EP0883719A1 - Coffrage pour la realisation d'un mur en beton - Google Patents
Coffrage pour la realisation d'un mur en betonInfo
- Publication number
- EP0883719A1 EP0883719A1 EP97902538A EP97902538A EP0883719A1 EP 0883719 A1 EP0883719 A1 EP 0883719A1 EP 97902538 A EP97902538 A EP 97902538A EP 97902538 A EP97902538 A EP 97902538A EP 0883719 A1 EP0883719 A1 EP 0883719A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- formwork
- walls
- formwork according
- folded
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/84—Walls made by casting, pouring, or tamping in situ
- E04B2/86—Walls made by casting, pouring, or tamping in situ made in permanent forms
- E04B2/8635—Walls made by casting, pouring, or tamping in situ made in permanent forms with ties attached to the inner faces of the forms
Definitions
- the invention relates to a formwork comprising two formwork walls placed opposite and connected by articulated connecting elements making it possible to hold the walls, or to a spacing defining a gap intended to receive a filling material such as concrete, either folded for storage and transport.
- formwork which delimits a volume into which concrete is poured.
- these forms comprise: two walls placed opposite, defining between them an interval into which concrete is introduced, and connecting devices maintaining the walls at one required spacing.
- spacers the ends of which come to bear on the shuttering faces arranged opposite, and these struts are crossed by blocking parts bearing on the external faces of the shuttering walls.
- a formwork of the aforementioned type is known from patent FR-A-2 675 181.
- the articulated connecting elements make it possible to reduce the number of assembly operations, and to facilitate the installation of the formwork while retaining its strength and its compliance with safety and manufacturing standards, this with a light structure.
- One of the results which the invention aims to obtain is a formwork of the aforementioned type which makes it possible to further increase the resistance of the concrete walls obtained.
- the invention relates to a formwork comprising two formwork walls placed opposite and connected by articulated connecting elements making it possible to hold the walls, ie at a spacing defining a gap intended to receive a material for filling such as concrete, be folded up for storage and transport.
- the articulated connecting elements consist of elongated folded elements noticeably zigzag.
- Each elongated element folded comprises opposite staggered parts connected by tie rods inclined in opposite directions on either side of each of the opposite parts.
- the opposite alternating parts of all the elongate connecting elements are aligned parallel to each other and are articulated to the walls, preferably by fixing means allowing a single degree of freedom in rotation around articulation axes formed by said parts. opposite.
- the invention also relates to a wall, in particular of concrete, incorporating this lost formwork, the articulated connecting elements of which, after having been used initially to facilitate the transport and the installation of the formwork, constitute, once the formwork is installed, a hooping substantially increasing the resistance of the wall, this thanks to their shape and their particular arrangement ensuring the distribution of forces within the wall described above.
- FIG. 1 and 2 top views of a lost formwork before introduction of the filling material
- - Figure 3 top view of two lost forms arranged side by side;
- this formwork 2 comprises two formwork walls 3 maintained at the spacing required by at least one articulated connection device 4.
- This connecting device 4 is articulated with each of the formwork walls 3 by means of vertical stiffeners 5. This articulation makes it possible to maintain the walls 3 either at the required spacing (as illustrated in the Figures), or folded up for storage and transport , thus facilitating the installation of the formwork.
- These formwork walls 3 will advantageously consist of a trellis whose meshes are determined to remove excess water from the concrete. They may be expanded metal panels provided with vertical stiffeners. The stiffeners 5 are for example fixed to the walls 3 using lugs forming hooks.
- the filling material hardens. It acts as a prestressing device. After setting it, any overloads on the wall determine a pressure in the concrete or other filling material. This pressure generates, in the filling material, compressive stresses in the direction in which this pressure is exerted, but generally tensile stresses in a direction perpendicular to this direction.
- connection device overcomes this difficulty.
- the tensile forces exerted on the concrete and in a direction perpendicular to the walls 3 induce equilibrium by reaction of the tensile forces in the connecting piece 4 and, by decomposition, a tangential compression force and parallel to the walls 3.
- the device 4 makes it possible to modify considerably the distribution of stresses inside the walls, when the latter are loaded. In fact, the higher the pressure which results from the load exerted along a longitudinal axis, the more the compressive stress on the skin 3, therefore the hooping effect, increases.
- the connecting device 4 comprises at least two tie rods 4A inclined in opposite directions on either side of a median plane M orthogonal to the shuttering faces, and the ends of these tie rods 4A have a fraction of the means connecting the tie rods 4A with the corresponding formwork wall 3, preferably surrounding the stiffener 5 and articulated thereon to the exclusion of any other degree of freedom, especially in translation.
- the connecting devices 4 are joined together by opposite straight parts 6 to form at least one group 7 of tie rods.
- This part 6 extends substantially in a plane parallel to the shuttering faces over a predetermined length and preferably equal to the width of the stiffener 5 in order to link in translation the device 4 for connection with the stiffener 5.
- This group 7 of tie rods is formed from a long element 7A folded substantially in a zigzag to form a series of waves substantially sawtooth.
- the section of this elongate element 7A is circular or polygonal.
- the wall is obtained using several elementary forms 10 of the aforementioned type arranged side by side.
- the length of the elongate element 7A folded in a zigzag is greater than the length of the formwork panel 10 through which it extends from so that the end 7B of a projecting panel can catch on the adjoining panel (see Figure 3).
- This end 7B will be shaped, for example, in the manner of a hook bearing on a stiffener 5.
- At least some tie rods 4A will optionally be provided with heating elements (not shown), such as thermistors to form a radiating wall.
- heating elements such as thermistors to form a radiating wall.
- the use of thermistors allows the generation of heat by creating a potential difference between the formwork walls.
- the part 6 of the element 7A is fixed to the shuttering wall 3 by fastening means with a single degree of freedom in rotation about an axis parallel to the plane of the shuttering faces, perpendicular to the vertical axis of the stiffeners 5 and to the exclusion of any other degree of freedom.
- the articulated parts of the connecting elements could be angled, as shown in dotted lines in FIG. 3, and articulated in the middle of a vertical stiffener of the type illustrated 5 or of reduced dimensions 5 ', or articulated behind 5 "wedge-shaped vertical stiffeners.
- connection devices 4 are fixed to the formwork walls using an elastic material 12 such as rubber ( Figure 4).
- the vertices 6 of the waves of the elongated element 7A folded in a zigzag are secured to a elongated piece 13 which reinforces the inertia of the formwork ( Figures 5 and 6).
- a elongated piece 13 which reinforces the inertia of the formwork.
- the connecting elements 4 of a formwork panel are for example arranged in a column with the top of their waves aligned ( Figure 2), or two connecting elements 4 are staggered ( Figure 1) so that the vertices of the waves are shifted. This constitutes a three-dimensional connection.
Abstract
Description
Claims
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR9602579 | 1996-02-26 | ||
FR9602579A FR2745315B1 (fr) | 1996-02-26 | 1996-02-26 | Procede de realisation d'un mur en beton coule entre deux parois collaborantes et moyens pour la mise en oeuvre du procede |
PCT/IB1997/000161 WO1997031165A1 (fr) | 1996-02-26 | 1997-02-25 | Coffrage pour la realisation d'un mur en beton |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0883719A1 true EP0883719A1 (fr) | 1998-12-16 |
EP0883719B1 EP0883719B1 (fr) | 2000-09-06 |
Family
ID=9489744
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP97902538A Expired - Lifetime EP0883719B1 (fr) | 1996-02-26 | 1997-02-25 | Coffrage pour la realisation d'un mur en beton |
Country Status (9)
Country | Link |
---|---|
EP (1) | EP0883719B1 (fr) |
CN (2) | CN1073185C (fr) |
AU (1) | AU1615897A (fr) |
BR (1) | BR9707678A (fr) |
DE (1) | DE69703033D1 (fr) |
ES (1) | ES2152080T3 (fr) |
FR (1) | FR2745315B1 (fr) |
TR (1) | TR199801667T2 (fr) |
WO (1) | WO1997031165A1 (fr) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2005042864A1 (fr) | 2003-11-03 | 2005-05-12 | Polyfinance Coffor Holding S.A. | Coffrage à résistance élevée pour mur en béton |
EP3263794A1 (fr) | 2016-07-01 | 2018-01-03 | Coffor Holding S.A. | Panneau pour coffrage |
Families Citing this family (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2800112B1 (fr) * | 1999-10-22 | 2002-05-24 | Philippe Durand | Armature pour paroi en beton |
FR2805555B1 (fr) | 2000-02-26 | 2003-05-02 | Guy Robert Henri Sarremejeanne | Coffrage perdus alveolaires pour la construction de murs et de planchers et procedes de fabrication et de mise en oeuvre desdits coffrages |
EP1207240A1 (fr) * | 2000-11-13 | 2002-05-22 | Pumila-Consultadoria e Servicios Ltda. | Mur en beton avec coffrage servant aussi d'armature |
CN100443680C (zh) * | 2001-09-21 | 2008-12-17 | 大连理工大学 | 蜂窝状模网 |
CN1303296C (zh) * | 2003-12-01 | 2007-03-07 | 杨爱华 | 非承重建筑模网 |
CN1325734C (zh) * | 2005-10-17 | 2007-07-11 | 朱秦江 | 复合保温隔热混凝土墙体及其装配式模板 |
EP1972734A1 (fr) * | 2007-03-22 | 2008-09-24 | Iconorm GmbH | Corps de fixation pour un panneau isolant |
FR2945305A1 (fr) * | 2009-05-05 | 2010-11-12 | Philippe Phliponeau | Module d'espacement pour coffrage et mur incorporant un tel module |
CN102936958B (zh) * | 2012-11-26 | 2014-09-03 | 成都市第六建筑工程公司 | 工具式支架定位混凝土楼板上部钢筋的施工方法 |
RU2561135C2 (ru) * | 2013-12-17 | 2015-08-20 | Сергей Михайлович Анпилов | Комплект несъемной опалубки, способ ее сборки и способ возведения монолитных стен здания и сооружения в несъемной опалубке из модульных элементов |
CN103981981A (zh) * | 2014-03-31 | 2014-08-13 | 浙江杭萧钢构股份有限公司 | 一种波浪形钢筋连接的双钢板混凝土组合剪力墙 |
CN105780967A (zh) * | 2016-04-27 | 2016-07-20 | 合肥工业大学 | 一种腹板波形筋拉结花纹钢板混凝土复合预制墙 |
CN106437138A (zh) * | 2016-09-30 | 2017-02-22 | 沈阳建筑大学 | 一种装配式墙体模板 |
CN108708485B (zh) * | 2018-05-19 | 2019-12-31 | 高建芳 | 一种预制混凝土装配式墙板的安装结构 |
TWI678453B (zh) * | 2018-09-12 | 2019-12-01 | 陳鴻椿 | 牆的模板裝置及製作工法 |
CN110607853A (zh) * | 2019-09-25 | 2019-12-24 | 金国洪 | 一种保护建筑的防火复合墙体 |
CN111705972A (zh) * | 2020-06-22 | 2020-09-25 | 舒长青 | 一种免拆彩塑建筑模板及其使用方法 |
CN111691575A (zh) * | 2020-06-30 | 2020-09-22 | 方志兰 | 一种加固型装配式轻质隔墙板 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2389238A (en) * | 1940-12-20 | 1945-11-20 | Phillips William Arthur | Composite structure and structural element |
DE1484271A1 (de) * | 1963-05-24 | 1969-05-08 | Klaue Hermann | Bauplatten und Verbindungsglieder zur Anfertigung von Gebaeudemauern |
FR1605055A (fr) * | 1963-11-25 | 1973-01-12 | ||
EP0164330B1 (fr) * | 1984-04-06 | 1990-10-03 | Eva Maria Dipl.-Ing. Gruber | Plancher en béton armé |
US5528876A (en) * | 1994-05-09 | 1996-06-25 | Lu; Sin-Yuan | Wall structure for buildings |
-
1996
- 1996-02-26 FR FR9602579A patent/FR2745315B1/fr not_active Expired - Fee Related
-
1997
- 1997-02-25 AU AU16158/97A patent/AU1615897A/en not_active Abandoned
- 1997-02-25 ES ES97902538T patent/ES2152080T3/es not_active Expired - Lifetime
- 1997-02-25 TR TR1998/01667T patent/TR199801667T2/xx unknown
- 1997-02-25 CN CN 97192602 patent/CN1073185C/zh not_active Expired - Fee Related
- 1997-02-25 EP EP97902538A patent/EP0883719B1/fr not_active Expired - Lifetime
- 1997-02-25 DE DE69703033T patent/DE69703033D1/de not_active Expired - Lifetime
- 1997-02-25 WO PCT/IB1997/000161 patent/WO1997031165A1/fr active IP Right Grant
- 1997-02-25 BR BR9707678-3A patent/BR9707678A/pt not_active IP Right Cessation
- 1997-02-25 CN CNB011181567A patent/CN1141473C/zh not_active Expired - Fee Related
Non-Patent Citations (1)
Title |
---|
See references of WO9731165A1 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2005042864A1 (fr) | 2003-11-03 | 2005-05-12 | Polyfinance Coffor Holding S.A. | Coffrage à résistance élevée pour mur en béton |
EP3263794A1 (fr) | 2016-07-01 | 2018-01-03 | Coffor Holding S.A. | Panneau pour coffrage |
WO2018002276A1 (fr) | 2016-07-01 | 2018-01-04 | Coffor Holding S.A. | Panneau pour coffrage |
Also Published As
Publication number | Publication date |
---|---|
TR199801667T2 (xx) | 1998-12-21 |
CN1346919A (zh) | 2002-05-01 |
CN1141473C (zh) | 2004-03-10 |
FR2745315B1 (fr) | 1998-05-15 |
EP0883719B1 (fr) | 2000-09-06 |
DE69703033D1 (de) | 2000-10-12 |
BR9707678A (pt) | 2000-01-04 |
FR2745315A1 (fr) | 1997-08-29 |
ES2152080T3 (es) | 2001-01-16 |
CN1073185C (zh) | 2001-10-17 |
CN1214098A (zh) | 1999-04-14 |
AU1615897A (en) | 1997-09-10 |
WO1997031165A1 (fr) | 1997-08-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0883719B1 (fr) | Coffrage pour la realisation d'un mur en beton | |
WO2002038878A1 (fr) | Mur en beton avec coffrage servant aussi d'armature | |
CA2781778C (fr) | Procede pour realiser une jonction etanche entre des pieces d'aeronef | |
EP0203904A1 (fr) | Paroi de coffrage et de blindage | |
BE468851A (fr) | ||
EP0188487B1 (fr) | Conduit enterre de grande section | |
