CN107190754A - The method that rectangular deep foundation pit quicksand is prevented and treated using pile framing shear wall - Google Patents

The method that rectangular deep foundation pit quicksand is prevented and treated using pile framing shear wall Download PDF

Info

Publication number
CN107190754A
CN107190754A CN201710521083.2A CN201710521083A CN107190754A CN 107190754 A CN107190754 A CN 107190754A CN 201710521083 A CN201710521083 A CN 201710521083A CN 107190754 A CN107190754 A CN 107190754A
Authority
CN
China
Prior art keywords
shear wall
quicksand
foundation
foundation ditch
pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710521083.2A
Other languages
Chinese (zh)
Inventor
孙国梁
任冠宇
宋文智
董强强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd, Shanghai Ershiye Construction Co Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201710521083.2A priority Critical patent/CN107190754A/en
Publication of CN107190754A publication Critical patent/CN107190754A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Retaining Walls (AREA)

Abstract

The present invention relates to building foundation field, the method that specifically a kind of use pile framing shear wall prevents and treats rectangular deep foundation pit quicksand;It is characterized in that:Including step 1, along on the outside of side slope, support pile is set;Step 2, foundation ditch Yield rainfall relation;Step 3, layer and section excavation pit, dig to stopping during drifting sand layer and excavate;Step 4, cushion cap, shearing foundation of wall and shear wall construction;The excavation of step 5, foundation ditch remainder.This construction method around foundation ditch by setting up supporting facility, so that the problems such as slope collapse caused by quicksand is answered in house;Meanwhile, supporting is built by the way of steel reinforcement cage, with adaptable advantage.

Description

The method that rectangular deep foundation pit quicksand is prevented and treated using pile framing shear wall
Technical field
The present invention relates to building foundation field, specifically a kind of use pile framing shear wall prevents and treats rectangular deep foundation pit quicksand Method.
Background technology
With the fast development of urban construction, urban land is gradually nervous, and many cities will develop underground space conduct The emphasis of urban construction.During underground engineering construction, drifting sand layer is frequently encountered.Drifting sand layer can cause substrate soil forfeiture to be held Loading capability, execution conditions deteriorate, and slope collapse can be caused when serious, or even jeopardize the safety of close to buildings.Conventional quicksand Prophylactico-therapeutic measures includes:Dry season constructs, beats steel sheet pile, not drainage construction, diaphram wall, well-points dewatering etc., and method is more single, Applicability is not strong, and Part Methods cost is higher, construction period is longer, and quicksand prevention effect is not good.
The content of the invention
It is an object of the present invention to provide a kind of quicksand prevention when being used for all kinds of excavation of foundation pit and foundation ditch can be effectively ensured applying The method of work safety.
In order to achieve the above object, the present invention is realized in:
A kind of method that use pile framing shear wall prevents and treats rectangular deep foundation pit quicksand, including
Step 1, along setting support pile on the outside of side slope;
Step 2, foundation ditch Yield rainfall relation;
Step 3, layer and section excavation pit, dig to stopping during drifting sand layer and excavate;
Step 4, cushion cap, shearing foundation of wall and shear wall construction;
The excavation of step 5, foundation ditch remainder.
Signified cushion cap in the method that described use pile framing shear wall prevents and treats rectangular deep foundation pit quicksand, step 4, basis and Shear wall construction includes
Step 4.1, by cushion cap, shearing foundation of wall, shear wall according to Structural Design Requirement assembling reinforcement and formwork step 4.2, pour Concrete is built, form removal after concrete reaches intensity requirement;
Step 4.3, after shear wall concrete strength reaches the 70% of design strength, then to remainder excavate.
The method that described use pile framing shear wall prevents and treats rectangular deep foundation pit quicksand, step 2 meaning foundation ditch Yield rainfall relation should Level of ground water is down to below the absolute altitude 500mm of foundation ditch bottom.
This construction method around foundation ditch by setting up supporting facility, so that house answers slope collapse caused by quicksand etc. to ask Topic;Meanwhile, supporting is built by the way of steel reinforcement cage, with adaptable advantage.
Brief description of the drawings
Fig. 1 is the construction schematic diagram of this prevention and controls.
Embodiment
The present invention is further illustrated below by way of specific embodiment.
A kind of method that use pile framing shear wall prevents and treats rectangular deep foundation pit quicksand, including
Step 1, along setting support pile 1 on the outside of side slope;
Step 2, foundation ditch Yield rainfall relation;
Step 3, layer and section excavation pit, dig to stopping during drifting sand layer and excavate;
Step 4, cushion cap 2, shearing foundation of wall and shear wall 3 are constructed;
The excavation of step 5, foundation ditch remainder.
Signified cushion cap 2, basis in the method that described use pile framing shear wall prevents and treats rectangular deep foundation pit quicksand, step 4 And the construction of shear wall 3 includes
Step 4.1, by cushion cap 2, shearing foundation of wall, shear wall 3 according to Structural Design Requirement assembling reinforcement and formwork step 4.2, Casting concrete, form removal after concrete reaches intensity requirement;
Step 4.3, after shear wall concrete strength reaches the 70% of design strength, then to remainder excavate.
The method that described use pile framing shear wall prevents and treats rectangular deep foundation pit quicksand, step 2 meaning foundation ditch Yield rainfall relation should Level of ground water is down to below the absolute altitude 500mm of foundation ditch bottom.
This construction method around foundation ditch by setting up supporting facility, so that house answers slope collapse caused by quicksand etc. to ask Topic;Meanwhile, supporting is built by the way of steel reinforcement cage, with adaptable advantage.

Claims (3)

1. a kind of method that use pile framing shear wall prevents and treats rectangular deep foundation pit quicksand, it is characterized in that:Including
Step 1, along setting support pile on the outside of side slope;
Step 2, foundation ditch Yield rainfall relation;
Step 3, layer and section excavation pit, dig to stopping during drifting sand layer and excavate;
Step 4, cushion cap, shearing foundation of wall and shear wall construction;
The excavation of step 5, foundation ditch remainder.
2. the method that use pile framing shear wall according to claim 1 prevents and treats rectangular deep foundation pit quicksand, it is characterized in that:Step Signified cushion cap, basis and shear wall construction include in rapid 4
Step 4.1, by cushion cap, shearing foundation of wall, shear wall according to Structural Design Requirement assembling reinforcement and formwork step 4.2, pour Concrete is built, form removal after concrete reaches intensity requirement;
Step 4.3, after shear wall concrete strength reaches the 70% of design strength, then to remainder excavate.
3. the method that use pile framing shear wall according to claim 1 prevents and treats rectangular deep foundation pit quicksand, it is characterized in that:Step Level of ground water should be down to below the absolute altitude 500mm of foundation ditch bottom by rapid 2 signified foundation ditch Yield rainfall relations.
CN201710521083.2A 2017-06-30 2017-06-30 The method that rectangular deep foundation pit quicksand is prevented and treated using pile framing shear wall Pending CN107190754A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710521083.2A CN107190754A (en) 2017-06-30 2017-06-30 The method that rectangular deep foundation pit quicksand is prevented and treated using pile framing shear wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710521083.2A CN107190754A (en) 2017-06-30 2017-06-30 The method that rectangular deep foundation pit quicksand is prevented and treated using pile framing shear wall

Publications (1)

Publication Number Publication Date
CN107190754A true CN107190754A (en) 2017-09-22

Family

ID=59881660

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710521083.2A Pending CN107190754A (en) 2017-06-30 2017-06-30 The method that rectangular deep foundation pit quicksand is prevented and treated using pile framing shear wall

Country Status (1)

Country Link
CN (1) CN107190754A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113202119A (en) * 2021-05-20 2021-08-03 中国水利水电第十一工程局有限公司 Combined cofferdam for strong-flow sand-ground layer gabion construction of linear river channel and construction method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103195087A (en) * 2013-04-09 2013-07-10 中建五局土木工程有限公司 Mould support method of foundation pit basement haunch shearing wall
CN203768928U (en) * 2014-02-27 2014-08-13 龙元建设集团股份有限公司 Device for blocking inside of foundation pit during sand shifting
JP2017057653A (en) * 2015-09-17 2017-03-23 ジェコス株式会社 Wale

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103195087A (en) * 2013-04-09 2013-07-10 中建五局土木工程有限公司 Mould support method of foundation pit basement haunch shearing wall
CN203768928U (en) * 2014-02-27 2014-08-13 龙元建设集团股份有限公司 Device for blocking inside of foundation pit during sand shifting
JP2017057653A (en) * 2015-09-17 2017-03-23 ジェコス株式会社 Wale

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张志坚: "挖孔桩施工中处理地下流砂的几种方法", 《安徽建筑》 *
肖玉明等: "以三角形稳固基础来处理深基坑边坡及控制流砂", 《建筑施工》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113202119A (en) * 2021-05-20 2021-08-03 中国水利水电第十一工程局有限公司 Combined cofferdam for strong-flow sand-ground layer gabion construction of linear river channel and construction method thereof

Similar Documents

Publication Publication Date Title
KR101960413B1 (en) Structure construction method
CN101250879B (en) Method for processing bottom solum trickleing water of deep building pit
CN106013053B (en) A kind of steel sheet pile construction method for supporting for being used to build underground garage open caisson
CN105839946B (en) Building with brick-concrete structure lifts increasing layer method
CN106285032B (en) Basement reconstruction construction with raft foundation building
CN105297757A (en) Construction method for quicksand layer pile foundation
CN107326928A (en) A kind of part is related to the construction method in the deeper subsurface garage of basement
CN114411756A (en) Construction method and construction device for water-rich sand layer subway station open excavation foundation pit without precipitation
CN206428707U (en) A kind of integrated pile tube dado structure of pattern foundation pit supporting structure precipitation
CN104264683A (en) Concave ultra-deep foundation pit zoned supporting method for three-side surrounded cultural protection building
CN104775439A (en) Foundation pit support and water stop integrated structure and construction method thereof
CN107100160A (en) A kind of construction technology for lower storage reservoir check dam vibro-replacement stone column
CN204959768U (en) A underground structure for airport
CN207211158U (en) Assembled pile board wall foundation pit supporting construction
CN114032916A (en) Method for dismantling inner support of foundation pit of mountain-facing body
CN105625480A (en) Anti-floating method and structure for open-segment tunnel structure
CN106988337B (en) It is a kind of for reducing the reinforcement means of bar shaped shallow foundation house differential settlement
CN107190754A (en) The method that rectangular deep foundation pit quicksand is prevented and treated using pile framing shear wall
RU2634912C1 (en) Method of arranging driven pile in punched well in weak water-saturated soils (versions)
CN202108045U (en) Sleeve pipe with anchor rod penetrating through underground continuous wall
KR101291098B1 (en) collecting well connector for eternal drainage construction technique
AU2020100004A4 (en) A Method Of Constructing A Column, A Subterranean Structure, And A Structure Made From The Method
CN103498476B (en) Major-diameter hole-forming pile pier foundation and net foundation slab reverse building construction method
CN108166487B (en) Soil retaining method for prestressed hollow pile
CN207469238U (en) Prefabricated flaring stake

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170922

RJ01 Rejection of invention patent application after publication