CN108867894A - A kind of fine fitment kitchen and toilet water protection standards construction technology - Google Patents
A kind of fine fitment kitchen and toilet water protection standards construction technology Download PDFInfo
- Publication number
- CN108867894A CN108867894A CN201810614236.2A CN201810614236A CN108867894A CN 108867894 A CN108867894 A CN 108867894A CN 201810614236 A CN201810614236 A CN 201810614236A CN 108867894 A CN108867894 A CN 108867894A
- Authority
- CN
- China
- Prior art keywords
- water
- waterproof
- pipeline
- kitchen
- parts
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/66—Sealings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
- Sewage (AREA)
Abstract
The present invention provides a kind of fine fitment kitchen and toilet water protection standards construction technology, is related to construction engineering technical field.Include the following steps:S1, at the waterproof of pipeline position, S2, base's water-proofing treatment, S3, the processing of wall ground waterproof, S4, internal corner part water-proofing treatment.Water-proofing treatment first is carried out to pipeline position, then carries out base's waterproof, water-proofing treatment then is carried out to wall ground, water-proofing treatment finally is carried out to internal corner part on the waterproof construction on wall ground again, further increases waterproof effect.By the multilayer flashing structure being layering, and for the water-proofing treatment at tube edge position and internal corner part, the waterproof construction of kitchen and toilet is enabled to reach 15 years or more waterproof effects.
Description
Technical field
The present invention relates to construction engineering technical fields, and in particular to a kind of fine fitment kitchen and toilet water protection standards construction work
Skill.
Background technique
Kitchen and toilet are the waterproof emphasis in house, and the area of kitchen and toilet is small, yin-yang angle is more, difficulty of construction is big, and water consumption
Greatly, in water Frequent Set, being easy in ground, metope, ground line root through walls, seam, wall and ground intersection area, metope cross-shaped portion
The positions such as position, sanitary ware and ground intersection area, pipe leakage and top plate leak.Although present various waterproof materials
Type and quality are being continuously improved and are being improved, but since concrete expands with heat and contract with cold the influence etc. of the crackle, pipeline hydraulic pressure of generation, single
The mode that one rigid self-waterproof and flexible water combines is difficult to reach waterproof requirement in the higher occasion of waterproof requirement, not only difficult
With final acceptance of construction, also gives to reprocess and bring difficulty.For fine fitment kitchen and toilet, waterproof requirement is high, once it seeps
Permeable, maintenance cost is high.
Summary of the invention
The purpose of the present invention is to provide a kind of fine fitment kitchen and toilet water protection standards construction technologies, to meet to fine fitment kitchen
Waterproof demand between defending.
The present invention solves its technical problem and adopts the following technical solutions to realize.
The present invention proposes a kind of fine fitment kitchen and toilet water protection standards construction technology, includes the following steps:
S1, pipeline position water-proofing treatment:
S11 knocks out the concrete sand pulp layer on pipeline edge ground to concrete, and outputs V-arrangement at pipeline position
Slot forms the construction part including V-shaped groove and pipeline edge ground,
S12 forms rough surface to construction part feather plucking processing,
S13 brushes interface waterproofing agent in the construction part and pipeline outer wall,
S14 is closed in the bottom of V-shaped groove with waterproof gasket cement,
S15 is filled up in V-shaped groove with mending mortar, and mending mortar forms the half arc flashing gradient at pipeline edge,
S16 after clear water maintenance, intersects to brush on mending mortar and pipeline outer wall and manages solid marine glue,
S17 pastes the mylar for impregnating and managing solid marine glue,
S18, feed pipe installation is then whole to brush interface waterproofing agent,
S19, using waterproof mortar it is levelling and painting;
S2, base's water-proofing treatment:
S21 removes substrate surface loose material, and cleans base;
S22 soaks to base base and is not absorbed water, and guarantees that base exists without bright water, and interface is brushed in base
Waterproofing agent;
S23, using mending mortar to there are the repairing of the region of hole is smooth;
S3, the processing of wall ground waterproof:
S31, in the metope brushing water conduction fracture of back side,
S32 indicates the watertight area for needing to construct, and the watertight area includes the ground location to connect and metope position
It sets, the ground location is extended to the metope of internal corner part by ground.
S33, using watertight area described in the waterproofing agent brushing of interface;
S34 smears out the half arc flashing gradient in internal corner part using mending mortar;
S35, using watertight area described in universal waterproofing slurry brushing;
S36, in the flexible III type waterproofing slurry of wall locations brushing K11;
S37, in the flexible II type waterproofing slurry of ground location brushing K11;
And S4, internal corner part water-proofing treatment:
S41, in internal corner part brushing extra play waterproofing slurry,
The mylar of extra play waterproofing slurry was impregnated in S42, paving;
S43, the brushing extra play waterproofing slurry on mylar,
Above-mentioned steps are successively carried out according to the sequence of step S1, S2, S3, S4.
The beneficial effect of the fine fitment kitchen and toilet water protection standards construction technology of the embodiment of the present invention is:
The present invention is based on the special constructions of kitchen and toilet, carry out for different positions (tube edge, inner corner trim, wall ground, base)
Water-proofing treatment is slotted in tube edge, carries out specific water-proofing treatment to tube edge, and carry out waterproof construction reinforcement to internal corner part, most
Meet greatly tube edge, at inner corner trim etc. Leakage Positions waterproof demand.Corresponding leakage stoppage scheme is determined according to different parts, is adopted
Various new quality material, kinds of processes is taken to combine, system solves the leakage problem of kitchen and toilet.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached
Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair
The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this
A little attached drawings obtain other relevant attached drawings.
Fig. 1 is the structural schematic diagram of the pipeline position water-proofing treatment of the embodiment of the present invention 1;
Fig. 2 is the structural schematic diagram of the base of the embodiment of the present invention 1, wall ground and internal corner part water-proofing treatment;
Fig. 3 is the structural schematic diagram for being mylar in the embodiment of the present invention 2;
Fig. 4 is the structural schematic diagram of the pipeline position water-proofing treatment in the embodiment of the present invention 3;
Fig. 5 is the structural schematic diagram of foamed aluminium prefabricated component in Fig. 4.
Icon:1- pipeline;2- feed pipe;11- concrete;The interface 12- waterproofing agent;13- waterproof gasket cement;14-
Mending mortar;15- manages solid marine glue;16- mylar;The 161- vertex of a cone;The 162- conical surface;17- waterproof mortar;The universal waterproof of 18-
Slurry;The flexible III type waterproofing slurry of 19-K11;The flexible II type waterproofing slurry of 20-K11;21- extra play waterproofing slurry;50- foam
Aluminium prefabricated component;51- sleeve part;51- base plate.
Specific embodiment
It in order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below will be in the embodiment of the present invention
Technical solution be clearly and completely described.The person that is not specified actual conditions in embodiment, according to normal conditions or manufacturer builds
The condition of view carries out.Reagents or instruments used without specified manufacturer is the conventional production that can be obtained by commercially available purchase
Product.
The embodiment of the present invention is specifically described below.
Please refer to Fig. 1 and Fig. 2, a kind of fine fitment kitchen and toilet water protection standards construction technology provided in an embodiment of the present invention, packet
Include following steps:S1, at the waterproof of pipeline position, S2, base's water-proofing treatment, S3, the processing of wall ground waterproof, S4, internal corner part is anti-
Water process.Water-proofing treatment first is carried out to pipeline position, then carries out base's waterproof, water-proofing treatment then is carried out to wall ground, most
Water-proofing treatment is carried out to internal corner part on the waterproof construction on wall ground again afterwards, further increases waterproof effect.Pass through layer stackup
The multilayer flashing structure added, and for the water-proofing treatment at tube edge position and internal corner part, enable to the waterproof knot of kitchen and toilet
Structure reaches 15 years or more waterproof effects.
Specifically, the step of S1, pipeline position water-proofing treatment includes:
S11, knockout 1 hem width of pipeline about 100mm concrete sand pulp layer to concrete 11, and outputed at pipeline position
V-shaped groove forms the construction part including V-shaped groove and pipeline edge ground.Preferably, V-shaped groove is 60mm wide 40mm deep.
S12 forms rough surface to the processing of construction part feather plucking.Such as the tube wall feather plucking of construction part is made with coarse sandpaper
Top material is more preferably bonded, and avoids hollowing.
S13 brushes interface waterproofing agent 12 in construction part and pipeline outer wall.
Preferably, interface waterproofing agent 12 includes mass ratio 1:3~4 liquid material and powder, in parts by weight, liquid material packet
It includes:380-420 parts of water-proof emulsion;2-5 parts of preservative;2-5 parts of defoaming agent;590-610 parts of water.Powder includes:Cement 320-380
Part;420-460 parts of sand;150-180 parts of coarse whiting;3-6 parts of porous silicon carbide;12-16 parts of zeolite molecular sieve;160-180 parts of gypsum;
1-3 parts of cellulose ether.Above-mentioned each raw material can be obtained from city's mid-sales.For example, water-proof emulsion selects the anti-water and milk of BASF PS608
Liquid, sand select 70-140 graded sand, and coarse whiting selects the 700CC of wide Fujian material company, and defoaming agent uses the W086 of this company of hamming.
Using the gelatification and porous silicon carbide of gypsum and the drainage of zeolite molecular sieve, waterproof effect can be further increased,
And strengthen hardness.It is further preferable that pressing 1:3 ratio addition liquid material and powder, can obtain compression strength at the interface of 0.8MPa
Waterproofing agent.
S14 is closed in the bottom of V-shaped groove with waterproof gasket cement 13.Preferably, waterproof gasket cement with a thickness of 15mm, prevent
Watertight sealing adhesive force is good, and elasticity is high, has good wriggling, can resist the fracture elongation of 2mm or so.
Preferably, in parts by weight, waterproof gasket cement 13 includes:120~140 parts of liquid polysulfide rubber;Silane is even
Agent 0.5-1 parts of connection;16-20 parts of manganese dioxide;8-10 parts of carbon black;3-5 parts of acrylic resin;20-30 parts of diethanol amine;Sorbose
4-8 parts of alcohol;3-5 parts of dispersing agent;4-8 parts of levelling agent.Above-mentioned each raw material component can be obtained from city's mid-sales.This waterproof gasket cement
It is preferable with interface waterproofing agent compatibility, preferable cementation can be generated between the two.And carbon black improves the mechanics of sealant
Performance, the addition of diethanol amine destroy the hydrogen bond between polysulfide rubber macromolecular, increase intermolecular distance, assign good coating
Workability.
S15, is repaired in V-shaped groove with mending mortar 14 smooth, and mending mortar 14 forms arc flashing at pipeline edge
The gradient.Preferably, tube edge inner corner trim smears out the arc flashing gradient of radius 15mm with arc plaster trowel, and the arc flashing gradient is deposited
It can effectively avoid generating inner corner trim seeping phenomenon.
Preferably, in parts by weight, mending mortar 14 includes:200-300 parts of sulphate aluminium cement;Portland cement
200-300 parts;500-600 parts of quartz sand;1-2 parts of defoaming agent;2-4 parts of cellulose ether;1-2 parts of water-reducing agent;Flyash 16-20
Part;1-2 parts of early strength agent.Above-mentioned each raw material component can be obtained from city's mid-sales.Such as RSAC52.5 grades of sulphate aluminium cement
Sulphate aluminium cement, defoaming agent are tributyl phosphate.Portland cement is PO42.5 portland cement or PO52.5 silicate cement
One of mud.Water-reducing agent is poly carboxylic acid series water reducer, and early strength agent is anhydrous calcium chloride, anhydrous sodium sulfate, lithium carbonate or carbonic acid
One of sodium.Flyash, which is added, can reduce the basicity and the heat of hydration of system, so that the fine fisssure of complex cementitious system hardenite
Line is reduced, and can be improved the durability of system, by the progress of hydration reaction, flyash can be further improved the strong of mending mortar
Degree and compactness improve wearability, reduce dry shrink.
S16 after clear water maintenance, intersects to brush on mending mortar and pipeline outer wall and manages solid marine glue 15.Preferably,
Intersect two deferents of brushing and consolidate marine glue, per pass is constructed when needing upper track material surface dry tack-free, and road can be descended to construct.Intersect and applies
Swiped through journey is:First left and right is laterally brushed, and is brushed longitudinal up and down, guarantee is not omitted.Managing solid marine glue can be rich using waterproof
The pipe of scholar company production consolidates marine glue.
S17 pastes the mylar 16 for impregnating and managing solid marine glue.Mylar can increase structure stabilization and tension it is strong
Degree.Mylar 16 has stronger stretching force, can increase the tensile strength and stretching force of waterproof construction.And it is solid anti-to impregnate pipe
The mylar of glue is capable of forming more slurry adhesive layers, and adhesive force is stronger.After mylar paving, need polyester with hairbrush
Cloth smoothes out, and the bubble in mylar is squeezed out, and avoids generating hollowing.
S18, feed pipe 2 are installed, then whole to brush interface waterproofing agent 12.The mounting height of feed pipe 2 is lower than screed-coat,
Feed pipe 2 will try water in advance, until water-tight.
S19, using waterproof mortar 17 it is levelling and painting.Preferably, feed pipe 2 is laid in waterproof mortar, and and waterproof
The top position distance 20mm or more of mortar.In order to avoid in feed pipe under the hydraulic pressure of water flowing, so that tube wall vibration, generates feed pipe
There is cracking phenomena with waterproof layer.
After completing pipeline position water-proofing treatment, on this waterproof construction, S2, base's water-proofing treatment, including following step are carried out
Suddenly:
S21 removes substrate surface loose material, and cleans base.Such as substrate surface dregs etc. is cleared up with tools such as perching knives
Other loose materials.Preferably detergent is used to be cleaned when cleaning base, in parts by weight, detergent includes:Water 70
~80 parts, 6~8 parts of oleoyl diethanol amine, 2~5 parts of tween, 5~10 parts of fatty alcohol polyoxyethylene ether, 4~8 parts of castor oil.It should
Detergent can infiltrate and permeate organic layer and spot, in the shorter time slurry, concrete of substrate surface etc. be removed.
And be easy to be removed by water, and noresidue, it avoids impacting subsequent construction.
S22 soaks to base base and is not absorbed water, and guarantees that base exists without bright water, and interface is brushed in base
Waterproofing agent 12.Specifically, hairbrush or roller band clear water are sufficiently humidified so as to construction area base, and the remaining water on ground uses sponge
It blots.Then interface waterproofing agent 12 is brushed.
S23, using 14 pairs of mending mortar, there are the repairing of the region of hole is smooth.Such as it the portions such as falls off to chase, hollowing
The hole of position is repaired.
After the water-proofing treatment for completing base, on this waterproof construction, S3, wall ground waterproof processing comprising following are carried out
Step:
S31, in the metope brushing water conduction fracture of back side, water conduction fracture with a thickness of 0.8mm.
Preferably, in parts by weight, water conduction fracture includes:460~520 parts of ordinary portland cement;Sand 420~
460 parts;8~12 parts of calcium formate;1~2 part of water-reducing agent;1~2 part of lignocellulosic;36~48 parts of penetrant crystalline material;Silicon ash 20~
25 parts;4~6 parts of water-soluble silicate;2~3 parts of gypsum.Preferably, penetrant crystalline material selects Canadian Kaydon Corp.'s production
KMA mortar additive.It can react to form hydrate crystal with cement-based material, block the pore of mortar and tiny split
Seam.In addition, micro- material using silicon ash acts on, the gap between filler particles improves the performance of cementing material, and can will fill
Moisture in gap cements out.Water-soluble silicate, gypsum can further react with aquation precipitate, generate more
The crystal such as more C-S-H gel, drated calcium aluminate and hydrated calcium silicate, calcium formate can promote to crystallize as crystal growth agent
The fast-growth of body.Water conduction fracture has the function of secondary waterproof, and micro-crack is entered if any water can be with its reaction life
Then moisture-proof function can be can reach at solid matter with filling chink, there is very strong adhesion property, adhesive strength can reach
To 2.5MPa or more, impermeability pressure can reach 1.5MPa or more.
S32 indicates the watertight area for needing to construct, and the watertight area includes the ground location to connect and metope position
It sets, the ground location is extended to the metope of internal corner part by ground.Specifically, mark kitchen and toilet metope, door two sides and
The wide in range water 300mm of outer side of door 500mm, shower house height 1800mm, position of the width beyond shower house 300mm is distinguished with adhesive tape
The watertight area of construction part is wanted out.
S33 brushes entire watertight area using interface waterproofing agent 12, and brushing thickness is preferably 0.6mm.
S34 smears out the half arc flashing gradient in internal corner part using mending mortar 14.Preferably, it is smeared with arc plaster trowel
The arc flashing gradient of radius 15mm out avoids generating inner corner trim seeping phenomenon.
S35 brushes watertight area using universal waterproofing slurry 18.Preferably, in parts by weight, universal waterproof
Slurry 18 includes:Water-proof emulsion:400 parts, defoaming agent:2 parts, preservative:2 parts, water:396 parts, ordinary portland cement:400
Part, 70-140 graded sand:598 parts, cellulose ether:1 part, water-reducing agent:1 part.Universal water-repellent paint has both flexibility and rigidity,
Good adhesive effect can be formed between different waterproof coating layers, and can effectively overcome the bonding between waterproof layer sliding
Move phenomenon.Further, when brushing, laterally and longitudinally uniformly each in metope is brushed together, and per pass waits for that dry tack free is tack-free
When, then brush down together, brush must not be leaked, the brushing of per pass is with a thickness of 1.2mm.Midway should carry out secondary agitation, prevention to material
Material, which shelves the time, too long to be caused to precipitate.
S36, in the flexible III type waterproofing slurry 19 of wall locations brushing K11.Preferably, in parts by weight, K11 is flexible
III type waterproofing slurry includes 850 parts of water-proof emulsion, 2 parts of defoaming agent, 2 parts of preservative, 146 parts of water, ordinary portland cement 450
Part, 300 parts of 70-140 graded sand, 250 parts of coarse whiting.The flexibility of the waterproofing slurry is excellent, and bonding force is strong, can be realized to wall
The efficient bonding of the components such as furring tile.
S37, in the flexible II type waterproofing slurry 20 of ground location brushing K11.Preferably, in parts by weight, K11 is flexible
II type waterproofing slurry include 900 parts of water-proof emulsion, 2 parts of defoaming agent, 2 parts of preservative, 96 parts of water, 450 parts of ordinary portland cement,
448 parts of 70-140 graded sand, 100 parts of coarse whiting, 16 parts of alumina silicate, 9 parts of polyvinyl alcohol.The waterproofing slurry is keeping flexibility, is gluing
While connecing property, there is certain plasticizing reinforcing effect, resistance to compression, impermeability are strong.
After the water-proofing treatment for completing wall ground, on the waterproof construction, S4, internal corner part water-proofing treatment are carried out comprising
Following steps:
S41, in internal corner part brushing extra play waterproofing slurry 21.Preferably, left in metope intersection height, width about 200mm
Right distance forms internal corner part.Intersect brushing twice extra play waterproofing slurry, per pass with a thickness of 1.2mm.According to parts by weight
Number meter, extra play waterproofing slurry includes 800 parts of BASF acrylic emulsion, 20 parts of polyaluminum ferric chloride, 160 parts of water;Silicate cement
320 parts of mud;260 parts of sand;2 parts of dispersing agent;180 parts of coarse whiting.Product can form one layer of tough and tensile waterproof membrane with super-elastic, at
Film speed is fast (film forming in 1~2min), has low temperature flexibility (- 20 DEG C without fracture).The film has concrete and cement mortar good
Good adhesiveness, adhesive strength are greater than 0.9Mpa, are firmly combined with basal plane, to reach permanent waterproof effect.
The mylar 16 of extra play waterproofing slurry was impregnated in S42, paving.
S43, the brushing extra play waterproofing slurry 21 on mylar.Intersect brushing twice extra play waterproofing slurry, per pass is thick
Degree is 1.2mm.
Above-mentioned steps are successively carried out according to the sequence of step S1, S2, S3, S4.
Embodiment 2
The device obtained by above-mentioned design has been able to satisfy the waterproof demand of fine fitment kitchen and toilet substantially, but in line with further
The objective of its function is improved, designer has carried out further improvement.To briefly describe, the present embodiment does not refer to place, can join
Examine corresponding contents in embodiment 1.
In the work progress of internal corner part water-proofing treatment, since the structure at inner corner trim is more special, paving is poly- at inner corner trim
When ester cloth carries out structural strengthening, phenomena such as be easy to causeing paving out-of-flatness, leads to not reach good waterproof and structure enhancing
Effect.Therefore, in the present embodiment, in step S42, the mylar of pyramid-shaped is used.
Referring to Fig. 3, the mylar 16 of pyramid-shaped includes the vertex of a cone 161 and three conical surfaces 162 for being intersected in the vertex of a cone 161.Vertebra
Top 161 has arc angle corresponding with internal corner part, and two adjacent conical surfaces 162 are mutually perpendicular to.And each conical surface 162 is respectively formed
Angle identical with the plane of paving is wanted.In use, when the mylar of pyramid-shaped to be impregnated to one section in extra play water-repellent paint
Between after, then the vertex of a cone 161 is placed at inner corner trim, the smooth each conical surface 162 of paving.By changing the construction of mylar, so that poly-
Ester cloth can be fitted closely in internal corner part.
Embodiment 3
The device obtained by above-mentioned design has been able to satisfy the waterproof demand of fine fitment kitchen and toilet substantially, but in line with further
The objective of its function is improved, designer has carried out further improvement.To briefly describe, the present embodiment does not refer to place, can join
Examine corresponding contents in embodiment 1.
In the work progress of pipeline position water-proofing treatment, since kitchen and toilet interior conduit is more, and pipeline location can bear compared with
Big hydraulic pressure, tube edge position are also easy to produce vibration because of hydraulic pressure problem, and tube edge position is caused to crack.
It please refers to Fig. 4 and Fig. 5, further includes following step after the step s 15 and before carrying out step S16 in the present embodiment
Suddenly:Foamed aluminium prefabricated component 50 is arranged outside pipeline 1.Foamed aluminium prefabricated component 50 include in hollow cylindrical sleeve part 51 and
Along the base plate 52 of the outwardly extending formation of the bottom margin of sleeve part.The thickness of foamed aluminium prefabricated component 50 is preferably 20~
25mm.Thickness is too small, then is unable to reach good effectiveness in vibration suppression, and compressive property is poor.And thickness is excessive, then at high cost, installing
It is inconvenient.
Further, there is a gap between foamed aluminium prefabricated component 50 and the lateral wall of pipeline 1, swelling is loaded in gap
Soil.Gap substantially 2~4mm.The height of foamed aluminium prefabricated component 50 is slightly below the embedment height of pipeline 1.In foamed aluminium prefabricated component
50 and gap top with sealing material (such as silicone adhesive) close.In gap filling bentonite, bentonite can penetrate into foamed aluminium
In the hole of prefabricated component, when percolating water occurs, water is contacted with bentonite, and bentonite clay particle water-swellable is prefabricated in foamed aluminium
Between formed with pipeline enclosure together with solid waterproof layer, effectively prevent the diffusion of water, and effectively prevent the generation of string water phenomenon.
Further, the smooth fillets that radius is 10~15mm are formed in the junction of sleeve part 51 and base plate 52, just
In subsequent waterproof construction.
When construction, by 50 sets of foamed aluminium prefabricated component outside pipeline 1, base plate 52 and ground face contact.Then pre- in foamed aluminium
Bentonite is inserted in the gap of product 50 and pipeline 1, top is sealed with silicone adhesive.Subsequently into step S16, mending mortar with
And intersects to brush on foamed aluminium prefabricated component outer wall and manage solid marine glue 15.
Foamed aluminium be after adding additives to pure aluminum or aluminum alloys, to be formed by foam process, at the same have concurrently metal and
Bubble feature has the function of energy-absorbing, fire prevention, anticorrosive, sound insulation and noise reduction etc..Foamed aluminium prefabricated component 50 is arranged outside pipeline 1, it can
The vibration of extraction duct effectively reduces the influence of pipeline hydraulic pressure.It is equivalent to outside pipeline 1 and forms separation layer, greatly reduction tube edge
The cracking risk of position.
Embodiments described above is a part of the embodiment of the present invention, instead of all the embodiments.Reality of the invention
The detailed description for applying example is not intended to limit the range of claimed invention, but is merely representative of selected implementation of the invention
Example.Based on the embodiments of the present invention, obtained by those of ordinary skill in the art without making creative efforts
Every other embodiment, shall fall within the protection scope of the present invention.
Claims (6)
1. a kind of fine fitment kitchen and toilet water protection standards construction technology, which is characterized in that include the following steps:
S1, pipeline position water-proofing treatment:
S11 knocks out the concrete sand pulp layer on pipeline edge ground to concrete, and outputs V-shaped groove, shape at pipeline position
At the construction part including V-shaped groove and pipeline edge ground,
S12 forms rough surface to construction part feather plucking processing,
S13 brushes interface waterproofing agent in the construction part and pipeline outer wall,
S14 is closed in the bottom of V-shaped groove with waterproof gasket cement,
S15 is filled up in V-shaped groove with mending mortar, and mending mortar forms the half arc flashing gradient at pipeline edge,
S16 after clear water maintenance, intersects to brush on mending mortar and pipeline outer wall and manages solid marine glue,
S17 pastes the mylar for impregnating and managing solid marine glue,
S18, feed pipe installation is then whole to brush interface waterproofing agent,
S19, using waterproof mortar it is levelling and painting;
S2, base's water-proofing treatment:
S21 removes substrate surface loose material, and cleans base;
S22 soaks to base base and is not absorbed water, and guarantees that base exists without bright water, and interface waterproof is brushed in base
Agent;
S23, using mending mortar to there are the repairing of the region of hole is smooth;
S3, the processing of wall ground waterproof:
S31, in the metope brushing water conduction fracture of back side,
S32 indicates the watertight area for needing to construct, and the watertight area includes the ground location to connect and wall locations, institute
State the metope that ground location is extended to internal corner part by ground.
S33, using watertight area described in the waterproofing agent brushing of interface;
S34 smears out the half arc flashing gradient in internal corner part using mending mortar;
S35, using watertight area described in universal waterproofing slurry brushing;
S36, in the flexible III type waterproofing slurry of wall locations brushing K11;
S37, in the flexible II type waterproofing slurry of ground location brushing K11;
And S4, internal corner part water-proofing treatment:
S41, in internal corner part brushing extra play waterproofing slurry,
The mylar of extra play waterproofing slurry was impregnated in S42, paving;
S43, the brushing extra play waterproofing slurry on mylar,
Above-mentioned steps are successively carried out according to the sequence of step S1, S2, S3, S4.
2. fine fitment kitchen and toilet water protection standards construction technology according to claim 1, which is characterized in that paving is in inner corner trim portion
The mylar of position is in pyramid-shaped, and the mylar includes the vertex of a cone and three conical surfaces for being intersected in the vertex of a cone, and the vertebra top has
Arc angle corresponding with internal corner part, two adjacent conical surfaces are mutually perpendicular to.
3. fine fitment kitchen and toilet water protection standards construction technology according to claim 1, which is characterized in that step S15 it
It is further comprising the steps of afterwards and before progress step S16:It is arranged foamed aluminium prefabricated component in pipeline external, the foamed aluminium is prefabricated
Part is folded in the interface waterproofing agent of pipeline outer wall and manages between solid marine glue, and the foamed aluminium prefabricated component includes in hollow cylindrical
Sleeve part and the outwardly extending formation of bottom margin along the sleeve part base plate.
4. fine fitment kitchen and toilet water protection standards construction technology according to claim 1, which is characterized in that the foamed aluminium is pre-
There is a gap between the interface waterproofing agent of the lateral wall of product and pipeline, bentonite is loaded in the gap, and described
The top in foamed aluminium prefabricated component and gap is closed with sealing material.
5. fine fitment kitchen and toilet water protection standards construction technology according to claim 1, which is characterized in that the interface waterproof
Agent includes mass ratio 1:3~4 liquid material and powder, in parts by weight,
6. fine fitment kitchen and toilet water protection standards construction technology according to claim 1, which is characterized in that according to parts by weight
Meter, water conduction fracture include:
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810614236.2A CN108867894B (en) | 2018-06-14 | 2018-06-14 | Waterproof standard construction process for finely decorated kitchen and toilet |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810614236.2A CN108867894B (en) | 2018-06-14 | 2018-06-14 | Waterproof standard construction process for finely decorated kitchen and toilet |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108867894A true CN108867894A (en) | 2018-11-23 |
CN108867894B CN108867894B (en) | 2020-03-24 |
Family
ID=64338932
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810614236.2A Active CN108867894B (en) | 2018-06-14 | 2018-06-14 | Waterproof standard construction process for finely decorated kitchen and toilet |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108867894B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110206234A (en) * | 2019-06-12 | 2019-09-06 | 西安市初元建设工程有限公司 | One kind going out roofing pipeline waterproof construction and its construction technology |
CN110629893A (en) * | 2019-09-23 | 2019-12-31 | 福州合力胜装饰工程设计有限公司 | Construction method of toilet waterproof engineering |
CN111502325A (en) * | 2020-04-29 | 2020-08-07 | 湖南先锋防水科技有限公司 | Repairing process for leakage of coating heat-insulation outer wall |
CN111515102A (en) * | 2020-04-07 | 2020-08-11 | 沈阳中车轨道交通装备有限公司 | Vehicle roof sealing process |
CN112746678A (en) * | 2019-10-31 | 2021-05-04 | 江西伦比新材料科技有限公司 | Kitchen and bathroom waterproof system and construction process thereof |
Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000087465A (en) * | 1998-09-08 | 2000-03-28 | Bridgestone Corp | Execution method for interior execution object |
JP2000309985A (en) * | 1999-02-26 | 2000-11-07 | Bridgestone Corp | Execution of sealing material |
TW200811345A (en) * | 2006-08-17 | 2008-03-01 | Cai-You Chen | Method for fixing water leakage problem in kitchen |
CN102758504A (en) * | 2012-07-12 | 2012-10-31 | 振华集团(昆山)建设工程有限公司 | Method for constructing wet-operation details of completely-decorated housings |
KR20140116734A (en) * | 2013-03-25 | 2014-10-06 | 학교법인연세대학교 | Waterproof construction structure for bathroom and construction method using the same |
JP2015042839A (en) * | 2014-10-28 | 2015-03-05 | 東リ株式会社 | Bathroom floor and construction method for the same |
CN104481034A (en) * | 2014-11-18 | 2015-04-01 | 北京合建志洋装饰工程有限公司 | Waterproofing construction method |
CN104481018A (en) * | 2014-11-10 | 2015-04-01 | 厦门防水博士建筑工程有限公司 | Home decoration toilet pipe-side floor drain treatment process |
CN105587938A (en) * | 2016-03-29 | 2016-05-18 | 山东天齐置业集团股份有限公司 | Toilet pipe root blocking structure and construction process thereof |
US20160177561A1 (en) * | 2013-04-26 | 2016-06-23 | Mgnt Products Group Llc | Integrated Bonding Flange Support Disk for Prefabricated Shower Tray |
KR101644037B1 (en) * | 2016-01-29 | 2016-08-01 | (주)대한하이텍건설 | Silicate Powder Type Waterproof Agent Composition Using Seaweeds and Waterproofing Methods using Thereof |
CN205577460U (en) * | 2016-03-02 | 2016-09-14 | 中标建设集团股份有限公司 | Bathroom pipeline root water repellent structure |
CN106703221A (en) * | 2017-01-17 | 2017-05-24 | 优居优住家居装饰(北京)有限公司 | Shower enclosure waterproof construction method |
CN106759955A (en) * | 2016-11-14 | 2017-05-31 | 东方雨虹民用建材有限责任公司 | The construction method of waterproof system is laid in a kind of toilet and toilet with waterproof system |
CN107059944A (en) * | 2017-04-06 | 2017-08-18 | 正威科技集团有限公司 | Basement seepage point gradually leak stopping structure and construction method |
CN206545282U (en) * | 2017-02-20 | 2017-10-10 | 上海东稻建设有限公司 | Toilet bathroom waterproof construction |
CN206667500U (en) * | 2017-04-12 | 2017-11-24 | 王天宁 | A kind of toilet waterproofing structure |
CN107476448A (en) * | 2017-06-28 | 2017-12-15 | 中冶天工集团天津有限公司 | A kind of construction method for waterproof at toilet doorway |
-
2018
- 2018-06-14 CN CN201810614236.2A patent/CN108867894B/en active Active
Patent Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000087465A (en) * | 1998-09-08 | 2000-03-28 | Bridgestone Corp | Execution method for interior execution object |
JP2000309985A (en) * | 1999-02-26 | 2000-11-07 | Bridgestone Corp | Execution of sealing material |
TW200811345A (en) * | 2006-08-17 | 2008-03-01 | Cai-You Chen | Method for fixing water leakage problem in kitchen |
CN102758504A (en) * | 2012-07-12 | 2012-10-31 | 振华集团(昆山)建设工程有限公司 | Method for constructing wet-operation details of completely-decorated housings |
KR20140116734A (en) * | 2013-03-25 | 2014-10-06 | 학교법인연세대학교 | Waterproof construction structure for bathroom and construction method using the same |
US20160177561A1 (en) * | 2013-04-26 | 2016-06-23 | Mgnt Products Group Llc | Integrated Bonding Flange Support Disk for Prefabricated Shower Tray |
JP2015042839A (en) * | 2014-10-28 | 2015-03-05 | 東リ株式会社 | Bathroom floor and construction method for the same |
CN104481018A (en) * | 2014-11-10 | 2015-04-01 | 厦门防水博士建筑工程有限公司 | Home decoration toilet pipe-side floor drain treatment process |
CN104481034A (en) * | 2014-11-18 | 2015-04-01 | 北京合建志洋装饰工程有限公司 | Waterproofing construction method |
KR101644037B1 (en) * | 2016-01-29 | 2016-08-01 | (주)대한하이텍건설 | Silicate Powder Type Waterproof Agent Composition Using Seaweeds and Waterproofing Methods using Thereof |
CN205577460U (en) * | 2016-03-02 | 2016-09-14 | 中标建设集团股份有限公司 | Bathroom pipeline root water repellent structure |
CN105587938A (en) * | 2016-03-29 | 2016-05-18 | 山东天齐置业集团股份有限公司 | Toilet pipe root blocking structure and construction process thereof |
CN106759955A (en) * | 2016-11-14 | 2017-05-31 | 东方雨虹民用建材有限责任公司 | The construction method of waterproof system is laid in a kind of toilet and toilet with waterproof system |
CN106703221A (en) * | 2017-01-17 | 2017-05-24 | 优居优住家居装饰(北京)有限公司 | Shower enclosure waterproof construction method |
CN206545282U (en) * | 2017-02-20 | 2017-10-10 | 上海东稻建设有限公司 | Toilet bathroom waterproof construction |
CN107059944A (en) * | 2017-04-06 | 2017-08-18 | 正威科技集团有限公司 | Basement seepage point gradually leak stopping structure and construction method |
CN206667500U (en) * | 2017-04-12 | 2017-11-24 | 王天宁 | A kind of toilet waterproofing structure |
CN107476448A (en) * | 2017-06-28 | 2017-12-15 | 中冶天工集团天津有限公司 | A kind of construction method for waterproof at toilet doorway |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110206234A (en) * | 2019-06-12 | 2019-09-06 | 西安市初元建设工程有限公司 | One kind going out roofing pipeline waterproof construction and its construction technology |
CN110629893A (en) * | 2019-09-23 | 2019-12-31 | 福州合力胜装饰工程设计有限公司 | Construction method of toilet waterproof engineering |
CN110629893B (en) * | 2019-09-23 | 2021-11-02 | 福州合力胜装饰工程设计有限公司 | Construction method of toilet waterproof engineering |
CN112746678A (en) * | 2019-10-31 | 2021-05-04 | 江西伦比新材料科技有限公司 | Kitchen and bathroom waterproof system and construction process thereof |
CN111515102A (en) * | 2020-04-07 | 2020-08-11 | 沈阳中车轨道交通装备有限公司 | Vehicle roof sealing process |
CN111515102B (en) * | 2020-04-07 | 2022-06-21 | 沈阳中车轨道交通装备有限公司 | Vehicle roof sealing process |
CN111502325A (en) * | 2020-04-29 | 2020-08-07 | 湖南先锋防水科技有限公司 | Repairing process for leakage of coating heat-insulation outer wall |
Also Published As
Publication number | Publication date |
---|---|
CN108867894B (en) | 2020-03-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108867894A (en) | A kind of fine fitment kitchen and toilet water protection standards construction technology | |
CN108868176B (en) | Construction method of kitchen and bathroom water leakage repairing system | |
CN104018598A (en) | Outer wall structure and construction and installation method | |
CN106284706A (en) | The construction method of external wall outer insulation rock cotton board | |
CN104120847B (en) | A kind of concrete porous brick wall exempts to paint the construction method that batch putty processes | |
CN108755979A (en) | A kind of toilet moistureproof and waterproof processing method | |
CN103806662B (en) | A kind of toilet bath room Waterproof Construction Technique | |
CN201128990Y (en) | Composite environment-friendly thermal insulation material for wall | |
CN108675712A (en) | A kind of combination of rigidity and flexibility waterproof material and construction method | |
CN110629893B (en) | Construction method of toilet waterproof engineering | |
CN104481018A (en) | Home decoration toilet pipe-side floor drain treatment process | |
CN208379803U (en) | A kind of fine fitment kitchen and toilet waterproof construction modular system | |
CN204662719U (en) | A kind of indoor seamless spliced secondary light partition wall system | |
CN108385998B (en) | Repairing process for external wall leakage water | |
CN211114595U (en) | Ancient building restores and uses ground brick | |
CN101586367B (en) | Method for preventing decorative surfaces of ceramic tiles in shower room from leaking water | |
CN109881794A (en) | A kind of swimming pool waterproof construction | |
CN206667500U (en) | A kind of toilet waterproofing structure | |
CN107675811B (en) | Bathroom waterproof system and construction method | |
CN102182323A (en) | Process for dry laying of autoclaved aerated concrete blocks in low-latitude plateaus | |
CN212251490U (en) | Wall pipe plugging structure | |
CN109336518A (en) | A kind of glue for tile and its construction method | |
CN108005216A (en) | A kind of floor drain system and its construction method | |
CN210067247U (en) | Rigid-flexible composite waterproof structure | |
CN209568553U (en) | Flexible water sealing system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |