CN205724669U - Frock is laid in cable layering beam splitting - Google Patents
Frock is laid in cable layering beam splitting Download PDFInfo
- Publication number
- CN205724669U CN205724669U CN201620264783.9U CN201620264783U CN205724669U CN 205724669 U CN205724669 U CN 205724669U CN 201620264783 U CN201620264783 U CN 201620264783U CN 205724669 U CN205724669 U CN 205724669U
- Authority
- CN
- China
- Prior art keywords
- cable
- frock
- beam splitting
- laid
- flat steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a kind of cable layering beam splitting and lay frock, including flat steel framework, brace, baffle plate and cable bearer, described cable bearer is fixed between flat steel framework, and described baffle plate is arranged on the two ends of cable bearer, and described brace is connected with flat steel framework.Frock is laid in the layering beam splitting of this utility model cable, just the cable needing the upper and lower to lay can be carried out pulling simultaneously, improve production efficiency, saved a large amount of manpower and time before cable laying.
Description
Technical field
This utility model relates to a kind of cable layering beam splitting and lays frock.
Background technology
At present, raising along with the shipboard automation degree of plant construction, number of cables is by the 2000 of the past~3,000 more than 10,000 developed into such as certain type ship, in order to ensure that the most numerous cable layings is by layering, the technological requirement of beam splitting, and reach the aesthetic property laid, construction workshop generally requires the substantial amounts of manpower of input and arranges the cable in pulling process again, unit in charge of construction's common practice be in pulling process due to non-combing good on, the cable of lower floor and corner gets up to " frame " with flitch temporarily, to ensure laying of follow-up cable, the drawback of this way is owing to cable lays, workmen needs the cable laying upper strata to carry out again after " go-no-go " " frame " upper flitch again, owing to the impact of cable weight easily causes the coat layer of power cable and the damage on cable tray surface.
Utility model content
It is high that the purpose of this utility model is to provide a kind of production efficiency, and frock is laid in the layering beam splitting of labor-saving cable.
This utility model be the technical scheme is that frock is laid in a kind of cable layering beam splitting for achieving the above object, including flat steel framework, brace, baffle plate and cable bearer, described cable bearer is fixed between flat steel framework, described baffle plate is arranged on the two ends of cable bearer, and described brace is connected with flat steel framework.
The bottom of described flat steel framework is provided with pipe clamp.
On described brace, pipe clamp is installed.
Described cable bearer is at least one layer.
Frock is laid in the layering beam splitting of this utility model one cable, just the cable needing the upper and lower to lay can be carried out pulling simultaneously, improve production efficiency, saved a large amount of manpower and time before cable laying.
Accompanying drawing explanation
Fig. 1 is the structural representation that frock is laid in the layering beam splitting of a kind of cable of this utility model.
In figure: 1, flat steel framework;2, brace;3, baffle plate;4, cable bearer;5, pipe clamp.
Detailed description of the invention
As shown in Figure 1, frock is laid in cable layering beam splitting, including flat steel framework 1, brace 2, baffle plate 3 and cable bearer 4, cable bearer 4 is fixed between flat steel framework 1, baffle plate 3 is arranged on the two ends of cable bearer 4, brace 2 is connected with flat steel framework 1, the bottom of flat steel framework 1 is provided with pipe clamp 5, pipe clamp 5 is installed on brace 2, cable bearer 4 can be one layer and be arranged on flat steel framework 1, can also be being arranged on flat steel framework of point multilamellar, frock is laid in the layering beam splitting of this utility model cable, before cable laying, just the cable needing the upper and lower to lay can be carried out pulling simultaneously, improve production efficiency, a large amount of manpower and time are saved.
Claims (4)
1. frock is laid in a cable layering beam splitting, it is characterized in that: include flat steel framework, brace, baffle plate and cable bearer, described cable bearer is fixed between flat steel framework, and described baffle plate is arranged on the two ends of cable bearer, and described brace is connected with flat steel framework.
Frock is laid in a kind of cable layering beam splitting the most according to claim 1, it is characterised in that: the bottom of described flat steel framework is provided with pipe clamp.
Frock is laid in a kind of cable layering beam splitting the most according to claim 1, it is characterised in that: on described brace, pipe clamp is installed.
Frock is laid in a kind of cable layering beam splitting the most according to claim 1, it is characterised in that: described cable bearer is at least one layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620264783.9U CN205724669U (en) | 2016-04-01 | 2016-04-01 | Frock is laid in cable layering beam splitting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620264783.9U CN205724669U (en) | 2016-04-01 | 2016-04-01 | Frock is laid in cable layering beam splitting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205724669U true CN205724669U (en) | 2016-11-23 |
Family
ID=57312708
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620264783.9U Active CN205724669U (en) | 2016-04-01 | 2016-04-01 | Frock is laid in cable layering beam splitting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205724669U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107086511A (en) * | 2017-06-01 | 2017-08-22 | 芜湖侨云友星电气工业有限公司 | A kind of wire harness fixing device |
CN115021149A (en) * | 2022-06-14 | 2022-09-06 | 中船澄西船舶修造有限公司 | High-safety ship cargo hold channel cable erection method |
-
2016
- 2016-04-01 CN CN201620264783.9U patent/CN205724669U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107086511A (en) * | 2017-06-01 | 2017-08-22 | 芜湖侨云友星电气工业有限公司 | A kind of wire harness fixing device |
CN107086511B (en) * | 2017-06-01 | 2018-08-31 | 芜湖侨云友星电气工业有限公司 | A kind of wire harness fixing device |
CN115021149A (en) * | 2022-06-14 | 2022-09-06 | 中船澄西船舶修造有限公司 | High-safety ship cargo hold channel cable erection method |
CN115021149B (en) * | 2022-06-14 | 2024-03-29 | 中船澄西船舶修造有限公司 | High-safety erection method for ship cargo compartment channel cable |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204401997U (en) | A kind of suspension type ceiling construction scaffold | |
CN204262644U (en) | Steel reinforcement cage welding jig | |
CN205724669U (en) | Frock is laid in cable layering beam splitting | |
CN204243624U (en) | Turning wire dispenser | |
CN103835511A (en) | Integral lifting method for ultra-long light thin giant steel tube truss | |
CN104294984A (en) | Thin-wall square box anti-floating structure and construction method thereof | |
CN203938196U (en) | A kind of device for transporting equipment of semi-underground powerhouse | |
CN104060841B (en) | Large-span steel girder construction method of installation | |
CN204920191U (en) | Aluminum alloy template room | |
CN202716526U (en) | Photovoltaic module lamination preparing production line | |
CN204243626U (en) | Cable unwinding device | |
CN203434534U (en) | Multipurpose cable corner protective laying pulley block | |
CN204715613U (en) | Steel work plate | |
CN202031309U (en) | Suspending operation platform for structural concrete constructions | |
CN202559750U (en) | Mold for making positioning device for shear wall body reinforcing cage of high-rise building | |
CN204706792U (en) | Distribution box | |
CN202674539U (en) | Vertical diameter-changing height-adjusting device universally used for ocean platform bridge frames | |
CN203266735U (en) | Cutting tool | |
CN203111460U (en) | Generator module multifunctional channel for floating production storage and offloading vessel | |
CN105781133A (en) | Simple edge protecting system and construction method thereof | |
CN104085559A (en) | Method for increasing production speed of steel pipe finishing line and tracking steel pipe information | |
CN209608230U (en) | Cable sheave frame | |
CN203707715U (en) | Cable trench assembly | |
CN205061177U (en) | Wire winding pile of installation ladder frame | |
CN203728456U (en) | Rotating platform for crane and crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |