is transversely fixed at construction joint, one end of steel plate for sealing water is embedded in advance in first pouring concrete position, the other end extends in rear pouring concrete position, the wooden a tree, used in making timber for boats is also respectively provided with above and below steel plate for sealing water, the wooden a tree, used in making timber for boats is located at construction joint and is arranged along the length direction of construction joint, and the side of the wooden a tree, used in making timber for boats is embedded in advance in first pouring concrete position.It is many and diverse to solve post empiricism, either it will affect construction speed in construction time or post-cast strip process phase, post-cast strip could should generally be closed after 60 days, various rubbish and sundries are inevitably dropped into during this period, since reinforcing bar is intensive, cleaning work is extremely difficult, and construction quality certainly will completely not influenced by clearing up.This construction method can reduce construction joint quantity, avoid post empiricism many and diverse and increase percolation-proof effect.Belong to foundation of civil work technical field of construction.

Description

A kind of basement bottom plate rear pouring tape construction joint optimization processing structure
Technical field
The utility model relates to a kind of basement bottom plate rear pouring tape construction joints to reduce infiltration hidden danger optimization processing structure, belong to Foundation of civil work technical field of construction.
Background technique
Currently, part engineering basement bottom board belongs to Super Large concrete structure, some construction areas about 40,000 are flat Square rice has enough flowing water sections, and the temperature and humidity that underground engineering is born in construction changes greatly, in such construction environment In, the temperature stress occurred in the construction stage is much larger than the tensile capacity of concrete material, fully relies on concrete itself by anti- Method be difficult it is anti-live, should take " anti-to put simultaneous apply ", " first put and resist afterwards ", the method for last " based on resisting ".This explanation Underground engineering environmental condition is most suitable for " jumping storehouse method " construction.Using the construction of storehouse method is jumped, i.e., overall structure is pressed construction joint segmentation, every One section is poured one section (one section of tripping is poured one section), through being no less than the 7d time fill out again pour it is integral.It can avoid with the construction of this scheme The fierce temperature difference and drying shrinkage action of a part of During Initial Stage Construction, a large amount of temperature dilation matrices for cutting down construction period, effectively control are split Seam, moreover it is possible to accelerate construction progress.The sealing tongue and groove for increasing by 80 × 80mm of twice is maximized in conjunction with steel plate for sealing water, high ribbed formwork and is reduced Seep water hidden danger, but it is many and diverse to pour belt construction, either will affect construction speed, post-cast strip one in construction time or post-cast strip process phase As could should close after 60 days, inevitably drop into various rubbish and sundries during this period, since reinforcing bar is intensive, cleaning It works extremely difficult, and construction quality certainly will completely not influenced by clearing up.
Summary of the invention
The purpose of this utility model is that: a kind of basement bottom plate rear pouring tape construction joint optimization processing structure is provided, with solution Certainly post empiricism is many and diverse, either will affect construction speed in construction time or post-cast strip process phase, and post-cast strip generally should be It could be closed after 60 days, inevitably drop into various rubbish and sundries during this period, since reinforcing bar is intensive, cleaning work phase Work as difficulty, and construction quality certainly will completely not influenced by clearing up.This construction method can reduce construction joint quantity, and post-cast strip is avoided to apply Work is many and diverse and increases percolation-proof effect.
To solve the above problems, such a basement bottom plate rear pouring tape construction joint optimization processing structure of proposed adoption, construction Steel plate for sealing water is transversely fixed at seam, one end of steel plate for sealing water is embedded in advance in first pouring concrete position, and the other end pours after extending to The wooden a tree, used in making timber for boats is also respectively provided in concrete position, above and below steel plate for sealing water, the wooden a tree, used in making timber for boats is located at construction joint and along construction joint Length direction setting, the side of the wooden a tree, used in making timber for boats is embedded in advance in first pouring concrete position.
In aforementioned construction joint optimization processing structure, the steel plate for sealing water by 8 bar spacing 30cm of Φ with upper and lower level steel Muscle is welded and fixed;
In aforementioned construction joint optimization processing structure, the spreading of steel plate for sealing water uses overlap welding mode, lap of splice 5cm.
Compared with prior art, the utility model structure is simple, easy for construction, solves that post empiricism is many and diverse to ask Topic, meanwhile, the method is combined with jump storehouse method, over length mass concrete is divided into several fritters of 40m*40m or so, every one Block pours one piece, and in each piece, once-pouring of concrete is completed, and adjacent two block concrete pours time interval and is no less than 7d, Adjacent storehouse flank side surface makes New-old concrete combine closely using steel plate water stopper and painted concrete interfacial agents, after cancelling tradition Band is poured, i.e., original two construction joints in post-cast strip position become one, therefore can effectively reduce construction joint quantity, and then reduce total Post-cast strip handle the time, lifting construction efficiency reduces difficulty and the time of cleaning task afterwards, guarantees construction quality.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Specific embodiment
To keep the purpose of this utility model, technical solution and advantage clearer, the utility model will be made into one below The detailed description of step.
Embodiment:
Referring to attached drawing 1, the present embodiment provides a kind of basement bottom plate rear pouring tape construction joint optimization processing structure, at construction joint It is transversely fixed with steel plate for sealing water 1, one end of steel plate for sealing water 1 is embedded in advance in first pouring concrete position 2, and the other end pours mixed after extending to In solidifying soil position 3, steel plate for sealing water 1 is fixed by 8 bar spacing 30cm of Φ with upper and lower level reinforcement welding, and steel plate for sealing water 1 connects Long to use overlap welding mode, lap of splice 5cm is also respectively provided with the wooden a tree, used in making timber for boats of 80 × 80mm above and below steel plate for sealing water 1 4, the wooden a tree, used in making timber for boats 4 is located at construction joint and is arranged along the length direction of construction joint, and the side of the wooden a tree, used in making timber for boats 4 is embedded in first pouring concrete position 2 in advance It is interior, the wooden a tree, used in making timber for boats 4 is removed after the completion of pouring and forms 80 × 80mm of twice sealing tongue and groove, reduces infiltration hidden danger, and in Fig. 1, appended drawing reference 5 is 18 thick templates.
Construction joint carries out dabbing processing after demoulding, and interface is made to form rough surface, mentions for casting concrete next time For ideal joint surface, makes conjunction old and new concret at firm entirety, greatly increase seam quality, improve and connect Leakage resistance energy at seam.
Above embodiments are only to illustrate rather than limit the technical solution of the utility model, although referring to above-described embodiment pair The utility model is described in detail, it will be apparent to an ordinarily skilled person in the art that: still can to the utility model into Row modification or equivalent replacement should all without departing from any modification or partial replacement of the spirit and scope of the utility model Cover in the scope of the claims of the utility model.

Claims (3)

1. a kind of basement bottom plate rear pouring tape construction joint optimization processing structure, it is characterised in that: be transversely fixed at construction joint Steel plate for sealing water (1), one end of steel plate for sealing water (1) are embedded in advance in first pouring concrete position (2), and the other end extends to rear pouring concrete portion It in position (3), is also respectively provided with above and below steel plate for sealing water (1) the wooden a tree, used in making timber for boats (4), the wooden a tree, used in making timber for boats (4) is located at construction joint and edge is applied The length direction setting of work seam, the side of the wooden a tree, used in making timber for boats (4) is embedded in advance in first pouring concrete position (2).
2. a kind of basement bottom plate rear pouring tape construction joint optimization processing structure according to claim 1, it is characterised in that: described Steel plate for sealing water (1) is fixed by 8 bar spacing 30cm of Φ with upper and lower level reinforcement welding.
3. a kind of basement bottom plate rear pouring tape construction joint optimization processing structure according to claim 1, it is characterised in that: sealing The spreading of steel plate (1) uses overlap welding mode, lap of splice 5cm.
CN201920235011.6U 2019-02-25 2019-02-25 A kind of basement bottom plate rear pouring tape construction joint optimization processing structure Expired - Fee Related CN209723051U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920235011.6U CN209723051U (en) 2019-02-25 2019-02-25 A kind of basement bottom plate rear pouring tape construction joint optimization processing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920235011.6U CN209723051U (en) 2019-02-25 2019-02-25 A kind of basement bottom plate rear pouring tape construction joint optimization processing structure

Publications (1)

Publication Number Publication Date
CN209723051U true CN209723051U (en) 2019-12-03

Family

ID=68683886

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920235011.6U Expired - Fee Related CN209723051U (en) 2019-02-25 2019-02-25 A kind of basement bottom plate rear pouring tape construction joint optimization processing structure

Country Status (1)

Country Link
CN (1) CN209723051U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109736357A (en) * 2019-02-25 2019-05-10 中建四局第一建筑工程有限公司 A kind of basement bottom plate rear pouring tape construction joint optimization processing structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109736357A (en) * 2019-02-25 2019-05-10 中建四局第一建筑工程有限公司 A kind of basement bottom plate rear pouring tape construction joint optimization processing structure

Similar Documents

Publication Publication Date Title
CN106677049B (en) Assembled steel-concrete combined structure bridge and construction method
CN204000956U (en) A kind of basement bottom plate rear pouring tape structure
CN109457993A (en) A kind of concrete column restoring and fastening method
CN108638324A (en) A kind of construction method of prefabricated case beam
CN103981798A (en) Novel articulated prefabricated hollow slab girder bridge hinge joint connector and construction method thereof
CN107013040A (en) The construction method of floor is poured after a kind of sleeve built-in type
CN103615053A (en) Construction method for post-cast belt of cast-in-place reinforced concrete structure
CN108708300A (en) A kind of loss of weight carries the Reinforcing Double-curve Arch Bridge method for maintaining of load extension durability
CN104631513A (en) Construction method for closing basement exterior wall post-cast strip
CN104674660A (en) Novel hollow plate hinge joint structure and construction method thereof
CN106437034A (en) Steel tube and semi-prefabricated semi-cast-in-place construction waste recycled concrete combined column and preparation method thereof
CN108951399A (en) A kind of Single-box multi-chamber box beam bridge and its construction method
CN109577377A (en) Basement post-pouring zone structure and its construction method
CN106193588A (en) A kind of method pouring building post-cast strip and pour mould
CN209261010U (en) It is a kind of to exempt to tear open the composite floor that bottom plate and steel bar girder form by UHPC
CN109707052A (en) Assembled beam and plate connecting node
CN106088657A (en) The ruggedized construction of a kind of rowlock wall body and construction method thereof
CN209723051U (en) A kind of basement bottom plate rear pouring tape construction joint optimization processing structure
CN106436732A (en) Reinforcing method and reinforcing structure for replacing strip foundations by raft foundations
CN110344844A (en) A kind of track engineering section of track well construction method
CN106638486A (en) Stage construction method for diaphragm wall and gallery of high-core rock-fill dam
CN204491412U (en) A kind of hollow sheet hinge crack structure
CN109469242A (en) A kind of profiled sheet-regeneration concrete composite floor and its construction method
CN109736357A (en) A kind of basement bottom plate rear pouring tape construction joint optimization processing structure
CN106917358B (en) A kind of cable-stayed bridge main-beam combination constructing method thereof and its counter weight construction system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191203