CN107292012A - It is a kind of based on method from BIM to skyscraper transported material - Google Patents
It is a kind of based on method from BIM to skyscraper transported material Download PDFInfo
- Publication number
- CN107292012A CN107292012A CN201710447150.0A CN201710447150A CN107292012A CN 107292012 A CN107292012 A CN 107292012A CN 201710447150 A CN201710447150 A CN 201710447150A CN 107292012 A CN107292012 A CN 107292012A
- Authority
- CN
- China
- Prior art keywords
- bim
- bim models
- models
- conveying arrangement
- conveying mechanism
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Business, Economics & Management (AREA)
- Geometry (AREA)
- Human Resources & Organizations (AREA)
- Evolutionary Computation (AREA)
- Computer Hardware Design (AREA)
- Health & Medical Sciences (AREA)
- Economics (AREA)
- General Health & Medical Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses it is a kind of based on BIM to the method for skyscraper transported material, comprise the following steps:1) height of high-rise building, is obtained, danger and the fault message for being possible to occur under the height is judged;2) information for wanting transported material, is obtained;3), with reference to step 1), the information that 2) obtains, set up the different BIM models of conveying arrangement and conveying mechanism using BIM technology, obtain the analog result of all BIM models;4), selected according to analog result, the conveying arrangement and conveying mechanism designed in selection best simulation result BIM models is manufactured and installed;5) transportation system of the optimal BIM models of the conveying arrangement obtained and conveying mechanism, is set up using BIM technology, the BIM models of all transportation systems are obtained;6), from step 5) in obtain selection one in all BIM models and be most preferably used as transportation system.The present invention solves the problem of causing to break down or even produce dangerous because conveying arrangement design is unreasonable in existing construction method.
Description
Technical field
The present invention relates to technical field of building construction, and in particular to it is a kind of based on BIM to the side of skyscraper transported material
Method.
Background technology
In Modernized City Construction, therefore the height more and more higher of building, in construction, can usually be related to
To high-rise building, construction of the building height more than 100 meters is typically referred to.It can be related in construction and transport material
Transport to high level, due to height it is higher, to during Super High transported material not only have certain danger, and easily occur therefore
Barrier, in order to avoid above mentioned problem, during material is transported, conveying arrangement reasonable in design.
In the prior art, the design of conveying arrangement is typically carried out according to construction experience, easily causes hair because design is unreasonable
Raw failure even produces danger.
The content of the invention
It is an object of the invention to provide it is a kind of based on method from BIM to skyscraper transported material, to solve existing apply
The problem of causing to break down or even produce dangerous because conveying arrangement design is unreasonable in work method.
The present invention is achieved through the following technical solutions:
It is a kind of based on BIM to the method for skyscraper transported material, comprise the following steps:
1) height of high-rise building, is obtained, danger and the fault message for being possible to occur under the height is judged;
2) weight, the dimension information for wanting transported material, are obtained;
3), with reference to step 1), 2) obtain information, the different BIM of conveying arrangement and conveying mechanism are set up using BIM technology
Model, obtains the analog result of all BIM models;
4), selected according to analog result, the conveying arrangement designed in selection best simulation result BIM models and conveying
Mechanism is manufactured and installed;
5) transportation system of the optimal BIM models of the conveying arrangement obtained and conveying mechanism, is set up using BIM technology, is obtained
The BIM models of transportation system that must be all;
6), from step 5) in obtain selection one in all BIM models and be most preferably defined as final material transport system.
In the prior art, the design of conveying arrangement is typically carried out according to construction experience, easily causes hair because design is unreasonable
Raw failure even produces danger.
The present invention sets up the different BIM models of conveying arrangement and conveying mechanism by using BIM technology, by BIM models
Simulation application obtains the analog result of all BIM models in the transport of materials of high-rise building, then selects optimal result to carry out
The manufacture and installation of conveying arrangement and conveying mechanism, meanwhile, optimal transportation system is obtained by BIM technology, it is to avoid failure
Occur, while reducing dangerous.
Further, by the analog result input database, analysis selection is carried out by database.
The present invention compared with prior art, has the following advantages and advantages:
The present invention sets up the different BIM models of conveying arrangement and conveying mechanism by using BIM technology, by BIM models
Simulation application obtains the analog result of all BIM models in the transport of materials of high-rise building, then selects optimal result to carry out
The manufacture and installation of conveying arrangement and conveying mechanism, meanwhile, optimal transportation system is obtained by BIM technology, it is to avoid failure
Occur, while reducing dangerous.
Embodiment
For the object, technical solutions and advantages of the present invention are more clearly understood, with reference to embodiment, to present invention work
Further to describe in detail, exemplary embodiment and its explanation of the invention is only used for explaining the present invention, is not intended as to this
The restriction of invention.
Embodiment:
It is a kind of based on BIM to the method for skyscraper transported material, comprise the following steps:
1) height of high-rise building, is obtained, danger and the fault message for being possible to occur under the height is judged;
2) weight, the dimension information for wanting transported material, are obtained;
3), with reference to step 1), 2) obtain information, the different BIM of conveying arrangement and conveying mechanism are set up using BIM technology
Model, obtains the analog result of all BIM models;
4), selected according to analog result, the conveying arrangement designed in selection best simulation result BIM models and conveying
Mechanism is manufactured and installed;
5) transportation system of the optimal BIM models of the conveying arrangement obtained and conveying mechanism, is set up using BIM technology, is obtained
The BIM models of transportation system that must be all;
6), from step 5) in obtain selection one in all BIM models and be most preferably defined as final material transport system;
In each step, by the analog result input database, analysis selection is carried out by database.
Above-described embodiment, has been carried out further to the purpose of the present invention, technical scheme and beneficial effect
Describe in detail, should be understood that the embodiment that the foregoing is only the present invention, be not intended to limit the present invention
Protection domain, within the spirit and principles of the invention, any modification, equivalent substitution and improvements done etc. all should be included
Within protection scope of the present invention.
Claims (2)
1. it is a kind of based on method from BIM to skyscraper transported material, it is characterised in that comprise the following steps:
1) height of high-rise building, is obtained, danger and the fault message for being possible to occur under the height is judged;
2) weight, the dimension information for wanting transported material, are obtained;
3), with reference to step 1), 2) obtain information, the different BIM moulds of conveying arrangement and conveying mechanism are set up using BIM technology
Type, obtains the analog result of all BIM models;
4), selected according to analog result, the conveying arrangement and conveying mechanism designed in selection best simulation result BIM models
Manufactured and installed;
5) transportation system of the optimal BIM models of the conveying arrangement obtained and conveying mechanism, is set up using BIM technology, institute is obtained
The BIM models of some transportation systems;
6), from step 5) in obtain selection one in all BIM models and be most preferably defined as final material transport system.
2. it is according to claim 1 it is a kind of based on method from BIM to skyscraper transported material, it is characterised in that by institute
Analog result input database is stated, analysis selection is carried out by database.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710447150.0A CN107292012A (en) | 2017-06-14 | 2017-06-14 | It is a kind of based on method from BIM to skyscraper transported material |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710447150.0A CN107292012A (en) | 2017-06-14 | 2017-06-14 | It is a kind of based on method from BIM to skyscraper transported material |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107292012A true CN107292012A (en) | 2017-10-24 |
Family
ID=60096962
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710447150.0A Pending CN107292012A (en) | 2017-06-14 | 2017-06-14 | It is a kind of based on method from BIM to skyscraper transported material |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107292012A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108133242A (en) * | 2017-11-21 | 2018-06-08 | 上海建工五建集团有限公司 | Construction material vertical transporting method and system |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101916970A (en) * | 2010-07-29 | 2010-12-15 | 广州电力设计院 | Indoor ventilation system of transformer substation and design method thereof |
US20120296609A1 (en) * | 2011-05-17 | 2012-11-22 | Azam Khan | Systems and methods for displaying a unified representation of performance related data |
CN204759417U (en) * | 2015-05-20 | 2015-11-11 | 河南省恒远起重机械集团有限公司 | Hoist cloud designing for manufacturing platform |
CN106202723A (en) * | 2016-07-10 | 2016-12-07 | 北京工业大学 | A kind of BIM subway work method |
CN106228208A (en) * | 2016-07-21 | 2016-12-14 | 重庆工程职业技术学院 | Control system based on BIM and method |
CN106372302A (en) * | 2016-08-31 | 2017-02-01 | 浙江精工钢结构集团有限公司 | Tower crane automatic model selection and optimization system and method based on BIM (Building Information Modeling) technology |
CN106707956A (en) * | 2017-02-15 | 2017-05-24 | 京能(锡林郭勒)发电有限公司 | Intelligent and fully-automatic stacker-reclaimer control device |
-
2017
- 2017-06-14 CN CN201710447150.0A patent/CN107292012A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101916970A (en) * | 2010-07-29 | 2010-12-15 | 广州电力设计院 | Indoor ventilation system of transformer substation and design method thereof |
US20120296609A1 (en) * | 2011-05-17 | 2012-11-22 | Azam Khan | Systems and methods for displaying a unified representation of performance related data |
CN204759417U (en) * | 2015-05-20 | 2015-11-11 | 河南省恒远起重机械集团有限公司 | Hoist cloud designing for manufacturing platform |
CN106202723A (en) * | 2016-07-10 | 2016-12-07 | 北京工业大学 | A kind of BIM subway work method |
CN106228208A (en) * | 2016-07-21 | 2016-12-14 | 重庆工程职业技术学院 | Control system based on BIM and method |
CN106372302A (en) * | 2016-08-31 | 2017-02-01 | 浙江精工钢结构集团有限公司 | Tower crane automatic model selection and optimization system and method based on BIM (Building Information Modeling) technology |
CN106707956A (en) * | 2017-02-15 | 2017-05-24 | 京能(锡林郭勒)发电有限公司 | Intelligent and fully-automatic stacker-reclaimer control device |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108133242A (en) * | 2017-11-21 | 2018-06-08 | 上海建工五建集团有限公司 | Construction material vertical transporting method and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107229802A (en) | Construction techniques based on BIM | |
CN105868502A (en) | BIM (building information modeling) based material management system and control method thereof | |
CN107255981A (en) | A kind of super high rise building transport of materials management system based on BIM | |
CN107292012A (en) | It is a kind of based on method from BIM to skyscraper transported material | |
EP3904868A4 (en) | Learned model generation method, learned model, surface defect inspection method, steel manufacturing method, pass/fail determination method, grade determination method, surface defect determination program, pass/fail determination program, determination system, and steel manufacturing equipment | |
Landingin et al. | Comparative analysis of RC irregular buildings designed according to different seismic design codes | |
Lee et al. | Applied technologies in minimizing accidents in construction industry | |
CN106639344A (en) | Concrete exposed reinforcing bar and hole repairing scheme | |
CN204983135U (en) | Elevator discrepancy floor regularization passageway | |
CN205724669U (en) | Frock is laid in cable layering beam splitting | |
CN104060832A (en) | Method and device for improving safety of unloading platform | |
CN106401157A (en) | Movable operation platform and high-altitude construction method | |
MX2017008684A (en) | Tank car top platform assembly closure plate. | |
Kochan et al. | Replacement of existing ground wire with OPGW under live-line conditions new training polygon in Olsztyn | |
CN105305332A (en) | Electric engineering construction method | |
CN204940519U (en) | People's Cargo Lift cage buffer platform | |
CN205419540U (en) | Explosive is reinforced (rfd) channel -section steel guide rail that suspends in midair of interface for railcar | |
CN203834912U (en) | Platform for mounting elevator | |
CN203821360U (en) | Multi-span universal combined type ship lock inspection door | |
CN204054321U (en) | Concrete prefabricated board production system and vibration control system thereof | |
CN111600203B (en) | Automatic arrangement method of two groups of electrical equipment | |
CN206004139U (en) | Non-conductor lightning conducter rod structure | |
CN102704665A (en) | Foldable horizontal protector between external climbing frame and building and foldable horizontal protection method | |
CN207526216U (en) | A kind of string mends outlet structure structure | |
CN106285718A (en) | High temperature resistant subway segment and processing method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171024 |
|
RJ01 | Rejection of invention patent application after publication |