CN107234162A - Sheet material automatic transport processing method and equipment - Google Patents

Sheet material automatic transport processing method and equipment Download PDF

Info

Publication number
CN107234162A
CN107234162A CN201710399123.0A CN201710399123A CN107234162A CN 107234162 A CN107234162 A CN 107234162A CN 201710399123 A CN201710399123 A CN 201710399123A CN 107234162 A CN107234162 A CN 107234162A
Authority
CN
China
Prior art keywords
sheet material
finished product
pipeline
cut
cutting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710399123.0A
Other languages
Chinese (zh)
Other versions
CN107234162B (en
Inventor
田世钰
王远青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGXI YUANCHENG AUTOMOBILE TECHNOLOGY CO., LTD.
Original Assignee
Jiangxi Yuan Geng Agricultural Machinery Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Yuan Geng Agricultural Machinery Ltd By Share Ltd filed Critical Jiangxi Yuan Geng Agricultural Machinery Ltd By Share Ltd
Priority to CN201710399123.0A priority Critical patent/CN107234162B/en
Publication of CN107234162A publication Critical patent/CN107234162A/en
Application granted granted Critical
Publication of CN107234162B publication Critical patent/CN107234162B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D28/00Shaping by press-cutting; Perforating
    • B21D28/02Punching blanks or articles with or without obtaining scrap; Notching

Abstract

The present invention provides a kind of sheet material automatic transport processing method and equipment, the equipment includes sheet material pipeline, sheet material cutting table, semi-finished product pipeline, cutting off tool component and transhipment arm, cutting off tool component is located at the top of sheet material cutting table, transport arm be located at sheet material cutting table side, it is described including:It is placed with when detecting on sheet material pipeline when sheet material is cut off, in the off-position that sheet material to be cut off is delivered to sheet material cutting table by sheet material pipeline;When detect wait cut off sheet material reach off-position on when, sheet material pipeline is stopped, and fall cutting off tool component, cut off with treating cut-out sheet material, when detecting cutting off tool component recovery to initial position, the semifinished sheet cut off is transported to from sheet material cutting table on semi-finished product pipeline by transporting arm, and starts sheet material pipeline.Sheet material automatic transport processing method and equipment in the present invention, whole sheet fabrication is completed using full-automation, and cost is low.

