CN205724669U - Frock is laid in cable layering beam splitting - Google Patents

Frock is laid in cable layering beam splitting Download PDF

Info

Publication number
CN205724669U
CN205724669U CN201620264783.9U CN201620264783U CN205724669U CN 205724669 U CN205724669 U CN 205724669U CN 201620264783 U CN201620264783 U CN 201620264783U CN 205724669 U CN205724669 U CN 205724669U
Authority
CN
China
Prior art keywords
cable
frock
beam splitting
laid
flat steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620264783.9U
Other languages
Chinese (zh)
Inventor
苏显文
郭常辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Liaonan Shipyard
Original Assignee
Dalian Liaonan Shipyard
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Liaonan Shipyard filed Critical Dalian Liaonan Shipyard
Priority to CN201620264783.9U priority Critical patent/CN205724669U/en
Application granted granted Critical
Publication of CN205724669U publication Critical patent/CN205724669U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of cable layering beam splitting and lay frock, including flat steel framework, brace, baffle plate and cable bearer, described cable bearer is fixed between flat steel framework, and described baffle plate is arranged on the two ends of cable bearer, and described brace is connected with flat steel framework.Frock is laid in the layering beam splitting of this utility model cable, just the cable needing the upper and lower to lay can be carried out pulling simultaneously, improve production efficiency, saved a large amount of manpower and time before cable laying.

Description

Frock is laid in cable layering beam splitting
Technical field
This utility model relates to a kind of cable layering beam splitting and lays frock.
Background technology
At present, raising along with the shipboard automation degree of plant construction, number of cables is by the 2000 of the past~3,000 more than 10,000 developed into such as certain type ship, in order to ensure that the most numerous cable layings is by layering, the technological requirement of beam splitting, and reach the aesthetic property laid, construction workshop generally requires the substantial amounts of manpower of input and arranges the cable in pulling process again, unit in charge of construction's common practice be in pulling process due to non-combing good on, the cable of lower floor and corner gets up to " frame " with flitch temporarily, to ensure laying of follow-up cable, the drawback of this way is owing to cable lays, workmen needs the cable laying upper strata to carry out again after " go-no-go " " frame " upper flitch again, owing to the impact of cable weight easily causes the coat layer of power cable and the damage on cable tray surface.
Utility model content
It is high that the purpose of this utility model is to provide a kind of production efficiency, and frock is laid in the layering beam splitting of labor-saving cable.
This utility model be the technical scheme is that frock is laid in a kind of cable layering beam splitting for achieving the above object, including flat steel framework, brace, baffle plate and cable bearer, described cable bearer is fixed between flat steel framework, described baffle plate is arranged on the two ends of cable bearer, and described brace is connected with flat steel framework.
The bottom of described flat steel framework is provided with pipe clamp.
On described brace, pipe clamp is installed.
Described cable bearer is at least one layer.
Frock is laid in the layering beam splitting of this utility model one cable, just the cable needing the upper and lower to lay can be carried out pulling simultaneously, improve production efficiency, saved a large amount of manpower and time before cable laying.
Accompanying drawing explanation
Fig. 1 is the structural representation that frock is laid in the layering beam splitting of a kind of cable of this utility model.
In figure: 1, flat steel framework;2, brace;3, baffle plate;4, cable bearer;5, pipe clamp.
Detailed description of the invention
As shown in Figure 1, frock is laid in cable layering beam splitting, including flat steel framework 1, brace 2, baffle plate 3 and cable bearer 4, cable bearer 4 is fixed between flat steel framework 1, baffle plate 3 is arranged on the two ends of cable bearer 4, brace 2 is connected with flat steel framework 1, the bottom of flat steel framework 1 is provided with pipe clamp 5, pipe clamp 5 is installed on brace 2, cable bearer 4 can be one layer and be arranged on flat steel framework 1, can also be being arranged on flat steel framework of point multilamellar, frock is laid in the layering beam splitting of this utility model cable, before cable laying, just the cable needing the upper and lower to lay can be carried out pulling simultaneously, improve production efficiency, a large amount of manpower and time are saved.

