CN102704665A - Foldable horizontal protector between external climbing frame and building and foldable horizontal protection method - Google Patents

Foldable horizontal protector between external climbing frame and building and foldable horizontal protection method Download PDF

Info

Publication number
CN102704665A
CN102704665A CN2012101871250A CN201210187125A CN102704665A CN 102704665 A CN102704665 A CN 102704665A CN 2012101871250 A CN2012101871250 A CN 2012101871250A CN 201210187125 A CN201210187125 A CN 201210187125A CN 102704665 A CN102704665 A CN 102704665A
Authority
CN
China
Prior art keywords
climbing frame
building
horizontal protective
horizontal
protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101871250A
Other languages
Chinese (zh)
Inventor
李栋
谭建国
赵亚军
陈俊杰
于新平
陈广林
黎金亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN2012101871250A priority Critical patent/CN102704665A/en
Publication of CN102704665A publication Critical patent/CN102704665A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a foldable horizontal protection method between an external climbing frame and a building. The method mainly comprises the following steps that a middle foldable horizontal protector and a bottom foldable horizontal protector are respectively arranged between the outer climbing frame and the building; when the outer climbing frame is lifted, the middle horizontal protector and the bottom horizontal protector are collected and folded and are lifted together with the outer climbing frame; and after the lifting of the outer climbing frame is completed, the middle horizontal protector and the bottom horizontal protector are placed down, and a gap between the outer climbing frame and the building is sealed. The middle horizontal protector is rotatablely connected with an outer climbing frame vertical rod through a rotating buckle, so that the middle horizontal protector can rotate in the vertical direction by using a connecting point as an axis, telescopic channel steel is arranged at the bottom of the outer climbing frame, in addition, a panel is paved on the telescopic channel steel, the dual effective protection effects can be realized on the gap between the outer climbing frame and the building, and in addition, the inconvenience when the horizontal protector is dismounted and erected again during the lifting of the outer climbing frame is avoided.

Description

But folding horizontal protective and means of defence thereof between outer climbing frame and building
Technical field
The present invention relates to the engineering measuring technology field, but folding horizontal protective technology between especially a kind of outer climbing frame and building.
Background technology
Because the high speed development of building trade; Highrise building is also more and more; The use of outer climbing frame is also more and more general, find by inquiry, present attaching hoisting scaffold (be called for short down: outer climbing frame) and the protection of the horizontal clearance between building basically all be in high-risk status; After even if horizontal clearance protection is for the first time passed through to check and accept, level when the support body improvement stage midway also is difficult to keep checking and accepting.
Because present speed of application is all very fast, structure, decoration of exterior wall finishing duration, the height of outer climbing frame was generally four and half (not allowing 5 times above floor height) generally at 4~5 days/layer; The lifting time be generally 4~5 days/inferior, the workman needs the protection of horizontal clearance is removed and pole need left building 20cm under order before each the lifting, need set up support body again and lay protected apron (routine is steel pipe frame upper berth composite board or bamboo board etc.) the horizontal clearance of bottom and structure after the lifting; The horizontal clearance of centre is set up support body and the horizontal blanket net of laying (the general minimum long 30cm of outer climbing frame support size again; The minimum horizontal clearance that leaves 30cm in support body and structure limit), owing to be manually-operated, repeatedly repeat construction; The workman neglects easily in the process; In case supervision and management is not in place, hole will appear in the part, is easy to cause falling object from high altitude or high-altitude to fall; Form great potential safety hazard, cause important social influence and economic loss.
Summary of the invention
Technical problem to be solved by this invention provides a kind of safe and reliable, easy to use, but can effectively solve the folding horizontal protective of horizontal clearance protection question between outer climbing frame and building.
For realizing above-mentioned technique effect, but the invention discloses folding horizontal protective method between a kind of outer climbing frame and building, said method mainly may further comprise the steps:
Foldable respectively between said outer climbing frame and building the protection of a middle part horizontal protective and a bottom level is set;
When promoting said outer climbing frame, folding said middle part horizontal protective and bottom level protection promote with said outer climbing frame;
After said outer climbing frame promotes and accomplishes, put down the protection of said middle part horizontal protective and bottom level, seal the gap between said outer climbing frame and building.
Said method is further improved and is,
In the vertical rod of said outer climbing frame, connect pole through rotary buckle;
On said pole, set firmly rack.
Said method is further improved and is,
On the truss of the bottom of said outer climbing frame, scalable channel-section steel is set;
Said outer climbing frame after promoting and accomplishing stretches out said scalable channel-section steel, lays panel.
But the invention also discloses folding horizontal protective between a kind of outer climbing frame and building, said horizontal protective comprises:
One middle part horizontal protective, the foldable said outer climbing frame middle part that is connected in of said middle part horizontal protective;
The protection of one bottom level, the foldable said outer climbing frame bottom that is connected in of said bottom level protection.
Said horizontal protective further improves and is, first end of said middle part horizontal protective is through the be rotatably connected vertical rod of said outer climbing frame of a rotary buckle, and second end of said middle part horizontal protective is in use against building.
Said horizontal protective further improves and is that said middle part horizontal protective comprises rack and pole, and said rack fixed mount is located on the said pole, and an end of said pole connects the vertical rod of said outer climbing frame through rotary buckle.
Said horizontal protective further improves and is, said bottom level protection comprises that plural scalable channel-section steel, said scalable channel-section steel are arranged in the bottom truss of said outer climbing frame, are equipped with panel on the said scalable channel-section steel.
Said horizontal protective further improves and is that said horizontal protective breaks off at outer climbing frame support place.
The present invention is owing to adopted above technical scheme; Make it have following beneficial effect to be: said middle part horizontal protective is rotatably connected with the outer climbing frame vertical rod through said rotary buckle, and to make it can be that an in the vertical direction rotates with tie point; And at the scalable channel-section steel of outer climbing frame bottom installation; And on said scalable channel-section steel, lay panel, can dual effective protection outer climbing frame and building gap, and the inconvenience of tearing the frame horizontal protective again open when having avoided outer climbing frame to promote.
Description of drawings
But Fig. 1 is the user mode sketch map of folding horizontal protective between outer climbing frame of the present invention and building.
But Fig. 2 is the structural representation of the middle part horizontal protective of folding horizontal protective between outer climbing frame of the present invention and building.
But Fig. 3 is the structural representation of the bottom level protection of folding horizontal protective between outer climbing frame of the present invention and building.
But the elevational schematic view of folding horizontal protective between outer climbing frame of the present invention and building when Fig. 4 is the outer climbing frame lifting.
The specific embodiment
For the benefit of to the further understanding of structure of the present invention, the present invention explains with the preferred embodiment of Fig. 1.
Consult shown in Figure 1; But the folding horizontal protective mainly is made up of middle part horizontal protective that is arranged at outer climbing frame 1 middle part 2 and the bottom level protection 3 that is arranged at outer climbing frame 1 bottom between outer climbing frame of the present invention and building; Cooperate shown in Figure 2; Between adjacent two outer climbing frame supports 10 a middle part horizontal protective 2 is set, the rack 22 that middle part horizontal protective 2 is located on the pole 21 by pole 21 and fixed mount is formed, wherein; First end 211 of pole 21 is connected with the vertical rod 11 of outer climbing frame 1 through a rotary buckle 24 that to make pole 21 can be that a spool in the vertical direction rotates with tie point, and second end 212 of pole 21 seals the gap between outer climbing frame 1 and the building 4 against building 4 with this.
Consult shown in Figure 3 again; Plural scalable channel-section steel 30 is set in the bottom of outer climbing frame 1 truss 12; Scalable channel-section steel 30 stretches out truss 12 and props up building 4, lays panel 31 on truss 12 that section channel-section steels 30 in stretching out, and panel 31 can be composite board or iron sheet; The horizontal clearance of 4 in outer climbing frame 1 and building is tight-closed, thoroughly intercept the small objects that middle part, upper strata horizontal protective 2 fails to intercept.
In conjunction with Fig. 1 and shown in Figure 4, but the folding horizontal protective can be realized the horizontal protective to construction gap between outer climbing frame and building through following steps between outer climbing frame of the present invention and building:
In the vertical rod 11 at outer climbing frame 1 middle part, connect pole 21 through rotary buckle 24;
On pole 21, set firmly rack 22, constitute the middle part horizontal protective 2 between outer climbing frame 1 and the building 4;
Scalable channel-section steel 30 is set on the bottom of outer climbing frame 1 truss 12;
Outer climbing frame 1 after promoting and accomplishing stretches out scalable channel-section steel 30, lays panel 31, constitutes the bottom level protection 3 between outer climbing frame 1 and the building 4;
When promoting outer climbing frame 1, pull-up middle part horizontal protective 2 is held together pole 21 and outer climbing frame vertical rod 11, and the plate body 31 that will be layed in simultaneously on the channel-section steel 30 is removed, and in channel-section steel 30 withdrawal truss 12, begins to promote after inspection all separates;
Outer climbing frame 1 is untied pole 21 and outer climbing frame vertical rod 11 after promoting and accomplishing, and middle part horizontal protective 2 is rotated down once more against building 4 around rotary buckle 24; Seal the gap, stretch out channel-section steel 30 simultaneously, and lay panel 31 against building 4; Fixation, the sealing horizontal clearance reaches the protection purpose.
More than combine accompanying drawing embodiment that the present invention is specified, those skilled in the art can make the many variations example to the present invention according to above-mentioned explanation.Thereby some details among the embodiment should not constitute qualification of the present invention, and the scope that the present invention will define with appended claims is as protection scope of the present invention.

Claims (8)

  1. But 1. folding horizontal protective method between outer climbing frame and building, it is characterized in that: said method mainly may further comprise the steps:
    Foldable respectively between said outer climbing frame and building the protection of a middle part horizontal protective and a bottom level is set;
    When promoting said outer climbing frame, folding said middle part horizontal protective and bottom level protection promote with said outer climbing frame;
    After said outer climbing frame promotes and accomplishes, put down the protection of said middle part horizontal protective and bottom level, seal the gap between said outer climbing frame and building.
  2. 2. the method for claim 1 is characterized in that through following steps said middle part horizontal protective being set:
    In the vertical rod of said outer climbing frame, connect pole through rotary buckle;
    On said pole, set firmly rack.
  3. 3. the method for claim 1 is characterized in that through following steps said bottom level protection being set:
    On the truss of the bottom of said outer climbing frame, scalable channel-section steel is set;
    Said outer climbing frame after promoting and accomplishing stretches out said scalable channel-section steel, lays panel.
  4. 4. but folding horizontal protective between outer climbing frame and building is characterized in that said horizontal protective comprises:
    One middle part horizontal protective, the foldable said outer climbing frame middle part that is connected in of said middle part horizontal protective;
    The protection of one bottom level, the foldable said outer climbing frame bottom that is connected in of said bottom level protection.
  5. 5. horizontal protective as claimed in claim 4 is characterized in that: first end of said middle part horizontal protective is through the be rotatably connected vertical rod of said outer climbing frame of a rotary buckle, and second end of said middle part horizontal protective is in use against building.
  6. 6. horizontal protective as claimed in claim 5 is characterized in that: said middle part horizontal protective comprises rack and pole, and said rack fixed mount is located on the said pole, and an end of said pole connects the vertical rod of said outer climbing frame through rotary buckle.
  7. 7. horizontal protective as claimed in claim 4 is characterized in that: said bottom level protection comprises that plural scalable channel-section steel, said scalable channel-section steel are arranged in the bottom truss of said outer climbing frame, are equipped with panel on the said scalable channel-section steel.
  8. 8. like the described horizontal protective of claim 4 ~ 7, it is characterized in that: said horizontal protective breaks off at outer climbing frame support place.
CN2012101871250A 2012-06-07 2012-06-07 Foldable horizontal protector between external climbing frame and building and foldable horizontal protection method Pending CN102704665A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101871250A CN102704665A (en) 2012-06-07 2012-06-07 Foldable horizontal protector between external climbing frame and building and foldable horizontal protection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101871250A CN102704665A (en) 2012-06-07 2012-06-07 Foldable horizontal protector between external climbing frame and building and foldable horizontal protection method

Publications (1)

Publication Number Publication Date
CN102704665A true CN102704665A (en) 2012-10-03

Family

ID=46897694

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101871250A Pending CN102704665A (en) 2012-06-07 2012-06-07 Foldable horizontal protector between external climbing frame and building and foldable horizontal protection method

Country Status (1)

Country Link
CN (1) CN102704665A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110331850A (en) * 2019-07-22 2019-10-15 浙江奔腾市政园林建设工程有限公司 Masking device and its application method for gap between scaffold and external wall

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2166178Y (en) * 1993-08-03 1994-05-25 张鸿勋 Gangboard stand of scaffold and its dust-proof life net combined apparatus
CN1786385A (en) * 2005-12-14 2006-06-14 姚康华 Protective frame special for construction of building main body
CN2832994Y (en) * 2005-09-20 2006-11-01 姚康华 Dedicated protection frame for construction of main structure
CN101338621A (en) * 2007-07-04 2009-01-07 南通市新华建筑安装工程有限公司 Architecture construction protective fence
CN201526155U (en) * 2009-05-11 2010-07-14 张恒亮 External protection device of scaffold
JP2010222958A (en) * 2009-02-24 2010-10-07 Jfe Kizai Forming Kk Baseboard for scaffold
CN201908447U (en) * 2010-12-10 2011-07-27 中建六局第三建筑工程有限公司 Lift-type horizontal safety net
CN102383588A (en) * 2011-08-25 2012-03-21 深圳市特辰科技股份有限公司 Lifting platform for protecting safety of high-level construction
CN202731319U (en) * 2012-06-07 2013-02-13 中国建筑第八工程局有限公司 Foldable horizontal protector between outer climb frame and building

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2166178Y (en) * 1993-08-03 1994-05-25 张鸿勋 Gangboard stand of scaffold and its dust-proof life net combined apparatus
CN2832994Y (en) * 2005-09-20 2006-11-01 姚康华 Dedicated protection frame for construction of main structure
CN1786385A (en) * 2005-12-14 2006-06-14 姚康华 Protective frame special for construction of building main body
CN101338621A (en) * 2007-07-04 2009-01-07 南通市新华建筑安装工程有限公司 Architecture construction protective fence
JP2010222958A (en) * 2009-02-24 2010-10-07 Jfe Kizai Forming Kk Baseboard for scaffold
CN201526155U (en) * 2009-05-11 2010-07-14 张恒亮 External protection device of scaffold
CN201908447U (en) * 2010-12-10 2011-07-27 中建六局第三建筑工程有限公司 Lift-type horizontal safety net
CN102383588A (en) * 2011-08-25 2012-03-21 深圳市特辰科技股份有限公司 Lifting platform for protecting safety of high-level construction
CN202731319U (en) * 2012-06-07 2013-02-13 中国建筑第八工程局有限公司 Foldable horizontal protector between outer climb frame and building

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈晓苏等: "附着升降脚手架的一种新型底部防护装置――移动式防护平台", 《建筑安全》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110331850A (en) * 2019-07-22 2019-10-15 浙江奔腾市政园林建设工程有限公司 Masking device and its application method for gap between scaffold and external wall
CN110331850B (en) * 2019-07-22 2021-03-30 浙江奔腾市政园林建设工程有限公司 Shielding device for gap between scaffold and building outer wall and using method thereof

Similar Documents

Publication Publication Date Title
CN103236656B (en) Column suspension type crossing structure and operating method thereof
CN104818772B (en) A kind of large span long cantilever conjoined structure and construction technology
CN103982040B (en) A kind of construction of super highrise building vertical multi-transportation device
CN204126290U (en) Elevator shaft horizontal protective device
CN102704665A (en) Foldable horizontal protector between external climbing frame and building and foldable horizontal protection method
CN104060809B (en) A kind of roofing daylighting glass steelframe installs equipment and operation method thereof
CN203475801U (en) Telescopic steel platform for elevator shaft
CN202731319U (en) Foldable horizontal protector between outer climb frame and building
CN205857384U (en) A kind of wide-span cylindrical reticulated shell seal bootr booth structure
CN203961326U (en) Superaltitude outrigger platform Flexible Safety protector
CN201635377U (en) Rigid suspended type scaffold provided with large-span steel roof equipment pipeline
CN106088638A (en) A kind of special building method for high-voltage line protection safety frame
CN205100365U (en) Flexible connected node of primary and secondary frame
CN104631844A (en) Steel column mounting operation platform and mounting method thereof
CN204435859U (en) Be exclusively used in the moveable platform of high-rise concrete construction of lift well
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN206233562U (en) The safety device of revealing all the details of hydraulic pressure lift form frame system
CN203867167U (en) Attached lifting scaffold bottom truss
CN203947753U (en) A kind of hanging-type construction support
CN204357020U (en) Ancient building eaves structure
CN204112746U (en) The two-layer connecting structure of vertical reinforcement of concrete frame structure
CN203998726U (en) Tower crane climbing frame anti-twisting equipment
CN206957178U (en) A kind of monoblock type all steel attached lifting scaffold structure
CN103899078B (en) Attachment automatic lifting protecting screen mounting method
CN107816204A (en) The outer protective frame of skyscraper staggered floor balcony also serves as operating platform erection method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20121003