CN110206234A - One kind going out roofing pipeline waterproof construction and its construction technology - Google Patents

One kind going out roofing pipeline waterproof construction and its construction technology Download PDF

Info

Publication number
CN110206234A
CN110206234A CN201910507901.2A CN201910507901A CN110206234A CN 110206234 A CN110206234 A CN 110206234A CN 201910507901 A CN201910507901 A CN 201910507901A CN 110206234 A CN110206234 A CN 110206234A
Authority
CN
China
Prior art keywords
pipeline
layer
waterproof layer
roofing
waterproof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910507901.2A
Other languages
Chinese (zh)
Inventor
梁小军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an Chuyuan Construction Engineering Co Ltd
Original Assignee
Xi'an Chuyuan Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xi'an Chuyuan Construction Engineering Co Ltd filed Critical Xi'an Chuyuan Construction Engineering Co Ltd
Priority to CN201910507901.2A priority Critical patent/CN110206234A/en
Publication of CN110206234A publication Critical patent/CN110206234A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
    • E04D13/14Junctions of roof sheathings to chimneys or other parts extending above the roof
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
    • E04D13/16Insulating devices or arrangements in so far as the roof covering is concerned, e.g. characterised by the material or composition of the roof insulating material or its integration in the roof structure

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)

Abstract

The present invention relates to the one kind in construction waterproofing engineering field to go out roofing pipeline waterproof construction and its construction technology, it includes roofing that roofing pipeline waterproof construction, which should be gone out, pipeline and water string, water string periphery is provided with SBS coil waterproof layer, SBS coil waterproof layer is higher than the setting of waterproof pipeline and SBS coil waterproof layer upper end is fitted closely with pipeline, SBS coil waterproof layer lower end is layed on roofing, macroporous absorption layer is provided between water string upper end and SBS coil waterproof layer, anchor ear is provided on the SBS coil waterproof layer being bonded with pipeline periphery wall, SBS coil waterproof layer periphery is provided with the mortar frustum of a cone;Roofing pipeline waterproof construction construction technology should be gone out and be followed successively by installation pipeline, roofing laying, filler, potting resin, anchor ear fastening and heap slope.The present invention can adsorb water string and the water in pipeline gap, avoid rainwater from not leaking along water string and pipeline gap, improve out the waterproof performance of roofing pipeline.

