CN202716526U - Photovoltaic module lamination preparing production line - Google Patents

Photovoltaic module lamination preparing production line Download PDF

Info

Publication number
CN202716526U
CN202716526U CN2012204063951U CN201220406395U CN202716526U CN 202716526 U CN202716526 U CN 202716526U CN 2012204063951 U CN2012204063951 U CN 2012204063951U CN 201220406395 U CN201220406395 U CN 201220406395U CN 202716526 U CN202716526 U CN 202716526U
Authority
CN
China
Prior art keywords
workbench
holder
photovoltaic module
placement platform
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2012204063951U
Other languages
Chinese (zh)
Inventor
黄笑峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Artes Photovoltaic Power Luoyang Co ltd
Canadian Solar Inc
Original Assignee
CSI Solar Power Luoyang Co Ltd
Canadian Solar China Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSI Solar Power Luoyang Co Ltd, Canadian Solar China Investment Co Ltd filed Critical CSI Solar Power Luoyang Co Ltd
Priority to CN2012204063951U priority Critical patent/CN202716526U/en
Application granted granted Critical
Publication of CN202716526U publication Critical patent/CN202716526U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/50Manufacturing or production processes characterised by the final manufactured product

Abstract

The utility model discloses a photovoltaic module lamination preparing production line which comprises a plurality of work benches which are mutually connected, conveying devices arranged between the work benches to convey materials, a plurality of material placing platforms arranged between two adjacent work benches and placing boxes arranged on sides of the work benches. The material placing platforms bridge two adjacent work benches, and different work contents can be finished by two adjacent work benches. Compared with the prior art, the photovoltaic module lamination preparing production line can greatly reduce time wasted by frequently transporting and improves production efficiency. In addition, one work bench is charge for one single work task, so that operators can grasp skills easily, time for pre-job training of new employees is greatly shortened, and production efficiency is improved.

