CN107318293A - Beach saline land comprehensive processing method - Google Patents

Beach saline land comprehensive processing method Download PDF

Info

Publication number
CN107318293A
CN107318293A CN201710602233.2A CN201710602233A CN107318293A CN 107318293 A CN107318293 A CN 107318293A CN 201710602233 A CN201710602233 A CN 201710602233A CN 107318293 A CN107318293 A CN 107318293A
Authority
CN
China
Prior art keywords
soil
salt
saline
eluted
alkaline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710602233.2A
Other languages
Chinese (zh)
Inventor
杨妃妃
傅莲莲
侯昌国
肖建茜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Derun Municipal Garden Co Ltd
Original Assignee
Zhejiang Derun Municipal Garden Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Derun Municipal Garden Co Ltd filed Critical Zhejiang Derun Municipal Garden Co Ltd
Priority to CN201710602233.2A priority Critical patent/CN107318293A/en
Publication of CN107318293A publication Critical patent/CN107318293A/en
Pending legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01BSOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
    • A01B79/00Methods for working soil
    • A01B79/02Methods for working soil combined with other agricultural processing, e.g. fertilising, planting

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Soil Sciences (AREA)
  • Environmental Sciences (AREA)
  • Soil Conditioners And Soil-Stabilizing Materials (AREA)

Abstract

The present invention relates to a kind of comprehensive processing method of beach saline land, belong to salt affected soil improving technology field.Comprise the following steps:(1)Earth excavation;(2)Build drainage system;(3)Backfill;(4)Elution and salt discharge;(5)Repeat step(4), saline and alkaline is reduced to prescribed limit;(6)Apply soil conditioner, using bio-feritlizer, improve soil quality, lift soil fertility.The present invention initially sets up drainage system, then plowed soils, and then the soil of scarifying is eluted, and washing water is discharged from drainage system, so as to reduce the saline and alkaline of soil;After repeatedly being eluted again, the saline and alkaline of soil is reduced rapidly, meets the growth of general plant;But because elution also takes away the fertile matter in soil simultaneously, soil now is barrenr, and is easier hardened, therefore the present invention has also carried out the operation of compound fertilizer after to Soil leaching, bio-feritlizer is such as applied, to improve the fertility of soil rapidly, is adapted to plant growth.