Description

One kind going out roofing pipeline waterproof construction and its construction technology
Technical field
The present invention relates to construction waterproofing engineering fields, go out roofing pipeline waterproof construction and its construction work more particularly, to one kind Skill.
Background technique
Roof is the top in house, and main function is exactly going along with sb. to guard him for rainwater-proof and building top, currently, house Roofing is primarily present plane roofing and two kinds of arch covering, and wherein the water storage performance of arch covering is poor, it is leak-proof can be relatively strong, and Plane roofing water-holding capacity is relatively strong, needs asphalt to carry out roof waterproof, often to improve the waterproofness of plane roofing Energy.
A kind of composite water-proof processing of roof pipeline out is disclosed in the Chinese patent of Publication No. CN107288274A Method, should go out roof pipeline composite water-proof processing method include construction roof heat insulation sloping layer, cement mortar screeding layer with And roof waterproof casing out, roof waterproof casing interior conduit is constructed out, and gap is filled out using pea gravel concreten between casing and pipeline In fact, sleeve bottom surrounding construction casing bottom cement mortar heap slope, cannula tip and tube contacts surface construction cannula tip cement Mortar heap slope, casing is outer and cement mortar screeding layer on construction high polymer asphalt waterproofing paint layer, high polymer asphalt waterproofing paint It is laid with SBS coil waterproof layer on layer, lime mortar separation layer and armored concrete protection are laid on roofing SBS coil waterproof layer Layer.
Roof pipeline installs out roof waterproof casing in reinforced concrete roof board, then when carrying out water-proofing treatment out The pipe laying in roof waterproof casing out tamps the gap between water string and pipeline by pea gravel concreten, Then on water string bottom surrounding cement mortar heap slope, and at the top of water string with tube contacts face cement mortar heap Slope after cement mortar reaches design strength, is laid with high polymer asphalt waterproofing paint layer outside casing and on cement mortar screeding layer, Then it is laid with SBS coil waterproof layer on high polymer asphalt waterproofing paint layer, is then laid with stone on roofing SBS coil waterproof layer Lime and brick separation layer after lime mortar reaches design strength, is laid with reinforced concrete protective layer on lime and brick separation layer.
In use, if rainfall is larger, rainwater can be with cannula tip cement mortar heap slope and pipe for above scheme Road gap is penetrated into, so that rainwater penetrates between pea gravel concreten and high polymer asphalt waterproofing paint layer, influences the waterproofness of roofing Can, so that roofing is damaged.
Summary of the invention
The object of the present invention is to provide one kind to go out roofing pipeline waterproof construction, can be in water string and pipeline gap Water adsorbed, leak rainwater will not along water string and pipeline gap, improve the waterproof performance in house.
Above-mentioned purpose one of the invention has the technical scheme that
One kind go out roofing pipeline waterproof construction, including the roofing, through the roofing setting pipeline and be wrapped in the pipe The water string of road periphery, Yu Suoshu waterproof pipe sleeve periphery are arranged with SBS coil waterproof layer, and the SBS coil waterproof layer is higher than Waterproof pipeline is arranged and SBS coil waterproof layer upper end is fitted closely with pipeline, and SBS coil waterproof layer lower end is layed in On roofing, it is provided with the macropore fitted closely with the pipeline between Yu Suoshu water string upper end and SBS coil waterproof layer and inhales Attached layer, being provided on the SBS coil waterproof layer being bonded with the pipeline periphery wall can make the SBS coil waterproof layer pipeline close The anchor ear of fitting, SBS coil waterproof layer periphery are provided with the mortar frustum of a cone on the roofing.
By implementing above-mentioned technical proposal, when encountering rainy weather, rainwater can be dropped on roofing, while part rainwater It is dropped in being adhered on SBS coil waterproof layer for pipeline periphery, then the SBS waterproof coiled material layer surface along pipeline periphery leaves, It is discharged by the drainage system of roofing, there are also the gaps that a small amount of rainwater penetrates into SBS coil waterproof layer and pipeline, and rainwater can be by macropore Adsorption layer absorption, so that rainwater will not continue to leak downwards;Roofing pipeline waterproof construction should be gone out, it can be between water string and pipeline Water in gap is adsorbed, and be leaked rainwater will not along water string and pipeline gap, is improved out the waterproof of roofing pipeline Performance;The anchor ear positioned at SBS coil waterproof layer periphery of design, can be such that SBS coil waterproof layer is bonded with pipeline even closer, It prevents rainwater from penetrating into, improves waterproof performance.
The present invention is further arranged to, and concrete base layer is provided on the roofing, is equipped on the concrete base layer Pea gravel concreten layer is equipped with rigid waterproof layer on the pea gravel concreten layer.
By implementing above-mentioned technical proposal, waterproof performance is can be improved in the layer structure that roofing is laid with, while being cooperated pipeline and being prevented Jacket pipe carries out waterproof.
The present invention is further arranged to, and the SBS coil waterproof layer be located above the roofing one section is layed in described Between pea gravel concreten layer and rigid waterproof layer.
By implementing above-mentioned technical proposal, since SBS coil waterproof layer is for a long time under sunshine or rainwater effect, Yi Fasheng is opened It splits, so, SBS coil waterproof layer is layed between pea gravel concreten layer and rigid waterproofing interlayer, it can be to SBS coil waterproof layer It is protected, improves the waterproof performance of roofing.
The present invention is further arranged to, and the through-hole passed through for the water string is offered on the roofing, close to described Through-hole is provided with the additional waterproof course positioned at roof surface.
By implementing above-mentioned technical proposal, water string and room is can be improved in additional waterproof course positioned at water string periphery The waterproof performance of face junction.
The present invention is further arranged to, and is filled with clay at the sealing of the rigid waterproof layer and SBS waterproof coiled material interlayer.
By implementing above-mentioned technical proposal, clay can avoid SBS volumes of rainwater from rigid waterproof layer with water string periphery Material waterproof lamellar spacing flows into, and causes the rainwater generated accumulation.
The present invention is further arranged to, the end that the SBS coil waterproof layer is bonded with pipeline periphery wall and the rigidity The spacing of waterproof layer surface is not less than 250mm.
By implementing above-mentioned technical proposal, SBS coil waterproof layer end is higher by rigid waterproofing layer surface 250mm, avoids When rainfall is excessive, roofing water level is excessively high, and SBS coil waterproof layer end is immersed in rainwater, influences the waterproof performance of roofing.
Goal of the invention two of the invention is that providing one kind goes out roofing pipeline waterproof construction construction technology, utilizes the construction work The firm performance of skill, the pipeline of installation is good, and improves the waterproof performance of pipeline and roofing junction.
Goal of the invention two of the invention is achieved through the following technical solutions:
One kind going out roofing pipeline waterproof construction construction technology, includes the following steps:
Step 1: in the through hole of roofing, water string being installed;
Step 2: after water string is installed, the installation pipeline in water string, and water string is enriched with pea gravel concreten With the gap of pipeline;
Step 3: after being installed, being laid with additional waterproof course around pipeline root;
Step 4: after the completion of additional waterproof course is laid with;Successively it is laid with concrete base layer, pea gravel concreten layer, SBS coil waterproof layer And rigid waterproof layer;Macroporous absorption layer is filled during being laid with SBS coil waterproof layer;
Step 5: filling clay in rigid waterproof layer and SBS waterproof coiled material lamellar spacing;
Step 6: after the completion of filling, being socketed anchor ear in SBS coil waterproof layer end;
Step 7: in SBS coil waterproof layer periphery, heap goes out the mortar frustum of a cone.
By implementing above-mentioned technical proposal, water string is installed in the through hole that roofing is reserved first, then by pipeline It is mounted in water string, is coaxially disposed pipeline and water string, then by the pea gravel concreten of finished product, to water string It is filled with the gap of pipeline, is then consolidated by construction tool, enrich pea gravel concreten between water string and pipeline Gap after the completion of filling, is laid with additional waterproof course in water string periphery, is then successively laid with concrete base layer, microlith coagulation again Soil layer, SBS coil waterproof layer, are subsequently filled macroporous absorption layer, re-lay rigid waterproof layer, then by clay to rigid waterproofing Layer and the gap being sheathed between the SBS coil waterproof layer of waterproof sebific duct periphery are filled;After clay has been filled, it is being arranged Heap slope is carried out around the SBS coil waterproof layer of water string periphery, heap goes out the mortar frustum of a cone;Roofing pipeline waterproof construction should be gone out The firm performance of construction technology, the pipeline of installation is good, and the waterproof performance of pipeline Yu roofing junction can be improved.
The present invention is further arranged to, the laying step of SBS coil waterproof layer in step 4 are as follows:
S1: pea gravel concreten surface is cleared up;
S2: in pea gravel concreten external coating inorganic agent, and make its brush uniformly, do not reveal the exact details;
S3: privileged sites carry out supplement processing, should overlay one layer of SBS coil waterproof layer to waterproof weak part;
S4: hot melt is laid with SBS coil waterproof layer, is joined using flame gun heating pea gravel concreten layer and SBS coil waterproof layer Place, rolling laying is carried out when the pitch of SBS coil waterproof layer just melts, make its uniformly, do not play drum;
S5: hot melt edge sealing makes it completely paste, overlap, and guarantee that lap width is when two adjacent SBS coil waterproof layers are laid with It is tamped with ointment 100mm, SBS coil waterproof layer end.
By implement above-mentioned technical proposal, carry out SBS coil waterproof layer be laid with when, first to pea gravel concreten layer surface into Row cleaning, the dust of pea gravel concreten layer surface, sundries are cleaned out, and are then handled in pea gravel concreten layer surface brushing Agent makes inorganic agent uniformly brush and pea gravel concreten layer surface and not reveal the exact details, then according to the specific structure of roofing, to waterproof Weak part increases paving SBS coil waterproof layer, then SBS coil waterproof layer is placed on pea gravel concreten layer to be laid, is laid with Extremely, pea gravel concreten layer and SBS coil waterproof layer intersection are heated by flame gun, so that SBS coil waterproof layer Bottom is melted to gluing shape, by one section of abutting pea gravel concreten layer of gluing shape of SBS coil waterproof layer, to SBS coil waterproof layer It is pressed, fits closely SBS coil waterproof layer with pea gravel concreten layer surface, then proceed to be laid with lower a roll SBS coiled material Lower a roll SBS coil waterproof layer is overlapped on the SBS coiled material being laid with and prevented by waterproof layer when being laid with lower a roll SBS coil waterproof layer Above water layer, lap width 100mm, another side overlaps remaining SBS coil waterproof layer, in SBS coil waterproof layer end oil Cream build-in, and tamp;The laying method of SBS coil waterproof layer can be such that SBS coil waterproof layer and pea gravel concreten layer stablizes and connect It connects, improves the switching performance of SBS coil waterproof layer and pea gravel concreten layer, while improving the waterproof performance of roofing.
In conclusion the invention has the following advantages:
One, roofing pipeline waterproof construction should be gone out, the macroporous absorption layer of design can carry out the water in water string and pipeline gap Absorption, the anchor ear of design avoid rainwater from not leaking along water string and pipeline gap, improve out the waterproof of roofing pipeline Performance;
Two, roofing pipeline waterproof construction construction technology should be gone out, the firm performance of the pipeline of installation is good, improves SBS coil waterproof layer With the switching performance of pea gravel concreten layer, and pipeline and the waterproof performance of roofing junction and the waterproofness of roofing entirety are improved Energy.
Detailed description of the invention
Fig. 1 is the overall structure diagram of roofing pipeline waterproof construction out provided in an embodiment of the present invention.
Fig. 2 is the face the A-A cross-sectional view of Fig. 1.
Appended drawing reference: 1, roofing;11, through-hole;2, pipeline;21, water string;22, macroporous absorption layer;23, anchor ear;3, it mixes Solidifying soil matrix layer;4, pea gravel concreten layer;5, SBS coil waterproof layer;6, rigid waterproof layer;7, additional waterproof course;8, mortar circular cone Platform;9, clay.
Specific embodiment
Below in conjunction with attached drawing, the technical solution of the embodiment of the present invention is described.
As shown in Figure 1, a kind of roofing pipeline waterproof construction out leads to including roofing 1 and in the through-hole 11 opened up on roofing 1 Water string 21 is installed in hole 11, the pipeline 2 being coaxially disposed with water string 21 is installed in water string 21, close to through-hole The additional waterproof course 7 positioned at 1 surface of roofing is provided at 11, additional waterproof course 7 is made of waterproof element mortar and waterproof mortar, Waterproof element mortar is stirred by mortar waterproof agent and cement with 1:3, and waterproof mortar includes mortar waterproof agent, cement and sand It is stirred with 1:2:6, roofing 1 and 7 surface of additional waterproof course are equipped with concrete base layer 3, are equipped on concrete base layer 3 thin Stone concrete layer 4, pea gravel concreten layer 4 are pea gravel concreten, and rigid waterproof layer 6 is equipped on pea gravel concreten layer 4, and rigidity is anti- Water layer 6 is waterproof mortar.
As depicted in figs. 1 and 2, it is provided with SBS coil waterproof layer 5 between pea gravel concreten layer 4 and rigid waterproof layer 6, SBS volumes Material waterproof layer 5 is SBS waterproof roll, and the extended segment of SBS coil waterproof layer 5, which is wrapped up in, invests water string 21 and 2 periphery of pipeline, SBS The extended segment of coil waterproof layer 5 is higher than waterproof pipeline 2 and 5 upper end of SBS coil waterproof layer is fitted closely with pipeline 2, and SBS coiled material The end of 5 extended segment of waterproof layer and the spacing on 6 surface of rigid waterproof layer are set as 300mm, 21 upper end of water string and SBS coiled material The macroporous absorption layer 22 fitted closely with pipeline 2 is filled between waterproof layer 5, macroporous absorption layer 22 is macroporous absorbent resin, SBS The extended segment end of coil waterproof layer 5, which is equipped with, to be sheathed on 5 periphery wall of SBS coil waterproof layer and can make SBS coil waterproof layer 5 The anchor ear 23 fitted closely with pipeline 2 is filled with clay 9, clay at the sealing between rigid waterproof layer 6 and SBS coil waterproof layer 5 9 use bituminous grout 9, and the junction of SBS coil waterproof layer 5 and rigid waterproof layer 6 is provided with the mortar frustum of a cone 8, mortar circle Frustum 8 is located on rigid waterproof layer 6 and the periphery of 5 extended segment of winding SBS coil waterproof layer.
One kind going out roofing pipeline waterproof construction construction technology, includes the following steps:
Step 1: at the through-hole 11 that roofing 1 is reserved, water string 21 is installed, by the gap between water string 21 and through-hole 11, It is enriched by pea gravel concreten;
Step 2: after water string 21 is installed, the installation pipeline 2 in water string 21, and waterproof is filled with pea gravel concreten Then the gap of casing 21 and pipeline 2 is consolidated by construction tool, water string 21 and the gap of pipeline 2 is enriched;
Step 3: after being installed, additional waterproof course 7 is laid with around pipeline root, makes additional waterproof course 7 for through-hole 11 and prevents 21 junction of jacket pipe is completely covered;
Step 4: after the completion of additional waterproof course 7 is laid with;It is anti-to be successively laid with concrete base layer 3, pea gravel concreten layer 4 and SBS coiled material Water layer 5 is first cleared up pea gravel concreten surface, when being laid with SBS coil waterproof layer 5 then on pea gravel concreten surface Brushing inorganic agent, inorganic agent are adhesive bitument primer, and make its brush uniformly, do not reveal the exact details, then the position of waterproof weakness should be overlayed Then SBS coil waterproof layer 5 re-lays SBS coil waterproof layer 5, when being laid with SBS coil waterproof layer 5, heated using flame gun Pea gravel concreten layer 4 and 5 junction of SBS coil waterproof layer, are rolled when the pitch of SBS coil waterproof layer 5 just melts Be laid with, make its uniformly, do not play drum, finally carry out hot melt edge sealing, when two adjacent SBS coil waterproof layers 5 are laid with, make two adjacent SBS Coil waterproof layer 5 is completely pasted and is overlapped, and guarantees that lap width is 100mm, is filled out in 5 end of SBS coil waterproof layer using ointment Real, ointment uses PVC waterproofing unction, is laid with SBS coil waterproof layer 5 when 2 junction of pipeline, macroporous absorbent resin is filled in In the area of space that 21 end of water string, pipeline 2 and SBS coil waterproof layer 5 are formed, the paving of rigid waterproof layer 6 is then carried out again If;
Step 5: clay 9 is filled in rigid waterproof layer 6 and 5 gap of SBS coil waterproof layer, clay 9 is bituminous grout 9;
Step 6: after the completion of filling, being socketed anchor ear 23 in 5 end of SBS coil waterproof layer;
Step 7: going out the mortar frustum of a cone 8 in 5 periphery heap of SBS coil waterproof layer.
The working principle of the invention is: when encountering rainy weather, rainwater can be dropped on roofing 1, while can also be dripped On the SBS coil waterproof layer 5 of 2 periphery of pipeline, part rainwater leaves along 5 surface of SBS coil waterproof layer of 2 periphery of pipeline, leads to The drainage system discharge for crossing roofing 1, there are also when the gap that a small amount of rainwater penetrates into SBS coil waterproof layer 5 and pipeline 2, rainwater can quilt Macroporous absorption layer 22 adsorbs, so that rainwater will not continue to leak downwards.

Claims (8)

1. one kind goes out roofing pipeline waterproof construction, which is characterized in that including the roofing (1), through the roofing (1) setting Pipeline (2) and the water string (21) for being wrapped in the pipeline (2) periphery, Yu Suoshu water string (21) periphery are arranged with SBS Coil waterproof layer (5), the SBS coil waterproof layer (5) are higher than waterproof pipeline (2) and are arranged and on the SBS coil waterproof layer (5) End is fitted closely with pipeline (2), and SBS coil waterproof layer (5) lower end is layed on roofing (1), Yu Suoshu water string (21) the macroporous absorption layer (22) fitted closely with the pipeline (2) is provided between upper end and SBS coil waterproof layer (5), with The SBS coil waterproof layer (5) and pipeline can be made by being provided on the SBS coil waterproof layer (5) of pipeline (2) the periphery wall fitting (2) anchor ear (23) fitted closely, SBS coil waterproof layer (5) periphery are provided with the circle of the mortar on the roofing (1) Frustum (8).
2. a kind of roofing pipeline waterproof construction out according to claim 1, which is characterized in that be arranged on the roofing (1) Have concrete base layer (3), is equipped with pea gravel concreten layer (4) on the concrete base layer (3), the pea gravel concreten layer (4) On be equipped with rigid waterproof layer (6).
3. a kind of roofing pipeline waterproof construction out according to claim 2, which is characterized in that the SBS coil waterproof layer (5) it is located at one section above the roofing (1) to be layed between the pea gravel concreten layer (4) and rigid waterproof layer (6).
4. a kind of roofing pipeline waterproof construction out according to claim 3, which is characterized in that opened up on the roofing (1) There is the through-hole (11) passed through for the water string (21), is provided with close to the through-hole (11) positioned at the anti-of roofing (1) surface Water extra play (7).
5. a kind of roofing pipeline waterproof construction out according to claim 4, which is characterized in that the rigid waterproof layer (6) Clay (9) are filled at sealing between SBS coil waterproof layer (5).
6. a kind of roofing pipeline waterproof construction out according to claim 5, which is characterized in that the SBS coil waterproof layer (5) spacing on the end being bonded with pipeline (2) periphery wall and the rigid waterproof layer (6) surface is not less than 250mm.
7. one kind goes out roofing pipeline waterproof construction construction technology, which comprises the steps of:
Step 1: at the through-hole (11) of roofing (1), installing water string (21);
Step 2: after water string (21) is installed, in water string (21) interior installation pipeline (2), and being filled with pea gravel concreten The gap of real water string and pipeline (2);
Step 3: after being installed, being laid with additional waterproof course (7) around pipeline (2) root;
Step 4: after the completion of additional waterproof course (7) is laid with;Successively it is laid with concrete base layer (3), pea gravel concreten layer (4), SBS volumes Material waterproof layer (5) and rigid waterproof layer (6);Macroporous absorption layer (22) are filled during being laid with SBS coil waterproof layer (5);
Step 5: filling clay (9) in rigid waterproof layer (6) and SBS coil waterproof layer (5) gap;
Step 6: after the completion of filling, being socketed anchor ear (23) in SBS coil waterproof layer (5) end;
Step 7: in SBS coil waterproof layer (5) periphery, heap goes out the mortar frustum of a cone (8).
8. a kind of roofing pipeline waterproof construction construction technology out according to claim 7, which is characterized in that SBS in step 4 The laying step of coil waterproof layer (5) are as follows:
S1: pea gravel concreten surface is cleared up;
S2: in pea gravel concreten external coating inorganic agent, and make its brush uniformly, do not reveal the exact details;
S3: privileged sites carry out supplement processing, should overlay one layer of SBS coil waterproof layer (5) to waterproof weak part;
S4: hot melt is laid with SBS coil waterproof layer (5), using flame gun heating pea gravel concreten layer (4) and SBS waterproof coiled material Layer (5) junction, carry out rolling laying when the pitch of SBS coil waterproof layer (5) just melts, make its uniformly, do not play drum;
S5: hot melt edge sealing makes it completely paste, overlap, and guarantee that lap width is when two adjacent SBS coil waterproof layers (5) are laid with It is tamped with ointment 100mm, SBS coil waterproof layer (5) end.
CN201910507901.2A 2019-06-12 2019-06-12 One kind going out roofing pipeline waterproof construction and its construction technology Pending CN110206234A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910507901.2A CN110206234A (en) 2019-06-12 2019-06-12 One kind going out roofing pipeline waterproof construction and its construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910507901.2A CN110206234A (en) 2019-06-12 2019-06-12 One kind going out roofing pipeline waterproof construction and its construction technology

Publications (1)

Publication Number Publication Date
CN110206234A true CN110206234A (en) 2019-09-06

Family

ID=67792268

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910507901.2A Pending CN110206234A (en) 2019-06-12 2019-06-12 One kind going out roofing pipeline waterproof construction and its construction technology

Country Status (1)

Country Link
CN (1) CN110206234A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111877645A (en) * 2020-08-06 2020-11-03 广州协安建设工程有限公司 Waterproof construction method for wind-resistant support of metal roof
CN112283458A (en) * 2020-09-11 2021-01-29 潍坊市晨鸣新型防水材料有限公司 Leakage stoppage flexible waterproof piece capable of quickly stopping leakage
CN113026823A (en) * 2021-04-26 2021-06-25 上海庞源机械租赁有限公司 Waterproof device for tower crane
CN113622604A (en) * 2021-08-18 2021-11-09 江苏省苏中建设集团股份有限公司 Passive house roof outlet vertical pipeline air-tightness construction method
CN114045997A (en) * 2021-11-19 2022-02-15 上海宝冶集团有限公司 Construction method of flexible roof waterproof sleeve

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669745A (en) * 2012-09-10 2014-03-26 陈祥凤 Heat preservation structure of pipelines going out of roof
CN205935451U (en) * 2016-08-25 2017-02-08 中启胶建集团有限公司 Roofing exhaust riser waterproof layer protection architecture
CN107288274A (en) * 2017-07-03 2017-10-24 中国十七冶集团有限公司 It is a kind of go out roof pipeline composite water-proof processing method
CN206722238U (en) * 2017-05-20 2017-12-08 青岛东捷建设工程有限公司 Antiseepage spills roof pipeline construction
CN207018644U (en) * 2017-06-29 2018-02-16 上海星杰装饰有限公司 A kind of pre-buried pipeline waterproof ground structure
CN207362992U (en) * 2017-09-21 2018-05-15 中建五局装饰幕墙有限公司 Floor drain leakage preventing structure
CN207891927U (en) * 2018-01-18 2018-09-21 江苏中森建筑设计有限公司 A kind of pile crown water proof structure
CN207905265U (en) * 2017-12-27 2018-09-25 广州市六为防水科技有限公司 A kind of fabricated roofing goes out roof pipeline waterproof construction
CN108867894A (en) * 2018-06-14 2018-11-23 厦门防水博士建筑工程有限公司 A kind of fine fitment kitchen and toilet water protection standards construction technology

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669745A (en) * 2012-09-10 2014-03-26 陈祥凤 Heat preservation structure of pipelines going out of roof
CN205935451U (en) * 2016-08-25 2017-02-08 中启胶建集团有限公司 Roofing exhaust riser waterproof layer protection architecture
CN206722238U (en) * 2017-05-20 2017-12-08 青岛东捷建设工程有限公司 Antiseepage spills roof pipeline construction
CN207018644U (en) * 2017-06-29 2018-02-16 上海星杰装饰有限公司 A kind of pre-buried pipeline waterproof ground structure
CN107288274A (en) * 2017-07-03 2017-10-24 中国十七冶集团有限公司 It is a kind of go out roof pipeline composite water-proof processing method
CN207362992U (en) * 2017-09-21 2018-05-15 中建五局装饰幕墙有限公司 Floor drain leakage preventing structure
CN207905265U (en) * 2017-12-27 2018-09-25 广州市六为防水科技有限公司 A kind of fabricated roofing goes out roof pipeline waterproof construction
CN207891927U (en) * 2018-01-18 2018-09-21 江苏中森建筑设计有限公司 A kind of pile crown water proof structure
CN108867894A (en) * 2018-06-14 2018-11-23 厦门防水博士建筑工程有限公司 A kind of fine fitment kitchen and toilet water protection standards construction technology

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
王朝熙: "《简明防水工程手册》", 31 January 1999, 中国建筑工业出版社 *
辽宁省石油化学工业厅: "《辽宁化工产品大全》", 31 December 1994 *
邝生鲁: "《现代精细化工高新技术与产品合成工艺》", 31 December 1997, 科学技术文献出版社 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111877645A (en) * 2020-08-06 2020-11-03 广州协安建设工程有限公司 Waterproof construction method for wind-resistant support of metal roof
CN111877645B (en) * 2020-08-06 2021-11-16 广州协安建设工程有限公司 Waterproof construction method for wind-resistant support of metal roof
CN112283458A (en) * 2020-09-11 2021-01-29 潍坊市晨鸣新型防水材料有限公司 Leakage stoppage flexible waterproof piece capable of quickly stopping leakage
CN112283458B (en) * 2020-09-11 2022-02-15 潍坊市晨鸣新型防水材料有限公司 Leakage stoppage flexible waterproof piece capable of quickly stopping leakage
CN113026823A (en) * 2021-04-26 2021-06-25 上海庞源机械租赁有限公司 Waterproof device for tower crane
CN113026823B (en) * 2021-04-26 2023-02-28 上海庞源机械租赁有限公司 Waterproof device for tower crane
CN113622604A (en) * 2021-08-18 2021-11-09 江苏省苏中建设集团股份有限公司 Passive house roof outlet vertical pipeline air-tightness construction method
CN114045997A (en) * 2021-11-19 2022-02-15 上海宝冶集团有限公司 Construction method of flexible roof waterproof sleeve

Similar Documents

Publication Publication Date Title
CN110206234A (en) One kind going out roofing pipeline waterproof construction and its construction technology
KR100278173B1 (en) Double waterproof sheet for concrete structure
CN106996165B (en) Planting roof waterproof heat-preservation exhaust system with exhaust device and construction method
CN108842817A (en) A kind of subway station overlays waterproof roll structure and its construction technology
CN107190924A (en) A kind of composite water-proof processing method of parapet of roofing waterproofing node
CN206352400U (en) Positively fixed type parapet of roofing position waterproof modular repair structure
CN209457282U (en) Ground library top plate planted roof deformation joint structure
CN107327308A (en) A kind of Railway Tunnel waterproof method
CN102912945B (en) Roof compound seepage-proofing steam exhausting hole detail treatment technology
CN205688670U (en) A kind of roofworks system structure
CN107288274A (en) It is a kind of go out roof pipeline composite water-proof processing method
KR200233893Y1 (en) Waterproof sheet for concrete structure
CN103774797A (en) Construction technology of bituminous waterproof sheet materials
CN112681624A (en) Construction method of roof planted in independent basement
CN103628506B (en) Construction method for waterproof positions of foundation platform and pile head
CN217601406U (en) Inner lining wall structure
CN107761783A (en) The method for waterproofing of skyscraper underground pile crown
KR101216662B1 (en) Construction structure of double insulation water proof and root proof and the method thereof
CN206351573U (en) A kind of basement plants top plate macromolecule waterproof system
KR200195343Y1 (en) Waterproof sheet for concrete structure
CN105239732B (en) A kind of construction method of the stretching roofing pipe of rainwater leakage prevention
CN212671026U (en) Planting roof
CN206888380U (en) Planted roof waterproof heat-preservation exhaust system with exhaust apparatus
CN112609976A (en) Construction process of intelligent exhaust circulation system
CN220377665U (en) Roof waterproof construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190906

RJ01 Rejection of invention patent application after publication