CN1073185C - 用于制备混凝土墙的模板 - Google Patents

用于制备混凝土墙的模板 Download PDF

Info

Publication number
CN1073185C
CN1073185C CN 97192602 CN97192602A CN1073185C CN 1073185 C CN1073185 C CN 1073185C CN 97192602 CN97192602 CN 97192602 CN 97192602 A CN97192602 A CN 97192602A CN 1073185 C CN1073185 C CN 1073185C
Authority
CN
China
Prior art keywords
template
wall
hinged
connector
length
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 97192602
Other languages
English (en)
Other versions
CN1214098A (zh
Inventor
弗朗索瓦·多龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Plami Consultation Service S.A.
Original Assignee
PLAMI CONSULTATION SERVICE SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PLAMI CONSULTATION SERVICE SA filed Critical PLAMI CONSULTATION SERVICE SA
Publication of CN1214098A publication Critical patent/CN1214098A/zh
Application granted granted Critical
Publication of CN1073185C publication Critical patent/CN1073185C/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/86Walls made by casting, pouring, or tamping in situ made in permanent forms
    • E04B2/8635Walls made by casting, pouring, or tamping in situ made in permanent forms with ties attached to the inner faces of the forms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Building Environments (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
  • Moulds, Cores, Or Mandrels (AREA)

Abstract

一种模板,包括两个面对面设置的,由铰接连接件连接的模板壁3;绞接连接件由弯折成锯齿状的长短杆组件(7A)组成;每一组件设有呈交错排列的相对部分6,每一相对部分的两边有沿相反方向倾斜的拉杆4A连接着,所有连接件的交错排列相对部分6互相平行,并最好用固定件5,12与模板壁3连接,以便只有一个转动自由度;铰接连接件在浇灌混凝土中产生垂直于模板面平行于墙外面的压力,从而产生能增加墙强度的箍圈作用。