Description

Sheet material automatic transport processing method and equipment
Technical field
The present invention relates to technical field of board processing, more particularly to a kind of sheet material automatic transport processing method and equipment.
Background technology
Infrastructure constantly is being carried out with national, the demand of sheet material is increasing, in order to meet under varying environment Use requirement, sheet material needs, by multiple and complicated manufacturing procedure, to be such as heat-treated, cut off, split.Sheet material Cutting process is Refer to the technique that a monoblock sheet material is cut into multi-sheets, among current production process of plate, sheet material Cutting process is must Indispensable.
Among prior art, at present when carrying out sheet material rupturing operation, it usually needs operator is manually toward plate cutting platform Upper feed, and feed is required to manually operate the cutting off tool for making to be located above plate cutting platform to fall every time, to complete sheet material Cut-out, while often completing once to cut off, be required to manually take out the sheet material cut off from plate cutting platform, it is this to adopt Manually come the scheme of the process that completes the cut-out of whole sheet material, mechanical automation degree is low, causes sheet fabrication efficiency low, simultaneously Manipulation strength and dangerous height.
The content of the invention
Based on this, it is an object of the invention to provide a kind of sheet material automatic transport processing method and equipment, to improve sheet material Processing efficiency.
A kind of sheet material automatic transport processing method according to embodiments of the present invention, sets applied to the processing of sheet material automatic transport Standby, the sheet material automatic transport process equipment includes sheet material pipeline, sheet material cutting table, semi-finished product pipeline, cutting off tool group Part and transhipment arm, the sheet material pipeline, the sheet material cutting table and the semi-finished product pipeline are arranged in order arrangement, described to cut Disconnected toolbox is located at the top of the sheet material cutting table, and the transhipment arm is located at the side of the sheet material cutting table, the plate Material automatic transport processing method includes:
It is placed with when sheet material is cut off, is treated by the sheet material pipeline by described on the sheet material pipeline when detecting Cut-out sheet material is delivered in the off-position of the sheet material cutting table;
It is described when cutting off in the sheet material arrival off-position when detecting, by sheet material pipeline stopping, and will The cutting off tool component is fallen, to be cut off to the sheet material to be cut off;
When detecting the cutting off tool component recovery to initial position, by the arm of transporting by cut off half Finished product sheet material is transported to from the sheet material cutting table on the semi-finished product pipeline, and starts the sheet material pipeline.
The method in addition, a kind of sample rack according to the above embodiment of the present invention switches tracks, can also have skill additional as follows Art feature:
Further, the sheet material automatic transport process equipment also includes sheet material rounding table, rebound, segmentation knife and plate Material pushing plate, the semi-finished product pipeline, the rebound and the sheet material rounding table are arranged in order arrangement, the segmentation knife Located at the top of the sheet material rounding table, the sheet material pushing plate is located at the top of the semi-finished product pipeline, and close to described Rebound, described when detecting the cutting off tool component recovery to initial position, by the transhipment arm by under cut-out The semifinished sheet come is transported to from the sheet material cutting table on the semi-finished product pipeline, and starts the sheet material pipeline The step of after, the sheet material automatic transport processing method also includes:
When detecting on the semi-finished product pipeline conveying semifinished sheet arrival rebound, by described The semifinished sheet is pushed on the split position of the sheet material rounding table by sheet material pushing plate;
When detecting on the semifinished sheet arrival split position, the segmentation knife is fallen, with to institute Semifinished sheet is stated to be split.
Further, the sheet material automatic transport process equipment also includes finished product head board and finished product pushing plate, the plate Material rounding table includes float support plate, fixed support plate and location-plate, the rebound, the float support plate, the fixation Supporting plate and the finished product pushing plate are arranged in order arrangement, and the location-plate is fixedly arranged on the top of the fixed support plate, and with The fixed support plate constitutes an accepting hole, when the semifinished sheet is located on the split position, the half-finished product plate Material is located at the top of the float support plate and the fixed support plate, and one end is contained in the accepting hole, is incited somebody to action described The segmentation knife is fallen, the step of to split to the semifinished sheet after, the sheet material automatic transport processing side Method also includes:
When detecting the segmentation knife and recovering to initial position, described float will be located at by the finished product head board The first finished product sheet material after segmentation in supporting plate is released from the sheet material rounding table;
When detecting the finished product head board and recovering to initial position, it will be received by the finished product pushing plate in described Hold the second finished product sheet material after the segmentation in hole to be pushed out on the float support plate;
When detecting the finished product pushing plate and recovering to initial position, it will be located at by the finished product head board described floating The second finished product sheet material in dynamic supporting plate is released from the sheet material rounding table.
Further, the sheet material automatic transport process equipment also includes sheet material pushing plate, and the sheet material pushing plate is located at The top of the sheet material pipeline, and close to the sheet material cutting table, placed in described ought detect on the sheet material pipeline When needing to be cut off sheet material, the sheet material to be cut off is delivered to the cut-out position of the sheet material cutting table by the sheet material pipeline After the step put, the sheet material automatic transport processing method also includes:
It is described when sheet material is cut off when stopping detecting on the sheet material pipeline, will be surplus by the sheet material pushing plate Remaining sheet material to be cut off is pushed in the off-position;
When detecting the sheet material pushing plate and recovering to initial position, the cutting off tool component is fallen, with to institute Remaining sheet material to be cut off is stated to be cut off.
Further, the sheet material automatic transport process equipment also includes tailing head board, and the tailing head board is located at The side of the sheet material cutting table, it is described when detecting the sheet material pushing plate and recovering to initial position, by the cut-out Toolbox is fallen, the step of to be cut off to the remaining sheet material to be cut off after, the sheet material automatic transport processing Method also includes:
When detecting the sheet material pushing plate and the cutting off tool component recovers to respective initial position, pass through The tailing head board releases the tailing on the sheet material cutting table from the sheet material cutting table.
A kind of sheet material automatic transport process equipment according to embodiments of the present invention, including sheet material pipeline, sheet material cutting table, Semi-finished product pipeline, cutting off tool component and transhipment arm, the sheet material pipeline, the sheet material cutting table and the semi-finished product are defeated Line sending is arranged in order arrangement, and the cutting off tool component is located at the top of the sheet material cutting table, and the transhipment arm is located at described The side of sheet material cutting table, the sheet material automatic transport process equipment also includes a control system, and the control system includes:
Sheet material convey control module, for when detect be placed with the sheet material pipeline wait cut off sheet material when, pass through The sheet material to be cut off is delivered in the off-position of the sheet material cutting table by the sheet material pipeline;
Sheet material cutting-off controlling module, for described when cutting off in the sheet material arrival off-position when detecting, by institute The stopping of sheet material pipeline is stated, and the cutting off tool component is fallen, to be cut off to the sheet material to be cut off;
Semi-finished product transport control module, when detecting the cutting off tool component recovery to initial position, by described The semifinished sheet cut off is transported on the semi-finished product pipeline by transhipment arm from the sheet material cutting table, and is started The sheet material pipeline
The method in addition, a kind of sample rack according to the above embodiment of the present invention switches tracks, can also have skill additional as follows Art feature:
Further, the sheet material automatic transport process equipment also includes sheet material rounding table, rebound, segmentation knife and plate Material pushing plate, the semi-finished product pipeline, the rebound and the sheet material rounding table are arranged in order arrangement, the segmentation knife Located at the top of the sheet material rounding table, the sheet material pushing plate is located at the top of the semi-finished product pipeline, and close to described Sheet material rounding table, the control system also includes:
Semi-finished product push control module, and the semi-finished product pipeline conveying semifinished sheet arrival is detected for working as When on the rebound, the semifinished sheet is pushed to the framing bits of the sheet material rounding table by the sheet material pushing plate Put;
Sheet material splits control module, for when detecting on the semifinished sheet arrival split position, by institute State segmentation knife to fall, to split the semifinished sheet.
Further, the sheet material automatic transport process equipment also includes finished product head board and finished product pushing plate, the plate Material rounding table includes float support plate, fixed support plate and location-plate, the rebound, the float support plate, the fixation Supporting plate and the finished product pushing plate are arranged in order arrangement, and the location-plate is fixedly arranged on the top of the fixed support plate, and with The fixed support plate constitutes an accepting hole, when the semifinished sheet is located on the split position, the half-finished product plate Material is located at the top of the float support plate and the fixed support plate, and one end is contained in the accepting hole, the control System also includes:
Finished product releases control module, for when detecting the segmentation knife and recovering to initial position, by it is described into Product head board releases the first finished product sheet material after the segmentation on the float support plate from the sheet material rounding table;
Finished product pushes control module, for when detecting the finished product head board and recovering to initial position, by described The second finished product sheet material after segmentation in the accepting hole is pushed out on the float support plate by finished product pushing plate;
When detecting the finished product pushing plate and recovering to initial position, the finished product release control module by it is described into Product head board releases the second finished product sheet material on the float support plate from the sheet material rounding table.
Further, the sheet material automatic transport process equipment also includes sheet material pushing plate, and the sheet material pushing plate is located at The top of the sheet material pipeline, and close to the sheet material cutting table, the control system also includes:
Sheet material promotes control module, for described when sheet material is cut off when stopping detecting on the sheet material pipeline, Remaining sheet material to be cut off is pushed in the off-position by the sheet material pushing plate;
When detecting the sheet material pushing plate and recovering to initial position, the sheet material cutting-off controlling module is by the cut-out Toolbox is fallen, to be cut off to the remaining sheet material to be cut off.
Further, the sheet material automatic transport process equipment also includes tailing head board, and the tailing head board is located at The side of the sheet material cutting table, the control system also includes:
Tailing releases control module, for when detect the sheet material pushing plate and the cutting off tool component recover to During respective initial position, by the tailing head board by the tailing on the sheet material cutting table from the sheet material cutting table Release.
Above-mentioned sheet material automatic transport processing method and equipment, it is only necessary to which sheet material to be cut off is positioned over the sheet material pipeline On, now the sheet material pipeline is by the off-position of sheet material to be cut off described in automatic transport to the sheet material cutting table, and When cutting off in the sheet material arrival off-position, the sheet material pipeline is automatically stopped, and the cutting off tool component is automatic Fall, to be cut off to the sheet material to be cut off, after the cut-out to sheet material is completed, the cutting off tool component will then revert to Initial position, now described arm of transporting will be transported to the semifinished sheet that cut-out is got off on the semi-finished product pipeline automatically, While sheet material pipeline described in automatic start, to enter the sheet material cut-out work of next round.Therefore the sheet material automatic transport adds Work method and apparatus completes the work of whole sheet material cut-out using full-automatic, improves the processing efficiency of sheet material, reduces Operational danger and manipulation strength, simultaneously because control and driving that the sheet material automatic transport processing method and equipment are used Element is relatively simple, and cost is low, while the maintenance of whole equipment is convenient.
Brief description of the drawings
Fig. 1 be first embodiment of the invention in sheet material automatic transport process equipment structural representation.
Fig. 2 is the mplifying structure schematic diagram at I in Fig. 1.
Fig. 3 is the mplifying structure schematic diagram at II in Fig. 1.
Fig. 4 is the mplifying structure schematic diagram at III in Fig. 1.
Fig. 5 be first embodiment of the invention in sheet fabrication process schematic diagram.
Fig. 6 be first embodiment of the invention in sheet material automatic transport processing method flow chart.
Fig. 7 be second embodiment of the invention in sheet material automatic transport process equipment structural representation.
Fig. 8 is the mplifying structure schematic diagram at IV in Fig. 7.
Main element symbol description:
Sheet material pipeline 10 Sheet material cutting table 20
Cutting off tool component 30 Transport arm 40
Semi-finished product pipeline 50 Rebound 60
Sheet material pushing plate 70 Sheet material rounding table 80
Segmentation knife 90 Finished product head board 100
Finished product pushing plate 110 Sheet material pushing plate 120
Tailing head board 130 First pedestal 140
Mounting bracket 150 Adsorbent equipment 41
Fixed part 71 Movable part 72
Float support plate 81 Fixed support plate 82
Location-plate 83 Accepting hole 84
Second pedestal 160 Cut off driver 1
Rotation driving cylinder 2 Sheet material push cylinder 3
Division driving device 4 Finished product releases cylinder 5
Finished product push cylinder 6 Sheet material pusher cylinder 7
Tailing releases cylinder 8 Tailing pipeline 170
Sheet material storage rack 180 Sheet material to be cut off 200
Semifinished sheet 201 First finished product sheet material 2011
Second finished product sheet material 2012
Following embodiment will further illustrate the present invention with reference to above-mentioned accompanying drawing.
Embodiment
For the ease of understanding the present invention, the present invention is described more fully below with reference to relevant drawings.In accompanying drawing Give some embodiments of the present invention.But, the present invention can be realized in many different forms, however it is not limited to this paper institutes The embodiment of description.On the contrary, the purpose that these embodiments are provided be make to the disclosure more it is thorough comprehensively.
It should be noted that when element is referred to as " being fixedly arranged on " another element, it can be directly on another element Or can also have element placed in the middle.When an element is considered as " connection " another element, it can be directly connected to To another element or it may be simultaneously present centering elements.Term as used herein " vertical ", " level ", " left side ", " right side " and similar statement are for illustrative purposes only.
Unless otherwise defined, all of technologies and scientific terms used here by the article is with belonging to technical field of the invention The implication that technical staff is generally understood that is identical.Term used in the description of the invention herein is intended merely to description tool The purpose of the embodiment of body, it is not intended that in the limitation present invention.Term as used herein " and/or " include one or more phases The arbitrary and all combination of the Listed Items of pass.
Fig. 1 to Fig. 5 is referred to, the sheet material automatic transport process equipment in first embodiment of the invention, including plate is shown Material pipeline 10, sheet material cutting table 20, cutting off tool component 30, transhipment arm 40, semi-finished product pipeline 50, rebound 60, sheet material Pushing plate 70, sheet material rounding table 80, segmentation knife 90, finished product head board 100, finished product pushing plate 110, sheet material pushing plate 120, tail Expect head board 130 and control system (not shown).
The sheet material pipeline 10, sheet material cutting table 20, the semi-finished product pipeline 50, the rebound 60, the plate Material rounding table 80 and the finished product pushing plate 110 are arranged in order arrangement.The sheet material pipeline 10 is used to convey sheet material to be cut off 200 in the off-position of the sheet material cutting table 20.
The sheet material cutting table 20 is arranged on one first pedestal 140, and the cutting off tool component 30 is fixedly arranged on described On one pedestal 140, and positioned at the top of the sheet material cutting table 20, the cutting off tool component 30 coordinates the sheet material cutting table 20 cut-out by completion to sheet material, i.e., when the cutting off tool component 30 is fallen in the way of punching press, coordinate the sheet material to cut Disconnected platform 20 can cut off the sheet material in the off-position.
One end of the transhipment arm 40 is rotatably installed on a mounting bracket 150, and the mounting bracket 150 is located at described the The side of one pedestal 140, the transhipment arm 40 be used for will the semifinished sheet 201 that cut off from the sheet material cutting table 20 It is transported on the semi-finished product pipeline 50.Specifically, the free terminal of the transhipment arm 40 is provided with adsorbent equipment 41, it is described Adsorbent equipment 41 is used to adsorb the semifinished sheet 201, the transhipment suction-operated of the arm 40 by the adsorbent equipment 41 And the semi-finished product are transported on the semi-finished product pipeline 50 by the rotation of itself to realize.Among the present embodiment, complete It is described to transport arm 40 to turn round among the process that the semifinished sheet 201 is transported on the semi-finished product pipeline 50 Dynamic angle is 90 °, and under suction-operated, the semifinished sheet 201, which will also be followed, rotates together with 90 °, i.e., described semi-finished product Sheet material 201 is horizontal positioned (along the conveying direction of the sheet material pipeline 10) on the sheet material cutting table 20, is transported to institute Rotate to be and be vertically arranged (conveying direction of the vertical sheet material pipeline 10) after stating on semi-finished product pipeline 50.
The semi-finished product pipeline 50 is used to convey the semifinished sheet 201 that transhipment arm 40 transhipment comes.
The rebound 60 is fixedly arranged on one second pedestal 160, the half-finished product plate on the semi-finished product pipeline 50 Material 201 will be delivered on the rebound 60.
The sheet material pushing plate 70 is located at the top of the semi-finished product pipeline 50, and close to the rebound 60, it is described Sheet material pushing plate 70 includes fixed part 71 and the movable part 72 being connected with the bottom of the fixed part 71, and the movable part 72 is relative The fixed part 71 can be rotated along the conveying direction of the semi-finished product pipeline 50, so that the conveying of the semi-finished product pipeline 50 The semifinished sheet 201 can jack-up and through the movable part 72, and when the semifinished sheet 201 is delivered to the mistake When on cab apron 60, the sheet material pushing plate 70 can be by the semifinished sheet on the rebound 60 by the movable part 72 201 are pushed on the split position of the sheet material rounding table 80.
The sheet material rounding table 80 is fixedly arranged on second pedestal 160, and the sheet material rounding table 80 includes float support Plate 81, fixed support plate 82 and location-plate 83, the rebound 60, the float support plate 81, the fixed support plate 82 and The finished product pushing plate 100 is arranged in order arrangement.The float support plate 81 is fixedly arranged on second pedestal by flexible member On 160, the location-plate 83 is fixedly arranged on the top of the fixed support plate 82, and constitutes a collecting with the fixed support plate 82 Hole 84, one end of the finished product pushing plate 100 is contained in the accepting hole 84.When the semifinished sheet 201 reaches described When on split position, the semifinished sheet 201 is located at the top of the float support plate 81 and the fixed support plate 82, and One end is contained in the accepting hole 84.
The segmentation knife 90 is fixedly arranged on second pedestal 160, and positioned at the top of the sheet material rounding table 80.Institute State segmentation knife 90 and coordinate segmentation of the sheet material rounding table 80 by completion to the semifinished sheet 201, i.e., when the segmentation When cutter 90 is fallen in the way of punching press, coordinate the sheet material rounding table 80 can be by described half on the split position Finished product sheet material 201 is split.
It should be understood that when the segmentation knife 90 coordinates the sheet material rounding table 80 to complete to the semifinished sheet After 201 segmentation, the semifinished sheet 201 will be divided into two parts, respectively on the float support plate 81 First finished product sheet material 2011 and the second finished product sheet material 2012 in the accepting hole 84.
The finished product pushing plate 100 is used to that institute will to be pushed out in the second finished product sheet material 2012 in the accepting hole 84 State on float support plate 81.
The finished product pushing plate 110 is located at the top side of the float support plate 81, for that will be located at the branch of floating Finished product sheet material after segmentation on fagging 81 is released from the sheet material rounding table 80.
The sheet material pushing plate 120 is located at the top of the sheet material pipeline 10, and close to the sheet material cutting table 20, institute The structure for stating sheet material pushing plate 120 is consistent with the structure of the sheet material pushing plate 70.When the sheet material 200 to be cut off is too short, lead Cause the sheet material pipeline 10 now described directly by described when cut-out sheet material 200 is delivered in the off-position The sheet material 200 to be cut off can be pushed in the off-position by sheet material pushing plate 120.
The tailing head board 130 is located at the side of the sheet material cutting table 20, for by the sheet material cutting table 20 Tailing released from the sheet material cutting table 20, the tailing for it is described after cut-out sheet material 200 after constantly cut-out it is remaining The sheet material that can not be cut off again.
The control system include sheet material conveying control module, sheet material cutting-off controlling module, semi-finished product transhipment control module, Semi-finished product conveying control module, semi-finished product push control module, sheet material segmentation control module, finished product and release control module, finished product Pushing control module, sheet material promotes control module and tailing to release control module.
The sheet material conveying control module is connected with the sheet material pipeline 10, and the sheet material pipeline is detected for working as Described in being placed with 10 when sheet material 200 is cut off, the sheet material 200 to be cut off is delivered to by institute by the sheet material pipeline 10 State in the off-position of sheet material cutting table 20.The sheet material conveying control module includes being arranged at the sheet material pipeline 10 On first sensor, the first sensor is used to detect whether be placed with the plate to be cut off on the sheet material pipeline 10 Material 200, and it is placed with described when sheet material 200 is cut off on the sheet material pipeline 10 when detecting, control signal is sent to open The sheet material pipeline 10 is opened, so as to which the sheet material 200 to be cut off is delivered into the cut-out by the sheet material pipeline 10 On position.The first sensor can be contact-making switch or proximity transducer.
The sheet material cutting-off controlling module is connected with the cutting off tool component 30, and the plate to be cut off is detected for working as When material 200 is reached in the off-position, the sheet material pipeline 10 is stopped, and the cutting off tool component 30 is fallen, To be cut off to the sheet material 200 to be cut off.Specifically, the cut-out that the sheet material cutting-off controlling module includes being electrically connected with is driven Dynamic device 1 and second sensor, the cutting off tool component 30 and the second sensor are fixedly arranged on the bottom of the cut-out driver 1 Portion, the second sensor is used to detect whether the sheet material 200 to be cut off reaches the off-position, and when described second Sensor detects described when cutting off sheet material 200 and reaching the off-position, sends a control signal to the cut-out driver 1 With sheet material pipeline 10, to stop the sheet material pipeline 10, and the cut-out driver 1 is set to drive the cutting off tool component 30 fall, and complete sheet material cut-out.The second sensor can be infrared sensor, and the cut-out driver 1 can be cylinder.
The semi-finished product transhipment control module is connected with the transhipment arm 40, and the cutting off tool component is detected for working as 30 when recovering to initial position, by the transhipment arm 40 by the semifinished sheet 201 cut off from the sheet material cutting table It is transported on 20 on the semi-finished product pipeline 50, and starts the sheet material pipeline 10.The semi-finished product transport control module Rotation driving cylinder 2 and 3rd sensor including electric connection, the rotation driving cylinder 2 are fixedly arranged on the mounting bracket 150 On, and be connected with the transhipment arm 40.The 3rd sensor is arranged on the lateral wall of the cut-out driver 1, for examining Survey whether the cutting off tool component 30 recovers to initial position, and recover when detecting the cutting off tool component 30 to initial During position, the rotation driving cylinder 2 and the sheet material pipeline 10 are sent a control signal to, so that the rotation driving cylinder The 2 drivings transhipment arm 40 is rotated, and under the suction-operated of the adsorbent equipment 41, is realized the semifinished sheet 201 It is transported on the semi-finished product pipeline 50, and starts the sheet material pipeline 10.The 3rd sensor can be opened for stroke Pass, contact-making switch or proximity transducer.
It is pointed out that to the 3rd sensor can be set, so that institute the priority time difference that control signal is sent State rotation driving cylinder 2 and when the sheet material pipeline 10 receives the control signal that the 3rd sensor sends and there is priority Between it is poor, successively perform the transfer semifinished sheet 201 so as to realize and start the action of the sheet material pipeline 10.
The semi-finished product conveying control module is connected with the semi-finished product pipeline 50, and the semi-finished product are detected for working as When being placed with the semifinished sheet 201 on pipeline 50, by the semi-finished product pipeline 50 by the semifinished sheet 201 It is delivered on the rebound 60.Semi-finished product conveying control module includes being arranged at the on the semi-finished product pipeline 50 Four sensors, the 4th sensor is used for detecting whether be placed with the semifinished sheet on the semi-finished product pipeline 50 201, and when detect be placed with the semifinished sheet 201 on the semi-finished product pipeline 50 when, send control signal to open The semi-finished product pipeline 50 is opened, so that the semifinished sheet 201 is delivered into the mistake by the semi-finished product pipeline 50 On cab apron 60.4th sensor can be contact-making switch or proximity transducer.
The semi-finished product push control module and are connected with the sheet material pushing plate 70, for defeated when detecting the semi-finished product Line sending 50 conveys the semifinished sheet 201 when reaching on the rebound 60, by the sheet material pushing plate 70 by described half Finished product sheet material 201 is pushed on the split position of the sheet material rounding table 80.Specifically, the semi-finished product push control module bag The sensor of sheet material push cylinder 3 and the 5th of electric connection is included, the sheet material push cylinder 3 is fixedly arranged on the semi-finished product hump lead 50 top, and be fixedly connected with the fixed part 71 of the sheet material pushing plate 70, the 5th sensor is located at the rebound On 60, for detecting whether the semifinished sheet 201 reaches the rebound 60, and the semifinished sheet ought be detected When on the 201 arrival rebounds 60, the sheet material push cylinder 3 is sent a control signal to, so that the sheet material push cylinder 3 Promote the sheet material pushing plate 70 to be moved towards the rebound 60, with by the sheet material pushing plate 70 by the half-finished product plate Material 201 is pushed on the split position of the sheet material rounding table 80.5th sensor can be contact-making switch.
The sheet material segmentation control module is connected with the segmentation knife 90, and the semifinished sheet is detected for working as When on the 201 arrival split positions, the segmentation knife 90 is fallen, to split to the semifinished sheet 201.Tool Body, the sheet material segmentation control module includes the sensor of division driving device 4 and the 6th being electrically connected with, the segmentation knife 90 The bottom of the division driving device 4 is fixedly arranged on, the 6th sensor is received on the fixed support plate 82, and positioned at described Hold in hole 84.6th sensor is detected for detecting that the semifinished sheet 201 reaches the split position, and working as When the semifinished sheet 201 is reached on the split position, control is sent to the segmentation knife 90, so that the segmentation is driven Dynamic device 4 drives the segmentation knife 90 to fall, and completes sheet material segmentation.6th sensor can be infrared sensor or contact Sensor, the division driving device 4 can be cylinder.
The finished product is released control module and is connected with the finished product head board 100, and the segmentation knife is detected for working as 90 when recovering to initial position, by the finished product head board 100 by the after the segmentation on the float support plate 81 One finished product sheet material 2011 is released from the sheet material rounding table 80.Specifically, the finished product releases control module and includes electrically connecting The finished product connect releases the sensor of cylinder 5 and the 7th, and the finished product is released cylinder 5 and is fixedly connected with the finished product head board 100, institute The 7th sensor is stated to be arranged on the lateral wall of the division driving device 4.7th sensor is used to detect the rounding knife Whether tool 90 recovers to initial position, and when detecting that the segmentation knife 90 recovers to initial position, sends a control signal to The finished product releases cylinder 5, so that the finished product releases cylinder 5 and promotes the finished product head board 100 towards the float support Plate 81 is moved, with will be described the first one-tenth after the segmentation on the float support plate 81 by the finished product head board 100 Product sheet material 2011 is released from the sheet material rounding table 80.7th sensor can be travel switch, contact-making switch or connect Nearly sensor.
The finished product pushes control module and is connected with the finished product pushing plate 110, and the finished product release is detected for working as When plate 100 is recovered to initial position, by the finished product pushing plate 110 by second finished product in the accepting hole 84 Sheet material 2012 is pushed out on the float support plate 81.Specifically, the finished product, which pushes control module, includes finished product push cylinder 6th, the 8th sensor and the 9th sensor, the finished product push cylinder 6 is with the finished product pushing plate 110 away from the accepting hole 84 One end connection, the 8th sensor is electrically connected with, institute with the finished product push cylinder 6 on the location-plate 83 State the 9th sensor to be arranged on the fixed mount of the fixed finished product push cylinder 6, and cylinder 5 is released with the finished product and electrically connect Connect.8th sensor be used for detect whether the finished product head board 100 recovers to initial position, and when detect it is described into When product head board 100 is recovered to initial position, the finished product push cylinder 6 is sent a control signal to, so that the finished product is pushed Cylinder 6 promotes the finished product pushing plate 110 to be moved towards the float support plate 81, to be incited somebody to action by the finished product pushing plate 110 The second finished product sheet material 2012 in the accepting hole 84 is pushed out on the float support plate 81.9th sensing Device is used to detect whether the finished product pushing plate 110 recovers to initial position, and recovers when detecting the finished product pushing plate 110 During to initial position, send a control signal to the finished product and release cylinder 5 so that the finished product release cylinder 5 promote it is described into Product head board 100 is moved towards the float support plate 81, will be located at the float support by the finished product head board 100 The second finished product sheet material 2012 (being released by the finished product pushing plate 110) on plate 81 is above pushed away from the sheet material rounding table 80 Go out.8th sensor and the 9th sensor can be infrared sensor or travel switch.
The sheet material promotes control module to be connected with the sheet material pushing plate 120, in when in the sheet material pipeline Stop detecting on 10 it is described when sheet material 200 is cut off, by the sheet material pushing plate 120 by remaining sheet material promotion cut off To the off-position of the sheet material cutting table 20.Specifically, the sheet material promote control module include the tenth sensor and with The sheet material pusher cylinder 7 that the first sensor is electrically connected with, the sheet material pusher cylinder 7 is fixedly arranged on the sheet material pipeline 10 Top, and be connected with the fixed part of the sheet material pushing plate 120.Wait to cut off described in sensing when first sensor stopping During sheet material 200, the representative sheet material 200 to be cut off is too short, and the sheet material pipeline 10 can not be directly by the sheet material to be cut off 200 are delivered in the off-position, and now the first sensor sends a control signal to the sheet material pusher cylinder 7, with Sheet material pusher cylinder 7 is set to promote the sheet material pushing plate 120 to be moved towards the off-position, to pass through the sheet material pushing plate 120 are pushed to remaining sheet material to be cut off in the off-position of the sheet material cutting table 20.Tenth sensor is located at institute State on sheet material pipeline 10, and be electrically connected with the cut-out driver 1, for detecting whether the sheet material pushing plate 120 is extensive It is multiple to initial position, and when detecting the sheet material pushing plate 120 and recovering to initial position, send a control signal to described cut Disconnected driver 1, so that the cut-out driver 1 drives the cutting off tool component 30 to fall, is completed to described remaining to be cut Disconnected sheet material is cut off.
The tailing is released control module and is connected with the tailing head board 130, and the sheet material promotion is detected for working as , will be described by the tailing head board 130 when plate 120 and the cutting off tool component 30 are recovered to respective initial position Tailing on sheet material cutting table 20 is released from the sheet material cutting table 20.Specifically, the tailing is released control module and included Tailing releases cylinder 8, and the tailing is released cylinder 8 and is electrically connected with respectively with the first sensor and the tenth sensor, When the tenth sensor, which detects the tailing head board 130, to be recovered to initial position, control signal is sent to the tail Material releases cylinder 8, then when the first sensor, which detects the cutting off tool component 30, to be recovered to initial position, represents The cutting off tool component 30 has completed the cut-out to the remaining sheet material to be cut off, and the sheet material that residue is not cut off is then tail Expect, now the first sensor will also send control signal and release cylinder 8 to the tailing, in the tenth sensor and institute Under the collective effect for the control signal for stating first sensor transmission, the tailing releases cylinder 8 and drives the tailing head board 130 Moved towards the sheet material cutting table 20, with by the tailing head board 130 by the tailing from the sheet material cutting table 20 It is upper to release.
It is pointed out that the first sensor, second sensor, 3rd sensor, the 4th sensor, the 5th sensing Device, the 6th sensor, the 7th sensor, the 8th sensor, the 9th sensor and the position of the tenth sensor and kind and not only It is limited to the present embodiment provided in, among other embodiments, can also be carried out according to actual conditions and actual requirement Selection.
Correspondingly, the present invention also provides a kind of sheet material automatic transport processing method, referring to Fig. 6, showing the present invention the The flow chart of sheet material automatic transport processing method in one embodiment, including step S01 to step S08.
Step S01, is placed with when sheet material is cut off on the sheet material pipeline when detecting, passes through the sheet material pipeline In the off-position that the sheet material to be cut off is delivered to the sheet material cutting table.
Step S02, it is described when cutting off in the sheet material arrival off-position when detecting, the sheet material pipeline is stopped Only, and by the cutting off tool component fall, to be cut off to the sheet material to be cut off.
Step S03, when detecting the cutting off tool component recovery to initial position, will be cut off by the transhipment arm The semifinished sheet got off is transported to from the sheet material cutting table on the semi-finished product pipeline, and starts the sheet material conveying Line.
Step S04, when detecting on the semi-finished product pipeline conveying semifinished sheet arrival rebound, On the split position that the semifinished sheet is pushed to the sheet material rounding table by the sheet material pushing plate.
Step S05, when detecting on the semifinished sheet arrival split position, the segmentation knife is fallen Under, to split to the semifinished sheet.
Step S06, when detecting the segmentation knife and recovering to initial position, will be located at by the finished product head board The first finished product sheet material after segmentation on the float support plate is released from the sheet material rounding table.
Step S07, when detecting the finished product head board and recovering to initial position, will be located by the finished product pushing plate It is pushed out in the second finished product sheet material after the segmentation in the accepting hole on the float support plate.
Step S08, when detecting the finished product pushing plate and recovering to initial position, by the finished product head board by position Released in the second finished product sheet material on the float support plate from the sheet material rounding table.
Further, also include in the present embodiment sheet material automatic transport processing method described in:
Step S11, it is described when sheet material is cut off when stopping detecting on the sheet material pipeline, pushed away by the sheet material Remaining sheet material to be cut off is pushed in the off-position by dynamic plate.
Step S12, when detecting the sheet material pushing plate and recovering to initial position, the cutting off tool component is fallen Under, to be cut off to the remaining sheet material to be cut off.
Step S13, when detecting the sheet material pushing plate and the cutting off tool component recovers to respective initial bit When putting, the tailing on the sheet material cutting table is released from the sheet material cutting table by the tailing head board.
To sum up, the sheet material automatic transport processing method and equipment among the above embodiment of the present invention, it is only necessary to which operator will Sheet material 200 to be cut off is positioned on the sheet material pipeline 10, and now the sheet material pipeline 10 will be to be cut described in automatic transport In disconnected sheet material 200 to the off-position of the sheet material cutting table 20, and when sheet material 200 to be cut off is reached in the off-position When, the cut-out for treating cut-out sheet material 200 is automatically performed, while the cut-out of a sheet material ought be completed often, passes through the turning arm energy It is enough that the semifinished sheet 201 cut off is transported to from the sheet material cutting table 20 on the semi-finished product pipeline automatically, And semifinished sheet 201 is then transported to the transition in the class by the semi-finished product pipeline automatically, when semifinished sheet 201 is reached During the transition class, semifinished sheet 201 can be pushed toward on the split position automatically by the sheet material pushing plate, When semifinished sheet 201 is reached on the split position, the effect of the segmentation to semifinished sheet 201 can be automatically performed, together When can be automatically by the finished product sheet material after segmentation from the plate by the finished product head board 100 and the finished product pushing plate 110 Released on material rounding table.Therefore the sheet material automatic transport processing method and equipment complete whole sheet material using full-automatic Processing, improves work and low production efficiency, reduces operational danger and labor intensity, simultaneously because the sheet material is automatically defeated Send that control that processing method and equipment are used and driving element are relatively simple, compared to robot, cost is greatly reduced, simultaneously The maintenance of whole equipment is simple.
Fig. 7 to Fig. 8 is refer to, the sheet material automatic conveying equipment in second embodiment of the invention is shown, the present embodiment is worked as In sheet material automatic transport process equipment and sheet material automatic transport process equipment among first embodiment it is more or less the same, difference Be in:
The sheet material automatic transport process equipment also includes tailing pipeline 170 and sheet material storage rack 180.The tailing is defeated One end of line sending 170 is connected with first pedestal 140, for conveying the tailing that the tailing head board 130 is released.The plate Material storage rack 180 is located at the side of the sheet material pipeline 10, and the top of the sheet material storage rack 180 is conveyed towards the sheet material Line 10 is tilted, and the sheet material storage rack 190 is used to stack sheet material 200 cut off, when needs are toward putting on the sheet material pipeline 10 Put when sheet material 200 is cut off, by way of hooking and drawing, you can one block of plate to be cut off of leaving behind is hooked from the sheet material storage rack 190 On material 200 to the sheet material pipeline 10.
Embodiment described above only expresses the several embodiments of the present invention, and it describes more specific and detailed, but simultaneously Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art For, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the guarantor of the present invention Protect scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (10)

1. a kind of sheet material automatic transport processing method, applied to sheet material automatic transport process equipment, it is characterised in that the sheet material Automatic transport process equipment includes sheet material pipeline, sheet material cutting table, semi-finished product pipeline, cutting off tool component and transhipment arm, The sheet material pipeline, the sheet material cutting table and the semi-finished product pipeline are arranged in order arrangement, the cutting off tool component Located at the top of the sheet material cutting table, the transhipment arm is located at the side of the sheet material cutting table, the sheet material automatic transport Processing method includes:
It is placed with when detecting on the sheet material pipeline when sheet material is cut off, waits to cut off by described by the sheet material pipeline Sheet material is delivered in the off-position of the sheet material cutting table;
It is described when cutting off in the sheet material arrival off-position when detecting, by sheet material pipeline stopping, and will be described Cutting off tool component is fallen, to be cut off to the sheet material to be cut off;
When detecting the cutting off tool component recovery to initial position, by the arm of transporting by the semi-finished product cut off Sheet material is transported to from the sheet material cutting table on the semi-finished product pipeline, and starts the sheet material pipeline.
2. sheet material automatic transport processing method according to claim 1, it is characterised in that the sheet material automatic transport processing Equipment also includes sheet material rounding table, rebound, segmentation knife and sheet material pushing plate, the semi-finished product pipeline, the rebound And the sheet material rounding table is arranged in order arrangement, the segmentation knife is located at the top of the sheet material rounding table, and the sheet material is pushed away Send plate to be located at the top of the semi-finished product pipeline, and close to the rebound, the cutting off tool group ought be detected described When part is recovered to initial position, the semifinished sheet cut off is transported from the sheet material cutting table by the transhipment arm To on the semi-finished product pipeline, and the step of start the sheet material pipeline after, the sheet material automatic transport processing method Also include:
When detecting on the semi-finished product pipeline conveying semifinished sheet arrival rebound, pass through the sheet material The semifinished sheet is pushed on the split position of the sheet material rounding table by pushing plate;
When detecting on the semifinished sheet arrival split position, the segmentation knife is fallen, with to described half Finished product sheet material is split.
3. sheet material automatic transport processing method according to claim 2, it is characterised in that the sheet material automatic transport processing Equipment also includes finished product head board and finished product pushing plate, and the sheet material rounding table includes float support plate, fixed support plate and determined Position plate, the rebound, the float support plate, the fixed support plate and the finished product pushing plate are arranged in order arrangement, institute State the top that location-plate is fixedly arranged on the fixed support plate, and an accepting hole constituted with the fixed support plate, when described half into When product sheet material is located on the split position, the semifinished sheet is located at the float support plate and the fixed support plate Top, and one end is contained in the accepting hole, falls the segmentation knife described, to be carried out to the semifinished sheet After the step of segmentation, the sheet material automatic transport processing method also includes:
When detecting the segmentation knife and recovering to initial position, the float support will be located at by the finished product head board The first finished product sheet material after segmentation on plate is released from the sheet material rounding table;
When detecting the finished product head board and recovering to initial position, the accepting hole will be in by the finished product pushing plate The second finished product sheet material after interior segmentation is pushed out on the float support plate;
When detecting the finished product pushing plate and recovering to initial position, the branch of floating will be located at by the finished product head board The second finished product sheet material on fagging is released from the sheet material rounding table.
4. sheet material automatic transport processing method according to claim 1, it is characterised in that the sheet material automatic transport processing Equipment also includes sheet material pushing plate, and the sheet material pushing plate is located at the top of the sheet material pipeline, and is cut close to the sheet material Disconnected platform, the sheet material automatic transport processing method also includes:
It is described when sheet material is cut off when stopping detecting on the sheet material pipeline, will be remaining by the sheet material pushing plate Sheet material to be cut off is pushed in the off-position;
When detecting the sheet material pushing plate and recovering to initial position, the cutting off tool component is fallen, with to described surplus Remaining sheet material to be cut off is cut off.
5. sheet material automatic transport processing method according to claim 4, it is characterised in that the sheet material automatic transport processing Equipment also includes tailing head board, and the tailing head board is located at the side of the sheet material cutting table, described to detect institute When stating sheet material pushing plate and recovering to initial position, the cutting off tool component is fallen, with to the remaining sheet material to be cut off After the step of being cut off, the sheet material automatic transport processing method also includes:
When detecting the sheet material pushing plate and the cutting off tool component recovers to respective initial position, by described Tailing head board releases the tailing on the sheet material cutting table from the sheet material cutting table.
6. a kind of sheet material automatic transport process equipment, it is characterised in that defeated including sheet material pipeline, sheet material cutting table, semi-finished product Line sending, cutting off tool component and transhipment arm, the sheet material pipeline, the sheet material cutting table and the semi-finished product pipeline are successively Arranged, the cutting off tool component is located at the top of the sheet material cutting table, and the transhipment arm is cut off located at the sheet material The side of platform, the sheet material automatic transport process equipment also includes a control system, and the control system includes:
Sheet material convey control module, for when detect be placed with the sheet material pipeline wait cut off sheet material when, by described The sheet material to be cut off is delivered in the off-position of the sheet material cutting table by sheet material pipeline;
Sheet material cutting-off controlling module, for described when cutting off in the sheet material arrival off-position when detecting, by the plate Material pipeline stops, and the cutting off tool component is fallen, to be cut off to the sheet material to be cut off;
Semi-finished product transport control module, when detecting the cutting off tool component recovery to initial position, pass through the transhipment The semifinished sheet cut off is transported on the semi-finished product pipeline by arm from the sheet material cutting table, and is started described Sheet material pipeline.
7. sheet material automatic transport process equipment according to claim 6, it is characterised in that the sheet material automatic transport processing Equipment also includes sheet material rounding table, rebound, segmentation knife and sheet material pushing plate, the semi-finished product pipeline, the rebound And the sheet material rounding table is arranged in order arrangement, the segmentation knife is located at the top of the sheet material rounding table, and the sheet material is pushed away Plate is sent to be located at the top of the semi-finished product pipeline, and close to the rebound, the control system also includes:
Semi-finished product push control module, for described when detecting the semi-finished product pipeline conveying semifinished sheet arrival When on rebound, the semifinished sheet is pushed to the split position of the sheet material rounding table by the sheet material pushing plate On;
Sheet material splits control module, for when detecting on the semifinished sheet arrival split position, described will divide Cutter tool is fallen, to split to the semifinished sheet.
8. sheet material automatic transport process equipment according to claim 7, it is characterised in that the sheet material automatic transport processing Equipment also includes finished product head board and finished product pushing plate, and the sheet material rounding table includes float support plate, fixed support plate and determined Position plate, the rebound, the float support plate, the fixed support plate and the finished product pushing plate are arranged in order arrangement, institute State the top that location-plate is fixedly arranged on the fixed support plate, and an accepting hole constituted with the fixed support plate, when described half into When product sheet material is located on the split position, the semifinished sheet is located at the float support plate and the fixed support plate Top, and one end is contained in the accepting hole, the control system also includes:
Finished product releases control module, for when detecting the segmentation knife and recovering to initial position, being pushed away by the finished product Ejecting plate releases the first finished product sheet material after the segmentation on the float support plate from the sheet material rounding table;
Finished product pushes control module, for when detecting the finished product head board and recovering to initial position, passing through the finished product The second finished product sheet material after segmentation in the accepting hole is pushed out on the float support plate by pushing plate;
When detecting the finished product pushing plate and recovering to initial position, the finished product is released control module and pushed away by the finished product Ejecting plate releases the second finished product sheet material on the float support plate from the sheet material rounding table.
9. sheet material automatic transport process equipment according to claim 6, it is characterised in that the sheet material automatic transport processing Equipment also includes sheet material pushing plate, and the sheet material pushing plate is located at the top of the sheet material pipeline, and is cut close to the sheet material Disconnected platform, the control system also includes:
Sheet material promotes control module, for described when sheet material is cut off when stopping detecting on the sheet material pipeline, passes through Remaining sheet material to be cut off is pushed in the off-position by the sheet material pushing plate;
When detecting the sheet material pushing plate and recovering to initial position, the sheet material cutting-off controlling module is by the cutting off tool Component is fallen, to be cut off to the remaining sheet material to be cut off.
10. sheet material automatic transport process equipment according to claim 9, it is characterised in that the sheet material automatic transport adds Construction equipment also includes tailing head board, and the tailing head board is located at the side of the sheet material cutting table, and the control system is also Including:
Tailing releases control module, for when detecting the sheet material pushing plate and the cutting off tool component recovers to respective Initial position when, the tailing on the sheet material cutting table is above pushed away from the sheet material cutting table by the tailing head board Go out.
CN201710399123.0A 2017-05-31 2017-05-31 Automatic conveying and processing method and equipment for plates Expired - Fee Related CN107234162B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710399123.0A CN107234162B (en) 2017-05-31 2017-05-31 Automatic conveying and processing method and equipment for plates

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710399123.0A CN107234162B (en) 2017-05-31 2017-05-31 Automatic conveying and processing method and equipment for plates

Publications (2)

Publication Number Publication Date
CN107234162A true CN107234162A (en) 2017-10-10
CN107234162B CN107234162B (en) 2019-12-10

Family

ID=59985334

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710399123.0A Expired - Fee Related CN107234162B (en) 2017-05-31 2017-05-31 Automatic conveying and processing method and equipment for plates

Country Status (1)

Country Link
CN (1) CN107234162B (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2490125A1 (en) * 1980-09-18 1982-03-19 Tardy Jacques Blade-clearance adjustment for metal sheet guillotine - mounts mobile blade roller on cammed sleeve locked by jacking axially onto stop
CN202655900U (en) * 2012-07-19 2013-01-09 湖北劲驰投资集团有限公司 Full-automatic numerical control steel-plate decoiling and flattening device
CN204109136U (en) * 2014-09-29 2015-01-21 群峰智能机械股份公司 A kind of automation line trigger
CN204308317U (en) * 2014-11-26 2015-05-06 余姚市富达电子有限公司 Insulating pot heat-generating disc cutting machine
CN204657951U (en) * 2015-06-10 2015-09-23 浙江中科新光铭光电科技有限公司 A kind of sheet material severing device
CN105150251A (en) * 2015-10-13 2015-12-16 康舒电子(东莞)有限公司 Full-automatic board separating machine
CN105458718A (en) * 2015-12-18 2016-04-06 江苏扬力数控机床有限公司 Automatic processing production line for metal sheets
CN105665825A (en) * 2016-04-20 2016-06-15 乐清市艾森特工具有限公司 High-speed plate cutting machine
CN106003182A (en) * 2016-05-25 2016-10-12 广西田阳至恒门业有限公司 Plate cutting equipment and feeding device thereof
CN205651064U (en) * 2016-05-16 2016-10-19 邹城众达知识产权咨询服务有限公司 Shearing machine
CN106695011A (en) * 2017-01-13 2017-05-24 北新集团建材股份有限公司 Cutting method of plates
CN106695331A (en) * 2017-01-14 2017-05-24 上海西屋开关有限公司 Novel full-automatic rolling forming production line

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2490125A1 (en) * 1980-09-18 1982-03-19 Tardy Jacques Blade-clearance adjustment for metal sheet guillotine - mounts mobile blade roller on cammed sleeve locked by jacking axially onto stop
CN202655900U (en) * 2012-07-19 2013-01-09 湖北劲驰投资集团有限公司 Full-automatic numerical control steel-plate decoiling and flattening device
CN204109136U (en) * 2014-09-29 2015-01-21 群峰智能机械股份公司 A kind of automation line trigger
CN204308317U (en) * 2014-11-26 2015-05-06 余姚市富达电子有限公司 Insulating pot heat-generating disc cutting machine
CN204657951U (en) * 2015-06-10 2015-09-23 浙江中科新光铭光电科技有限公司 A kind of sheet material severing device
CN105150251A (en) * 2015-10-13 2015-12-16 康舒电子(东莞)有限公司 Full-automatic board separating machine
CN105458718A (en) * 2015-12-18 2016-04-06 江苏扬力数控机床有限公司 Automatic processing production line for metal sheets
CN105665825A (en) * 2016-04-20 2016-06-15 乐清市艾森特工具有限公司 High-speed plate cutting machine
CN205651064U (en) * 2016-05-16 2016-10-19 邹城众达知识产权咨询服务有限公司 Shearing machine
CN106003182A (en) * 2016-05-25 2016-10-12 广西田阳至恒门业有限公司 Plate cutting equipment and feeding device thereof
CN106695011A (en) * 2017-01-13 2017-05-24 北新集团建材股份有限公司 Cutting method of plates
CN106695331A (en) * 2017-01-14 2017-05-24 上海西屋开关有限公司 Novel full-automatic rolling forming production line

Also Published As

Publication number Publication date
CN107234162B (en) 2019-12-10

Similar Documents

Publication Publication Date Title
CN112770992B (en) Vacuum gripper, feed unit and method for transporting flat components
EP2720838B1 (en) Device for selective collecting of portions cut from a sheet placed on a workplane
CN107986026B (en) Full-automatic manipulator equipment
CN104227422A (en) Automatic testing, riveting and laser carving production line for wired charger
CN208118449U (en) Round bottles welding and air-tightness detection device
CN103979274A (en) Laser cutting flexible manufacture system
CN105600562A (en) Paper receiving table of printing machine
CN213438207U (en) Automatic assembling device for shell and plug of pressure sensor of automobile air conditioner
CN107234162A (en) Sheet material automatic transport processing method and equipment
CN108328378A (en) A kind of sheet material machine fully automatic feeding device
CN210504694U (en) Glass cleaning line material loading machine
US10207308B2 (en) Managing panel-like workpieces and products
CN107537780A (en) A kind of logistics rapid sorting device
CN115985825A (en) Transistor module material loading trades a set system
CN213503238U (en) Full-automatic multi-station flexible transfer system
CN210816324U (en) Material detection system
CN110626787B (en) Material detection system and material detection method
CN212086600U (en) Automatic board removing equipment for hollow-out-free PCB (printed circuit board) yoke board
CN211386508U (en) Dustpan rivet fixing hole processing equipment in dustpan production line
CN210585945U (en) Copper-clad plate detecting and sorting system
CN209901747U (en) Installation system of cabin wiring harness relay
CN111792375A (en) Full-automatic turn-over equipment of work piece based on electromagnetic force and manipulator
CN210360140U (en) Computer mainframe box assembling equipment
CN207467668U (en) A kind of fully automatic feeding machine
CN106364136B (en) Full-automatic module stripping fitting all-in-one machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20191118

Address after: 330100 Jiangxi city in Nanchang Province, the new County Changleng Industrial Zone (two) Huang Xi Road North

Applicant after: JIANGXI YUANCHENG AUTOMOBILE TECHNOLOGY CO., LTD.

Address before: 330100 Jiangxi city of Nanchang province of new No. 168 Changleng Town Industrial Park Wangcheng district mayor Huang Xi Road Building 2

Applicant before: Jiangxi yuan Geng agricultural machinery Limited by Share Ltd

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191210

Termination date: 20200531