Description

Beach saline land comprehensive processing method
Technical field
The present invention relates to a kind of comprehensive processing method of beach saline land, belong to salt affected soil improving technology field.
Background technology
The soil salinization is to limit the major obstacle that utilizes of coastal region optimization of land resource, with coastal region economy and The fast development of urbanization, agricultural land area is constantly reduced, and improves and oneself has been put on scientific research day using salt-soda soil morning Journey.It has been investigated that, coastal saline-alkali soil salt accumulation in surface soil phenomenon is serious and overall salt content is higher, and soil is in alkalescence.Soil Middle Main Salts composition is sodium chloride and calcium chloride, and salinity is based on chloride and sulfate in topsoil.In 0-40 cm Na in deep soil layer+、Cl-、S04 2-For main salt ion.According to institute's salt content and the number of alkali number, it can also be further divided into Slight alkaline land(0.1%~0.25%), moderate saline-alkali soil(0.1%~0.25%)With it is heavy salinized(0.5%~0.8%).At this In the soil of sample, general plant is difficult to survive.Therefore, this area is in the urgent need to a kind of method in improvement salt-soda soil.
Such as Authorization Notice No. CN102232328B Chinese invention patent, the method and salt in a kind of improvement salt-soda soil are disclosed The implantation methods on alkali ground.The method in the improvement salt-soda soil be first excavate 40-60cm topsoil, then spread barrier film, every From spreading planting soil on film.It is to prevent the planting soil accumulation of salt in the surface soil to spread barrier film.This method principle is simple, but complex operation, puts into This is also very high.Not only need to excavate the substantial amounts of earthwork, in addition it is also necessary to carry out fill backward with substantial amounts of planting soil.In fact, due near The popularization of mechanization of agriculture over year, the operation such as earth excavation, real tillage is popularized very much, but needed in this programme it is a large amount of Planting soil be still relatively difficult.Therefore, although this method effect clearly, but is due to that cost is high, therefore very Difficulty is widely applied.
In the prior art, also useful a large amount of fresh water are rinsed so that the technical scheme of salt affected soil desalination, implementing should Need first to set up drainage system before scheme, preferably to discharge salt solution when rinsing.Such technical scheme, although be not required to The earthwork that planting soil goes fill backward to excavate is purchased, but easily the phenomenon of the accumulation of salt in the surface soil occurs.It is primarily due to level of ground water Rise to infiltrate in the soil after improvement so that the soil after improvement is changed into saline-alkali soil again.Therefore, according to this technology Scheme is accomplished by carrying out the measure of the accumulation of salt in the surface soil.
In the prior art, the smaller technical scheme of financial cost is directly to be improved using soil conditioner.Soil changes Good dose is typically natural high poly- liquid, organic improving matrix or organic waste, such as pyrolkigneous liquid, plant charcoal, garden waste.But This scheme is only applicable to slight alkaline land, and improved effect is also poor, and the plant of some Salt And Alkali Tolerances can only be planted after improvement.
And it is more inexpensive, it is adaptable to various salt-soda soils, and with the alkaline land improving side of good anti-accumulation of salt in the surface soil effect The problem of case is still this area urgent need to resolve.
The content of the invention
The invention solves the problems that above mentioned problem, so as to provide a kind of modification method in salt-soda soil.
Technical proposal that the invention solves the above-mentioned problems is as follows:
Beach saline land comprehensive processing method, comprises the following steps:
(1)Earth excavation:In salt-soda soil earth excavation, earth excavation depth is not less than 50cm;
(2)Build drainage system:After earth excavation, gutter is poured with cement, gutter is arranged on the salt-soda soil with S types;Row The position in ditch is set lower than the earth excavation;Then gutter is made to turn into dark the top covering in the gutter with dividing plate Canal, then buries hidden pipe in the salt-soda soil and is communicated with the closed conduit;And Anti-stop cover is set in the discharge outlet of the hidden pipe;
(3)Backfill:Backfilled with original soil, the drainage system is covered;
(4)Elution and salt discharge:Backfill soil is eluted and salt discharge with water or weakly acidic solution, while finely tuning the acid of soil Basicity, leacheate is discharged from the drainage system, takes away part salinity in salt affected soil;
(5)Repeat step(4), saline and alkaline is reduced to less than 0.3%;
(6)Apply soil conditioner in the alkaline land soil eluted, using bio-feritlizer, persistently improve soil quality, carry Rise soil fertility;One or more of the soil conditioner in sulphur, calcium superphosphate, lime, gypsum.
Preferably, first collecting washing water with a small amount of water wash salt affected soil, pH value is tested, then be according to pH value judgement It is no to need to use weakly acidic solution;If desired, first being eluted with weakly acidic solution, then eluted with clear water;Such as need not be directly with clear Water wash;One or more of the weakly acidic solution in carbon acid solution, acetum, ammoniacal liquor, watery hydrochloric acid, dilute sulfuric acid.
Preferably, also including polyacrylamide in the soil conditioner.
Preferably, the bio-feritlizer is to use organic waste made from primary raw material carries out compost.
Preferably, the preparation method of the bio-feritlizer is specific as follows:Build in a cement pit, pond and be put into filler, fill out Spawn incubation agent is added in material, organic waste is put into, is mixed thoroughly together with filler, environment temperature is maintained 20 DEG C~30 DEG C, Allow its spontaneous fermentation;The Spawn incubation agent is the crushed material of glucose or starch grain seed;The filler be selected from rice bran, One or more in wood chip, bark chip, stalk crushed material.
Preferably, the height of the closed conduit is 20-30cm, width is 20-30cm.
Preferably, also including step(7), in the salt-soda soil upper area, set up mulch film to prevent or mitigate moisture Evaporation.
Preferably, also including step(8), the ecological region planting arbor above the closed conduit;In salt-soda soil plantation Industrial crops.
The invention has the advantages that:
1st, the present invention initially sets up drainage system, then plowed soils, and then the soil of scarifying is eluted, and washing water is from row Water system is discharged, so as to reduce the saline and alkaline of soil;After repeatedly being eluted again, the saline and alkaline of soil is reduced rapidly, meets one As plant growth;But because elution also takes away the fertile matter in soil simultaneously, soil now is barrenr, and compares appearance It is easily hardened, therefore the present invention has also carried out the operation of compound fertilizer after to Soil leaching, such as applies bio-feritlizer, and soil is improved with rapid The fertility of earth, is adapted to plant growth.
2nd, due to being located in coastal region, the soil of improvement is easy to, because the rising of underground sea water infiltrates, cause soil to return Salt;When level of ground water rises, defensive measure of the present invention, i.e. covered conduit, because the setting height of covered conduit is less than the salt-soda soil turned over Topsoil, when level of ground water rises, is appeared in covered conduit, as long as the moisture appeared in covered conduit is taken out by drainage system first Walk;That is, can be solved by drainage system;
3rd, invention can not only be prevented effectively from the soil accumulation of salt in the surface soil after improvement, and be also with very big tribute in itself to improved soil Offer;The present invention by Soil leaching, then successively further corrects saline and alkaline using soil conditioner and bio-feritlizer and carried first High soil fertility, and the anti-hardened ability of soil is improved, it is not limited solely to the growth that the soil after improvement is adapted to various plants The plant of some Salt And Alkali Tolerances;
4th, invention first backfills the earthwork also above covered conduit and re-lays bio-feritlizer, finally plants arbor;Arbor has after growing up to Flourishing root system, due to being planted in above the dividing plate of covered conduit, for many years after, even if dividing plate rots, and the root system of arbor is in growth Shi Zehui bypasses previous still unputrefied dividing plate, so as to maintain the covered conduit using root system as new dividing plate so that covered conduit is able to forever protect Stay;So that the present invention has permanent anti-accumulation of salt in the surface soil ability.
5 present invention additionally use special bio-feritlizer, so as to compensate for causing soil fertility reduction because of elution Problem, this special bio-feritlizer be by by ferment of filler bed with discard organic matter and addition based on glucide Spawn incubation agent is substrate, maintains certain temperature made from spontaneous fermentation, using this special bio-feritlizer, have Effectively lift soil fertility and the effect of soil hardening will not be made.
6th, mulch film is set up above salt-soda soil of the invention also after improvement to reduce moisture evaporation, so as to be effectively retained in soil Moisture, it is to avoid because capillary effect caused by underground water rise.
7th, in summary, the present invention is a kind of suitable for various salt-soda soils, and with the salt of good anti-accumulation of salt in the surface soil effect Alkali ground comprehensive processing method.
Embodiment
Present embodiment is only explanation of the invention, is not limitation of the present invention, people in the art Member's any change for being made after the specification of the present invention has been read, as long as in the range of claims, all will be by The protection of Patent Law.
Embodiment one
Beach saline land comprehensive processing method, comprises the following steps:
(1)Earth excavation:In salt-soda soil earth excavation, earth excavation depth 50cm;
(2)Build drainage system:After earth excavation, gutter is poured with cement, gutter is arranged on the salt-soda soil with S types;Row The position in ditch is set lower than the earth excavation, is highly 20-30cm, and width is 20-30cm and then with dividing plate by the row The top covering in ditch makes gutter turn into closed conduit, and then bury hidden pipe in the salt-soda soil communicates with the closed conduit;And institute State and Anti-stop cover is set in the discharge outlet of hidden pipe;
(3)Backfill:Backfilled with original soil, the drainage system is covered;
(4)Elution and salt discharge:Backfill soil is eluted and salt discharge with water, leacheate is discharged from the drainage system, is taken away Part salinity in salt affected soil;
(5)Repeat step(4), saline and alkaline is reduced to less than 0.3%;
(6)Apply soil conditioner in the alkaline land soil eluted, using bio-feritlizer, persistently improve soil quality, carry Rise soil fertility;The soil conditioner is sulphur and polyacrylamide;The preparation method of the bio-feritlizer is specific as follows:Build Make and addition Spawn incubation agent in filler, filler is put into a cement pit, pond, put into organic waste, mixed thoroughly together with filler, will Environment temperature maintains 20 DEG C~30 DEG C, allows its spontaneous fermentation;The Spawn incubation agent is corn flour;Filler is rice bran and wood Bits;
(7)In the salt-soda soil upper area, set up mulch film to prevent or mitigate moisture evaporation;
(8)Ecological region planting arbor above the closed conduit;Planted economic crops in the salt-soda soil.
Embodiment two
Beach saline land comprehensive processing method, comprises the following steps:
(1)Earth excavation:In salt-soda soil earth excavation, earth excavation depth 60cm;
(2)Build drainage system:After earth excavation, gutter is poured with cement, gutter is arranged on the salt-soda soil with S types;Row The position in ditch is set lower than the earth excavation, is highly 20-30cm, and width is 20-30cm and then with dividing plate by the row The top covering in ditch makes gutter turn into closed conduit, and then bury hidden pipe in the salt-soda soil communicates with the closed conduit;And institute State and Anti-stop cover is set in the discharge outlet of hidden pipe;
(3)Backfill:Backfilled with original soil, the drainage system is covered;
(4)Elution and salt discharge:First with a small amount of water wash salt affected soil, washing water is collected, pH value is tested, then be according to pH value judgement It is no to need to use weakly acidic solution;If desired, first being eluted with weakly acidic solution, then eluted with clear water;Such as need not be directly with clear Water wash;The weakly acidic solution is selected from acetum;
(5)Repeat step(4), saline and alkaline is reduced to less than 0.3%;
(6)Apply soil conditioner in the alkaline land soil eluted, using bio-feritlizer, persistently improve soil quality, carry Rise soil fertility;The soil conditioner is sulphur and polyacrylamide;The preparation method of the bio-feritlizer is specific as follows:Build Make and addition Spawn incubation agent in filler, filler is put into a cement pit, pond, put into organic waste, mixed thoroughly together with filler, will Environment temperature maintains 20 DEG C~30 DEG C, allows its spontaneous fermentation;The Spawn incubation agent is glucose;The filler is selected from wood chip With bark chip;
(7)In the salt-soda soil upper area, set up mulch film to prevent or mitigate moisture evaporation;
(8)Ecological region planting arbor above the closed conduit;Planted economic crops in the salt-soda soil.
Embodiment three
Beach saline land comprehensive processing method, comprises the following steps:
(1)Earth excavation:In salt-soda soil earth excavation, earth excavation depth 60cm;
(2)Build drainage system:After earth excavation, gutter is poured with cement, gutter is arranged on the salt-soda soil with S types;Row The position in ditch is set lower than the earth excavation, is highly 20-30cm, and width is 20-30cm and then with dividing plate by the row The top covering in ditch makes gutter turn into closed conduit, and then bury hidden pipe in the salt-soda soil communicates with the closed conduit;And institute State and Anti-stop cover is set in the discharge outlet of hidden pipe;
(3)Backfill:Backfilled with original soil, the drainage system is covered;
(4)Elution and salt discharge:First with a small amount of water wash salt affected soil, washing water is collected, pH value is tested, then be according to pH value judgement It is no to need to use weakly acidic solution;If desired, first being eluted with weakly acidic solution, then eluted with clear water;Such as need not be directly with clear Water wash;The weakly acidic solution is selected from watery hydrochloric acid;
(5)Repeat step(4), saline and alkaline is reduced to less than 0.3%;
(6)Apply soil conditioner in the alkaline land soil eluted, using bio-feritlizer, persistently improve soil quality, carry Rise soil fertility;The soil conditioner is sulphur, gypsum and polyacrylamide;The preparation method of the bio-feritlizer is specific such as Under:Build and addition Spawn incubation agent in filler, filler is put into a cement pit, pond, put into organic waste, mixed together with filler It is even, environment temperature is maintained 20 DEG C~30 DEG C, its spontaneous fermentation is allowed;The Spawn incubation agent is corn flour;The filler choosing From straw, bark chip and wood chip;
(7)In the salt-soda soil upper area, set up mulch film to prevent or mitigate moisture evaporation;
(8)Ecological region planting arbor above the closed conduit;Planted economic crops in the salt-soda soil.
Example IV
Beach saline land comprehensive processing method, comprises the following steps:
(1)Earth excavation:In salt-soda soil earth excavation, earth excavation depth 50cm;
(2)Build drainage system:After earth excavation, gutter is poured with cement, gutter is arranged on the salt-soda soil with S types;Row The position in ditch is set lower than the earth excavation, is highly 20-30cm, and width is 20-30cm and then with dividing plate by the row The top covering in ditch makes gutter turn into closed conduit, and then bury hidden pipe in the salt-soda soil communicates with the closed conduit;And institute State and Anti-stop cover is set in the discharge outlet of hidden pipe;
(3)Backfill:Backfilled with original soil, the drainage system is covered;
(4)Elution and salt discharge:First with a small amount of water wash salt affected soil, washing water is collected, pH value is tested, then be according to pH value judgement It is no to need to use weakly acidic solution;If desired, first being eluted with weakly acidic solution, then eluted with clear water;Such as need not be directly with clear Water wash;One or more of the weakly acidic solution in carbon acid solution, acetum, ammoniacal liquor, watery hydrochloric acid, dilute sulfuric acid;
(5)Repeat step(4), saline and alkaline is reduced to less than 0.3%;
(6)Apply soil conditioner in the alkaline land soil eluted, using bio-feritlizer, persistently improve soil quality, carry Rise soil fertility;The soil conditioner is sulphur and gypsum;The preparation method of the bio-feritlizer is specific as follows:Build a water Addition Spawn incubation agent in filler, filler is put into mud sump, pond, organic waste is put into, is mixed thoroughly together with filler, by environment temperature Degree maintains 20 DEG C~30 DEG C, allows its spontaneous fermentation;The Spawn incubation agent is ground rice;The filler be selected from rice bran, wood chip and Stalk crushed material;
(7)In the salt-soda soil upper area, set up mulch film to prevent or mitigate moisture evaporation;
(8)Ecological region planting arbor above the closed conduit;Planted economic crops in the salt-soda soil.

Claims (8)

1. the comprehensive processing method of beach saline land, comprises the following steps:
(1)Earth excavation:In salt-soda soil earth excavation, earth excavation depth is not less than 50cm;
(2)Build drainage system:After earth excavation, gutter is poured with cement, gutter is arranged on the salt-soda soil with S types;Row The position in ditch is set lower than the earth excavation;Then gutter is made to turn into dark the top covering in the gutter with dividing plate Canal, then buries hidden pipe in the salt-soda soil and is communicated with the closed conduit;And Anti-stop cover is set in the discharge outlet of the hidden pipe;
(3)Backfill:Backfilled with original soil, the drainage system is covered;
(4)Elution and salt discharge:Backfill soil is eluted and salt discharge with water or weakly acidic solution, while finely tuning the acid of soil Basicity, leacheate is discharged from the drainage system, takes away part salinity in salt affected soil;
(5)Repeat step(4), saline and alkaline is reduced to less than 0.3%;
(6)Apply soil conditioner in the alkaline land soil eluted, using bio-feritlizer, persistently improve soil quality, carry Rise soil fertility;One or more of the soil conditioner in sulphur, calcium superphosphate, lime, gypsum.
2. the native modification method of a kind of coastal saline-alkali according to claim 1, it is characterised in that:It is first saline and alkaline with a small amount of water wash Soil, collects washing water, tests pH value, then judge whether to need to use weakly acidic solution according to pH value;If desired, first using weak acid Property solution elution, then eluted with clear water;Directly it need not such as be eluted with clear water;The weakly acidic solution is selected from carbon acid solution, vinegar One or more in acid solution, ammoniacal liquor, watery hydrochloric acid, dilute sulfuric acid.
3. the native modification method of a kind of coastal saline-alkali according to claim 1, it is characterised in that:In the soil conditioner also Include polyacrylamide.
4. the native modification method of a kind of coastal saline-alkali according to claim 1, it is characterised in that:The bio-feritlizer is to use Organic waste is that primary raw material is carried out made from compost.
5. the native modification method of a kind of coastal saline-alkali according to claim 4, it is characterised in that:The preparation of the bio-feritlizer Method is specific as follows:Build and addition Spawn incubation agent in filler, filler is put into a cement pit, pond, put into organic waste, with Filler is mixed thoroughly together, and environment temperature is maintained into 20 DEG C~30 DEG C, allows its spontaneous fermentation;The Spawn incubation agent be glucose or The crushed material of starch grain seed;The one kind or many of the filler in rice bran, wood chip, bark chip, stalk crushed material Kind.
6. the native modification method of a kind of coastal saline-alkali according to claim 1, it is characterised in that:The height of the closed conduit is 20-30cm, width is 20-30cm.
7. the native modification method of a kind of coastal saline-alkali according to claim 1, it is characterised in that:Also include step(7), institute Salt-soda soil upper area is stated, sets up mulch film to prevent or mitigate moisture evaporation.
8. the native modification method of a kind of coastal saline-alkali according to claim 1, it is characterised in that:Also include step(8), institute State the ecological region planting arbor above closed conduit;Planted economic crops in the salt-soda soil.
CN201710602233.2A 2017-07-21 2017-07-21 Beach saline land comprehensive processing method Pending CN107318293A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710602233.2A CN107318293A (en) 2017-07-21 2017-07-21 Beach saline land comprehensive processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710602233.2A CN107318293A (en) 2017-07-21 2017-07-21 Beach saline land comprehensive processing method

Publications (1)

Publication Number Publication Date
CN107318293A true CN107318293A (en) 2017-11-07

Family

ID=60199675

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710602233.2A Pending CN107318293A (en) 2017-07-21 2017-07-21 Beach saline land comprehensive processing method

Country Status (1)

Country Link
CN (1) CN107318293A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108076719A (en) * 2018-01-04 2018-05-29 中国科学院南京土壤研究所 A kind of engineering improvement on heavy salinized ground of haftplatte and ecological planting and establishing method
CN108112294A (en) * 2017-12-23 2018-06-05 广东粤壮园林建设有限公司 A kind of saline and alkali land improvement method
CN108184356A (en) * 2018-01-06 2018-06-22 江苏恒绿建设工程有限公司 A kind of modification method of alkaline land soil
CN108338037A (en) * 2018-04-18 2018-07-31 山东农业大学 A method of it pouring acetic acid and alleviates salt affected soil to grape growth stress
CN109076739A (en) * 2018-07-26 2018-12-25 中国科学院遗传与发育生物学研究所 A kind of strand heavy salinized ground method for recovering vegetation
CN109429605A (en) * 2018-11-01 2019-03-08 谢宁汉 A kind of salt-soda soil and desertification administering method
CN109479642A (en) * 2018-12-27 2019-03-19 袁米农业科技有限公司 A kind of implantation methods of sorghum
CN109743922A (en) * 2019-03-21 2019-05-14 盐城市农产品质量监督检验测试中心 A kind of modification method of booth vegetable soil
CN111892460A (en) * 2020-07-24 2020-11-06 天津开发区坤禾生物技术有限公司 Bio-organic fertilizer for improving soil quality of saline-alkali soil and application thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6503287B1 (en) * 1999-04-09 2003-01-07 Hendrikus Schraven System and method of soil distribution, such as a soil blend, capable of being blown into place
CN105359663A (en) * 2015-11-30 2016-03-02 天津吉天环境科技发展有限公司 Improvement method for soil of saline and alkaline land
CN106385852A (en) * 2016-08-31 2017-02-15 山东胜伟园林科技有限公司 Method for leaching saline-alkali soil

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6503287B1 (en) * 1999-04-09 2003-01-07 Hendrikus Schraven System and method of soil distribution, such as a soil blend, capable of being blown into place
CN105359663A (en) * 2015-11-30 2016-03-02 天津吉天环境科技发展有限公司 Improvement method for soil of saline and alkaline land
CN106385852A (en) * 2016-08-31 2017-02-15 山东胜伟园林科技有限公司 Method for leaching saline-alkali soil

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108112294A (en) * 2017-12-23 2018-06-05 广东粤壮园林建设有限公司 A kind of saline and alkali land improvement method
CN108076719A (en) * 2018-01-04 2018-05-29 中国科学院南京土壤研究所 A kind of engineering improvement on heavy salinized ground of haftplatte and ecological planting and establishing method
CN108076719B (en) * 2018-01-04 2020-03-24 中国科学院南京土壤研究所 Engineering improvement and ecological planting method for sticky plate severe saline-alkali soil
CN108184356A (en) * 2018-01-06 2018-06-22 江苏恒绿建设工程有限公司 A kind of modification method of alkaline land soil
CN108338037A (en) * 2018-04-18 2018-07-31 山东农业大学 A method of it pouring acetic acid and alleviates salt affected soil to grape growth stress
CN109076739A (en) * 2018-07-26 2018-12-25 中国科学院遗传与发育生物学研究所 A kind of strand heavy salinized ground method for recovering vegetation
CN109076739B (en) * 2018-07-26 2021-06-01 中国科学院遗传与发育生物学研究所 Method for recovering vegetation in coastal severe saline-alkali soil
CN109429605A (en) * 2018-11-01 2019-03-08 谢宁汉 A kind of salt-soda soil and desertification administering method
CN109479642A (en) * 2018-12-27 2019-03-19 袁米农业科技有限公司 A kind of implantation methods of sorghum
CN109743922A (en) * 2019-03-21 2019-05-14 盐城市农产品质量监督检验测试中心 A kind of modification method of booth vegetable soil
CN111892460A (en) * 2020-07-24 2020-11-06 天津开发区坤禾生物技术有限公司 Bio-organic fertilizer for improving soil quality of saline-alkali soil and application thereof

Similar Documents

Publication Publication Date Title
CN107318293A (en) Beach saline land comprehensive processing method
CN104429214B (en) One engineering-chemistry-desalination water-saving technology preliminary transformation salinity ground method
CN104472052B (en) A kind of engineering-chemical-biological-desalination water saving-information technology improvement saline land method
CN107182341A (en) A kind of beach saline land modification method
CN104871678B (en) A kind of method improveing salt-soda soil
CN105519274A (en) Integration method of large-scale coastal newly reclaimed beach agricultural land ecologicalization exploitation
CN105638018A (en) Method for improving moderately-severely hardened saline-alkali land
CN104472185B (en) A kind of by chemical-biological technology degree of depth improvement salt-soda soil method
CN104962288A (en) Preparation and use method of saline-alkali soil biological improver
CN103262689A (en) Coastal saline-alkali soil terrace type afforesting method for improvement of dredger fill
CN105027721A (en) Water saving saline land soil improvement method
CN106612697A (en) Coastal saline-alkali soil comprehensive treatment method
CN111642167B (en) Water-retention, water-saving, fertilizer-retention and fertilizer-saving treatment method for transforming dry land and sand land into paddy field
CN103814647A (en) Saline land improvement method appropriate for arid and semi-arid region
CN110073756A (en) A kind of beach newly encloses tideland for cultivation the efficient modification method of farmland soil
CN106165603A (en) A kind of method of saline-alkali wetland plantation alfalfa
CN104718835A (en) Method for assisting in ecological restoration of tailings through alfalfa green manure and planting alfalfa
CN112088607A (en) Saline-alkali soil improvement method and application thereof
Sunday E et al. Contemporary global issue of rising water scarcity for agriculture: the quest for effective and feasible soil moisture and free-water surface conservation strategies
CN106817942A (en) By alkaline land improving into spongy soil method
Minhas et al. Management of soil salinity and alkalinity problems in India
CN114128433A (en) Method for integrating straw total returning and field management
CN105875164A (en) Method for no-tillage watermelon cultivation in Northern Jiangsu intertidal zone saline-alkali soil
CN105941058A (en) A method of performing natural soil cultivation on strongly saline-alkaline soil by using nutrient soil capable of improving soil permeability
CN103109616A (en) Method for repairing water leakage of paddy field in secondary-stacking system coal mining subsidence ash and mudstone layer weathering area

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 325000 Building 3-5, No. 1, Standard Workshop 217 Linghua Road, Oujiangkou Industrial Agglomeration Area, Wenzhou City, Zhejiang Province

Applicant after: ZHEJIANG DERUN MUNICIPAL GARDEN CO., LTD.

Address before: In Longwan District of Wenzhou city in Zhejiang province 325000 port industrial agglomeration area Ling Kun Wang Xiang Cun Wang Xiangdong Street Street No. 13

Applicant before: ZHEJIANG DERUN MUNICIPAL GARDEN CO., LTD.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171107