Description

用于制备混凝土墙的模板
本发明涉及一种模板,它包含有两个面对面设置的模板壁,该模板壁由铰接的连接件连接,使得模板壁能保持连接状态,以便或者使模板壁相隔一定间距,从而接收填充材料,例如混凝土;或者使模板壁合拢,以便储存或运输。
本发明也涉及将模板弃放在墙中而制备的墙。
为了建造混凝土墙,传统作法是利用界定出一定容积的模板,在该容积中浇灌混凝土。这些模板一般包含有:两个面对面设置的模板壁,两壁之间确定出一定的间隔,在该间隔中引入混凝土;以及连接装置,用来使模板壁保持在所要求的间隔位置上。为了保持住模板壁,一般是利用例如联杆来实现,联杆的端部支撑在面对面设置的模板面上,联杆又被支撑在模板壁外面上的锁定件所横穿。
当混凝土凝固时,回收模板,取出锁定件。埋入混凝土中的联杆不再起什么作用,可以留在墙中或取出,联杆不会增加墙的强度,而且相反还会使墙脆弱。
实质上是混凝土的质量决定了墙的强度。为了增加混凝土墙的强度,众所周知一般利用弃放式模板,模板的密封壁或渗透壁就构成墙的表面。这些壁经常作为波浪形,使墙面锚定在混凝土中。人们把这种模板叫做合作模板。由这种方式制备的最终复合结构的强度是混凝土强度和由模板构成的墙面强度两者的迭合。
这些模板壁之间局部位置上用联杆连接,联杆由可回收的锁定件横穿或由其端部锚定在所述模板面的扣紧件所横穿。这些扣紧件基本沿与模板面成正交的方向上伸展。在这种情况下,模板壁和连接模板壁的扣紧件共同合作来增强混凝土墙的结构。根据扣紧件的种类,可以采用热法和机械法将两模板壁拆开。
法国专利FR-A-2675181公开了上述那种模板。铰接的连接件使组装操作量减少,并使模板安装就位工作变容易,同时又能保证模板强度,使其符合生产和安全标准,而其结构重量是轻的。
本发明所要获得的结果之一就是上述种类的模板,该模板使得所获得的混凝土墙的强度进一步增加。
为此,本发明的目的是提供一种模板,该模板包括有两面对面设置的模板壁,而模板壁由铰接的连接件连接,使得模板壁能保持连接状态,以便或者使模板壁相隔一定间距,从而接收填充材料,例如混凝土;或者使模板壁合拢,以便储存或运输。
根据本发明,铰接的连接件由弯折成锯齿状的长短杆组件组成。每一个弯折的长短杆组件设有呈交错排列形式相对部分,每一相对部分的两边都有沿相反方向倾斜的拉杆连接着。所有的长短杆组件的短连接件的交错排列相对部分互相平行,并铰接在模板壁上,最好用一种固定方式来铰接,这种方式使得只在围绕所述相对部分形成的铰接轴线作转动的方向上有自由度。
采用这种模板,连接件同时在填充材料上产生:
——一方面,取向与模板面垂直的压力,和
——另一方面,取向与所述墙的外面基本平行的压力,以便形成一个起箍圈作用的墙面。
本发明也涉及将模板弃放在墙中而制备的墙,特别是混凝土墙,模板中的铰接连接件在它们起到使模板便于运输和安排的作用之后,并且在模板安装就位后,就形成能明显增加所述墙强度的箍紧作用,这是因为其构形和其特别的排列确保了上述墙中力的分布。
本发明其他特征将在本发明权利要求书中得以展示。
附图简要说明
通过随后结合附图对实施例所作的说明,本发明将得到更好的理解,这些示意性的附图是:
图1和图2是引入填充材料之前弃放模板的俯视图;
图3是并排安置的两弃放模板的俯视图;
图4是弃放模板变化实施例;
图5和图6是连接装置的两个变化实施例。
最佳实施例
现参阅附图,从图中看到,为了建造混凝土墙1,人们利用弃放在墙中的合作模板2。通常,该模板2包括两个模板壁3,它们由铰接的连接机构4保持在一所要求间隔的位置上。
连接机构4通过垂直的加强肋5铰接在各模板壁3上。这种铰接使得模板壁3或者可以保持所要求的间隔,或者可以合拢以便储存和运输,从而方便模板的安置。
这些模板壁3最好由栅格构成,栅格的网孔是为了排除混凝土多余水分而确定的。它可能涉及设有垂直加强肋的展开金属壁板。加强肋5例如通过形成锁钩的卡板件固定在模板壁3上。
如图4所示,这些铰接的连接件4同时在填充材料上产生:
——一方面,取向与模板面3垂直的压力F,和
——另一方面,取向与所述墙的外面基本平行的压力G,以便形成一个起箍圈作用的墙面。这样连接件就在混凝土中构成箍圈。
所以,在用流动材料(例如混凝土)填充模板壁3之间的空间时,流动材料产生流体静压力,这种静压力会由于模板壁3的渗透性变弱而增大。这压力成为作用在模板壁3上的拉应力,拉应力通过反作用引起了:
-在连接件4中的拉应力,
-在模板壁3中的纵向压应力。
这些应力一直保持到填充材料硬化为止。它起预应力结构的作用。在填充材料凝固后,所有作用在墙上的过载引起了在混凝土或其他填充材料中的压力。这个在填充材料中的压力在该压力施力的方向上产生压应力,但一般在与此方向垂直的方向上产生拉应力。
由于混凝土是一种不抗拉应力的材料,连接结构可以克服这个困难。
实际上,在垂直模板壁3的方向上作用在混凝土上的拉应力为连接件4中的拉应力的反作用所平衡,并通过分解,产生一与模板壁3相切平行的压应力。
由于模板壁3通过加强肋5和连接结构4锚固在混凝土中,那么处于加强肋5之间的混凝土整体就处在压应力的作用下。因此,在墙受载时,结构4就能明显地改变墙内部的应力分布。实际上,沿纵轴线方向作用的负载所产生的压力越大,则作用在墙面3上的压应力也就越大,这就加大了箍紧效果。
如图3所示,连接结构4至少包含有两个拉杆4A,该拉杆沿相反方向倾斜,并位于垂直于模板面的中间面M的两边,拉杆4A的端部展示出拉杆4A与相应模板壁3连接的部分连接结构,它最好绕加强肋5而设并铰接在加强肋上,以排除所有其他的自由度,特别是平移的自由度。
因此,连接结构4之间通过相对的直部6连接起来,形成至少一拉杆组7。这个直部6基本上在平行于模板面的平面内伸展到一预定的长度,该预定的长度最好等于加强肋5的长度,以便在平移方向上将连接结构4和加强肋5连接起来。
拉杆组7是由弯折成锯齿状的长短杆组件(7A)构成,以便形成一列基本呈锯齿状的波浪形。长短杆组件(7A)的截面为圆形或多边形。
不管长短杆组件(7A)的截面是什么样的,在浇灌的混凝土加载作用下,垂直于所述的模板面作用着力,拉杆通过其设置将混凝土的静压力分布成:
-一方面,取向垂直于模板面的力,和
-另一方面,取向平行于前述所述面的力,该力如同箍圈一样强固了模板面。
这个作用通过在浇灌的混凝土的高部施一压力而进一步加强。实际上,所有倾向增加墙厚度的力都会在拉杆中引发出拉应力,而在墙位于拉杆端部之间的部分中引发出压应力。
墙就是通过多个并排设置的、前述那种单元模板10而建造起来。
为了确保力传递的连接性和有利于墙的总惯量,弯折成锯齿状的长短杆组件(7A)的长度要比组件在其中横穿伸展的模板10的壁板长度长,以便使超出的壁板端部7B能锚定在邻接的壁板上(见图3)。该端部7B与支撑在加强肋5上的锁钩作用一样。
或许至少有一些拉杆4A设有加热件(未示出),例如热敏电阻,以便形成一辐射壁。采用热敏电阻就可以释放热量,因而在模板壁之间形成势能差。
最好是,将加强肋5固定在模板壁3上的锁钩也将长短杆组件(7A)锁定在模板的壁板上。
根据本发明的特征,组件7A的部分6是通过固定件固定在模板壁3上的,只有单个自由度,绕平行于模板面平面的轴线,垂直于加强肋5的垂直轴线作转动,而排除任何其他自由度。
在变化的实施例中,连接件的铰接部分可以作成角形来代替已有的直线部分6,如图3虚线所示,该铰接部分铰接在垂直加强肋5的中部,或减小尺寸的加强肋5′中部,或铰接在呈楔形物的垂直加强肋5″的后面。
为了确保在声学上和力学上能摘开,连接结构4是通过一种弹性材料12,例如橡胶(图4)而固定在模板壁上的。
为了改善力的传递,弯折在之字形的四肢长躯干短组件7A所形成的波浪形,其波峰6与增大模板惯量的短件13连在一起(见图5和图6)。借助该短件13,可以很容易地使弯折成锯齿状的长短杆组件(7A)以及模板壁具有一被记忆拱形,同时使另一纵向件连接在组件7A的相对面上来实现(见图5)。因此,确定组件7A从一侧到另一侧不同间距就使展开的长度不相同,于是这就形成了模板的曲线面(见图5)。
模板壁板的连接件4例如可以排成列,其波浪形的波峰对齐(见图2),或两连接件4呈交错排列,以便波浪形的波峰岔开。这样就构成一个三维连接。

Claims (13)

1、一种用于制备混凝土墙的模板,该模板包括有两面对面设置的模板壁(3),而模板壁由铰接的连接件连接,使得模板壁(3)能保持连接状态,以便或者使模板壁相隔一定的接收填充材料的间距;或者使模板壁呈现便于储存或运输的合拢,其特征在于铰接的连接件由弯折成锯齿状的长短杆组件(7A)组成,每一个弯折的长短杆组件(7A)设有呈交错排列形式相对部分(6),每一所述相对部分(6)的两边都有沿相反方向倾斜的拉杆(4A)连接着,所有长短杆组件(7A)的交错排列相对部分(6)互相平行,并与模板壁(3)连接。
2、根据权利要求1所述的模板,其特征在于连接件是通过固定件(5,12)铰接在模板壁(3)上,并且只有一个转动自由度。
3、根据权利要求1所述的模板,其特征在于弯折成锯齿状的长短杆组件(7A)形成一列基本成锯齿状的波浪形。
4、根据权利要求1所述的模板,其特征在于弯折成锯齿状的长短杆组件(7A)的长度大于组件在其中横穿伸展的模板(10)的壁板长度,以便使超出的端部(7B)能锚定在邻接的壁板上。
5、根据权利要求1所述的模板,其特征在于至少有一根拉杆(4A)设有加热元件。
6、根据权利要求1所述的模板,其特征在于拉杆(4A)通过一种弹性材料(12)来固定在模板壁(3)上。
7、根据权利要求1所述的模板,其特征在于至少弯折成锯齿状的长短杆组件(7A)一侧的波浪形波峰与增大模板惯量并确定模板几何形状的短件(13)连在一起。
8、根据权利要求1所述的模板,其特征在于纵向连接件(7A)是铰接在与模板壁(3)连接在一起的垂直加强肋(5)上的。
9、根据权利要求8所述的模板,其特征在于纵向连接件(7A)设有两个相对直线部分(6),该直线部分安置在垂直加强肋(5)和模板壁之间。
10、根据权利要求1所述的模板,其特征在于倾斜的拉杆(4A)相对于一中间平面(M)呈对称设置。
11、根据权利要求1所述的模板,其特征在于模板设有两个互相相对岔开的长短杆组件(7A),以便其呈交错的相对部分(6)能面对面的设置。
12、根据权利要求1所述的模板,其特征在于模板壁(3)是形成栅格的展开金属壁板,栅格上设置用于排除部分填充材料的网孔。
13、前述任何一个权利要求所述的模板用于墙体,所述的模板弃放式地包含其中,所述的模板的连接件同时产生取向与模板面垂直和平行的压力对填充材料起箍圈作用而形成的墙面。
CN 97192602 1996-02-26 1997-02-25 用于制备混凝土墙的模板 Expired - Fee Related CN1073185C (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR96/02579 1996-02-26
FR9602579A FR2745315B1 (fr) 1996-02-26 1996-02-26 Procede de realisation d'un mur en beton coule entre deux parois collaborantes et moyens pour la mise en oeuvre du procede

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CNB011181567A Division CN1141473C (zh) 1996-02-26 1997-02-25 用于制备混凝土墙的模板

Publications (2)

Publication Number Publication Date
CN1214098A CN1214098A (zh) 1999-04-14
CN1073185C true CN1073185C (zh) 2001-10-17

Family

ID=9489744

Family Applications (2)

Application Number Title Priority Date Filing Date
CN 97192602 Expired - Fee Related CN1073185C (zh) 1996-02-26 1997-02-25 用于制备混凝土墙的模板
CNB011181567A Expired - Fee Related CN1141473C (zh) 1996-02-26 1997-02-25 用于制备混凝土墙的模板

Family Applications After (1)

Application Number Title Priority Date Filing Date
CNB011181567A Expired - Fee Related CN1141473C (zh) 1996-02-26 1997-02-25 用于制备混凝土墙的模板

Country Status (9)

Country Link
EP (1) EP0883719B1 (zh)
CN (2) CN1073185C (zh)
AU (1) AU1615897A (zh)
BR (1) BR9707678A (zh)
DE (1) DE69703033D1 (zh)
ES (1) ES2152080T3 (zh)
FR (1) FR2745315B1 (zh)
TR (1) TR199801667T2 (zh)
WO (1) WO1997031165A1 (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103981981A (zh) * 2014-03-31 2014-08-13 浙江杭萧钢构股份有限公司 一种波浪形钢筋连接的双钢板混凝土组合剪力墙
CN111705972A (zh) * 2020-06-22 2020-09-25 舒长青 一种免拆彩塑建筑模板及其使用方法

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2800112B1 (fr) * 1999-10-22 2002-05-24 Philippe Durand Armature pour paroi en beton
FR2805555B1 (fr) 2000-02-26 2003-05-02 Guy Robert Henri Sarremejeanne Coffrage perdus alveolaires pour la construction de murs et de planchers et procedes de fabrication et de mise en oeuvre desdits coffrages
EP1207240A1 (fr) 2000-11-13 2002-05-22 Pumila-Consultadoria e Servicios Ltda. Mur en beton avec coffrage servant aussi d'armature
CN100443680C (zh) * 2001-09-21 2008-12-17 大连理工大学 蜂窝状模网
WO2005042864A1 (fr) * 2003-11-03 2005-05-12 Polyfinance Coffor Holding S.A. Coffrage à résistance élevée pour mur en béton
CN1303296C (zh) * 2003-12-01 2007-03-07 杨爱华 非承重建筑模网
CN1325734C (zh) * 2005-10-17 2007-07-11 朱秦江 复合保温隔热混凝土墙体及其装配式模板
EP1972734A1 (de) * 2007-03-22 2008-09-24 Iconorm GmbH Fixierkörper für eine Dämmplatte
FR2945305A1 (fr) * 2009-05-05 2010-11-12 Philippe Phliponeau Module d'espacement pour coffrage et mur incorporant un tel module
CN102936958B (zh) * 2012-11-26 2014-09-03 成都市第六建筑工程公司 工具式支架定位混凝土楼板上部钢筋的施工方法
RU2561135C2 (ru) * 2013-12-17 2015-08-20 Сергей Михайлович Анпилов Комплект несъемной опалубки, способ ее сборки и способ возведения монолитных стен здания и сооружения в несъемной опалубке из модульных элементов
CN105780967A (zh) * 2016-04-27 2016-07-20 合肥工业大学 一种腹板波形筋拉结花纹钢板混凝土复合预制墙
EP3263794A1 (fr) 2016-07-01 2018-01-03 Coffor Holding S.A. Panneau pour coffrage
CN106437138A (zh) * 2016-09-30 2017-02-22 沈阳建筑大学 一种装配式墙体模板
CN108708485B (zh) * 2018-05-19 2019-12-31 高建芳 一种预制混凝土装配式墙板的安装结构
TWI678453B (zh) * 2018-09-12 2019-12-01 陳鴻椿 牆的模板裝置及製作工法
CN110607853A (zh) * 2019-09-25 2019-12-24 金国洪 一种保护建筑的防火复合墙体
CN111691575A (zh) * 2020-06-30 2020-09-22 方志兰 一种加固型装配式轻质隔墙板

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2389238A (en) * 1940-12-20 1945-11-20 Phillips William Arthur Composite structure and structural element
DE1484271A1 (de) * 1963-05-24 1969-05-08 Klaue Hermann Bauplatten und Verbindungsglieder zur Anfertigung von Gebaeudemauern
FR1605055A (zh) * 1963-11-25 1973-01-12
ATE57221T1 (de) * 1984-04-06 1990-10-15 Gruber Eva Maria Stahlbetondecke.
US5528876A (en) * 1994-05-09 1996-06-25 Lu; Sin-Yuan Wall structure for buildings

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103981981A (zh) * 2014-03-31 2014-08-13 浙江杭萧钢构股份有限公司 一种波浪形钢筋连接的双钢板混凝土组合剪力墙
CN111705972A (zh) * 2020-06-22 2020-09-25 舒长青 一种免拆彩塑建筑模板及其使用方法

Also Published As

Publication number Publication date
DE69703033D1 (de) 2000-10-12
EP0883719A1 (fr) 1998-12-16
BR9707678A (pt) 2000-01-04
AU1615897A (en) 1997-09-10
CN1141473C (zh) 2004-03-10
TR199801667T2 (xx) 1998-12-21
CN1346919A (zh) 2002-05-01
CN1214098A (zh) 1999-04-14
WO1997031165A1 (fr) 1997-08-28
ES2152080T3 (es) 2001-01-16
FR2745315B1 (fr) 1998-05-15
EP0883719B1 (fr) 2000-09-06
FR2745315A1 (fr) 1997-08-29

Similar Documents

Publication Publication Date Title
CN1073185C (zh) 用于制备混凝土墙的模板
CA2463630C (en) Indirectly prestressed, concrete, roof-ceiling construction with flat soffit
CN1231013A (zh) 纤维包混合结构建筑系统
US6832454B1 (en) Beam filled with material, deck system and method
US4125979A (en) Construction unit
JP2001524175A (ja) 建築要素
US20020026765A1 (en) Structural members
US6581352B1 (en) Concrete composite structural system
US20080172973A1 (en) System for reinforcing a building structural component
CN1623024A (zh) 用于极大跨度的具有网格状平底面的双预应力屋顶-顶棚结构
JP4022205B2 (ja) 部材の接合構造
JP3030695B2 (ja) 三次元拘束コンクリ−ト構造部材のパイプア−チ橋梁
CN2621197Y (zh) 免拆除建筑模网
CA2229589A1 (en) A dry-pack method of recycling organic fibre and other polymeric materials into building blocks
CN114086720B (zh) 一种frp筋增强grc的建筑承重装置及方法
GB2287968A (en) Reinforced structural member
CN105452578A (zh) 结构框架
Balsamo et al. The use of aramidic fibres to improve the structural behaviour of masonry structures under seismic actions
RU73364U1 (ru) Строительный элемент
CN221232811U (zh) 加筋保温墙板、工装和建筑
GB2119826A (en) Reinforcement for concrete joints
CN2365143Y (zh) 梁柱连接紧固组合式包装箱
RU52037U1 (ru) Предварительно напряженная каркасная вантовая сборная арочная конструкция
Kaneko et al. Simple column-beam joint of steel structures employing steel fiber reinforced cementitious composite. Experimental verification on structural performance of joint.
GB2027478A (en) Beams or lintels

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: TECHNOPARK LTD. TO: PLAMI CONSULTATION SERVICE S.A.

CP03 Change of name, title or address

Address after: Madeira International Airport

Applicant after: Plami Consultation Service S.A.

Address before: Dublin

Applicant before: Technopark Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Dalian Huacheng DIPY construction formwork Co. Ltd.

Assignor: PUMILA-CONSULTADORLA E SERVICOS LDA

Contract record no.: 200210119

Denomination of invention: Formwork for preparing concrete wall

Granted publication date: 20011017

License type: Exclusive

Record date: 2002.8.19

LIC Patent licence contract for exploitation submitted for record

Free format text: LICENCE

Name of requester: DALIAN HUA CHENG DI PI CONSTRUCTION FORMWORK CO.,

Effective date: 20020819

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20011017

Termination date: 20100225