FR2510163A1 (fr) | Procede de renforcement d'une poutre en bois | |
EP0833987B1 (fr) | Paroi moulee a armature continue, procede de realisation d'une telle paroi et coffrage pour realiser cette paroi | |
CA2325628A1 (fr) | Conduite de circulation de fluide sous pression et procede de realisation d'une telle conduite | |
CA2200677C (fr) | Systeme d'assemblage de panneaux prefabriques pour la realisation d'une cloison de piscine et cloison de piscine ainsi obtenue | |
EP0152367A1 (fr) | Dispositif de formation de joint d'un dallage de type industriel, généralement en béton | |
FR3018298B1 (fr) | Barrette de renfort pour element de structure | |
FR2682141A1 (fr) | Procede pour realiser un joint de construction entre deux elements prefabriques d'un ouvrage, joint de construction s'y rapportant et ouvrage comportant un tel joint. | |
EP1222340B1 (fr) | Coffrage a paroi filtrante | |
FR2738581A1 (fr) | Coffrage perdu pour la realisation de parois porteuses isolantes thermiquement et/ou phonetiquement et parois ainsi obtenues | |
CH488879A (fr) | Procédé de construction | |
FR2514056A1 (fr) | Element de construction composite autoportant | |
EP3914784A1 (fr) | Dispositif de liaison destine a realiser une liaison entre des elements de constructions adjacents entre eux | |
FR2816647A1 (fr) | Parement pour ouvrage en terre renforcee | |
CH285402A (fr) | Ensemble formé d'éléments préfabriqués et procédé pour sa fabrication. | |
FR2547607A1 (fr) | Procede d'obtention de conduits souterrains de grande section, se trouvant sous forte couverture, et conduits obtenus par ce procede | |
FR2647486A1 (fr) | Buse arche en beton arme | |
FR2548246A1 (fr) | Panneau prefabrique de parement exterieur de batiment | |
FR2632705A1 (fr) | Conduit tubulaire | |
BE393173A (fr) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 19980817 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): BE CH DE ES FR GB GR IT LI NL PT |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
17Q | First examination report despatched |
Effective date: 19990129 |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: PUMILA-CONSULTADORIA E SERVICOS LTDA. |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): BE CH DE ES FR GB GR IT LI NL PT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20000906 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRE;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.SCRIBED TIME-LIMIT Effective date: 20000906 Ref country code: GB Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20000906 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REF | Corresponds to: |
Ref document number: 69703033 Country of ref document: DE Date of ref document: 20001012 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: NV Representative=s name: GRIFFES CONSULTING S.A. |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20001206 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20001207 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20001208 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: CH Payment date: 20010115 Year of fee payment: 5 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2152080 Country of ref document: ES Kind code of ref document: T3 |
|
NLV1 | Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20010228 |
|
GBV | Gb: ep patent (uk) treated as always having been void in accordance with gb section 77(7)/1977 [no translation filed] |
Effective date: 20000906 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed | ||
BERE | Be: lapsed |
Owner name: PUMILA-CONSULTADORIA E SERVICOS LTDA Effective date: 20010228 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20020228 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20020228 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20090219 Year of fee payment: 13 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20090213 Year of fee payment: 13 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20101029 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20100301 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20110308 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20110307 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20100226 |