Description

The photovoltaic module lamination is prepared streamline
Technical field
The utility model relates to the production technology of photovoltaic module, relates in particular to a kind of streamline for preparation before the photovoltaic module lamination.
Background technology
Common photovoltaic module generally includes cell piece, be positioned at the glued membrane of cell piece both sides (such as the EVA glued membrane), be positioned at the transparent panel of cell piece top and be positioned at the backboard of cell piece below, described element is laminated into one by the mode of lamination, forms a photovoltaic battery panel.
Before lamination, at first need to carry out a series of preparation, just each material is put into laminating apparatus at last and carry out lamination, preparation before the described lamination comprises lifting puts, cell piece is put, carrying, welding, cut glue, the operations such as range estimation, one group of main dependence two people, from lifting transparent panel (such as glass) to finishing all lamination warming-up exercises, namely these two operating personnel need to lift and put transparent panel, lay cell piece, the welding busbar, the EVA glued membrane, and then be carried to the range estimation platform and carry out range estimation work before the lamination, put into again laminating apparatus after range estimation finishes at last and carry out lamination, in this process, the action that each operating personnel needs to be grasped is more, everyone need be equipped with flatiron on hand, sealing-tape machine, the instruments such as scissors, find in the practice, this operating type has the inconvenience part, and for example: every group of personnel's job content is more, and the new employee usually need to be through could skillfully grasping work in every technical ability after the long time of training; And every group of personnel need to lift transparent panel, get battery strings, and handling process has caused great time waste; The workload of two people on the same group during as upper and lower hand is often unbalanced, easily causes the time waited for of setting about more, affects operating efficiency.
The utility model content
The technical problem that the utility model solves is to provide a kind of photovoltaic module lamination to prepare streamline, but its Effective Raise production efficiency reduces human cost.
For solving the problems of the technologies described above, the utility model adopts following technical scheme: a kind of photovoltaic module lamination is prepared streamline, comprise some workbench that are connected each other, the conveyer that transmits material between the workbench, some between adjacent two workbench the material placement platform and be positioned at the holder of described workbench one side, described material placement platform is across between adjacent two workbench, and described adjacent two workbench are responsible for finishing different actions.
As the further improvement of the technical program, described workbench comprises: place the first workbench of transparent panel and upper strata glued membrane, the second workbench that is used for laying photovoltaic cell string, the 3rd workbench, the 4th workbench that is used for welding short busbar, the 5th workbench that is used for placing insulation strip, the 6th workbench that is used for the long busbar of welding that are used for taping, be used for the joint strip code and lay lower floor's glued membrane the 7th workbench, be used for the 9th workbench laying the 8th workbench of backboard and be used for estimating.
As the further improvement of the technical program, described material placement platform comprises at the first material placement platform between described the second workbench and the 3rd workbench, at the second material placement platform between described the 7th workbench and the 8th workbench and the 3 material placement platform between described the 8th workbench and the 9th workbench.
As the further improvement of the technical program, described holder comprises the template holder that is positioned at the second workbench both sides, be positioned at the 3rd workbench both sides adhesive tape holder, be positioned at the 4th workbench both sides short busbar holder, be positioned at the 5th workbench one side the insulation strip holder, be positioned at the long busbar holder of the 6th workbench both sides and the bar code holder that is positioned at the 7th and the 8th workbench one side.
Compared with prior art, the utility model lamination is prepared streamline can greatly reduce the time waste that frequent carrying brings, and enhances productivity; In addition, because each workbench only is responsible for single task, so that operating personnel more easily acquire skill, also greatly shorten the time of new employee's pre-job training, enhance productivity.
Description of drawings
Fig. 1 is the production model schematic diagram of photovoltaic module lamination preparation in the prior art.
Fig. 2 is the schematic diagram that photovoltaic module lamination described in the utility model is prepared streamline.
The specific embodiment
See also shown in Figure 2, the utility model provides a kind of photovoltaic module lamination to prepare streamline, be used for finishing the every preparation before assembly is carried out lamination, this streamline comprise the workbench that some straight lines arrange, the conveyer that connects each workbench, some between adjacent two workbench the material placement platform and be positioned at the holder of described workbench both sides.
Described workbench distributes by the pipelining mode, all lamination preparations are carried out the segmented arrangement, task between the different workbench is not identical, each workbench only is responsible for finishing same task, adjacent two workbench each other mutual when working do not affect, and described each workbench all is equipped with 1-2 name staff.
Figure 2 shows that most preferred embodiment of the present utility model, described workbench comprises successively: place the first workbench of transparent panel (such as glass) and upper strata glued membrane (such as the EVA glued membrane), the second workbench that is used for laying battery strings, the 3rd workbench, the 4th workbench that is used for welding short busbar, the 5th workbench that is used for placing insulation strip, the 6th workbench that is used for the long busbar of welding that are used for taping, be used for the joint strip code and lay the EVA of lower floor glued membrane the 7th workbench, be used for the 9th workbench laying the 8th workbench of backboard and be used for estimating.
Described material placement platform is Overbridge type, it is across between adjacent two workbench, be used for the materials such as placing battery strings, EVA glued membrane and backboard, wherein, it comprises at the first material placement platform between described the second workbench and the 3rd workbench, at the second material placement platform between described the 7th workbench and the 8th workbench and the 3 material placement platform between described the 8th workbench and the 9th workbench.
Described holder is used for placing material and the instruments such as template, sealing-tape machine, Iron Stand, temperature control platform, busbar, insulation strip, scissors, bar code, and purpose is handled easily personnel work, to increase work efficiency.Wherein, described holder comprise the template holder that is positioned at the second workbench both sides, be positioned at the 3rd workbench both sides adhesive tape holder, be positioned at the 4th workbench both sides short busbar holder, be positioned at the 5th workbench one side the insulation strip holder, be positioned at the long busbar holder of the 6th workbench both sides and the bar code holder that is positioned at the 7th and the 8th workbench one side.
In the actual production, concrete operation is as follows successively:
1, is responsible for transparent panel (such as glass) and upper strata EVA glued membrane lifted by 2 operating personnel of the first workbench and is put on the first workbench and finishes laying work, then be transported to the second workbench by conveyer;
2,2 operating personnel by the second workbench are responsible for the material from the first workbench is carried out the laying work of battery strings, by conveyer assembly are sent to the 3rd workbench after finishing;
3,2 of the 3rd workbench staff carry out contraposition to the battery strings that the second workbench lays according to template first, then to the assembly operation of taping, are sent to the 4th workbench by conveyer after finishing;
4,2 operating personnel by the 4th workbench are responsible for welding short busbar, are sent to the 5th workbench after finishing;
5, be sent to the 6th workbench by 1 work that operating personnel are responsible for placing insulation strip and square of the 5th workbench, and by conveyer;
6,2 operating personnel by the 6th workbench are responsible for welding long busbar, and are sent to the 7th workbench;
7,1 operating personnel by the 7th workbench are responsible for joint strip code, the EVA of bedding lower floor glued membrane and open-work, and are sent to the 8th workbench;
The work of 8, covering backboard, joint strip code by 2 operating personnel of the 8th workbench is sent to the 9th workbench at last;
9,2 operating personnel by the 9th workbench estimate, and need to utilize the range estimation jacking system to carry out in this process, and assembly must be through personnel before entering laminating apparatus and carrying out lamination.
Through facts have proved, in the situation that output is constant, after adopting streamline described in the utility model, operating personnel can greatly reduce, reduced human cost, and every group of personnel need the situation of carrying in the prior art, the utility model streamline only needs material handling to the first workbench is got final product, greatly reduce the time waste that frequent carrying brings, improved production efficiency; In addition, because each workbench only is responsible for single task, so that operating personnel more easily acquire skill, also greatly shorten the time of new employee's pre-job training, and determine a post owing to deciding the people after the division of labor, need not each workbench and be equipped with a complete set of tool of production, greatly reduced the quantity of the instruments such as flatiron, sealing-tape machine, scissors, improved the utilization rate of instrument, particularly electric iron, energy-saving and emission-reduction have also been had important meaning.
The above; it only is most preferred embodiment of the present utility model; be not that the utility model is done any pro forma restriction; any those of ordinary skill in the art; do not breaking away from the technical solutions of the utility model scope situation; utilize the method content of above-mentioned announcement that technical solutions of the utility model are made many possible changes and modification, all belong to the scope of claims protection.

Claims (4)

1. a photovoltaic module lamination is prepared streamline, it is characterized in that: comprise some workbench that are connected each other, the conveyer that transmits material between the workbench, some between adjacent two workbench the material placement platform and be positioned at the holder of described workbench one side, described material placement platform is across between adjacent two workbench, and described adjacent two workbench are responsible for finishing different actions.
2. photovoltaic module lamination according to claim 1 is prepared streamline, and it is characterized in that: described workbench comprises: place the first workbench of transparent panel and upper strata glued membrane, the second workbench that is used for laying photovoltaic cell string, the 3rd workbench, the 4th workbench that is used for welding short busbar, the 5th workbench that is used for placing insulation strip, the 6th workbench that is used for the long busbar of welding that are used for taping, be used for the joint strip code and lay lower floor's glued membrane the 7th workbench, be used for the 9th workbench laying the 8th workbench of backboard and be used for estimating.
3. photovoltaic module lamination according to claim 2 is prepared streamline, and it is characterized in that: described material placement platform comprises at the first material placement platform between described the second workbench and the 3rd workbench, at the second material placement platform between described the 7th workbench and the 8th workbench and the 3 material placement platform between described the 8th workbench and the 9th workbench.
4. photovoltaic module lamination according to claim 3 is prepared streamline, it is characterized in that: described holder comprises the template holder that is positioned at the second workbench both sides, be positioned at the 3rd workbench both sides adhesive tape holder, be positioned at the 4th workbench both sides short busbar holder, be positioned at the 5th workbench one side the insulation strip holder, be positioned at the long busbar holder of the 6th workbench both sides and the bar code holder that is positioned at the 7th and the 8th workbench one side.
CN2012204063951U 2012-08-16 2012-08-16 Photovoltaic module lamination preparing production line Expired - Lifetime CN202716526U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012204063951U CN202716526U (en) 2012-08-16 2012-08-16 Photovoltaic module lamination preparing production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012204063951U CN202716526U (en) 2012-08-16 2012-08-16 Photovoltaic module lamination preparing production line

Publications (1)

Publication Number Publication Date
CN202716526U true CN202716526U (en) 2013-02-06

Family

ID=47618362

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012204063951U Expired - Lifetime CN202716526U (en) 2012-08-16 2012-08-16 Photovoltaic module lamination preparing production line

Country Status (1)

Country Link
CN (1) CN202716526U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105895733A (en) * 2015-07-17 2016-08-24 无锡市正罡自动化设备有限公司 Solar cell string automatic superposition welding machine
CN106241376A (en) * 2016-09-01 2016-12-21 肖智柏 Automatically chain road produces assembly and lays station
CN106271259A (en) * 2016-09-01 2017-01-04 肖智柏 Automatically chain road produces assembly and lays station and production method thereof
CN110508956A (en) * 2019-09-04 2019-11-29 苏州德睿联自动化科技有限公司 Imbrication plate busbar welding equipment and method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105895733A (en) * 2015-07-17 2016-08-24 无锡市正罡自动化设备有限公司 Solar cell string automatic superposition welding machine
CN106241376A (en) * 2016-09-01 2016-12-21 肖智柏 Automatically chain road produces assembly and lays station
CN106271259A (en) * 2016-09-01 2017-01-04 肖智柏 Automatically chain road produces assembly and lays station and production method thereof
CN110508956A (en) * 2019-09-04 2019-11-29 苏州德睿联自动化科技有限公司 Imbrication plate busbar welding equipment and method
CN110508956B (en) * 2019-09-04 2024-02-06 苏州德睿联自动化科技有限公司 Device and method for welding bus bars of shingle

Similar Documents

Publication Publication Date Title
CN202716526U (en) Photovoltaic module lamination preparing production line
CN205240672U (en) Pipeline upset machine of weighing on line
CN103531668A (en) Full-automatic photovoltaic module laminating equipment
CN102501552B (en) Intelligent laying production equipment for crystalline silicon solar laminated plates
CN205969363U (en) Stuff makeup device
CN202053237U (en) Multipurpose platform capable of rotating by 360 degrees
CN103659951A (en) Circulating production line of jointed board of finger-joint board
CN203409874U (en) Seven-station panel furniture edge banding/ gang drill processing production line
CN203134844U (en) A solar battery welding operation device
CN202140500U (en) Adhesive tape stripping device
CN204957098U (en) Paper machine is spread to photovoltaic line duplex position
CN205724669U (en) Frock is laid in cable layering beam splitting
CN206255618U (en) Article automatic grabbing device
CN209291456U (en) A kind of Automatic-feeding device systems of PVC card piece laminating technology
CN204999465U (en) Assembly device of elevator package door plant
CN107538888A (en) A kind of light steel light composite board flexible manufacturing system and its manufacture method
CN202805339U (en) Circulating production line for finger joint plates
CN102954908B (en) Container pattern or conventional rigid add and subtract the method for weight load in case in testing
CN201410695Y (en) Structure for maintaining wood floor
CN202296267U (en) Stack transmitting device
CN206550579U (en) A kind of welding production line and its planer-type workpiece grabbing mechanism
CN206590580U (en) A kind of structure for realizing the automatic stocker of producing line glass
CN205910785U (en) Automatic machine of delivering of parcel
CN202443995U (en) Conveyance device of solar battery assembly
CN202189825U (en) Multi-station cascade bench

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 215000 199 deer Road, hi tech Development Zone, Jiangsu, Suzhou

Co-patentee after: ARTES PHOTOVOLTAIC POWER (LUOYANG) Co.,Ltd.

Patentee after: CSI SOLAR POWER GROUP Co.,Ltd.

Address before: 215000 199 deer Road, hi tech Development Zone, Jiangsu, Suzhou

Co-patentee before: ARTES PHOTOVOLTAIC POWER (LUOYANG) Co.,Ltd.

Patentee before: CSI SOLAR POWER (CHINA) Inc.

CP03 Change of name, title or address

Address after: No. 199, deer mountain road, Suzhou high tech Zone, Jiangsu Province

Patentee after: Atlas sunshine Power Group Co.,Ltd.

Patentee after: ARTES PHOTOVOLTAIC POWER (LUOYANG) Co.,Ltd.

Address before: 215000 199 Lushan Road, high tech Zone, Suzhou, Jiangsu Province

Patentee before: CSI SOLAR POWER GROUP Co.,Ltd.

Patentee before: ARTES PHOTOVOLTAIC POWER (LUOYANG) Co.,Ltd.

CP03 Change of name, title or address
CX01 Expiry of patent term

Granted publication date: 20130206

CX01 Expiry of patent term