CN107292012A - It is a kind of based on method from BIM to skyscraper transported material - Google Patents

It is a kind of based on method from BIM to skyscraper transported material Download PDF

Info

Publication number
CN107292012A
CN107292012A CN201710447150.0A CN201710447150A CN107292012A CN 107292012 A CN107292012 A CN 107292012A CN 201710447150 A CN201710447150 A CN 201710447150A CN 107292012 A CN107292012 A CN 107292012A
Authority
CN
China
Prior art keywords
bim
bim models
models
conveying arrangement
conveying mechanism
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710447150.0A
Other languages
Chinese (zh)
Inventor
周江峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Zhi Jian New Architectural Design Consulting Co Ltd
Original Assignee
Chengdu Zhi Jian New Architectural Design Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Zhi Jian New Architectural Design Consulting Co Ltd filed Critical Chengdu Zhi Jian New Architectural Design Consulting Co Ltd
Priority to CN201710447150.0A priority Critical patent/CN107292012A/en
Publication of CN107292012A publication Critical patent/CN107292012A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Geometry (AREA)
  • Human Resources & Organizations (AREA)
  • Evolutionary Computation (AREA)
  • Computer Hardware Design (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses it is a kind of based on BIM to the method for skyscraper transported material, comprise the following steps:1) height of high-rise building, is obtained, danger and the fault message for being possible to occur under the height is judged;2) information for wanting transported material, is obtained;3), with reference to step 1), the information that 2) obtains, set up the different BIM models of conveying arrangement and conveying mechanism using BIM technology, obtain the analog result of all BIM models;4), selected according to analog result, the conveying arrangement and conveying mechanism designed in selection best simulation result BIM models is manufactured and installed;5) transportation system of the optimal BIM models of the conveying arrangement obtained and conveying mechanism, is set up using BIM technology, the BIM models of all transportation systems are obtained;6), from step 5) in obtain selection one in all BIM models and be most preferably used as transportation system.The present invention solves the problem of causing to break down or even produce dangerous because conveying arrangement design is unreasonable in existing construction method.

Description

It is a kind of based on method from BIM to skyscraper transported material
Technical field
The present invention relates to technical field of building construction, and in particular to it is a kind of based on BIM to the side of skyscraper transported material Method.
Background technology
In Modernized City Construction, therefore the height more and more higher of building, in construction, can usually be related to To high-rise building, construction of the building height more than 100 meters is typically referred to.It can be related in construction and transport material Transport to high level, due to height it is higher, to during Super High transported material not only have certain danger, and easily occur therefore Barrier, in order to avoid above mentioned problem, during material is transported, conveying arrangement reasonable in design.
In the prior art, the design of conveying arrangement is typically carried out according to construction experience, easily causes hair because design is unreasonable Raw failure even produces danger.
The content of the invention
It is an object of the invention to provide it is a kind of based on method from BIM to skyscraper transported material, to solve existing apply The problem of causing to break down or even produce dangerous because conveying arrangement design is unreasonable in work method.
The present invention is achieved through the following technical solutions:
It is a kind of based on BIM to the method for skyscraper transported material, comprise the following steps:
1) height of high-rise building, is obtained, danger and the fault message for being possible to occur under the height is judged;
2) weight, the dimension information for wanting transported material, are obtained;
3), with reference to step 1), 2) obtain information, the different BIM of conveying arrangement and conveying mechanism are set up using BIM technology Model, obtains the analog result of all BIM models;
4), selected according to analog result, the conveying arrangement designed in selection best simulation result BIM models and conveying Mechanism is manufactured and installed;
5) transportation system of the optimal BIM models of the conveying arrangement obtained and conveying mechanism, is set up using BIM technology, is obtained The BIM models of transportation system that must be all;
6), from step 5) in obtain selection one in all BIM models and be most preferably defined as final material transport system.
In the prior art, the design of conveying arrangement is typically carried out according to construction experience, easily causes hair because design is unreasonable Raw failure even produces danger.
The present invention sets up the different BIM models of conveying arrangement and conveying mechanism by using BIM technology, by BIM models Simulation application obtains the analog result of all BIM models in the transport of materials of high-rise building, then selects optimal result to carry out The manufacture and installation of conveying arrangement and conveying mechanism, meanwhile, optimal transportation system is obtained by BIM technology, it is to avoid failure Occur, while reducing dangerous.
Further, by the analog result input database, analysis selection is carried out by database.
The present invention compared with prior art, has the following advantages and advantages:
The present invention sets up the different BIM models of conveying arrangement and conveying mechanism by using BIM technology, by BIM models Simulation application obtains the analog result of all BIM models in the transport of materials of high-rise building, then selects optimal result to carry out The manufacture and installation of conveying arrangement and conveying mechanism, meanwhile, optimal transportation system is obtained by BIM technology, it is to avoid failure Occur, while reducing dangerous.
Embodiment
For the object, technical solutions and advantages of the present invention are more clearly understood, with reference to embodiment, to present invention work Further to describe in detail, exemplary embodiment and its explanation of the invention is only used for explaining the present invention, is not intended as to this The restriction of invention.
Embodiment:
It is a kind of based on BIM to the method for skyscraper transported material, comprise the following steps:
1) height of high-rise building, is obtained, danger and the fault message for being possible to occur under the height is judged;
2) weight, the dimension information for wanting transported material, are obtained;
3), with reference to step 1), 2) obtain information, the different BIM of conveying arrangement and conveying mechanism are set up using BIM technology Model, obtains the analog result of all BIM models;
4), selected according to analog result, the conveying arrangement designed in selection best simulation result BIM models and conveying Mechanism is manufactured and installed;
5) transportation system of the optimal BIM models of the conveying arrangement obtained and conveying mechanism, is set up using BIM technology, is obtained The BIM models of transportation system that must be all;
6), from step 5) in obtain selection one in all BIM models and be most preferably defined as final material transport system;
In each step, by the analog result input database, analysis selection is carried out by database.
Above-described embodiment, has been carried out further to the purpose of the present invention, technical scheme and beneficial effect Describe in detail, should be understood that the embodiment that the foregoing is only the present invention, be not intended to limit the present invention Protection domain, within the spirit and principles of the invention, any modification, equivalent substitution and improvements done etc. all should be included Within protection scope of the present invention.

Claims (2)

1. it is a kind of based on method from BIM to skyscraper transported material, it is characterised in that comprise the following steps:
1) height of high-rise building, is obtained, danger and the fault message for being possible to occur under the height is judged;
2) weight, the dimension information for wanting transported material, are obtained;
3), with reference to step 1), 2) obtain information, the different BIM moulds of conveying arrangement and conveying mechanism are set up using BIM technology Type, obtains the analog result of all BIM models;
4), selected according to analog result, the conveying arrangement and conveying mechanism designed in selection best simulation result BIM models Manufactured and installed;
5) transportation system of the optimal BIM models of the conveying arrangement obtained and conveying mechanism, is set up using BIM technology, institute is obtained The BIM models of some transportation systems;
6), from step 5) in obtain selection one in all BIM models and be most preferably defined as final material transport system.
2. it is according to claim 1 it is a kind of based on method from BIM to skyscraper transported material, it is characterised in that by institute Analog result input database is stated, analysis selection is carried out by database.
CN201710447150.0A 2017-06-14 2017-06-14 It is a kind of based on method from BIM to skyscraper transported material Pending CN107292012A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710447150.0A CN107292012A (en) 2017-06-14 2017-06-14 It is a kind of based on method from BIM to skyscraper transported material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710447150.0A CN107292012A (en) 2017-06-14 2017-06-14 It is a kind of based on method from BIM to skyscraper transported material

Publications (1)

Publication Number Publication Date
CN107292012A true CN107292012A (en) 2017-10-24

Family

ID=60096962

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710447150.0A Pending CN107292012A (en) 2017-06-14 2017-06-14 It is a kind of based on method from BIM to skyscraper transported material

Country Status (1)

Country Link
CN (1) CN107292012A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108133242A (en) * 2017-11-21 2018-06-08 上海建工五建集团有限公司 Construction material vertical transporting method and system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101916970A (en) * 2010-07-29 2010-12-15 广州电力设计院 Indoor ventilation system of transformer substation and design method thereof
US20120296609A1 (en) * 2011-05-17 2012-11-22 Azam Khan Systems and methods for displaying a unified representation of performance related data
CN204759417U (en) * 2015-05-20 2015-11-11 河南省恒远起重机械集团有限公司 Hoist cloud designing for manufacturing platform
CN106202723A (en) * 2016-07-10 2016-12-07 北京工业大学 A kind of BIM subway work method
CN106228208A (en) * 2016-07-21 2016-12-14 重庆工程职业技术学院 Control system based on BIM and method
CN106372302A (en) * 2016-08-31 2017-02-01 浙江精工钢结构集团有限公司 Tower crane automatic model selection and optimization system and method based on BIM (Building Information Modeling) technology
CN106707956A (en) * 2017-02-15 2017-05-24 京能(锡林郭勒)发电有限公司 Intelligent and fully-automatic stacker-reclaimer control device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101916970A (en) * 2010-07-29 2010-12-15 广州电力设计院 Indoor ventilation system of transformer substation and design method thereof
US20120296609A1 (en) * 2011-05-17 2012-11-22 Azam Khan Systems and methods for displaying a unified representation of performance related data
CN204759417U (en) * 2015-05-20 2015-11-11 河南省恒远起重机械集团有限公司 Hoist cloud designing for manufacturing platform
CN106202723A (en) * 2016-07-10 2016-12-07 北京工业大学 A kind of BIM subway work method
CN106228208A (en) * 2016-07-21 2016-12-14 重庆工程职业技术学院 Control system based on BIM and method
CN106372302A (en) * 2016-08-31 2017-02-01 浙江精工钢结构集团有限公司 Tower crane automatic model selection and optimization system and method based on BIM (Building Information Modeling) technology
CN106707956A (en) * 2017-02-15 2017-05-24 京能(锡林郭勒)发电有限公司 Intelligent and fully-automatic stacker-reclaimer control device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108133242A (en) * 2017-11-21 2018-06-08 上海建工五建集团有限公司 Construction material vertical transporting method and system

Similar Documents

Publication Publication Date Title
CN107229802A (en) Construction techniques based on BIM
CN105868502A (en) BIM (building information modeling) based material management system and control method thereof
CN107255981A (en) A kind of super high rise building transport of materials management system based on BIM
CN107292012A (en) It is a kind of based on method from BIM to skyscraper transported material
EP3904868A4 (en) Learned model generation method, learned model, surface defect inspection method, steel manufacturing method, pass/fail determination method, grade determination method, surface defect determination program, pass/fail determination program, determination system, and steel manufacturing equipment
Landingin et al. Comparative analysis of RC irregular buildings designed according to different seismic design codes
Lee et al. Applied technologies in minimizing accidents in construction industry
CN106639344A (en) Concrete exposed reinforcing bar and hole repairing scheme
CN204983135U (en) Elevator discrepancy floor regularization passageway
CN205724669U (en) Frock is laid in cable layering beam splitting
CN104060832A (en) Method and device for improving safety of unloading platform
CN106401157A (en) Movable operation platform and high-altitude construction method
MX2017008684A (en) Tank car top platform assembly closure plate.
Kochan et al. Replacement of existing ground wire with OPGW under live-line conditions new training polygon in Olsztyn
CN105305332A (en) Electric engineering construction method
CN204940519U (en) People's Cargo Lift cage buffer platform
CN205419540U (en) Explosive is reinforced (rfd) channel -section steel guide rail that suspends in midair of interface for railcar
CN203834912U (en) Platform for mounting elevator
CN203821360U (en) Multi-span universal combined type ship lock inspection door
CN204054321U (en) Concrete prefabricated board production system and vibration control system thereof
CN111600203B (en) Automatic arrangement method of two groups of electrical equipment
CN206004139U (en) Non-conductor lightning conducter rod structure
CN102704665A (en) Foldable horizontal protector between external climbing frame and building and foldable horizontal protection method
CN207526216U (en) A kind of string mends outlet structure structure
CN106285718A (en) High temperature resistant subway segment and processing method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171024

RJ01 Rejection of invention patent application after publication