Claims (4)

1. frock is laid in a cable layering beam splitting, it is characterized in that: include flat steel framework, brace, baffle plate and cable bearer, described cable bearer is fixed between flat steel framework, and described baffle plate is arranged on the two ends of cable bearer, and described brace is connected with flat steel framework.
Frock is laid in a kind of cable layering beam splitting the most according to claim 1, it is characterised in that: the bottom of described flat steel framework is provided with pipe clamp.
Frock is laid in a kind of cable layering beam splitting the most according to claim 1, it is characterised in that: on described brace, pipe clamp is installed.
Frock is laid in a kind of cable layering beam splitting the most according to claim 1, it is characterised in that: described cable bearer is at least one layer.
CN201620264783.9U 2016-04-01 2016-04-01 Frock is laid in cable layering beam splitting Active CN205724669U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620264783.9U CN205724669U (en) 2016-04-01 2016-04-01 Frock is laid in cable layering beam splitting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620264783.9U CN205724669U (en) 2016-04-01 2016-04-01 Frock is laid in cable layering beam splitting

Publications (1)

Publication Number Publication Date
CN205724669U true CN205724669U (en) 2016-11-23

Family

ID=57312708

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620264783.9U Active CN205724669U (en) 2016-04-01 2016-04-01 Frock is laid in cable layering beam splitting

Country Status (1)

Country Link
CN (1) CN205724669U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107086511A (en) * 2017-06-01 2017-08-22 芜湖侨云友星电气工业有限公司 A kind of wire harness fixing device
CN115021149A (en) * 2022-06-14 2022-09-06 中船澄西船舶修造有限公司 High-safety ship cargo hold channel cable erection method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107086511A (en) * 2017-06-01 2017-08-22 芜湖侨云友星电气工业有限公司 A kind of wire harness fixing device
CN107086511B (en) * 2017-06-01 2018-08-31 芜湖侨云友星电气工业有限公司 A kind of wire harness fixing device
CN115021149A (en) * 2022-06-14 2022-09-06 中船澄西船舶修造有限公司 High-safety ship cargo hold channel cable erection method
CN115021149B (en) * 2022-06-14 2024-03-29 中船澄西船舶修造有限公司 High-safety erection method for ship cargo compartment channel cable

Similar Documents

Publication Publication Date Title
CN204401997U (en) A kind of suspension type ceiling construction scaffold
CN204262644U (en) Steel reinforcement cage welding jig
CN205724669U (en) Frock is laid in cable layering beam splitting
CN204243624U (en) Turning wire dispenser
CN103835511A (en) Integral lifting method for ultra-long light thin giant steel tube truss
CN104294984A (en) Thin-wall square box anti-floating structure and construction method thereof
CN203938196U (en) A kind of device for transporting equipment of semi-underground powerhouse
CN104060841B (en) Large-span steel girder construction method of installation
CN204920191U (en) Aluminum alloy template room
CN202716526U (en) Photovoltaic module lamination preparing production line
CN204243626U (en) Cable unwinding device
CN203434534U (en) Multipurpose cable corner protective laying pulley block
CN204715613U (en) Steel work plate
CN202031309U (en) Suspending operation platform for structural concrete constructions
CN202559750U (en) Mold for making positioning device for shear wall body reinforcing cage of high-rise building
CN204706792U (en) Distribution box
CN202674539U (en) Vertical diameter-changing height-adjusting device universally used for ocean platform bridge frames
CN203266735U (en) Cutting tool
CN203111460U (en) Generator module multifunctional channel for floating production storage and offloading vessel
CN105781133A (en) Simple edge protecting system and construction method thereof
CN104085559A (en) Method for increasing production speed of steel pipe finishing line and tracking steel pipe information
CN209608230U (en) Cable sheave frame
CN203707715U (en) Cable trench assembly
CN205061177U (en) Wire winding pile of installation ladder frame
CN203728456U (en) Rotating platform for crane and crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant