- foundation
- foundation ditch
- pit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Retaining Walls (AREA)
Abstract
The present invention relates to building foundation field, the method that specifically a kind of use pile framing shear wall prevents and treats rectangular deep foundation pit quicksand;It is characterized in that:Including step 1, along on the outside of side slope, support pile is set;Step 2, foundation ditch Yield rainfall relation;Step 3, layer and section excavation pit, dig to stopping during drifting sand layer and excavate;Step 4, cushion cap, shearing foundation of wall and shear wall construction;The excavation of step 5, foundation ditch remainder.This construction method around foundation ditch by setting up supporting facility, so that the problems such as slope collapse caused by quicksand is answered in house;Meanwhile, supporting is built by the way of steel reinforcement cage, with adaptable advantage.
Description
Technical field
The present invention relates to building foundation field, specifically a kind of use pile framing shear wall prevents and treats rectangular deep foundation pit quicksand
Method.
Background technology
With the fast development of urban construction, urban land is gradually nervous, and many cities will develop underground space conduct
The emphasis of urban construction.During underground engineering construction, drifting sand layer is frequently encountered.Drifting sand layer can cause substrate soil forfeiture to be held
Loading capability, execution conditions deteriorate, and slope collapse can be caused when serious, or even jeopardize the safety of close to buildings.Conventional quicksand
Prophylactico-therapeutic measures includes:Dry season constructs, beats steel sheet pile, not drainage construction, diaphram wall, well-points dewatering etc., and method is more single,
Applicability is not strong, and Part Methods cost is higher, construction period is longer, and quicksand prevention effect is not good.
The content of the invention
It is an object of the present invention to provide a kind of quicksand prevention when being used for all kinds of excavation of foundation pit and foundation ditch can be effectively ensured applying
The method of work safety.
In order to achieve the above object, the present invention is realized in:
A kind of method that use pile framing shear wall prevents and treats rectangular deep foundation pit quicksand, including
Step 1, along setting support pile on the outside of side slope;
Step 2, foundation ditch Yield rainfall relation;
Step 3, layer and section excavation pit, dig to stopping during drifting sand layer and excavate;
Step 4, cushion cap, shearing foundation of wall and shear wall construction;
The excavation of step 5, foundation ditch remainder.
Signified cushion cap in the method that described use pile framing shear wall prevents and treats rectangular deep foundation pit quicksand, step 4, basis and
Shear wall construction includes
Step 4.1, by cushion cap, shearing foundation of wall, shear wall according to Structural Design Requirement assembling reinforcement and formwork step 4.2, pour
Concrete is built, form removal after concrete reaches intensity requirement;
Step 4.3, after shear wall concrete strength reaches the 70% of design strength, then to remainder excavate.
The method that described use pile framing shear wall prevents and treats rectangular deep foundation pit quicksand, step 2 meaning foundation ditch Yield rainfall relation should
Level of ground water is down to below the absolute altitude 500mm of foundation ditch bottom.
This construction method around foundation ditch by setting up supporting facility, so that house answers slope collapse caused by quicksand etc. to ask
Topic;Meanwhile, supporting is built by the way of steel reinforcement cage, with adaptable advantage.
Brief description of the drawings
Fig. 1 is the construction schematic diagram of this prevention and controls.
Embodiment
The present invention is further illustrated below by way of specific embodiment.
A kind of method that use pile framing shear wall prevents and treats rectangular deep foundation pit quicksand, including
Step 1, along setting support pile 1 on the outside of side slope;
Step 2, foundation ditch Yield rainfall relation;
Step 3, layer and section excavation pit, dig to stopping during drifting sand layer and excavate;
Step 4, cushion cap 2, shearing foundation of wall and shear wall 3 are constructed;
The excavation of step 5, foundation ditch remainder.
Signified cushion cap 2, basis in the method that described use pile framing shear wall prevents and treats rectangular deep foundation pit quicksand, step 4
And the construction of shear wall 3 includes
Step 4.1, by cushion cap 2, shearing foundation of wall, shear wall 3 according to Structural Design Requirement assembling reinforcement and formwork step 4.2,
Casting concrete, form removal after concrete reaches intensity requirement;
Step 4.3, after shear wall concrete strength reaches the 70% of design strength, then to remainder excavate.
The method that described use pile framing shear wall prevents and treats rectangular deep foundation pit quicksand, step 2 meaning foundation ditch Yield rainfall relation should
Level of ground water is down to below the absolute altitude 500mm of foundation ditch bottom.
This construction method around foundation ditch by setting up supporting facility, so that house answers slope collapse caused by quicksand etc. to ask
Topic;Meanwhile, supporting is built by the way of steel reinforcement cage, with adaptable advantage.
Claims (3)
1. a kind of method that use pile framing shear wall prevents and treats rectangular deep foundation pit quicksand, it is characterized in that:Including
Step 1, along setting support pile on the outside of side slope;
Step 2, foundation ditch Yield rainfall relation;
Step 3, layer and section excavation pit, dig to stopping during drifting sand layer and excavate;
Step 4, cushion cap, shearing foundation of wall and shear wall construction;
The excavation of step 5, foundation ditch remainder.
2. the method that use pile framing shear wall according to claim 1 prevents and treats rectangular deep foundation pit quicksand, it is characterized in that:Step
Signified cushion cap, basis and shear wall construction include in rapid 4
Step 4.1, by cushion cap, shearing foundation of wall, shear wall according to Structural Design Requirement assembling reinforcement and formwork step 4.2, pour
Concrete is built, form removal after concrete reaches intensity requirement;
Step 4.3, after shear wall concrete strength reaches the 70% of design strength, then to remainder excavate.
3. the method that use pile framing shear wall according to claim 1 prevents and treats rectangular deep foundation pit quicksand, it is characterized in that:Step
Level of ground water should be down to below the absolute altitude 500mm of foundation ditch bottom by rapid 2 signified foundation ditch Yield rainfall relations.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710521083.2A CN107190754A (en) | 2017-06-30 | 2017-06-30 | The method that rectangular deep foundation pit quicksand is prevented and treated using pile framing shear wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710521083.2A CN107190754A (en) | 2017-06-30 | 2017-06-30 | The method that rectangular deep foundation pit quicksand is prevented and treated using pile framing shear wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107190754A true CN107190754A (en) | 2017-09-22 |
Family
ID=59881660
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710521083.2A Pending CN107190754A (en) | 2017-06-30 | 2017-06-30 | The method that rectangular deep foundation pit quicksand is prevented and treated using pile framing shear wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107190754A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113202119A (en) * | 2021-05-20 | 2021-08-03 | 中国水利水电第十一工程局有限公司 | Combined cofferdam for strong-flow sand-ground layer gabion construction of linear river channel and construction method thereof |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103195087A (en) * | 2013-04-09 | 2013-07-10 | 中建五局土木工程有限公司 | Mould support method of foundation pit basement haunch shearing wall |
CN203768928U (en) * | 2014-02-27 | 2014-08-13 | 龙元建设集团股份有限公司 | Device for blocking inside of foundation pit during sand shifting |
JP2017057653A (en) * | 2015-09-17 | 2017-03-23 | ジェコス株式会社 | Wale |
-
2017
- 2017-06-30 CN CN201710521083.2A patent/CN107190754A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103195087A (en) * | 2013-04-09 | 2013-07-10 | 中建五局土木工程有限公司 | Mould support method of foundation pit basement haunch shearing wall |
CN203768928U (en) * | 2014-02-27 | 2014-08-13 | 龙元建设集团股份有限公司 | Device for blocking inside of foundation pit during sand shifting |
JP2017057653A (en) * | 2015-09-17 | 2017-03-23 | ジェコス株式会社 | Wale |
Non-Patent Citations (2)
Title |
---|
张志坚: "挖孔桩施工中处理地下流砂的几种方法", 《安徽建筑》 * |
肖玉明等: "以三角形稳固基础来处理深基坑边坡及控制流砂", 《建筑施工》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113202119A (en) * | 2021-05-20 | 2021-08-03 | 中国水利水电第十一工程局有限公司 | Combined cofferdam for strong-flow sand-ground layer gabion construction of linear river channel and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101960413B1 (en) | Structure construction method | |
CN101250879B (en) | Method for processing bottom solum trickleing water of deep building pit | |
CN106013053B (en) | A kind of steel sheet pile construction method for supporting for being used to build underground garage open caisson | |
CN105839946B (en) | Building with brick-concrete structure lifts increasing layer method | |
CN106285032B (en) | Basement reconstruction construction with raft foundation building | |
CN105297757A (en) | Construction method for quicksand layer pile foundation | |
CN107326928A (en) | A kind of part is related to the construction method in the deeper subsurface garage of basement | |
CN114411756A (en) | Construction method and construction device for water-rich sand layer subway station open excavation foundation pit without precipitation | |
CN206428707U (en) | A kind of integrated pile tube dado structure of pattern foundation pit supporting structure precipitation | |
CN104264683A (en) | Concave ultra-deep foundation pit zoned supporting method for three-side surrounded cultural protection building | |
CN104775439A (en) | Foundation pit support and water stop integrated structure and construction method thereof | |
CN107100160A (en) | A kind of construction technology for lower storage reservoir check dam vibro-replacement stone column | |
CN204959768U (en) | A underground structure for airport | |
CN207211158U (en) | Assembled pile board wall foundation pit supporting construction | |
CN114032916A (en) | Method for dismantling inner support of foundation pit of mountain-facing body | |
CN105625480A (en) | Anti-floating method and structure for open-segment tunnel structure | |
CN106988337B (en) | It is a kind of for reducing the reinforcement means of bar shaped shallow foundation house differential settlement | |
CN107190754A (en) | The method that rectangular deep foundation pit quicksand is prevented and treated using pile framing shear wall | |
RU2634912C1 (en) | Method of arranging driven pile in punched well in weak water-saturated soils (versions) | |
CN202108045U (en) | Sleeve pipe with anchor rod penetrating through underground continuous wall | |
KR101291098B1 (en) | collecting well connector for eternal drainage construction technique | |
AU2020100004A4 (en) | A Method Of Constructing A Column, A Subterranean Structure, And A Structure Made From The Method | |
CN103498476B (en) | Major-diameter hole-forming pile pier foundation and net foundation slab reverse building construction method | |
CN108166487B (en) | Soil retaining method for prestressed hollow pile | |
CN207469238U (en) | Prefabricated flaring stake |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170922 |
|
RJ01 | Rejection of invention patent application after publication |