CN107288274A - It is a kind of go out roof pipeline composite water-proof processing method - Google Patents
It is a kind of go out roof pipeline composite water-proof processing method Download PDFInfo
- Publication number
- CN107288274A CN107288274A CN201710532459.XA CN201710532459A CN107288274A CN 107288274 A CN107288274 A CN 107288274A CN 201710532459 A CN201710532459 A CN 201710532459A CN 107288274 A CN107288274 A CN 107288274A
- Authority
- CN
- China
- Prior art keywords
- processing method
- construction
- waterproof
- layer
- proof processing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D13/00—Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
- E04D13/14—Junctions of roof sheathings to chimneys or other parts extending above the roof
- E04D13/1407—Junctions of roof sheathings to chimneys or other parts extending above the roof for flat roofs
Abstract
The invention discloses it is a kind of go out roof pipeline composite water-proof processing method.Its operating procedure:Construction roof heat insulation sloping layer, cement mortar screeding layer and go out roof waterproof sleeve pipe;It is described go out roof waterproof sleeve pipe interior conduit construction;Space is tamped using pea gravel concreten between described sleeve pipe and the pipeline;Described sleeve pipe bottom surrounding construction casing bottom cement mortar heap slope;With the tube contacts surface construction cannula tip cement mortar heap slope at the top of described sleeve pipe;Construction high polymer asphalt waterproofing paint layer outside described sleeve pipe and on cement mortar screeding layer;SBS coil waterproof layers are laid on the high polymer asphalt waterproofing paint layer;Construction lime mortar separation layer and reinforced concrete protective layer on the roofing SBS coil waterproof layers.The present invention uses composite water-proof processing method, not only can be with protective conduit and waterproof, and waterproof layer is difficult to be destroyed.
Description
Technical field
The present invention relates to construction site construction tool technical field, more particularly to it is a kind of go out roof pipeline it is compound anti-
Method for treating water.
Background technology
With the progress and the raising of material and culture level of science and technology, building roof waterproof technology has the hair advanced by leaps and bounds
Exhibition.At present, roof waterproof is mainly using single SBS coiled materials or pea gravel concreten as waterproof layer, SBS coil waterproof layers it is endurable
Pierce performance and UV resistance is poor;Although and pea gravel concreten waterproof layer puncture-resistant, UV resistant performance very well, elongation percentage and
Tensile strength is than relatively low.Going out the water-proofing treatment mode of roof pipeline:Going out roof pipeline bottom surrounding using cement mortar heap
Slope, then in pipeline external and roofing construction SBS coil waterproof layers.Although this processing mode is simple, to going out roofing
Very little, waterproof effect is poor for the waterproof measure of pipeline, and the SBS coil waterproof layers of pipeline external are more easily damaged, so as to not reach
Waterproof effect.
The content of the invention
Present invention aims at provide it is a kind of go out roof pipeline composite water-proof processing method, with solve it is existing go out roofing
Not the problem of pipeline waterproof processing does not excessively simply reach good waterproof effect.
The present invention operating procedure be:
(1) roof waterproof set pipe construction is gone out;
(2) construction of roof waterproof sleeve pipe interior conduit is gone out described in;
(3) space is tamped using pea gravel concreten between the water string and the pipeline;
(4) the water string bottom surrounding construction casing bottom cement mortar heap slope;
(5) at the top of the water string and tube contacts surface construction cannula tip cement mortar heap slope;
(6) cement mortar is reached after design strength, is constructed outside the water string and on cement mortar screeding layer
High polymer asphalt waterproofing paint layer;
(7) SBS coil waterproof layers are laid on the high polymer asphalt waterproofing paint layer;
(8) construction lime mortar separation layer on the SBS coil waterproof layers;
(9) lime mortar is reached after design strength, and construction reinforced bar concrete is protected on the lime mortar separation layer
Sheath.
As a further improvement on the present invention, the water string is rigid waterproof sleeve, the water string and roofing
Vertically.
As a further improvement on the present invention, the space between water string 1 and pipeline 2 is identical
As a further improvement on the present invention, the high polymer asphalt waterproofing paint layer and the SBS coil waterproof layers will
The water string wraps up and exceeds top mortar heap slope, is 250mm beyond height.
As a further improvement on the present invention, described sleeve pipe bottom cement mortar heap slope, width is 100mm, is highly
50mm。
As a further improvement on the present invention, cement mortar heap slope at the top of described sleeve pipe, width is that the water string is straight
Footpath and the difference of the pipe diameter, highly 1/2 for the water string diameter.
As a further improvement on the present invention, the mixing ratio of the cement of the cement mortar and sand is 1:2.5.
As a further improvement on the present invention, the high polymer asphalt waterproofing paint thickness degree is 2mm, interior paving density 10*
10 coromat cloth.
As a further improvement on the present invention, the SBS coil waterproof layers thickness is 3mm.
As a further improvement on the present invention, the thickness of the lime mortar separation layer is lime in 10mm, lime mortar
Ratio with sand is 1:4.
Water string can play a part of protective conduit and waterproof in the present invention;The design of heap slope can allow water to flow faster
It is dynamic, and it is easy to the laying of waterproof layer;Paving coromat cloth is used as aggregate in high polymer asphalt waterproofing paint layer, it is easy to Gao Ju
The laying of thing asphalt waterproofing paint layer, and be difficult to be destroyed;Go out roof pipeline using multiple water-proofing treatment, waterproof effect is more
It is good.
Brief description of the drawings
Fig. 1 is specific embodiment of the invention schematic diagram.
1. water string;2. pipeline;3. reinforced concrete roof board;4. roof heat insulation sloping layer;5. cement mortar screeding
Layer;6. lime mortar separation layer;7. reinforced concrete protective layer;8. cannula tip cement mortar heap slope;9. pea gravel concreten;
10. high polymer asphalt waterproofing paint layer 11.SBS coil waterproof layers;12. sleeve bottom cement mortar heap slope.
Embodiment
Fig. 1 shows the specific embodiment of the invention.Such as Fig. 1, the present invention it is a kind of go out roof pipeline composite water-proof at
Reason method, its operating procedure:
(1) roof waterproof sleeve pipe 1 is gone out in reinforced concrete roof board construction and installation, it is ensured that go out roof waterproof sleeve pipe 1 and room
Face is vertical;
(2) pipe laying 2 in roof waterproof sleeve pipe 1 is gone out described in, it is ensured that the space between water string 1 and pipeline 2 is identical;
(3) space is tamped using pea gravel concreten 8 between the water string 1 and the pipeline 2;
(4) the bottom surrounding construction casing bottom cement mortar heap slope 12 of water string 1;
(5) top of water string 1 and cement mortar heap slope 8 at the top of the contact surface construction casing of pipeline 2;
(6) cement mortar is reached after design strength, is constructed outside described sleeve pipe 1 and on cement mortar screeding layer 5 high
Polymers asphalt waterproofing paint layer 10;
(7) laying SBS coil waterproof layers 11 on the high polymer asphalt waterproofing paint layer 10;
(8) construction lime mortar separation layer 6 on the roofing SBS coil waterproof layers 11;
(9) lime mortar is reached after design strength, and construction reinforced bar concrete is protected on the lime mortar separation layer 6
Sheath 7.
The water string is rigid waterproof sleeve.The high polymer asphalt waterproofing paint layer 10 and the SBS coiled materials are anti-
Water layer 11 wraps up sleeve pipe, is 250mm beyond height beyond mortar heap slope 8 at the top of described sleeve pipe.Described sleeve pipe bottom cement bonded sand
Heap slope 12 is starched, width is 100mm, is highly 50mm.Cement mortar heap slope 8 at the top of described sleeve pipe, width is the water string 1
The difference of diameter and the diameter of pipeline 2, highly 1/2 for the water string diameter.The cement and sand of the cement mortar
Mixing ratio be 1:2.5.10 thickness of the high polymer asphalt waterproofing paint layer are 2mm, interior paving density 10*10 coromats
Cloth.The thickness of SBS coil waterproof layers 11 is 3mm.The thickness of the lime mortar separation layer 6 is 10mm.The lime mortar
The thickness of separation layer is that the ratio of lime and sand in 10mm, lime mortar is 1:4.Water string can play guarantor in the present invention
The effect in pillar road and waterproof;The design of heap slope can allow water to flow faster, and be easy to the laying of waterproof layer;High polymer pitch
Paving coromat cloth is used as aggregate in waterproof coating layer, it is easy to the laying of high polymer asphalt waterproofing paint layer, and be difficult by
Destruction;Go out roof pipeline using multiple water-proofing treatment, waterproof effect is more preferable.
Claims (10)
1. it is a kind of go out roof pipeline composite water-proof processing method, its operating procedure:
(1) roof waterproof set pipe construction is gone out;
(2) pipe laying in roof waterproof sleeve pipe is gone out described in;
(3) space is tamped using pea gravel concreten between the water string and the pipeline;
(4) the water string bottom surrounding construction casing bottom cement mortar heap slope;
(5) at the top of the water string and tube contacts surface construction cannula tip cement mortar heap slope;
(6) cement mortar is reached after design strength, and construction is high poly- outside the water string and on cement mortar screeding layer
Thing asphalt waterproofing paint layer;
(7) SBS coil waterproof layers are laid on the high polymer asphalt waterproofing paint layer;
(8) construction lime mortar separation layer on the SBS coil waterproof layers;
(9) lime mortar is reached after design strength, the construction reinforced bar concrete cover on the lime mortar separation layer.
2. it is according to claim 1 go out roof pipeline composite water-proof processing method, it is characterised in that:The waterproof jacket
Manage as rigid waterproof sleeve, the water string is vertical with roofing.
3. it is according to claim 1 go out roof pipeline composite water-proof processing method, it is characterised in that:Water string 1
Space between pipeline 2 is identical.
4. it is according to claim 1 go out roof pipeline composite water-proof processing method, it is characterised in that:The high polymer
The water string is wrapped up and exceeds top mortar heap slope by asphalt waterproofing paint layer and the SBS coil waterproof layers, beyond height
Spend for 250mm.
5. it is according to claim 1 go out roof pipeline composite water-proof processing method, it is characterised in that:Described sleeve pipe bottom
Portion cement mortar heap slope, width is 100mm, is highly 50mm.
6. it is according to claim 1 go out roof pipeline composite water-proof processing method, it is characterised in that:Described sleeve pipe top
Portion cement mortar heap slope, width is the difference of the water string diameter and the pipe diameter, is highly the water string
The 1/2 of diameter.
7. the composite water-proof processing method for going out roof pipeline according to claim 1 or 3 or 4, it is characterised in that:It is described
The cement of cement mortar and the mixing ratio of sand are 1:2.5.
8. it is according to claim 1 go out roof pipeline composite water-proof processing method, it is characterised in that:The high polymer
Asphalt waterproofing paint thickness degree is 2mm, interior paving density 10*10 coromat cloth.
9. it is according to claim 1 go out roof pipeline composite water-proof processing method, it is characterised in that:It is described
SBS coil waterproof layers thickness is 3mm.
10. it is according to claim 1 go out roof pipeline composite water-proof processing method, it is characterised in that:The lime
The thickness of mortar separation layer is that the ratio of lime and sand in 10mm, lime mortar is 1:4.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710532459.XA CN107288274A (en) | 2017-07-03 | 2017-07-03 | It is a kind of go out roof pipeline composite water-proof processing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710532459.XA CN107288274A (en) | 2017-07-03 | 2017-07-03 | It is a kind of go out roof pipeline composite water-proof processing method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107288274A true CN107288274A (en) | 2017-10-24 |
Family
ID=60098229
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710532459.XA Pending CN107288274A (en) | 2017-07-03 | 2017-07-03 | It is a kind of go out roof pipeline composite water-proof processing method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107288274A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109667392A (en) * | 2018-12-24 | 2019-04-23 | 中国电建集团山东电力建设第工程有限公司 | A kind of cold-resistant roof waterproof system and construction method |
CN110206234A (en) * | 2019-06-12 | 2019-09-06 | 西安市初元建设工程有限公司 | One kind going out roofing pipeline waterproof construction and its construction technology |
CN113622604A (en) * | 2021-08-18 | 2021-11-09 | 江苏省苏中建设集团股份有限公司 | Passive house roof outlet vertical pipeline air-tightness construction method |
CN114045997A (en) * | 2021-11-19 | 2022-02-15 | 上海宝冶集团有限公司 | Construction method of flexible roof waterproof sleeve |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2154139C2 (en) * | 1998-04-14 | 2000-08-10 | Оренбургский государственный университет | Fitting for attachment of hydraulic insulation layers to ventilation blocks |
FR2895760A1 (en) * | 2006-01-03 | 2007-07-06 | Luigi Pillosio | Object e.g. advertising sign, anchoring method, involves fixing object on rigid steel plate comprising flat lower surface, which is applied and fixed on upper surface of flat roof using adhesive |
CN203080816U (en) * | 2013-01-31 | 2013-07-24 | 河南东大泰隆冶金科技有限公司 | Waterproof structure for pipeline to penetrate through punching roof panel |
CN103669745A (en) * | 2012-09-10 | 2014-03-26 | 陈祥凤 | Heat preservation structure of pipelines going out of roof |
CN204081310U (en) * | 2014-08-19 | 2015-01-07 | 上海建工二建集团有限公司 | Roofing sleeve pipe seepage control system device |
CN105239729A (en) * | 2015-09-29 | 2016-01-13 | 中国建筑第八工程局有限公司 | Construction method for restoration of secondary hole excavation in constructed roof for pipeline penetration |
CN205116582U (en) * | 2015-10-26 | 2016-03-30 | 中国建筑第六工程局有限公司 | Stretch out protection architecture of roofing pipeline |
-
2017
- 2017-07-03 CN CN201710532459.XA patent/CN107288274A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2154139C2 (en) * | 1998-04-14 | 2000-08-10 | Оренбургский государственный университет | Fitting for attachment of hydraulic insulation layers to ventilation blocks |
FR2895760A1 (en) * | 2006-01-03 | 2007-07-06 | Luigi Pillosio | Object e.g. advertising sign, anchoring method, involves fixing object on rigid steel plate comprising flat lower surface, which is applied and fixed on upper surface of flat roof using adhesive |
CN103669745A (en) * | 2012-09-10 | 2014-03-26 | 陈祥凤 | Heat preservation structure of pipelines going out of roof |
CN203080816U (en) * | 2013-01-31 | 2013-07-24 | 河南东大泰隆冶金科技有限公司 | Waterproof structure for pipeline to penetrate through punching roof panel |
CN204081310U (en) * | 2014-08-19 | 2015-01-07 | 上海建工二建集团有限公司 | Roofing sleeve pipe seepage control system device |
CN105239729A (en) * | 2015-09-29 | 2016-01-13 | 中国建筑第八工程局有限公司 | Construction method for restoration of secondary hole excavation in constructed roof for pipeline penetration |
CN205116582U (en) * | 2015-10-26 | 2016-03-30 | 中国建筑第六工程局有限公司 | Stretch out protection architecture of roofing pipeline |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109667392A (en) * | 2018-12-24 | 2019-04-23 | 中国电建集团山东电力建设第工程有限公司 | A kind of cold-resistant roof waterproof system and construction method |
CN109667392B (en) * | 2018-12-24 | 2024-01-19 | 中国电建集团山东电力建设第一工程有限公司 | Cold-resistant roof waterproof system and construction method |
CN110206234A (en) * | 2019-06-12 | 2019-09-06 | 西安市初元建设工程有限公司 | One kind going out roofing pipeline waterproof construction and its construction technology |
CN113622604A (en) * | 2021-08-18 | 2021-11-09 | 江苏省苏中建设集团股份有限公司 | Passive house roof outlet vertical pipeline air-tightness construction method |
CN114045997A (en) * | 2021-11-19 | 2022-02-15 | 上海宝冶集团有限公司 | Construction method of flexible roof waterproof sleeve |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107288274A (en) | It is a kind of go out roof pipeline composite water-proof processing method | |
CN107190924A (en) | A kind of composite water-proof processing method of parapet of roofing waterproofing node | |
CN202788022U (en) | Wall crack combined type repair structure | |
CN108797651B (en) | Construction method of basement bottom plate leakage water repairing system | |
CN108797904A (en) | A kind of accessible roof secretly buries discharge duct construction method | |
CN107012992B (en) | A kind of construction method of the waterproof integrated system of foam concrete roof heat insulation | |
CN206319910U (en) | Infiltration disposal system is reinforced in a kind of tunnel-liner | |
CN110206234A (en) | One kind going out roofing pipeline waterproof construction and its construction technology | |
CN102776897A (en) | Wash apron anti-settling anti-cracking construction method and structure | |
WO2024001680A1 (en) | Waterproof uplift-resistant pile and construction method | |
CN106812219A (en) | Filling wall top stuff up a crack construction method | |
CN103362253A (en) | Construction method for insulating layer of roof | |
CN105714992A (en) | Pottery tile laying structure and laying method thereof | |
CN108442617A (en) | A kind of ceramic tile fixing means | |
CN106758644A (en) | Light-weight foamed concrete road surface structure and its construction method | |
CN111140263B (en) | Tunnel concrete lining crack width calculation method and crack treatment method | |
CN202532026U (en) | Floor board pipeline waterproof structure | |
CN206928310U (en) | A kind of water proof equipment and waterproof system | |
CN208329409U (en) | A kind of parapet of roofing water leak-proof structure | |
CN206273919U (en) | Toilet doorway waterproof construction | |
CN105239732B (en) | A kind of construction method of the stretching roofing pipe of rainwater leakage prevention | |
CN108589758A (en) | A kind of foundation structure and construction method of acid-resistance infiltration | |
CN103526890B (en) | Silica nanometer insulation quilt roof heat insulation structure and construction technology thereof | |
US11001526B2 (en) | Paver adhesive and method of laying pavers using same | |
CN209011441U (en) | One kind going out roofing air hose node waterproof structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171024 |
|